UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-K

(Mark One)

 
   

X

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF
THE SECURITIES EXCHANGE ACT OF 1934

   
 

For the Fiscal Year Ended December 31, 2006

 

OR

 

TRANSITION REPORT PURSUANT TO SECTION 13
OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

   
 

For the transition period from ____________ to ____________


Commission
File Number

Registrant, State of Incorporation, Address of
Principal Executive Offices, Telephone Number, and
IRS Employer Identification No.

 


Commission
File Number

Registrant, State of Incorporation, Address of
Principal Executive Offices, Telephone Number, and
IRS Employer Identification No.

1-11299

ENTERGY CORPORATION
(a Delaware corporation)
639 Loyola Avenue
New Orleans, Louisiana 70113
Telephone (504) 576-4000
72-1229752

 

1-31508

ENTERGY MISSISSIPPI, INC.
(a Mississippi corporation)
308 East Pearl Street
Jackson, Mississippi 39201
Telephone (601) 368-5000
64-0205830

         
         

1-10764

ENTERGY ARKANSAS, INC.
(an Arkansas corporation)
425 West Capitol Avenue
Little Rock, Arkansas 72201
Telephone (501) 377-4000
71-0005900

 

0-5807

ENTERGY NEW ORLEANS, INC.
(a Louisiana corporation)
1600 Perdido Street, Building 529
New Orleans, Louisiana 70112
Telephone (504) 670-3620
72-0273040

         
         

1-27031

ENTERGY GULF STATES, INC.
(a Texas corporation)
350 Pine Street
Beaumont, Texas 77701
Telephone (409) 838-6631
74-0662730

 

1-9067

SYSTEM ENERGY RESOURCES, INC.
(an Arkansas corporation)
Echelon One
1340 Echelon Parkway
Jackson, Mississippi 39213
Telephone (601) 368-5000
72-0752777

         
         

1-32718

ENTERGY LOUISIANA, LLC
(a Texas limited liability company)
446 North Boulevard
Baton Rouge, Louisiana 70802
Telephone (225) 381-5868
75-3206126

     

Securities registered pursuant to Section 12(b) of the Act:


Registrant


Title of Class

Name of Each Exchange
on Which Registered

     

Entergy Corporation

Common Stock, $0.01 Par Value - 198,309,610
shares outstanding at February 28, 2007


Equity Units, 7.625%

New York Stock Exchange, Inc.
Chicago Stock Exchange Inc.
NYSE Arca, Inc.

New York Stock Exchange, Inc.

     

Entergy Arkansas, Inc.

Mortgage Bonds, 6.7% Series due April 2032
Mortgage Bonds, 6.0% Series due November 2032

New York Stock Exchange, Inc.
New York Stock Exchange, Inc.

     

Entergy Gulf States, Inc.

Preferred Stock, Cumulative, $100 Par Value:
$4.40 Dividend Series
$4.52 Dividend Series
$5.08 Dividend Series
Adjustable Rate Series B (Depository Receipts)


New York Stock Exchange, Inc.
New York Stock Exchange, Inc.
New York Stock Exchange, Inc.
New York Stock Exchange, Inc.

     

Entergy Louisiana, LLC

Mortgage Bonds, 7.6% Series due April 2032

New York Stock Exchange, Inc.

     

Entergy Mississippi, Inc.

Mortgage Bonds, 6.0% Series due November 2032
Mortgage Bonds, 7.25% Series due December 2032

New York Stock Exchange, Inc.
New York Stock Exchange, Inc.

     

Securities registered pursuant to Section 12(g) of the Act:

Registrant

Title of Class

   

Entergy Arkansas, Inc.

Preferred Stock, Cumulative, $100 Par Value
Preferred Stock, Cumulative, $0.01 Par Value

   

Entergy Gulf States, Inc.

Preferred Stock, Cumulative, $100 Par Value

   

Entergy Mississippi, Inc.

Preferred Stock, Cumulative, $100 Par Value

   

Entergy New Orleans, Inc.

Preferred Stock, Cumulative, $100 Par Value

Indicate by check mark if the registrants are well-known seasoned issuers, as defined in Rule 405 of the Securities Act. Yes o No þ

Indicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No þ

Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days. Yes þ No o

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of the registrants' knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. [ ]

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of "accelerated filer and large accelerated filer" in Rule 12b-2 of the Securities Exchange Act of 1934.

 

Large
accelerated
filer

 



Accelerated filer

 


Non-accelerated filer

Entergy Corporation

Ö

       

Entergy Arkansas, Inc.

       

Ö

Entergy Gulf States, Inc.

       

Ö

Entergy Louisiana, LLC

       

Ö

Entergy Mississippi, Inc.

       

Ö

Entergy New Orleans, Inc.

       

Ö

System Energy Resources, Inc.

       

Ö

Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Act.) Yes o No þ

System Energy Resources meets the requirements set forth in General Instruction I(1) of Form 10-K and is therefore filing this Form 10-K with reduced disclosure as allowed in General Instruction I(2). System Energy Resources is reducing its disclosure by not including Part III, Items 10 through 13 in its Form 10-K.

The aggregate market value of Entergy Corporation Common Stock, $0.01 Par Value, held by non-affiliates as of the end of the second quarter of 2006, was $14.7 billion based on the reported last sale price of $70.75 per share for such stock on the New York Stock Exchange on June 30, 2006. Entergy Corporation is the sole holder of the common stock of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Mississippi, Inc., Entergy New Orleans, Inc., and System Energy Resources, Inc. Entergy Corporation is also the sole holder of the common stock of Entergy Louisiana Holdings, Inc., which is the sole holder of the common membership interests in Entergy Louisiana, LLC.

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the Proxy Statement of Entergy Corporation to be filed in connection with its Annual Meeting of Stockholders, to be held May 4, 2007, are incorporated by reference into Parts I and III hereof.

TABLE OF CONTENTS

 

SEC Form 10-K
Reference Number

Page
Number

     

Definitions

 

i

Entergy's Business

Part I. Item 1.

1

  Financial Information for Utility and Non-Utility Nuclear

 

2

  Strategy

 

3

Report of Management

 

4

  Entergy Corporation and Subsidiaries

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Hurricane Katrina and Hurricane Rita

 

5

    Results of Operations

 

9

    Liquidity and Capital Resources

 

16

    Significant Factors and Known Trends

 

25

    Critical Accounting Estimates

 

39

    New Accounting Pronouncements

 

45

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

47

  Report of Independent Registered Public Accounting Firm

 

48

  Consolidated Statements of Income For the Years Ended December 31, 2006,
   2005, and 2004

Part II. Item 8.

49

  Consolidated Statements of Cash Flows For the Years Ended December 31,
   2006, 2005, and 2004

Part II. Item 8.

50

  Consolidated Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

52

  Consolidated Statements of Retained Earnings, Comprehensive Income, and
   Paid in Capital for the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

54

Notes to Financial Statements

Part II. Item 8.

55

  Utility

Part I. Item 1.

165

    Customers

 

165

    Electric Energy Sales

 

165

    Retail Rate Regulation

 

167

    Property and Other Generation Resources

 

173

    Fuel Supply

 

177

    Federal Regulation of the Utility

 

179

    Service Companies

 

183

    Entergy Louisiana Corporate Restructuring

 

183

    Earnings Ratios

 

185

  Non-Utility Nuclear

Part I. Item 1.

185

    Property

 

185

    Energy and Capacity Sales

 

186

    Fuel Supply

 

186

    Other Business Activities

 

187

  Energy Commodity Services

Part I. Item 1.

188

    Non-Nuclear Wholesale Assets Business

 

188

    Entergy-Koch, L.P.

 

188

  Regulation of Entergy's Business

Part I. Item 1.

189

    PUHCA 2005

 

189

    Federal Power Act

 

189

    State Regulation

 

189

    Regulation of the Nuclear Power Industry

 

190

    Environmental Regulation

 

193

  Litigation

 

200

  Research Spending

 

203

  Employees

 

204

 

  Risk Factors

Part I. Item 1A.

205

  Unresolved Staff Comments

Part I. Item 1B.

217

Entergy Arkansas, Inc.

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Results of Operations

 

218

    Liquidity and Capital Resources

 

221

    Significant Factors and Known Trends

 

224

    Critical Accounting Estimates

 

228

    New Accounting Pronouncements

 

229

  Report of Independent Registered Public Accounting Firm

 

230

  Income Statements For the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

231

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

233

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

234

  Statements of Retained Earnings for the Years Ended December 31, 2006,
   2005, and 2004

Part II. Item 8.

236

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

237

Entergy Gulf States, Inc.

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Hurricane Rita and Hurricane Katrina

 

238

    Results of Operations

 

239

    Liquidity and Capital Resources

 

244

    Significant Factors and Known Trends

 

247

    Critical Accounting Estimates

 

252

    New Accounting Pronouncements

 

255

  Report of Independent Registered Public Accounting Firm

 

256

  Income Statements For the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

257

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

259

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

260

  Statements of Retained Earnings, Comprehensive Income, and Paid-in Capital
   for the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

262

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

263

Entergy Louisiana, LLC

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Hurricane Rita and Hurricane Katrina

 

264

    Results of Operations

 

265

    Liquidity and Capital Resources

 

270

    Significant Factors and Known Trends

 

273

    Critical Accounting Estimates

 

276

    New Accounting Pronouncements

 

278

  Report of Independent Registered Public Accounting Firm

 

279

  Income Statements For the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

280

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

281

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

282

  Statements of Members' Equity and Comprehensive Income for the Years
   Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

284

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

285

     

 

Entergy Mississippi, Inc.

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Hurricane Katrina and Storm Costs Recovery Filing

 

286

    Results of Operations

 

287

    Liquidity and Capital Resources

 

289

    Significant Factors and Known Trends

 

293

    Critical Accounting Estimates

 

294

    New Accounting Pronouncements

 

295

  Report of Independent Registered Public Accounting Firm

 

296

  Income Statements For the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

297

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

299

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

300

  Statements of Retained Earnings for the Years Ended December 31, 2006,
   2005, and 2004

Part II. Item 8.

302

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

303

Entergy New Orleans, Inc. (Debtor-in-possession)

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Hurricane Katrina

 

304

    Bankruptcy Proceedings

 

305

    Results of Operations

 

307

    Liquidity and Capital Resources

 

310

    Significant Factors and Known Trends

 

313

    Critical Accounting Estimates

 

315

    New Accounting Pronouncements

 

316

  Report of Independent Registered Public Accounting Firm

 

317

  Income Statements For the Years Ended December 31, 2006, 2005, and
   2004

Part II. Item 8.

318

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

319

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

320

  Statements of Retained Earnings for the Years Ended December 31, 2006,
   2005, and 2004

Part II. Item 8.

322

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

323

System Energy Resources, Inc.

   

  Management's Financial Discussion and Analysis

Part II. Item 7.

 

    Results of Operations

 

324

    Liquidity and Capital Resources

 

324

    Significant Factors and Known Trends

 

327

    Critical Accounting Estimates

 

328

    New Accounting Pronouncements

 

329

  Report of Independent Registered Public Accounting Firm

 

330

  Income Statements For the Years Ended December 31, 2006, 2005, and 2004

Part II. Item 8.

331

  Statements of Cash Flows For the Years Ended December 31, 2006, 2005,
   and 2004

Part II. Item 8.

333

  Balance Sheets, December 31, 2006 and 2005

Part II. Item 8.

334

  Statements of Retained Earnings for the Years Ended December 31, 2006,
   2005, and 2004

Part II. Item 8.

336

  Selected Financial Data - Five-Year Comparison

Part II. Item 6.

337

 

Properties

Part I. Item 2.

338

Legal Proceedings

Part I. Item 3.

338

Submission of Matters to a Vote of Security Holders

Part I. Item 4.

338

Directors and Executive Officers of Entergy Corporation

Part III. Item 10.

338

Market for Registrants' Common Equity and Related Stockholder Matters

Part II. Item 5.

340

Selected Financial Data

Part II. Item 6.

342

Management's Discussion and Analysis of Financial Condition and Results of
  Operations

Part II. Item 7.

342

Quantitative and Qualitative Disclosures About Market Risk

Part II. Item 7A.

342

Financial Statements and Supplementary Data

Part II. Item 8.

342

Changes in and Disagreements with Accountants on Accounting and Financial
  Disclosure

Part II. Item 9.

342

Controls and Procedures

Part II. Item 9A.

343

Attestation Report of Registered Public Accounting Firm

Part II. Item 9A.

344

Other Information

Part II. Item 9B.

351

Directors and Executive Officers of the Registrants

Part III. Item 10.

352

Executive Compensation

Part III. Item 11.

356

Security Ownership of Certain Beneficial Owners and Management

Part III. Item 12.

392

Certain Relationships and Related Transactions and Director Independence

Part III. Item 13.

395

Principal Accountant Fees and Services

Part III. Item 14.

396

Exhibits and Financial Statement Schedules

Part IV. Item 15.

399

Signatures

 

400

Consents of Independent Registered Public Accounting Firm

 

407

Report of Independent Registered Public Accounting Firm

 

409

Index to Financial Statement Schedules

 

S-1

Exhibit Index

 

E-1

This combined Form 10-K is separately filed by Entergy Corporation and its six "Registrant Subsidiaries": Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., and System Energy Resources, Inc. Information contained herein relating to any individual company is filed by such company on its own behalf. Each company makes representations only as to itself and makes no other representations whatsoever as to any other company.

The report should be read in its entirety as it pertains to each respective registrant. No one section of the report deals with all aspects of the subject matter. Separate Item 6, 7, and 8 sections are provided for each registrant, except for the Notes to the financial statements. The Notes to the financial statements for all of the registrants are combined. All Items other than 6, 7, and 8 are combined for the registrants.

FORWARD-LOOKING INFORMATION

In this combined report and from time to time, Entergy Corporation, the Utility operating companies and System Energy, each makes statements as registrants concerning its expectations, beliefs, plans, objectives, goals, strategies, and future events or performance. Such statements are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Words such as "believes," "intends," "plans," "predicts" and "estimates" and similar expressions are intended to identify forward-looking statements but are not the only means to identify these statements. Although each of these registrants believes that these forward-looking statements and the underlying assumptions are reasonable, it cannot provide assurance that they will prove correct. Any forward-looking statement is based on information current as of the date of this combined report and speaks only as of the date on which such statement is made. Except to the extent required by the federal securities laws, these registrants undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise.

Forward-looking statements involve a number of risks and uncertainties. There are factors that could cause actual results to differ materially from those expressed or implied in the forward-looking statements, including those factors discussed in (a) Item 1A. Risk Factors, (b) Item 7. Management's Financial Discussion and Analysis, and (c) the following factors (in addition to others described elsewhere in this combined report and in subsequent securities filings):

FORWARD-LOOKING INFORMATION (Concluded)

 

 

 

 

DEFINITIONS

Certain abbreviations or acronyms used in the text and notes are defined below:

Abbreviation or Acronym

Term

AEEC

Arkansas Electric Energy Consumers

AFUDC

Allowance for Funds Used During Construction

ALJ

Administrative Law Judge

ANO 1 and 2

Units 1 and 2 of Arkansas Nuclear One Steam Electric Generating Station (nuclear), owned by Entergy Arkansas

APSC

Arkansas Public Service Commission

Board

Board of Directors of Entergy Corporation

Cajun

Cajun Electric Power Cooperative, Inc.

capacity factor

Actual plant output divided by maximum potential plant output for the period

City Council or Council

Council of the City of New Orleans, Louisiana

CPI-U

Consumer Price Index - Urban

DOE

United States Department of Energy

EITF

FASB's Emerging Issues Task Force

Energy Commodity Services

Entergy's business segment that includes Entergy-Koch, LP and Entergy's non-nuclear wholesale assets business

Entergy

Entergy Corporation and its direct and indirect subsidiaries

Entergy Corporation

Entergy Corporation, a Delaware corporation

Entergy-Koch

Entergy-Koch, LP, a joint venture equally owned by subsidiaries of Entergy and Koch Industries, Inc.

Entergy Louisiana

Entergy Louisiana, LLC

EPA

United States Environmental Protection Agency

EPDC

Entergy Power Development Corporation, a wholly-owned subsidiary of Entergy Corporation

ERCOT

Electric Reliability Council of Texas

FASB

Financial Accounting Standards Board

FEMA

Federal Emergency Management Agency

FERC

Federal Energy Regulatory Commission

firm liquidated damages

Transaction that requires receipt or delivery of energy at a specified delivery point (usually at a market hub not associated with a specific asset); if a party fails to deliver or receive energy, the defaulting party must compensate the other party as specified in the contract

FSP

FASB Staff Position

Grand Gulf

Unit No. 1 of Grand Gulf Steam Electric Generating Station (nuclear), 90% owned or leased by System Energy

GWh

Gigawatt-hour(s), which equals one million kilowatt-hours

Independence

Independence Steam Electric Station (coal), owned 16% by Entergy Arkansas, 25% by Entergy Mississippi, and 7% by Entergy Power

IRS

Internal Revenue Service

ISO

Independent System Operator

kV

Kilovolt

kW

Kilowatt

kWh

Kilowatt-hour(s)

i

DEFINITIONS (Continued)

Abbreviation or Acronym

Term

   

LDEQ

Louisiana Department of Environmental Quality

LPSC

Louisiana Public Service Commission

Mcf

1,000 cubic feet of gas

MMBtu

One million British Thermal Units

MPSC

Mississippi Public Service Commission

MW

Megawatt(s), which equals one thousand kilowatt(s)

MWh

Megawatt-hour(s)

Nelson Unit 6

Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, owned 70% by Entergy Gulf States

Net debt ratio

Gross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents

Net MW in operation

Installed capacity owned or operated

Net revenue

Operating revenue net of fuel, fuel-related, and purchased power expenses; and other regulatory credits

Non-Utility Nuclear

Entergy's business segment that owns and operates five nuclear power plants and sells electric power produced by those plants to wholesale customers

NRC

Nuclear Regulatory Commission

NYPA

New York Power Authority

OASIS

Open Access Same Time Information Systems

PPA

Purchased power agreement

production cost

Cost in $/MMBtu associated with delivering gas, excluding the cost of the gas

PRP

Potentially responsible party (a person or entity that may be responsible for remediation of environmental contamination)

PUCT

Public Utility Commission of Texas

PUHCA 1935

Public Utility Holding Company Act of 1935, as amended

PUHCA 2005

Public Utility Holding Company Act of 2005, which repealed PUHCA 1935, among other things

PURPA

Public Utility Regulatory Policies Act of 1978

Registrant Subsidiaries

Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., and System Energy Resources, Inc.

Ritchie Unit 2

Unit 2 of the R.E. Ritchie Steam Electric Generating Station (gas/oil)

River Bend

River Bend Steam Electric Generating Station (nuclear), owned by Entergy Gulf States

SEC

Securities and Exchange Commission

SFAS

Statement of Financial Accounting Standards as promulgated by the FASB

SMEPA

South Mississippi Electric Power Agency, which owns a 10% interest in Grand Gulf

spark spread

Dollar difference between electricity prices per unit and natural gas prices after assuming a conversion ratio for the number of natural gas units necessary to generate one unit of electricity

System Agreement

Agreement, effective January 1, 1983, as modified, among the Utility operating companies relating to the sharing of generating capacity and other power resources

System Energy

System Energy Resources, Inc.

System Fuels

System Fuels, Inc.

ii

DEFINITIONS (Concluded)

Abbreviation or Acronym

Term

   

TWh

Terawatt-hour(s), which equals one billion kilowatt-hours

unit-contingent

Transaction under which power is supplied from a specific generation asset; if the specified generation asset is unavailable as a result of forced outage or unanticipated event or circumstance, the seller is not liable to the buyer for any damages resulting from the seller's failure to deliver power

unit-contingent with
availability guarantees

Transaction under which power is supplied from a specific generation asset; if the specified generation asset is unavailable as a result of forced outage or unanticipated event or circumstance, the seller is not liable to the buyer for any damages resulting from the seller's failure to deliver power unless the actual availability over a specified period of time is below an availability threshold specified in the contract

Unit Power Sales Agreement

Agreement, dated as of June 10, 1982, as amended and approved by FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy's share of Grand Gulf

UK

The United Kingdom of Great Britain and Northern Ireland

Utility

Entergy's business segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution

Utility operating companies

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans

Waterford 3

Unit No. 3 (nuclear) of the Waterford Steam Electric Generating Station, 100% owned or leased by Entergy Louisiana

weather-adjusted usage

Electric usage excluding the effects of deviations from normal weather

White Bluff

White Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas

 

iii

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Page left blank intentionally)

 

 

ENTERGY'S BUSINESS

Entergy Corporation is an integrated energy company engaged primarily in electric power production and retail electric distribution operations. Entergy owns and operates power plants with approximately 30,000 MW of electric generating capacity, and Entergy is the second-largest nuclear power generator in the United States. Entergy delivers electricity to 2.6 million utility customers in Arkansas, Louisiana, Mississippi, and Texas. Entergy generated annual revenues of $10.9 billion in 2006 and had approximately 13,800 employees as of December 31, 2006.

Entergy operates primarily through two business segments: Utility and Non-Utility Nuclear.

  • Utility generates, transmits, distributes, and sells electric power in a four-state service territory that includes portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operates a small natural gas distribution business.
  • Non-Utility Nuclear owns and operates five nuclear power plants located in the northeastern United States and sells the electric power produced by those plants primarily to wholesale customers. This business also provides services to other nuclear power plant owners.

In addition to its two primary, reportable, operating segments, Entergy also operates the non-nuclear wholesale assets business. The non-nuclear wholesale assets business sells to wholesale customers the electric power produced by power plants that it owns while it focuses on improving performance and exploring sales or restructuring opportunities for its power plants. Such opportunities are evaluated consistent with Entergy's market-based point-of-view.

1

OPERATING INFORMATION
For the Years Ended December 31, 2006, 2005, and 2004
             
    Utility   Non-Utility Nuclear   Entergy Consolidated (a)
    (In Thousands)
2006            
Operating revenues   $9,150,030   $1,544,873   $10,932,158 
Operating expenses   $7,852,754   $1,082,743   $9,126,798 
Other income   $155,651   $99,449   $348,587 
Interest and other charges   $428,662   $47,424   $577,805 
Income taxes   $333,105   $204,659   $443,044 
Loss from discontinued operations   $-   $-   ($496)
Net income   $691,160   $309,496   $1,132,602 
             
2005            
Operating revenues   $8,526,943   $1,421,547   $10,106,247 
Operating expenses   $7,186,035   $996,012   $8,314,258 
Other income   $111,186   $71,827   $211,451 
Interest and other charges   $386,672   $50,874   $501,031 
Income taxes   $405,662   $163,865   $559,284 
Loss from discontinued operations   $-   $-   ($44,794)
Net income   $659,760   $282,623   $898,331 
             
2004            
Operating revenues   $8,142,808   $1,341,852   $9,685,521 
Operating expenses   $6,795,146   $978,687   $8,035,349 
Other income   $108,925   $78,141   $125,999 
Interest and other charges   $406,315   $53,657   $501,301 
Income taxes   $406,864   $142,620   $365,305 
Loss from discontinued operations   $-   $-   ($41)
Net income   $643,408   $245,029   $909,524 
             
CASH FLOW INFORMATION
For the Years Ended December 31, 2006, 2005, and 2004
             
    Utility   Non-Utility Nuclear   Entergy Consolidated (a)
    (In Thousands)
2006      
Net cash flow provided by operating activities   $2,564,009    $833,318    $3,419,415 
Net cash flow used in investing activities   ($1,564,509)   ($450,219)   ($1,899,149)
Net cash flow used in financing activities   ($736,693)   ($211,544)   ($1,083,727)
             
2005            
Net cash flow provided by operating activities   $973,692    $551,263    $1,467,808 
Net cash flow used in investing activities   ($1,709,175)   ($368,497)   ($1,992,608)
Net cash flow provided by (used in) financing activities   $646,588    ($110,482)   $496,390 
             
2004            
Net cash flow provided by operating activities   $2,207,876    $414,518    $2,929,319 
Net cash flow used in investing activities   ($1,198,009)   ($386,023)   ($1,143,225)
Net cash flow used in financing activities   ($824,579)   ($37,894)   ($1,671,859)
             
FINANCIAL POSITION INFORMATION
As of December 31, 2006 and 2005
             
    Utility   Non-Utility Nuclear   Entergy Consolidated (a)
    (In Thousands)
2006            
Current assets   $2,400,212   $820,613   $3,325,434
Other property and investments   $1,584,160   $1,581,610   $3,347,453
Property, plant and equipment - net   $16,939,438   $2,252,415   $19,438,077
Deferred debits and other assets   $4,314,549   $715,092   $4,971,767
Current liabilities   $1,990,160   $543,384   $2,465,130
Non-current liabilities   $16,928,131   $2,115,289   $20,419,714
Shareholders' equity   $6,320,068   $2,711,056   $8,197,887
             
2005            
Current assets   $3,188,548   $699,299   $4,062,682
Other property and investments   $1,433,300   $1,473,450   $3,213,917
Property, plant and equipment - net   $16,899,266   $2,001,727   $19,197,045
Deferred debits and other assets   $3,727,706   $713,096   $4,384,013
Current liabilities   $2,326,053   $517,847   $3,112,366
Non-current liabilities   $16,254,896   $2,254,827   $19,997,020
Shareholders' equity   $6,667,871   $2,114,898   $7,748,271
             
(a) In addition to the two operating segments presented here, Entergy Consolidated also includes Entergy Corporation (parent company), other business activity, and intercompany eliminations, including the Energy Commodity Services business, the Competitive Retail Services business, and earnings on the proceeds of sales of previously-owned businesses. The Energy Commodity Services business was presented as a reportable segment prior to 2005, but it has not met the quantitative thresholds for a reportable segment since 2003, and with the sale of Entergy-Koch's businesses in 2004, management does not expect the Energy Commodity Services business to meet the quantitative thresholds in the foreseeable future. The 2004 information in the tables above has been restated to include the Energy Commodity Services business in the Entergy Consolidated column. As a result of the Entergy New Orleans bankruptcy filing, Entergy has discontinued the consolidation of Entergy New Orleans retroactive to January 1, 2005, and is reporting Entergy New Orleans results under the equity method of accounting.
             

2

The following shows the principal subsidiaries and affiliates within Entergy's business segments. Companies that file reports and other information with the SEC under the Securities Exchange Act of 1934 are identified in bold-faced type.

       


Entergy Corporation

   
                   
                   
                   
                 

Utility

 

Non-Utility Nuclear

 

Other Businesses

                     
 

Entergy Arkansas, Inc.

   

Entergy Nuclear Operations, Inc.

     

Energy Commodity Services

 
 

Entergy Gulf States, Inc.

   

Entergy Nuclear Finance, Inc.

           
 

Entergy Louisiana Holdings, Inc.

   

Entergy Nuclear Generation Co. (Pilgrim)

   

Entergy-Koch, LP

     

Non-Nuclear Wholesale Assets

 

Entergy Louisiana, LLC

   

Entergy Nuclear FitzPatrick LLC

   

(50% ownership)

       
 

Entergy Mississippi, Inc.

   

Entergy Nuclear Indian Point 2, LLC

           

Entergy Power Development Corp.

 

Entergy New Orleans, Inc.

   

Entergy Nuclear Indian Point 3, LLC

           

Entergy Asset Management, Inc.

 

System Energy Resources, Inc.

   

Entergy Nuclear Vermont Yankee, LLC

         

Entergy Power, Inc.

 

Entergy Operations, Inc.

   

Entergy Nuclear, Inc.

           
 

Entergy Services, Inc.

   

Entergy Nuclear Fuels Company

         
 

System Fuels, Inc.

   

Entergy Nuclear Nebraska LLC

             
       

Entergy Nuclear Power Marketing LLC

       

Strategy

Entergy aspires continually to achieve industry-leading total shareholder returns in an environmentally responsible fashion by leveraging the scale and expertise inherent in its core nuclear and utility operations.  Entergy's scope includes electricity generation, transmission and distribution as well as natural gas transportation and distribution.  Entergy focuses on operational excellence with an emphasis on safety, reliability, customer service, sustainability, cost efficiency, and risk management.  Entergy also focuses on portfolio management to make periodic buy, build, hold, or sell decisions based upon its analytically-derived points of view which are continuously updated as market conditions evolve.

___________________________________________________________________________________________

Availability of SEC filings and other information on Entergy's website

Entergy's annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments are available without charge on its website, http://www.shareholder.com/entergy/edgar.cfm, as soon as reasonably practicable after they are filed electronically with the SEC. Entergy is providing the address to its Internet site solely for the information of investors. Entergy does not intend the address to be an active link or to otherwise incorporate the contents of the website into this report.

Part I, Item 1 is continued on page 165.

3

ENTERGY CORPORATION AND SUBSIDIARIES

REPORT OF MANAGEMENT

Management of Entergy Corporation and its subsidiaries has prepared and is responsible for the financial statements and related financial information included in this document. To meet this responsibility, management establishes and maintains a system of internal controls designed to provide reasonable assurance regarding the preparation and fair presentation of financial statements in accordance with generally accepted accounting principles. This system includes communication through written policies and procedures, an employee Code of Entegrity, and an organizational structure that provides for appropriate division of responsibility and training of personnel. This system is also tested by a comprehensive internal audit program.

Entergy management assesses the effectiveness of Entergy's internal control over financial reporting on an annual basis. In making this assessment, management uses the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control - Integrated Framework. Management acknowledges, however, that all internal control systems, no matter how well designed, have inherent limitations and can provide only reasonable assurance with respect to financial statement preparation and presentation.

Entergy Corporation and its subsidiaries' independent registered public accounting firm, Deloitte & Touche LLP, has issued an attestation report on Entergy management's assessment of the effectiveness of Entergy's internal control over financial reporting as of December 31, 2006, which is included herein on pages 344 through 350.

In addition, the Audit Committee of the Board of Directors, composed solely of independent Directors, meets with the independent auditors, internal auditors, management, and internal accountants periodically to discuss internal controls, and auditing and financial reporting matters. The Audit Committee appoints the independent auditors annually, seeks shareholder ratification of the appointment, and reviews with the independent auditors the scope and results of the audit effort. The Audit Committee also meets periodically with the independent auditors and the chief internal auditor without management present, providing free access to the Audit Committee.

Based on management's assessment of internal controls using the COSO criteria, management believes that Entergy maintained effective internal control over financial reporting as of December 31, 2006. Management further believes that this assessment, combined with the policies and procedures noted above, provides reasonable assurance that Entergy's financial statements are fairly and accurately presented in accordance with generally accepted accounting principles.

J. WAYNE LEONARD
Chairman and Chief Executive Officer of Entergy Corporation

LEO P. DENAULT
Executive Vice President and Chief Financial Officer of Entergy Corporation

HUGH T. MCDONALD
Chairman, President, and Chief Executive Officer of Entergy Arkansas, Inc.

JOSEPH F. DOMINO
Chairman of Entergy Gulf States, Inc., President and Chief Executive Officer - Texas of Entergy Gulf States, Inc.

E. RENAE CONLEY
Chair of the Board, President, and Chief Executive Officer of Entergy Louisiana, LLC; President and Chief Executive Officer- Louisiana of Entergy Gulf States, Inc.

CAROLYN C. SHANKS
Chairman, President, and Chief Executive Officer of Entergy Mississippi, Inc.

RODERICK K. WEST
President and Chief Executive Officer of Entergy New Orleans, Inc.

GARY J. TAYLOR
Chairman, President, and Chief Executive Officer of System Energy Resources, Inc.

THEODORE H. BUNTING, JR.
Vice President and Chief Financial Officer of System Energy Resources, Inc.

JAY A. LEWIS
Vice President and Chief Financial Officer of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., and Entergy New Orleans, Inc.

4

ENTERGY CORPORATION AND SUBSIDIARIES

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

Entergy operates primarily through two business segments: Utility and Non-Utility Nuclear.

In addition to its two primary, reportable, operating segments, Entergy also operates the non-nuclear wholesale assets business. The non-nuclear wholesale assets business sells to wholesale customers the electric power produced by power plants that it owns while it focuses on improving performance and exploring sales or restructuring opportunities for its power plants. Such opportunities are evaluated consistent with Entergy's market-based point-of-view.

Following are the percentages of Entergy's consolidated revenues and net income generated by its operating segments and the percentage of total assets held by them:

   

% of Revenue

 

% of Net Income

 

% of Total Assets

Segment

 

2006

 

2005

 

2004

 

2006

 

2005

 

2004

 

2006

 

2005

 

2004

                                     

Utility

 

84

 

84

 

84

 

61

 

73 

 

71 

 

81

 

82 

 

81 

Non-Utility Nuclear

 

14

 

14

 

14

 

27

 

31 

 

27 

 

17

 

16 

 

16 

Parent Company &
  Other Business Segments

 


2

 


2

 


2

 


12

 


(4)

 


 


2

 


 


Hurricane Katrina and Hurricane Rita

In August and September 2005, Hurricanes Katrina and Rita caused catastrophic damage to large portions of the Utility's service territory in Louisiana, Mississippi, and Texas, including the effect of extensive flooding that resulted from levee breaks in and around the greater New Orleans area. The storms and flooding resulted in widespread power outages, significant damage to electric distribution, transmission, and generation and gas infrastructure, and the loss of sales and customers due to mandatory evacuations and the destruction of homes and businesses. Total restoration costs through December 31, 2006 for the repair or replacement of the Utility's electric and gas facilities damaged by Hurricanes Katrina and Rita and for business continuity are $1.48 billion (including $38 million of AFUDC). The costs include $828 million in construction expenditures and $654 million recorded originally as regulatory assets. Entergy recorded regulatory assets in accordance with its accounting policies because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable, based on historic treatment of such costs in the Utility's service territories and communications with local regulators. These costs do not include other potential incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates, which base rate revenue was not received due to a loss of anticipated sales. For instance, at Entergy New Orleans, the Utility operating company that continues to experience a reduction in the level of cost recovery due to lost customers caused by Hurricane Katrina, Entergy estimates that lost net revenue due to Hurricane Katrina will total approximately $194 million through 2007. In addition, Entergy estimates that the hurricanes caused $38 million of uncollectible Utility customer receivables. Entergy estimates that its additional storm restoration spending, excluding Entergy New Orleans, will be approximately $60 million.

5

Entergy New Orleans has spent approximately $188 million on storm restoration through December 31, 2006, and estimates that it will ultimately spend approximately $275 million. Entergy New Orleans also incurred $22 million of uncollectible accounts receivable because of Hurricane Katrina. The storm restoration cost estimate includes approximately $80 million in spending for accelerated rebuilding of the gas system in New Orleans that Entergy New Orleans expects will be necessary due to massive salt water intrusion into the system caused by the flooding in New Orleans. The salt water intrusion is expected to shorten the life of the gas system, making it necessary to rebuild that system over time, earlier than otherwise would be expected. The storm restoration cost estimate given above does not include the longer-term spending expected for the gas rebuild project. Entergy New Orleans currently estimates the additional longer-term costs to rebuild the gas system to be $385 million, with the project extending for many years into the future.

Entergy is pursuing a broad range of initiatives to recover storm restoration and business continuity costs. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for damage caused by Hurricanes Katrina and Rita, and, as noted above, pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, in combination with securitization. Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans have filed with their respective retail regulators for recovery of storm restoration costs. The proceedings are discussed in Note 2 to the financial statements.

See Note 8 to the financial statements for a discussion of Entergy's non-nuclear property insurance program. Entergy is currently evaluating the amount of the covered losses for each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. There is an aggregation limit of $1 billion for all parties insured by OIL, Entergy's primary insurer, for any one occurrence, and Entergy has been notified by OIL that it expects claims for both Hurricanes Katrina and Rita to materially exceed this limit. The Utility operating companies have received $51.5 million through December 31, 2006 on their insurance claims. Entergy currently estimates that its remaining net insurance recoveries for the losses caused by the hurricanes, including the effect of the OIL aggregation limit being exceeded, will be approximately $350 million. Entergy currently expects to receive payment for the majority of its estimated insurance recoveries related to Hurricanes Katrina and Rita through 2009.

Community Development Block Grants (CDBG)

In December 2005, the U.S. Congress passed the Katrina Relief Bill, a hurricane aid package that includes $11.5 billion in Community Development Block Grants (for the states affected by Hurricanes Katrina, Rita, and Wilma) that allows state and local leaders to fund individual recovery priorities. The bill includes language that permits funding to be provided for infrastructure restoration.

Entergy Mississippi filed a request with the Mississippi Development Authority for CDBG funding for reimbursement of its Hurricane Katrina infrastructure restoration costs and received $81 million in October 2006.

Entergy New Orleans, Entergy Louisiana, and Entergy Gulf States-Louisiana provided justification statements to state and local officials in March 2006 and presented revised justification statements to the Louisiana Recovery Authority (LRA) in September 2006. The statements include the estimated costs of Hurricanes Katrina and Rita damage, as well as for Entergy New Orleans a lost customer base component intended to help offset the need for storm-related rate increases. The statements include justification for CDBG funding of $592 million for Entergy New Orleans, $539 million for Entergy Louisiana, and $183 million for Entergy Gulf States-Louisiana.

In October 2006, the LRA Board endorsed a resolution proposing to allocate $200 million in CDBG funds to Entergy New Orleans to defray gas and electric utility system repair costs in an effort to provide rate relief for Entergy New Orleans customers. The proposal was developed as an action plan amendment and published for public comment. State lawmakers approved the action plan in December 2006, and the U. S. Department of Housing and Urban Development approved it in February 2007. In addition, the City Council must review and certify the amount of Entergy New Orleans' eligible storm costs before an application can be filed with the LRA and CDBG funding can be released to Entergy New Orleans. Entergy

 

6

 

 

New Orleans filed applications seeking City Council certification of $210 million in storm-related costs incurred through December 2006. Entergy New Orleans has supplemented this request to include the estimated future cost of the gas system rebuild. In January 2007, the City Council passed a resolution in which it stated its intent to render a decision in the certification proceeding by March 2007.

Entergy New Orleans Bankruptcy

Because of the effects of Hurricane Katrina, on September 23, 2005, Entergy New Orleans filed a voluntary petition in the United States Bankruptcy Court for the Eastern District of Louisiana seeking reorganization relief under the provisions of Chapter 11 of the United States Bankruptcy Code (Case No. 05-17697). Entergy Corporation owns 100 percent of the common stock of Entergy New Orleans, has continued to supply general and administrative services through Entergy Services, and has provided debtor-in-possession financing to Entergy New Orleans. Uncertainties surrounding the nature, timing, and specifics of the bankruptcy proceedings, however, caused Entergy to deconsolidate Entergy New Orleans and reflect Entergy New Orleans' financial results under the equity method of accounting retroactive to January 1, 2005. Because Entergy owns all of the common stock of Entergy New Orleans, this change did not affect the amount of net income Entergy records from Entergy New Orleans' operations for any current or prior period, but did result in Entergy New Orleans' net income for 2005 and 2006 being presented as "Equity in earnings (loss) of unconsolidated equity affiliates" rather than its results being included in each individual income statement line item, as is the case for periods prior to 2005. Entergy has reviewed the carrying value of its equity investment in Entergy New Orleans to determine if an impairment has occurred as a result of the storm, the flood, the power outages, restoration costs, and changes in customer load. Entergy determined that no impairment has occurred because management believes that cost recovery is probable. Entergy will continue to assess the carrying value of its investment in Entergy New Orleans as developments occur in Entergy New Orleans' recovery efforts.

On February 5, 2007, Entergy New Orleans filed an amended plan of reorganization and a disclosure statement with the bankruptcy court. The bankruptcy court entered an order on February 13, 2007 that approves the adequacy of Entergy New Orleans' disclosure statement. The Unsecured Creditors' Committee also filed a plan of reorganization on February 5, 2007. The Unsecured Creditors' Committee's plan is similar in some respects to Entergy New Orleans' plan, but contains several differences. The significant differences are noted below. A hearing regarding confirmation for both plans of reorganization is scheduled for May 3 and 4, 2007.

Entergy New Orleans' plan of reorganization reflects its continuing effort to work with federal, state, and local authorities to resolve the bankruptcy in a manner that allows Entergy New Orleans' customers to be served by a financially viable entity as required by law. The plan of reorganization provides full compensation to Entergy New Orleans' creditors whose claims are allowed by the bankruptcy court. Conditions precedent proposed in Entergy New Orleans' plan of reorganization before it can become effective include:

In addition, key factors that will continue to influence the timing and outcome of Entergy New Orleans' recovery efforts include the level of economic recovery of New Orleans and the number of customers that return to New Orleans, including the timing of their return. Entergy New Orleans currently estimates that approximately 95,000 electric customers and 65,000 gas customers have returned and are taking service. Prior to Hurricane Katrina, Entergy New Orleans had approximately 190,000 electric customers and 144,000 gas customers.

The Unsecured Creditors' Committee's plan does not contain the conditions precedent regarding receipt by Entergy New Orleans of insurance proceeds and CDBG funds. Instead, the Unsecured Creditors' Committee's plan proposes exit financing of up to $150 million, with a maturity of up

 

7

 

 

 to 5 years, and with an estimated interest rate of 10.5%, increasing by 1% per year. Obtaining this exit financing is a condition precedent to the Unsecured Creditors' Committee's plan.

The bankruptcy judge set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans, with certain exceptions, had to file their proofs of claim in the bankruptcy case. Approximately 560 claims, including amending claims, have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and is seeking withdrawal or modification of claims or objecting to claims with which it disagrees. Several of the filed claims have been withdrawn or disallowed by the bankruptcy court. Entergy New Orleans currently estimates that the prepetition claims that will be allowed in the bankruptcy case will approximate the prepetition liabilities currently recorded by Entergy New Orleans.

Entergy New Orleans' plan of reorganization proposes to pay the third-party prepetition accounts payable in full in cash and to issue three-year notes in satisfaction of the affiliate prepetition accounts payable, and proposes that its first mortgage bonds will remain outstanding with their current maturity dates and interest terms. The plan of reorganization proposes that Entergy New Orleans' preferred stock will also remain outstanding on its current dividend terms, with payment of unpaid preferred dividends in arrears. The Unsecured Creditors' Committee's plan is similar, but would pay the affiliate prepetition accounts payable in cash.

Entergy New Orleans' plan of reorganization proposes to pay interest from September 23, 2005 on the third-party and affiliate accounts payable at the Louisiana judicial rate of interest in 2005 (6%) and 2006 (8%), and at the Louisiana judicial rate of interest plus 1% thereafter. The Louisiana judicial rate of interest is 9.5% for 2007. Pursuant to an agreement with the first mortgage bondholders, Entergy New Orleans' plan of reorganization also proposes to pay the first mortgage bondholders an amount equal to the one year of interest from the bankruptcy petition date that the bondholders had waived previously in the bankruptcy proceeding. As approved by the bankruptcy court, Entergy New Orleans has begun paying interest accruing after September 23, 2006 on its first mortgage bonds. In the fourth quarter 2006 Entergy New Orleans accrued for the interest from September 23, 2005 through December 2006 and for the proposed payment to the bondholders in the amount of the one year of waived interest.

Municipalization is one potential outcome of Entergy New Orleans' recovery effort that may be pursued by a stakeholder or stakeholders, even after Entergy New Orleans exits from bankruptcy. In June 2006, the Louisiana Legislature passed a law that establishes a governance structure for a public power authority, if municipalization of Entergy New Orleans' utility business is pursued. Entergy New Orleans' October 2006 settlement approved by the City Council allowing phased-in rate increases through 2008, discussed in "Significant Factors and Known Trends", provides that Entergy New Orleans will work with the City Council to seek an exception to the Stafford Act that will afford Stafford Act protections to Entergy New Orleans if another catastrophic event affects Entergy New Orleans. The Stafford Act provides for restoration funding from the federal government for municipal and cooperative utilities, but does not allow such funding for investor-owned utilities like Entergy New Orleans.

8

Results of Operations

2006 Compared to 2005

Following are income statement variances for Utility, Non-Utility Nuclear, Parent & Other business segments, and Entergy comparing 2006 to 2005 showing how much the line item increased or (decreased) in comparison to the prior period:

 


Utility

 

Non-Utility
Nuclear

 

Parent & Other


Entergy

(In Thousands)

2005 Consolidated Net Income (Loss)

 

$659,760  

 

$282,623  

 

($44,052)

$898,331  

Net revenue (operating revenue less fuel expense,
purchased power, and other regulatory charges
(credits) - net)

 



195,681  



114,028  



3,952  



313,661  

Other operation and maintenance expenses

 

177,725  

49,264  

(13,831)

213,158  

Taxes other than income taxes

 

38,662  

8,489  

(1,111)

46,040  

Depreciation

 

19,780  

13,215  

(1,580)

31,415  

Other income

 

44,465  

27,622  

65,049  

137,136  

Interest charges

 

41,990  

(3,450)

38,234  

76,774  

Other expenses

 

3,146  

6,465  

66  

9,677  

Discontinued operations (net-of-tax)

 

-  

 -  

44,298  

44,298  

Income taxes

 

(72,557)

40,794  

(84,477)

(116,240)

2006 Consolidated Net Income

 

$691,160  

 

$309,496  

 

$131,946  

$1,132,602 

Refer to "SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON OF ENTERGY CORPORATION AND SUBSIDIARIES" which accompanies Entergy Corporation's financial statements in this report for further information with respect to operating statistics.

Net Revenue

Utility

Following is an analysis of the change in net revenue, which is Entergy's measure of gross margin, comparing 2006 to 2005.

  

 

Amount

  

 

(In Millions)

 

 

 

2005 net revenue

 

$4,075.4 

Base revenues/Attala costs

 

143.2 

Fuel recovery

 

39.6 

Pass-through rider revenue

 

35.5 

Transmission revenue

 

20.8 

Storm cost recovery

 

 12.3 

Volume/weather

 

10.6 

Price applied to unbilled electric sales

 

 (43.7)

Purchased power capacity

 

(34.5)

Other

 

 11.9 

2006 net revenue

 

$4,271.1 

9

The base revenues variance resulted primarily from increases effective October 2005 in the Louisiana jurisdiction of Entergy Gulf States for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station, and increases in the Texas jurisdiction of Entergy Gulf States related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006. The Attala costs variance is due to the recovery of Attala power plant costs at Entergy Mississippi through the power management rider. The net income effect of the Attala cost recovery is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes.

The fuel recovery variance resulted primarily from adjustments of fuel clause recoveries at Entergy Gulf States - Louisiana and increased recovery in 2006 of fuel costs from retail and special rate customers.

The pass-through rider revenue variance is due to a change in 2006 in the accounting for city franchise tax revenues in Arkansas as directed by the APSC. The change results in an increase in rider revenue with a corresponding increase in taxes other than income taxes, resulting in no effect on net income.

The transmission revenue variance is primarily due to new transmission customers in 2006. Also contributing to the increase was an increase in rates effective June 2006.

The storm cost recovery variance is due to the return earned on the interim recovery of storm-related costs at Entergy Louisiana and Entergy Gulf States - Louisiana in 2006 as allowed by the LPSC. The storm cost recovery filings are discussed in Note 2 to the financial statements.

The volume/weather variance resulted from an increase of 1.7% in electricity usage primarily in the industrial sector. The increase was partially offset by the effect of less favorable weather on billed sales in the residential sector, compared to the same period in 2005, and a decrease in usage during the unbilled period.

The price applied to unbilled sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation at Entergy Louisiana and the Louisiana jurisdiction of Entergy Gulf States, which is in accordance with regulatory treatment. See "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates" herein.

The purchased power capacity variance is primarily due to higher capacity charges and new purchased power contracts in 2006. A portion of the variance is due to the amortization of deferred capacity costs and is offset in base revenues due to base rate increases implemented to recover incremental deferred and ongoing purchased power capacity charges, as discussed above.

Non-Utility Nuclear

Net revenue increased for Non-Utility Nuclear primarily due to higher pricing in its contracts to sell power. Also contributing to the increase in revenues was increased generation in 2006 due to power uprates completed in 2005 and 2006 at certain plants and fewer refueling outages in 2006. Following are key performance measures for Non-Utility Nuclear for 2006 and 2005:

 

 

2006

 

2005

 

 

 

 

 

Net MW in operation at December 31

 

4,200

 

4,105

Average realized price per MWh

 

$44.59

 

$42.39

Generation in GWh for the period

 

34,655

 

33,539

Capacity factor for the period

 

95%

 

93%

10

Other Operation and Maintenance Expenses

Other operation and maintenance expenses increased for the Utility from $1.471 billion in 2005 to $1.649 billion in 2006 primarily due to the following:

  • an increase of $52 million in payroll and benefits costs;
  • an increase of $20 million in nuclear costs as a result of higher NRC fees, security costs, labor-related costs, and a non-refueling plant outage at Entergy Gulf States in February 2006;
  • an increase of $16 million in customer service support costs due to an increase in contract costs and an increase in customer write-offs;
  • the receipt in 2005 of proceeds of $16 million from a settlement, which is discussed further in "Significant Factors and Known Trends - Central States Compact Claim;"
  • an increase of $16 million in fossil operating costs due to the purchase of the Attala plant in January 2006 and the Perryville plant coming online in July 2005;
  • an increase of $12 million related to storm reserves. This increase does not include costs associated with Hurricanes Katrina and Rita; and
  • an increase of $12 million due to a return to normal expense patterns in 2006 versus the deferral or capitalization of storm costs in 2005.

Other operation and maintenance expenses increased for Non-Utility Nuclear from $588 million in 2005 to $637 million in 2006 primarily due to the timing of refueling outages, increased benefit and insurance costs, and increased NRC fees.

Taxes Other Than Income Taxes

Taxes other than income taxes increased for the Utility from $322 million in 2005 to $361 million in 2006 primarily due to an increase in city franchise taxes in Arkansas due to a change in 2006 in the accounting for city franchise tax revenues as directed by the APSC. The change results in an increase in taxes other than income taxes with a corresponding increase in rider revenue, resulting in no effect on net income. Also contributing to the increase was higher franchise tax expense at Entergy Gulf States as a result of higher gross revenues in 2006 and a customer refund in 2005.

Other Income

Other income increased for the Utility from $111 million in 2005 to $156 million in 2006 primarily due to carrying charges recorded on storm restoration costs.

Other income increased for Non-Utility Nuclear primarily due to miscellaneous income of $27 million ($16.6 million net-of-tax) resulting from a reduction in the decommissioning liability for a plant as a result of a revised decommissioning cost study and changes in assumptions regarding the timing of when decommissioning of a plant will begin.

Other income increased for Parent & Other primarily due to a gain related to its Entergy-Koch investment of approximately $55 million (net-of-tax) in the fourth quarter of 2006. In 2004, Entergy-Koch sold its energy trading and pipeline businesses to third parties. At that time, Entergy received $862 million of the sales proceeds in the form of a cash distribution by Entergy-Koch. Due to the November 2006 expiration of contingencies on the sale of Entergy-Koch's trading business, and the corresponding release to Entergy-Koch of sales proceeds held in escrow, Entergy received additional cash distributions of approximately $163 million during the fourth quarter of 2006 and recorded a gain of approximately $55 million (net-of-tax). Entergy expects future cash distributions upon liquidation of the partnership will be less than $35 million.

11

Interest Charges

Interest charges increased for the Utility and Parent & Other primarily due to additional borrowing to fund the significant storm restoration costs associated with Hurricanes Katrina and Rita.

Discontinued Operations

In April 2006, Entergy sold the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas, and now reports this portion of the business as a discontinued operation. Earnings for 2005 were negatively affected by $44.8 million (net-of-tax) of discontinued operations due to the planned sale. This amount includes a net charge of $25.8 million (net-of-tax) related to the impairment reserve for the remaining net book value of the Competitive Retail Services business' information technology systems. Results for 2006 include an $11.1 million gain (net-of-tax) on the sale of the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas.

Income Taxes

The effective income tax rates for 2006 and 2005 were 28.1% and 37.3%, respectively. The lower effective income tax rate in 2006 is primarily due to tax benefits, net of reserves, resulting from the tax capital loss recognized in connection with the liquidation of Entergy Power International Holdings, Entergy's holding company for Entergy-Koch, LP. Also contributing to the lower rate for 2006 is an IRS audit settlement that allowed Entergy to release from its tax reserves all settled issues from 1996-1998. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rates, and for additional discussion regarding income taxes.

2005 Compared to 2004

Following are income statement variances for Utility, Non-Utility Nuclear, Parent & Other business segments, and Entergy comparing 2005 to 2004 showing how much the line item increased or (decreased) in comparison to the prior period:

 


Utility

 

Non-Utility
Nuclear

 

Parent & Other


Entergy

(In Thousands)

2004 Consolidated Net Income

 

$643,408 

 

$245,029 

 

$21,087

$909,524 

Net revenue (operating revenue less fuel expense,
purchased power, and other regulatory charges
(credits) - net)

 



(168,559)



57,496 



(16,384)



(127,447)

Other operation and maintenance expenses

 

(98,636)

(7,839)

(39,651)

(146,126)

Taxes other than income taxes

 

(22,400)

2,182 

(896)

(21,114)

Depreciation

 

(39,883)

9,680 

(6,994)

(37,197)

Other income

 

2,261 

(6,314)

89,505 

85,452 

Interest charges

 

(19,643)

(2,783)

22,156 

(270)

Other expenses

 

(886)

(8,897)

(44)

(9,827)

Provision for asset impairments

 

(55,000)

(55,000)

Discontinued operations (net-of-tax)

 

(44,753)

(44,753)

Income taxes

 

(1,202)

21,245 

173,936 

193,979 

2005 Consolidated Net Income (Loss)

 

$659,760 

 

$282,623 

 

($44,052)

$898,331 

12

The uncertainties inherent in Entergy New Orleans' bankruptcy proceedings caused Entergy to deconsolidate Entergy New Orleans and reflect Entergy New Orleans' financial results under the equity method of accounting retroactive to January 1, 2005. Because Entergy owns all of the common stock of Entergy New Orleans, this change did not affect the amount of net income Entergy records resulting from Entergy New Orleans' operations for any current or prior period, but did result in Entergy New Orleans' net income for 2005 and 2006 being presented as "Equity in earnings (loss) of unconsolidated equity affiliates" rather than its results being included in each individual income statement line item, as is the case for 2004. Transactions in 2005 and 2006 between Entergy New Orleans and other Entergy subsidiaries are not eliminated in consolidation as they are in 2004. The variance explanations for 2005 compared to 2004 below reflect the 2004 results of operations of Entergy New Orleans as if it were deconsolidated in 2004, consistent with the 2005 presentation as "Equity in earnings (loss) of unconsolidated equity affiliates." Entergy's as reported consolidated results for 2004 and the amounts included in those consolidated results for Entergy New Orleans, which exclude inter-company items, are set forth in the table below.

   

For the Year Ended
December 31, 2004

  

 

Entergy
Corporation
and
Subsidiaries
(as reported)

 


Amounts required
to deconsolidate
Entergy New
Orleans in 2004 *

 

 

(In Thousands)

         

Operating Revenues

 

$9,685,521 

 

($435,194)

Operating Expenses:

       

   Fuel, fuel-related expenses, and gas purchased for
    resale and purchased power

 


4,189,818 

 


(206,240)

   Other operation and maintenance

 

2,268,332 

 

(102,451)

   Taxes other than income taxes

 

403,635 

 

(43,577)

   Depreciation and amortization

 

893,574 

 

(29,657)

   Other regulatory credits - net

 

(90,611)

 

4,670 

   Other operating expenses

 

370,601 

 

-  

Total Operating Expenses

 

$8,035,349 

 

($377,255)

Other Income

 

$125,999 

 

($2,044)

Interest and Other Charges

 

$501,301 

 

($16,008)

Income from Continuing Operations Before Income Taxes

 

$1,274,870 

 

($18,798)

Income Taxes

 

$365,305 

 

($16,868)

Consolidated Net Income

 

$909,524 

 

$- 

*

Reflects the entry necessary to deconsolidate Entergy New Orleans for 2004. The column includes intercompany eliminations.

13

Net Revenue

Utility

Following is an analysis of the change in net revenue, which is Entergy's measure of gross margin, comparing 2005 to 2004.

   

Amount

   

(In Millions)

     

2004 net revenue (does not include $233.6 from Entergy New Orleans)

 

$4,010.3 

Price applied to unbilled sales

 

40.8 

Rate refund provisions

 

36.4 

Volume/weather

 

3.6 

2004 deferrals

 

(15.2)

Other

 

(0.5)

2005 net revenue

 

$4,075.4 

The price applied to unbilled sales variance resulted primarily from an increase in the fuel cost component included in the price applied to unbilled sales. The increase in the fuel cost component is attributable to an increase in the market prices of natural gas and purchased power. See "Critical Accounting Estimates - Unbilled Revenue" and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The rate refund provisions variance is due primarily to accruals recorded in 2004 for potential rate action at Entergy Gulf States and Entergy Louisiana.

The volume/weather variance includes the effect of more favorable weather in 2005 compared to 2004 substantially offset by a decrease in weather-adjusted usage due to the effects of Hurricanes Katrina and Rita and a decrease in usage during the unbilled sales period.

The 2004 deferrals variance is due to the deferrals related to Entergy's voluntary severance program, in accordance with a stipulation with the LPSC staff. The deferrals are being amortized over a four-year period effective January 2004.

Non-Utility Nuclear

Net revenue increased for Non-Utility Nuclear primarily due to higher pricing in its contracts to sell power. Also contributing to the increase in revenues was increased generation in 2005 due to power uprates at several plants completed in 2004 and 2005 and fewer planned and unplanned outages in 2005. Following are key performance measures for Non-Utility Nuclear for 2005 and 2004:

 

2005

 

2004

 

 

 

 

Net MW in operation at December 31

4,105

 

4,058

Average realized price per MWh

$42.39

 

$41.26

Generation in GWh for the year

33,539

 

32,524

Capacity factor for the year

93%

 

92%

14

Other Operation and Maintenance Expenses

Other operation and maintenance expenses increased slightly for the Utility from $1.467 billion in 2004 to $1.471 billion in 2005. The variance includes the following:

Taxes Other Than Income Taxes

Taxes other than income taxes increased for the Utility from $300.7 million in 2004 to $321.9 million in 2005 primarily due to higher employment taxes and higher assessed values for ad valorem tax purposes in 2005.

Other Income

Other income decreased for the Utility from $134 million in 2004 to $111.2 million in 2005 primarily due to:

The decrease for the Utility was partially offset by an increase of $35.3 million in interest and dividend income due to both the proceeds from the radwaste settlement, which is discussed further in "Significant Factors and Known Trends - Central States Compact Claim," and increased interest on temporary cash investments.

Other income decreased slightly for Non-Utility Nuclear from $78 million in 2004 to $72 million in 2005. 2005 includes $15.8 million net-of-tax resulting from a reduction in the decommissioning liability for a plant, and 2004 includes $11.9 million net-of-tax resulting from a reduction in the decommissioning liability for a plant. Both of these reductions are discussed in Note 9 to the financial statements.

Other income increased for Parent & Other primarily because of a $46.4 million loss in 2004 from Entergy's investment in Entergy-Koch, primarily resulting from Entergy-Koch's trading business reporting a loss from its operations in 2004. Miscellaneous income from proceeds of $18.9 million from the sale of SO2 allowances by the non-nuclear wholesale assets business also contributed to the increase.

15

Provision for Asset Impairments and Discontinued Operations

Entergy recorded a $55 million ($36 million net-of-tax) charge in 2004 as a result of an impairment of the value of the Warren Power plant, which is owned in the non-nuclear wholesale assets business. Entergy concluded that the plant's value was impaired based on valuation studies prepared in connection with the Entergy Asset Management stock sale discussed below.

Earnings for Parent & Other in 2005 were negatively affected by $44.8 million (net-of-tax) of discontinued operations due to the planned sale of the retail electric portion of Entergy's Competitive Retail Services business operating in the ERCOT region of Texas. This amount includes a net charge of $25.8 million, net-of-tax, related to the impairment reserve for the remaining net book value of the Competitive Retail Services business' information technology systems.

Income Taxes

The effective income tax rates for 2005 and 2004 were 37.3% and 28.7%, respectively. The lower effective income tax rate in 2004 is primarily due to a tax benefit resulting from the sale in December 2004 of preferred stock and less than 1% of the common stock of Entergy Asset Management, an Entergy subsidiary. An Entergy subsidiary sold the stock to a third party for $29.75 million. The sale resulted in a capital loss for tax purposes of $370 million, producing a net tax benefit of $97 million that Entergy recorded in the fourth quarter of 2004. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rates, and for additional discussion regarding income taxes.

Liquidity and Capital Resources

This section discusses Entergy's capital structure, capital spending plans and other uses of capital, sources of capital, and the cash flow activity presented in the cash flow statement.

Capital Structure

Entergy's capitalization is balanced between equity and debt, as shown in the following table. The decrease in the debt to capital percentage from 2005 to 2006 is the result of an increase in shareholders' equity, primarily due to an increase in retained earnings, partially offset by repurchases of common stock. The increase in the debt to capital percentage from 2004 to 2005 is the result of increased debt outstanding due to additional borrowings on Entergy Corporation's revolving credit facility, additional debt issuances, including Entergy Corporation's equity units issuance, along with a decrease in shareholders' equity, primarily due to repurchases of common stock.

 

 

2006

 

2005

 

2004

 

 

 

 

 

 

 

Net debt to net capital at the end of the year

 

49.4%

 

51.5%

 

45.3%

Effect of subtracting cash from debt

 

2.9%

 

1.6%

 

2.1%

Debt to capital at the end of the year

 

52.3%

 

53.1%

 

47.4%

Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, preferred stock with sinking fund, and long-term debt, including the currently maturing portion. Capital consists of debt, shareholders' equity, and preferred stock without sinking fund. Net capital consists of capital less cash and cash equivalents. Entergy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy's financial condition.

16

Long-term debt, including the currently maturing portion, makes up substantially all of Entergy's total debt outstanding. Following are Entergy's long-term debt principal maturities and estimated interest payments as of December 31, 2006. To estimate future interest payments for variable rate debt, Entergy used the rate as of December 31, 2006. The figures below include payments on the Entergy Louisiana and System Energy sale-leaseback transactions, which are included in long-term debt on the balance sheet.

Long-term debt maturities and estimated interest payments

 

2007

 

2008

 

2009

 

2010-2011

 

after 2011

(In Millions)

 

 

 

 

 

 

 

 

 

 

 

Utility

 

$453

 

$1,154

 

$582

 

$1,389

 

$7,219

Non-Utility Nuclear

 

100

 

36

 

36

 

71

 

192

Parent Company and Other
  Business Segments

 


144

 


410

 


396

 


1,765

 


-

Total

 

$697

 

$1,600

 

$1,014

 

$3,225

 

$7,411

Note 5 to the financial statements provides more detail concerning long-term debt.

In May 2005, Entergy Corporation entered into a $2 billion five-year revolving credit facility, which expires in May 2010. In December 2005, Entergy Corporation entered into a $1.5 billion three-year revolving credit facility, which expires in December 2008. Entergy Corporation also has the ability to issue letters of credit against the total borrowing capacity of both the three-year and the five-year credit facilities.

Following is a summary of the borrowings outstanding and capacity available under these facilities as of December 31, 2006.


Facility

 


Capacity

 


Borrowings

 

Letters
of Credit

 

Capacity
Available

   

(In Millions)

                 

5-Year Facility

 

$2,000 

 

$820 

 

$94  

 

$1,086

3-Year Facility

 

$1,500 

 

$- 

 

$-  

 

$1,500

Entergy Corporation's credit facilities require it to maintain a consolidated debt ratio of 65% or less of its total capitalization. If Entergy fails to meet this debt ratio, or if Entergy or one of the Utility operating companies (other than Entergy New Orleans) default on other indebtedness or are in bankruptcy or insolvency proceedings, an acceleration of the credit facilities' maturity dates may occur.

Capital lease obligations, including nuclear fuel leases, are a minimal part of Entergy's overall capital structure, and are discussed further in Note 10 to the financial statements. Following are Entergy's payment obligations under those leases:

 

2007

 

2008

 

2009

 

2010-2011

 

after 2011

 

(In Millions)

Capital lease payments, including nuclear fuel leases


$153

 


$186

 


$-

 


$-

 


$2

17

Notes payable includes borrowings outstanding on credit facilities with original maturities of less than one year. Entergy Arkansas, Entergy Gulf States, and Entergy Mississippi each have 364-day credit facilities available as follows:


Company

 


Expiration Date

 

Amount of
Facility

 

Amount Drawn as of
Dec. 31, 2006

 

 

 

 

 

 

 

Entergy Arkansas

 

April 2007

 

$85 million

 

-

Entergy Gulf States

 

February 2011

 

$50 million (a)

 

-

Entergy Mississippi

 

May 2007

 

$30 million (b)

 

-

Entergy Mississippi

 

May 2007

 

$20 million (b)

 

-

(a)

The credit facility allows Entergy Gulf States to issue letters of credit against the borrowing capacity of the facility. As of December 31, 2006, $1.4 million in letters of credit had been issued.

(b)

Borrowings under the Entergy Mississippi facilities may be secured by a security interest in its accounts receivable.

Operating Lease Obligations and Guarantees of Unconsolidated Obligations

Entergy has a minimal amount of operating lease obligations and guarantees in support of unconsolidated obligations. Entergy's guarantees in support of unconsolidated obligations are not likely to have a material effect on Entergy's financial condition or results of operations. Following are Entergy's payment obligations as of December 31, 2006 on non-cancelable operating leases with a term over one year:

 

2007

 

2008

 

2009

 

2010-2011

 

after 2011

 

(In Millions)

 

 

 

 

 

 

 

 

 

 

Operating lease payments

$97

 

$80

 

$78

 

$123

 

$144

The operating leases are discussed more thoroughly in Note 10 to the financial statements.

Summary of Contractual Obligations of Consolidated Entities

Contractual Obligations

 

2007

 

2008-2009

 

2010-2011

 

after 2011

 

Total

 

 

(In Millions)

 

 

 

 

 

 

 

 

 

 

 

Long-term debt (1)

 

$697

 

$2,614

 

$3,225

 

$7,411

 

$13,947

Capital lease payments (2)

 

$153

 

$186

 

$-

 

$2

 

$341

Operating leases (2)

 

$97

 

$158

 

$123

 

$144

 

$522

Purchase obligations (3)

 

$1,414

 

$2,127

 

$1,754

 

$3,690

 

$8,985

(1)

Includes estimated interest payments. Long-term debt is discussed in Note 5 to the financial statements.

(2)

Capital lease payments include nuclear fuel leases. Lease obligations are discussed in Note 10 to the financial statements.

(3)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. Almost all of the total are fuel and purchased power obligations.

In addition to these contractual obligations, in 2007, Entergy expects to contribute $176 million to its pension plans, including Entergy New Orleans' contribution of $44 million, and $66 million to other postretirement plans, including Entergy New Orleans' contribution of $5 million.

18

Capital Funds Agreement

Pursuant to an agreement with certain creditors, Entergy Corporation has agreed to supply System Energy with sufficient capital to:

Capital Expenditure Plans and Other Uses of Capital

Following are the amounts of Entergy's planned construction and other capital investments by operating segment for 2007 through 2009, excluding Entergy New Orleans:

Planned construction and capital investments

 

2007

 

2008

 

2009

 

 

 

(In Millions)

 

 

  

 

  

 

  

 

Maintenance Capital:

 

 

 

 

 

 

 

Utility

 

$776

 

$763

 

$762

 

Non-Utility Nuclear

 

97

 

78

 

82

 

Parent and Other

 

12

 

3

 

1

 

 

 

885

 

844

 

845

Capital Commitments:

 

 

 

 

 

 

 

Utility

 

406

 

985

 

482

 

Non-Utility Nuclear

 

447

 

172

 

219

 

 

 

853

 

1,157

 

701

Total

 

$1,738

$2,001 

$1,546

Entergy New Orleans' planned capital expenditures for the years 2007-2009 total $110 million, and in addition Entergy New Orleans expects for the years 2007-2009 to pay $109 million for capital investments related to Hurricane Katrina restoration and its gas rebuild project, of which $55 million is expected to be spent in 2007.

Maintenance Capital refers to amounts Entergy plans to spend on routine capital projects that are necessary to support reliability of its service, equipment, or systems and to support normal customer growth.

Capital Commitments refers to non-routine capital investments for which Entergy is either contractually obligated, has Board approval, or otherwise expects to make to satisfy regulatory or legal requirements. Amounts reflected in this category include the following:

19

The planned construction and capital investment amounts given above include minimal amounts for initial development costs for potential new nuclear development at the Grand Gulf and River Bend sites in the Utility, including licensing and design activities. This project is in the early stages, and several issues remain to be addressed over time before significant capital would be committed to this project. From time to time, Entergy considers other capital investments as potentially being necessary or desirable in the future. Because no contractual obligation, commitment, or Board approval exists to pursue these investments, they are not included in Entergy's planned construction and capital investments. These potential investments are also subject to evaluation and approval in accordance with Entergy's policies before amounts may be spent.

In July 2006, Entergy's Non-Utility Nuclear business reached an agreement to purchase Consumers Energy Company's 798 MW Palisades nuclear energy plant located near South Haven, Michigan for $380 million. The NRC recently renewed until 2031 the Palisades' operating license. Entergy's Non-Utility Nuclear business will acquire the plant, nuclear fuel, and other assets. In the near-term, Entergy intends to finance the acquisition through borrowings under Entergy Corporation's revolving credit facilities. As part of the purchase, Entergy's Non-Utility Nuclear business also executed a 15-year purchased power agreement with Consumers Energy for 100% of the plant's output, excluding any future uprates. Entergy's Non-Utility Nuclear business will assume responsibility for eventual decommissioning of the plant. Consumers Energy will retain $200 million of the projected $566 million Palisades decommissioning trust fund balance, and Entergy may return approximately $100 million more of the trust fund to Consumers Energy depending upon a pending tax ruling. Also as part of the transaction, Consumers Energy will pay Entergy's Non-Utility Nuclear business $30 million to accept responsibility for spent fuel at the decommissioned Big Rock nuclear plant, which is located near Charlevoix, Michigan. Management expects to close the transaction in the second quarter 2007, pending the approvals of the NRC, the FERC, the Michigan Public Service Commission, and other regulatory agencies.

Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of business restructuring, regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, and the ability to access capital.

The planned construction and capital investments given above do not include the costs associated with the potential interconnection between Entergy Gulf States and ERCOT that is discussed in Note 2 to the financial statements. These potential costs are currently estimated to be approximately $1 billion. The planned construction and capital investments given above also do not include the potential replacement of the Waterford 3 steam generators, which could be scheduled as early as 2011.  Routine inspections of the Waterford 3 steam generators during the fall 2006 refueling outage identified degradation of certain tube spacer supports in the steam generators that required repair beyond that anticipated prior to the refueling outage inspections.  Corrective measures were successfully implemented to permit continued operation of the steam generators. Future inspections of the steam generators will be scheduled to address this degradation mechanism and could result in additional planned outages, pending discussions with the NRC regarding this issue.  Entergy will continue to manage steam generator component life in accordance with industry standard practices.

Dividends and Stock Repurchases

Declarations of dividends on Entergy's common stock are made at the discretion of the Board. Among other things, the Board evaluates the level of Entergy's common stock dividends based upon Entergy's earnings, financial strength, and future investment opportunities. At its January 2007 meeting, the Board declared a dividend of $0.54 per share, which is the same quarterly dividend that Entergy has paid since the fourth quarter 2004. Entergy paid $449 million in 2006 and $454 million in 2005 in cash dividends on its common stock.

In accordance with Entergy's stock-based compensation plan, Entergy periodically grants stock options to its key employees, which may be exercised to obtain shares of Entergy's common stock. According to the plan, these shares can be newly issued shares, treasury stock, or shares purchased on the open market. Entergy's management has been authorized by the Board to repurchase on the open market shares up to an amount sufficient to fund the exercise of grants under the plans. In addition to this authority, the Board approved a program under which Entergy was

 

20

 

 

 authorized to repurchase up to $1.5 billion of its common stock through 2006. Entergy completed the $1.5 billion program in the fourth quarter 2006. In 2006, Entergy repurchased 6,672,000 shares of common stock under both programs for a total purchase price of $584 million.

On January 29, 2007, the Board approved a new repurchase program under which Entergy is authorized to repurchase up to $1.5 billion of its common stock, which Entergy expects to complete over the next two years.

Debtor-in-Possession Credit Agreement

On September 26, 2005, Entergy New Orleans, as borrower, and Entergy Corporation, as lender, entered into the Debtor-in-Possession (DIP) credit agreement, a debtor-in-possession credit facility to provide funding to Entergy New Orleans during its business restoration efforts. On December 9, 2005, the bankruptcy court issued its final order approving the DIP Credit Agreement. The credit facility provides for up to $200 million in loans. The facility enables Entergy New Orleans to request funding from Entergy Corporation, but the decision to lend money is at the sole discretion of Entergy Corporation. As of December 31, 2006, Entergy New Orleans had $52 million of outstanding borrowings under the DIP credit agreement.

Borrowings under the DIP credit agreement are due in full, and the agreement will terminate, at the earliest of (i) August 23, 2007, (ii) the acceleration of the loans and the termination of the DIP credit agreement in accordance with its terms, (iii) the date of the closing of a sale of all or substantially all of Entergy New Orleans' assets pursuant to either section 363 of the United States Bankruptcy Code or a confirmed plan of reorganization, or (iv) the effective date of a plan of reorganization in Entergy New Orleans' bankruptcy case.

As security for Entergy Corporation as the lender, the terms of the December 9, 2005 bankruptcy court order provide that all borrowings by Entergy New Orleans under the DIP Credit Agreement are: (i) entitled to superpriority administrative claim status pursuant to section 364(c)(1) of the Bankruptcy Code; (ii) secured by a perfected first priority lien on all property of Entergy New Orleans pursuant to sections 364(c)(2) and 364(d) of the Bankruptcy Code, except on any property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition; and (iii) secured by a perfected junior lien pursuant to section 364(c)(3) of the Bankruptcy Code on all property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens in favor of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition.

The interest rate on borrowings under the DIP credit agreement will be the average interest rate of borrowings outstanding under Entergy Corporation's $2 billion revolving credit facility, which was approximately 5.7% per annum at December 31, 2006.

Sources of Capital

Entergy's sources to meet its capital requirements and to fund potential investments include:

Circumstances such as weather patterns, fuel and purchased power price fluctuations, and unanticipated expenses, including unscheduled plant outages and storms, could affect the timing and level of internally generated funds in the future. In the following section, Entergy's cash flow activity for the previous three years is discussed.

21

Provisions within the Articles of Incorporation or pertinent indentures and various other agreements relating to the long-term debt and preferred stock of certain of Entergy Corporation's subsidiaries restrict the payment of cash dividends or other distributions on their common and preferred stock. As of December 31, 2006, Entergy Arkansas and Entergy Mississippi had restricted retained earnings unavailable for distribution to Entergy Corporation of $396.4 million and $121.6 million, respectively. All debt and common and preferred equity issuances by the Registrant Subsidiaries require prior regulatory approval and their preferred equity and debt issuances are also subject to issuance tests set forth in corporate charters, bond indentures, and other agreements. The Registrant Subsidiaries have sufficient capacity under these tests to meet foreseeable capital needs, except for Entergy New Orleans. As stated in the conditions precedent to the effectiveness of its proposed plan of reorganization described above, Entergy New Orleans believes that it requires the receipt of CDBG funds and insurance proceeds to meet its capital requirements resulting from the effects of Hurricane Katrina.

After the repeal of PUHCA 1935, effective February 8, 2006, the FERC, under the Federal Power Act, and not the SEC, has jurisdiction over authorizing securities issuances by the Utility operating companies and System Energy (except securities with maturities longer than one year issued by (a) Entergy Arkansas, which are subject to the jurisdiction of the APSC and (b) Entergy New Orleans, which are currently subject to the jurisdiction of the bankruptcy court). Under PUHCA 2005 and the Federal Power Act, no approvals are necessary for Entergy Corporation to issue securities. Under a savings provision in PUHCA 2005, each of the Utility operating companies and System Energy may rely on the financing authority in its existing PUHCA 1935 SEC order or orders through December 31, 2007 or until the SEC authority is superseded by FERC authorization. The FERC has issued an order (FERC Short-Term Order) approving the short-term borrowing limits of the Utility operating companies (except Entergy New Orleans) and System Energy through March 31, 2008. Entergy Gulf States and Entergy Louisiana, LLC have obtained long-term financing authorization from the FERC. Entergy New Orleans may rely on existing SEC PUHCA 1935 orders for its short-term financing authority, subject to bankruptcy court approval. In addition to borrowings from commercial banks, the FERC Short-Term Order authorized the Registrant Subsidiaries (except Entergy New Orleans which is authorized by an SEC PUHCA 1935 order) to continue as participants in the Entergy System money pool. The money pool is an intercompany borrowing arrangement designed to reduce Entergy's subsidiaries' dependence on external short-term borrowings. Borrowings from the money pool and external short-term borrowings combined may not exceed authorized limits. As of December 31, 2006, Entergy's subsidiaries' aggregate money pool and external short-term borrowings authorized limit was $2.0 billion, the aggregate outstanding borrowing from the money pool was $251.6 million, and Entergy's subsidiaries had no outstanding short-term borrowing from external sources. To the extent that the Registrant Subsidiaries wish to rely on SEC financing orders under PUHCA 1935, there are capitalization and investment grade ratings conditions that must be satisfied in connection with security issuances, other than money pool borrowings. See Note 4 to the financial statements for further discussion of Entergy's short-term borrowing limits.

Cash Flow Activity

As shown in Entergy's Statements of Cash Flows, cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

     

2006

 

2005

 

2004

     

(In Millions)

               

Cash and cash equivalents at beginning of period

 

$583 

 

$620

 

$507 

             

Effect of deconsolidating Entergy New Orleans in 2005

 

 

(8)

 

               

Cash flow provided by (used in):

           
 

Operating activities

 

 3,419 

 

 1,468 

 

2,929 

 

Investing activities

 

(1,899)

 

(1,992)

 

(1,143)

 

Financing activities

 

(1,084)

 

496 

 

(1,672)

Effect of exchange rates on cash and cash equivalents

 

(3)

 

(1)

 

(1)

 

Net increase (decrease) in cash and cash equivalents

 

433 

 

(29)

 

113 

               

Cash and cash equivalents at end of period

 

$1,016 

 

$583 

 

$620 

22

Operating Cash Flow Activity

2006 Compared to 2005

Entergy's cash flow provided by operating activities increased by $1,952 million in 2006 compared to 2005 primarily due to the following activity:

Entergy Corporation received a $344 million income tax refund (including $71 million attributable to Entergy New Orleans) as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005. The Gulf Opportunity Zone Act was enacted in December 2005.  The Act contains provisions that allow a public utility incurring a net operating loss as a result of Hurricane Katrina to carry back the casualty loss portion of the net operating loss ten years to offset previously taxed income.  The Act also allows a five-year carry back of the portion of the net operating loss attributable to Hurricane Katrina repairs expense and first year depreciation deductions, including 50% bonus depreciation, on Hurricane Katrina capital expenditures. In accordance with Entergy's intercompany tax allocation agreement, $273 million of the refund was distributed to the Utility (including Entergy New Orleans) in April 2006, with the remainder distributed primarily to Non-Utility Nuclear.

2005 Compared to 2004

Entergy's cash flow provided by operating activities decreased by $1,461 million in 2005 compared to 2004 primarily due to the following activity:

Investing Activities

2006 Compared to 2005

Net cash used in investing activities decreased slightly in 2006 compared to 2005 and was affected by the following activity:

 

23

 

 

2005 Compared to 2004

Net cash used in investing activities increased by $849 million in 2005 compared to 2004 primarily due to the following activity:

  • Construction expenditures were $47 million higher in 2005 than in 2004, including an increase of $147 million in the Utility business and a decrease of $82 million in the Non-Utility Nuclear business. Utility construction expenditures in 2005 include $302 million caused by Hurricanes Katrina and Rita.
  • The non-nuclear wholesale assets business realized $75 million in net proceeds from sales of portions of three of its power plants in 2004.
  • Entergy Louisiana purchased the 718 MW Perryville power plant in June 2005 for $162 million.
  • Entergy received net returns of invested capital from Entergy-Koch of $49 million in 2005 compared to $284 million in 2004 after the sale by Entergy-Koch of its trading and pipeline businesses. This activity is reported in the "Decrease in other investments" line in the cash flow statement.
  • Approximately $60 million of the cash collateral for a letter of credit that secured the installment obligations owed to NYPA for the acquisition of the FitzPatrick and Indian Point 3 nuclear power plants was released to Entergy in 2004.
  • The Utility used $390 million in 2005 and $54 million in 2004 for other regulatory investments as a result of fuel cost under-recovery. See Note 1 to the financial statements for discussion of the accounting treatment of these fuel cost under-recoveries.

Offsetting these factors was the following:

  • The non-nuclear wholesale assets business received a return of invested capital of $34 million in 2005 from the Top Deer wind power joint venture after Top Deer obtained debt financing.

Financing Activities

2006 Compared to 2005

Net cash used in financing activities was $1,084 million in 2006 compared to net cash flow provided by financing activities of $496 million in 2005. Following is a description of the significant financing activity affecting this comparison:

24

2005 Compared to 2004

Financing activities provided $496 million of cash in 2005 compared to using $1,672 million of cash in 2004 primarily due to the following activity:

  • Net issuances of long-term debt by the Utility segment provided $462 million of cash in 2005 compared to retirements of long-term debt net of issuances using $345 million in 2004. See Note 5 to the financial statements for the details of long-term debt outstanding at December 31, 2005.
  • Entergy Corporation increased the net borrowings on its credit facility by $735 million in 2005 compared to $50 million during 2004. See Note 4 to the financial statements for a description of the Entergy Corporation credit facility.
  • Entergy Corporation repurchased $878 million of its common stock in 2005 compared to $1,018 million in 2004.
  • Entergy Corporation issued $500 million of long-term notes in connection with its equity units offering in December 2005.
  • Entergy Louisiana, LLC issued $100 million of preferred membership interests in December 2005.

Significant Factors and Known Trends

Following are discussions of significant factors and known trends affecting Entergy's business, including rate regulation and fuel-cost recovery, federal regulation, and market and credit risk sensitive instruments.

State and Local Rate Regulation and Fuel-Cost Recovery

The rates that the Utility operating companies and System Energy charge for their services significantly influence Entergy's financial position, results of operations, and liquidity. These companies are closely regulated and the rates charged to their customers are determined in regulatory proceedings. Governmental agencies, including the APSC, the City Council, the LPSC, the MPSC, the PUCT, and the FERC, are primarily responsible for approval of the rates charged to customers. The status of material retail rate proceedings is summarized below and described in more detail in Note 2 to the consolidated financial statements.

Company

 

Authorized
ROE

 

Pending Proceedings/Events

 

 

 

 

Entergy Arkansas

 

11.0%

 

  • Base rates have been in effect since 1998. Entergy Arkansas filed a rate case in August 2006 requesting a general base rate increase of $150 million (using an ROE of 11.25%), as well as recovery of FERC-allocated costs pursuant to the FERC decision on the System Agreement. Entergy Arkansas also requested a capacity management rider to recover incremental capacity costs. A procedural schedule has been established with a hearing in April 2007 with new rates expected to be effective in June 2007.
  • In December 2005, Entergy Arkansas provided notice of its intent to terminate participation in the System Agreement following a final order from the FERC establishing terms under which Entergy Arkansas may be required to make payments to other Utility operating companies to achieve rough production cost equalization.
  • Entergy Arkansas completed recovery in January 2006 of transition to competition costs through an $8.5 million transition cost recovery rider that has been in effect since October 2004.
25

 

 

 

 

Entergy Gulf States-Texas

 

10.95%

 

  • Base rates are currently set at rates approved by the PUCT in June 1999.
  • In June 2005, a Texas law was enacted that provides for a base rate freeze until mid-2008, but allows Entergy Gulf States to seek before then recovery of certain incremental purchased power capacity costs and recover reasonable and necessary transition to competition costs. An $18 million annual capacity rider was implemented effective December 2005. A $14.5 million annual transition cost recovery rider was implemented effective March 2006, which the PUCT approved in June 2006. The transition cost recovery rider is for a 15-year period.
  • In December 2006, the PUCT approved the recovery of $353 million (net of expected insurance proceeds of $66 million) in storm cost recovery expenses plus carrying charges. Entergy Gulf States will file a semi-annual report with the PUCT to reflect any additional insurance proceeds or other government grant money received, which would be applied against the storm cost recovery balance. In February 2007, the PUCT voted to approve securitization of the $353 million in storm cost recovery expenses, but it also offset the securitization amount by $31.6 million, which the PUCT Commissioners determined was the net present value of the accumulated deferred income tax benefits related to the storm costs. The PUCT further voted to impose certain caps on the amount of qualified transaction costs that can be included in the total securitization amount. The PUCT is expected to issue a financing order authorizing the issuance of securitization bonds by early-March 2007, and Entergy Gulf States intends to implement rates to recover revenues to pay the securitization bonds by mid-2007.

 

 

 

 

 

Entergy Gulf States-Louisiana

 

9.9%-11.4%

 

  • A three-year formula rate plan is in place with an ROE mid-point of 10.65% for the initial three-year term of the plan. Entergy Gulf States made its first formula rate plan filing in June 2005 for the test year ending December 31, 2004.
  • In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Gulf States implemented a $17.2 million increase, subject to refund, effective September 2006 for 1) recovery of $6.7 million of LPSC-approved incremental deferred and ongoing capacity costs and 2) $10.5 million of interim storm cost recovery pursuant to an LPSC order. The filing reflects an 11.1% return on common equity which is within the authorized bandwidth.
  • In May 2006, Entergy Gulf States completed the $6 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, interim recovery of $0.85 million per month was instituted via the formula rate plan. Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Gulf States' supplemental and amending storm cost recovery application, which was filed in July 2006. Entergy Gulf States supplemented that filing on February 28, 2007, and seeks to recover $219 million in storm-related costs and to build an $87 million storm reserve. The February 2007 filing also seeks authority to securitize the storm cost recovery and storm reserve amounts. Hearings are expected to begin in April 2007.

 

 

 

 

 

26

Entergy Louisiana

 

9.45%-
11.05%

 

  • A three-year formula rate plan is in place with an ROE mid-point of 10.25% for the initial three-year term of the plan. Entergy Louisiana made its first formula rate plan filing under this plan in May 2006 based on a 2005 test year.
  • In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Louisiana implemented a $143.4 million increase, subject to refund, effective September 2006 for 1) ongoing and deferred incremental capacity costs of $119.2 million and 2) $24.2 million of interim storm cost recovery pursuant to an LPSC order. In response to an LPSC Staff report, Entergy Louisiana subsequently reduced rates by $0.5 million annually, effective October 2006, to reflect issues and errors identified by the staff with which Entergy Louisiana agrees. The modified filing reflects a 9.56% return on common equity, which is within the authorized bandwidth, and a reduction in the collection of ongoing and deferred incremental capacity costs to $118.7 million. Entergy Louisiana and the LPSC Staff are working to resolve outstanding issues.
  • In April 2006, Entergy Louisiana completed the $14 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, interim recovery of $2 million per month was instituted via the formula rate plan. Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Louisiana's supplemental and amending storm cost recovery application, which was filed in July 2006. Entergy Louisiana supplemented that filing on February 28, 2007, and seeks to recover $561 million in storm-related costs and to build a $141 million storm reserve. The February 2007 filing also seeks authority to securitize the storm cost recovery and storm reserve amounts. Hearings are expected to begin in April 2007.

 

 

 

 

 

Entergy Mississippi

 

9.7%-
12.4%

 

  • An annual formula rate plan is in place. In April 2006, Entergy Mississippi submitted its annual scheduled formula rate plan filing with the MPSC reflecting a return on equity of 9.35%, resulting in a deficiency.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which was implemented in August 2006.
  • The MPSC approved the purchase of the 480MW Attala power plant and the investment cost recovery through its power management rider. As a consequence of the events surrounding Entergy Mississippi's ongoing efforts to recover storm restoration costs associated with Hurricane Katrina, in October 2006, the MPSC approved a revision to Entergy Mississippi's power management rider. The revision has the effect of allowing Entergy Mississippi to recover the annual ownership costs of the Attala plant until such time as there has been a resolution of Entergy Mississippi's recovery of its storm restoration costs and a general rate case can be filed.
  • In October 2006, the Mississippi Development Authority approved for payment and Entergy Mississippi received $81 million in CDBG funding for Hurricane Katrina costs. The MPSC then issued a financing order authorizing the issuance of $48 million of state bonds, with $8 million for the remainder of Entergy Mississippi's certified Hurricane Katrina restoration costs not funded by CDBG and $40 million for the increase in Entergy Mississippi's storm damage reserve.

 

 

 

 

 

27

Entergy New Orleans

 

10.75% -Electric; 10.75% -Gas

 

  • In October 2006, the City Council approved a settlement agreement that calls for a phased-in rate increase to ensure Entergy New Orleans' ability to focus on restoration of electric and gas systems. When fully implemented by January 1, 2008, electric base rates will increase by $3.9 million. Recovery of all Grand Gulf costs through the fuel adjustment clause will continue. Gas base rates increased by $4.75 million in November 2006, and will increase an additional $1.5 million in March 2007 and an additional $4.75 million in November 2007. The settlement calls for Entergy New Orleans to file a base rate case by July 31, 2008. The settlement agreement discontinues the formula rate plan and the generation performance-based plan but permits Entergy New Orleans to file an application to seek authority to implement formula rate plan mechanisms no sooner than six months following the effective date of the implementation of the base rates resulting from the July 31, 2008 base rate case. Any storm costs in excess of CDBG funding and insurance proceeds will be addressed in that base rate case. The settlement also authorizes a $75 million storm reserve for damage from future storms, which will be created over a ten-year period through a storm reserve rider beginning in March 2007.
  • In October 2006, the Louisiana Recovery Authority (LRA) Board endorsed a resolution proposing to allocate $200 million in CDBG funds to Entergy New Orleans to defray gas and electric utility system repair costs in an effort to provide rate relief for Entergy New Orleans customers. The action plan was approved by state lawmakers in December 2006 and by the U. S. Department of Housing and Urban Development in February 2007. In addition, the City Council must review and certify the storm costs before an application can be filed with the LRA and CDBG funds can be released to Entergy New Orleans. The City Council has stated its intent to complete its certification by March 2007.

 

 

 

 

 

System Energy

 

10.94%

 

  • ROE approved by July 2001 FERC order. No cases pending before FERC.

In addition to the regulatory scrutiny connected with base rate proceedings, the Utility operating companies' fuel and purchased power costs recovered from customers are subject to regulatory scrutiny. The Utility operating companies' significant fuel and purchased power cost proceedings are described in Note 2 to the financial statements.

Federal Regulation

The FERC regulates wholesale rates (including Entergy Utility intrasystem sales pursuant to the System Agreement) and interstate transmission of electricity, as well as rates for System Energy's sales of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement.

System Agreement Proceedings

The Utility operating companies historically have engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement, which is a rate schedule that has been approved by the FERC. The LPSC has been pursuing litigation involving the System Agreement at the FERC. The proceeding includes challenges to the allocation of costs as defined by the System Agreement and raises questions of imprudence by the Utility operating companies in their execution of the System Agreement.

28

In June 2005, the FERC issued a decision in the System Agreement litigation, and essentially affirmed its decision in a December 2005 order on rehearing. The FERC decision concluded, among other things, that:

The FERC's decision would reallocate total production costs of the Utility operating companies whose relative total production costs expressed as a percentage of Entergy System average production costs are outside an upper or lower bandwidth. This would be accomplished by payments from Utility operating companies whose production costs are more than 11% below Entergy System average production costs to Utility operating companies whose production costs are more than the Entergy System average production cost, with payments going first to those Utility operating companies whose total production costs are farthest above the Entergy System average.

An assessment of the potential effects of the FERC's decision requires assumptions regarding the future total production cost of each Utility operating company, which assumptions include the mix of solid fuel and gas-fired generation available to each company and the costs of natural gas and purchased power.  Entergy Louisiana, Entergy Gulf States, and Entergy Mississippi are more dependent upon gas-fired generation sources than Entergy Arkansas or Entergy New Orleans. Of these, Entergy Arkansas is the least dependent upon gas-fired generation sources.  Therefore, increases in natural gas prices likely will increase the amount by which Entergy Arkansas' total production costs are below the average total production costs of the Utility operating companies. 

Considerable uncertainty exists regarding future gas prices. For purposes of the August 2006 Entergy Arkansas general base rate case filing discussed above in "State and Local Rate Regulation," an assessment of the potential effects of the FERC's June 2005 order, as amended by its December 2005 order on rehearing, was calculated on the basis of a 2006 test year, using a 2006 gas price that consisted of a non-weighted average of twelve months of gas prices calculated as follows: January through May 2006 were actual, volume-weighted monthly averages of day-ahead cash prices as reported by Energy Intelligence Natural Gas Week; the June 2006 price was the First of the Month Index price as reported by Platts Inside FERC's Gas Market Report; the July 2006 price was the 5/31/06 NYMEX Henry Hub settlement price; and August through December 2006 were 30 calendar-day rolling averages as of May 31, 2006 of forward NYMEX Henry Hub gas contracts.  For example, the August 2006 price was an average of all the daily NYMEX settlement prices for the August 2006 contract for each trading day from the period 5/2/06 - 5/31/06 inclusive.  A similar calculation was made using the daily settlements of the September 2006 through December 2006 NYMEX contracts to arrive at those monthly prices. This resulted in an average annual gas price of $7.49/mmBtu. If an annual average gas price of $7.49/mmBtu occurred for 2006 as assumed, the following potential annual production cost reallocation among the Utility operating companies could result:

 

Annual Payments
or (Receipts)

 

(In Millions)

Entergy Arkansas

$284

Entergy Gulf States

($197)

Entergy Louisiana

($59)

Entergy Mississippi

($28)

Entergy New Orleans

$0

29

If the actual, annual, average natural gas price deviates by $1/mmBtu up or down from the price assumed above, it is expected that Entergy Arkansas' annual payments will change in the same direction by approximately $70 to $80 million.

The LPSC, APSC, MPSC, and the AEEC have appealed the FERC decision to the Court of Appeals for the D.C. Circuit. Entergy and the City of New Orleans have intervened in the various appeals. The parties to the proceeding reached agreement on a proposed briefing schedule that would result in the completion of briefing during the first half of 2007. The proposed briefing schedule has been submitted to the Court of Appeals.

Management believes that any changes in the allocation of production costs resulting from the FERC's decision and related retail proceedings should result in similar rate changes for retail customers. The timing of recovery of these costs in rates could be the subject of additional proceedings before Entergy's retail regulators. Although the outcome and timing of the FERC and other proceedings cannot be predicted at this time, Entergy does not believe that the ultimate resolution of these proceedings will have a material effect on its financial condition or results of operations.

Entergy's Utility Operating Companies' Compliance Filing

In April 2006, the Utility operating companies filed with the FERC its compliance filing to implement the provisions of the FERC's decision. The filing amends the System Agreement to provide for the calculation of production costs, average production costs, and payments/receipts among the Utility operating companies to the extent required to maintain rough production cost equalization pursuant to the FERC's decision. The FERC accepted the compliance filing in November 2006, with limited modifications. In accordance with the FERC's order, the first payments/receipts would be based on calendar year 2006 production costs, with any payments/receipts among the Utility operating companies to be made in seven monthly installments commencing in June 2007. Various parties have filed requests for rehearing of the FERC's order accepting the compliance filing. Among other things, the LPSC requests rehearing of the FERC's decision to have the first payments commence in June 2007, rather than earlier; to not require interest on the unpaid balance, and the FERC's decision with regard to the re-pricing of energy from the Vidalia hydroelectric project for purposes of calculating production cost disparities. Various Arkansas parties request rehearing of the FERC's decision (1) to require payments be made over seven months, rather than 12; (2) on the application of the +/- 11% bandwidth; and (3) the FERC's decision to reject various accounting allocations proposed by the Utility operating companies. The Utility operating companies filed a revised compliance plan on December 18, 2006 implementing the provisions of the FERC's November order.

APSC System Agreement Investigation

Citing its concerns that the benefits of its continued participation in the current form of the System Agreement have been seriously eroded, in December 2005, Entergy Arkansas submitted its notice that it will terminate its participation in the current System Agreement effective 96 months from December 19, 2005 or such earlier date as authorized by the FERC. Entergy Arkansas indicated, however, that a properly structured replacement agreement could be a viable alternative. The APSC had previously commenced an investigation, in 2004, into whether Entergy Arkansas' continued participation in the System Agreement is in the best interests of its customers. In June 2006 the APSC issued an order in its investigation requiring Entergy Arkansas President Hugh McDonald to file testimony in response to several questions involving details of what action Entergy Arkansas or Entergy has taken to ensure that Entergy Arkansas' customers are protected from additional costs including those related to the following areas: construction of new generating plants located outside of Arkansas, costs of the Entergy New Orleans bankruptcy, and costs associated with restoration of facilities damaged by Hurricanes Katrina and Rita. Mr. McDonald was also directed to describe actions taken since December 19, 2005 to encourage or persuade the FERC to authorize Entergy Arkansas to exit the Entergy System Agreement sooner than 96 months, and to describe current and future actions related to development of a replacement system agreement. Responsive testimony was filed with the APSC in July and August 2006. A public hearing for the purpose of cross-examination of Mr. McDonald on his testimony and for questioning by the APSC was also conducted in July 2006. There is no further procedural schedule set in this investigation at this time.

30

The APSC also commenced investigations concerning Entergy Louisiana's Vidalia purchased power contract and Entergy Louisiana's then pending acquisition of the Perryville power plant. Entergy Arkansas has provided information to the APSC in these investigations and no further activity has occurred in them.

APSC Complaint at the FERC

In June 2006, the APSC filed a complaint with the FERC against Entergy Services as the representative of Entergy Corporation and the Utility operating companies, pursuant to Sections 205, 206 and 207 of the Federal Power Act (FPA). The APSC complaint states, "the purpose of the complaint is to institute an investigation into the prudence of Entergy's practices affecting the wholesale rates that flow through its System Agreement." The complaint requests, among other things, that the FERC disallow any costs found to be imprudent, with a refund effective date to be set at the earliest possible time. Specific areas of requested investigation include:

The complaint also requests that the FERC exercise its authority under Section 207 of the FPA to investigate the adequacy of Entergy's transmission system and direct it to make all necessary upgrades to ensure that its transmission facilities provide reliable, adequate and economic service.

In July 2006, the Utility operating companies submitted their answer to the APSC complaint. In their answer, the Utility operating companies acknowledge that while the FERC is the appropriate forum to consider the issues raised in the APSC's complaint, the APSC has provided no probative evidence supporting its allegations and has not met the standards under the FPA to have a matter set for hearing. Under the FPA standards, the APSC must create "serious doubt" as to the propriety of the challenged actions. As indicated in the Utility operating companies' answer, the APSC complaint does not raise a "serious doubt" but instead largely relies on unsupported assertions, many of which have been investigated in other proceedings. In those limited instances when the APSC complaint references "evidence" in an attempt to support its request for a hearing, the "evidence" to which it refers in fact does nothing to support its position but, rather, shows that the Utility operating companies have acted prudently. As further indicated in the Utility operating companies' answer, following the issuance of the FERC's System Agreement decision, all of the production costs of the Utility operating companies are now inputs to a formula rate that will result in bandwidth payments among the Utility operating companies in order to roughly equalize production costs. The Utility operating companies' answer further explains that based on well-established Supreme Court precedent, the FERC has exclusive jurisdiction over all inputs that will be included in the System Agreement bandwidth formula rates filed in compliance with the FERC's System Agreement decision and retail regulators are preempted from taking any action that disturbs the FERC's findings with respect to these production cost inputs and the FERC-determined allocation of production costs among the Utility operating companies. The Utility operating companies believe that their conduct with respect to these issues has been prudent and will vigorously defend such conduct.

Several parties have intervened in the proceeding, including the MPSC, the LPSC, and the City Council. The LPSC's answer and comments in response to the APSC complaint ask the FERC to investigate whether Entergy Arkansas' withdrawal from the System Agreement is fair, just, and reasonable. In September 2006, the Utility operating companies, the APSC, and other intervenors in the proceeding filed responses to the answers and comments submitted by the various intervenors in July 2006. In their responses, the APSC and the LPSC, among others, argue that the FERC need not address at this time its jurisdiction over the matters raised by the complaint and further that the retail regulators are not preempted from exercising jurisdiction over those same production costs that are being considered in the proceeding. In October 2006, the Utility operating companies filed an answer to the other parties' September 2006 comments. In the October 2006 answer, the Utility operating companies explain,

 

31

 

 

 among other things, that the FERC must address the jurisdictional issues raised by the parties to the proceeding and that the LPSC's and APSC's view concerning jurisdiction and preemption are inconsistent with federal law and regulation.

LPSC System Agreement Complaint at the FERC

On December 18, 2006, the LPSC filed a complaint requesting the FERC "immediately institute a proceeding to determine whether, and on what terms, [Entergy Arkansas] may withdraw" from the System Agreement. The complaint alleges that "safeguards must be adopted to ensure that the remaining operating companies and their customers are protected from adverse effects of the termination attempt of [Entergy Arkansas]." The LPSC requests that the FERC (1) investigate the effect that Entergy Arkansas' notice of termination will have on the rates, charges, and billings under the System Agreement and the capacity and production costs of the remaining Utility operating companies and adopt remedies that are just and reasonable; and (2) provide for the continuation of the bandwidth payments by Entergy Arkansas, require Entergy Arkansas provide "generating capacity or wholesale power contracts to Entergy Louisiana and Entergy Gulf States-Louisiana sufficient to satisfy the rough production cost equalization requirements established in the System Agreement orders, or require "hold harmless protection be put in place to prevent any harm to [Entergy Louisiana] and [Entergy Gulf States-Louisiana] as a result of the impact of [Entergy Arkansas'] termination." The LPSC complaint further urges the FERC to find that "Entergy controls the actions of [Entergy Arkansas] and is responsible for and liable for any damages caused and remedies required due to [Entergy Arkansas'] termination." The Utility operating companies filed a response to the LPSC complaint on January 31, 2007 explaining that the System Agreement explicitly provides each Utility operating company the unilateral right to terminate its participation in the System Agreement upon 96 months written notice to the other Utility operating companies. This right is absolute and unambiguous and is not conditioned or limited in any way, as the LPSC's complaint would suggest. The unilateral right to terminate has been in the System Agreement at least since 1973 and the agreement has been litigated before the FERC by the LPSC on numerous occasions. At no point has the LPSC raised this issue nor has the FERC determined the termination provision to be unjust or unreasonable.

MPSC System Agreement Inquiry

In response to an inquiry from the MPSC, Entergy Mississippi advised the MPSC of its view that it would be premature to decide at this time whether to terminate Entergy Mississippi's participation in the current System Agreement. Entergy Mississippi indicated that it would report to the MPSC during the first quarter of 2007 regarding its continuing evaluation of the issues concerning Entergy Mississippi's participation in the current System Agreement.

Independent Coordinator of Transmission

In 2000, the FERC issued an order encouraging utilities to voluntarily place their transmission facilities under the control of independent RTOs (regional transmission organizations) by December 15, 2001. The FERC issued this order after previously requiring that utilities file an open access transmission tariff to implement the federal mandate to offer unused transmission capacity to the wholesale power marketplace on a nondiscriminatory basis. Delays in implementing the FERC RTO order have occurred due to a variety of reasons, including the fact that utility companies, other stakeholders, and federal and state regulators continue to work to resolve various issues related to the establishment of such RTOs.

In November 2006, after years of filings, orders, technical conferences, and proceedings at the FERC, the Utility operating companies installed the Southwest Power Pool (SPP) as their Independent Coordinator of Transmission (ICT). The installation does not transfer control of Entergy's transmission system to the ICT, but rather vests with the ICT responsibility for:

 

32

 

 

The initial term of the ICT is four years, and Entergy is precluded from terminating the ICT prior to the end of the four-year period. A transmission users group has been established that will provide input directly to the ICT. If there is a dispute between the ICT and Entergy concerning transmission service requests, transmission planning, and interconnection requests, the ICT's position will prevail during the pendency of the dispute resolution. In its April 2006 order approving Entergy's ICT proposal, the FERC stated that the WPP must be operational within approximately 14 months of the FERC order or the FERC may reevaluate all approvals to proceed with the ICT.

After the FERC issued its April 2006 order approving the ICT proposal, the Utility operating companies made their compliance filing with the FERC in May 2006, including the executed ICT agreement with SPP. Several parties filed protests regarding the compliance filing. In October 2006, the FERC accepted the Utility operating companies' compliance filing, with modification, and directed the Utility operating companies to install SPP as the ICT within 30 days of the order. As stated above, SPP was installed as the ICT in November 2006. The Utility operating companies filed a request for clarification with respect to two provisions of the FERC order accepting the compliance filing and several other parties have filed for rehearing of the FERC's order. The Utility operating companies submitted a revised compliance filing implementing the provisions of the FERC's October 2006 order. In addition to the requests for rehearing on the FERC's order accepting the compliance filing, certain parties have submitted requests for rehearing of the various FERC orders approving the ICT proposal. These requests for rehearing are also pending before the FERC.

On October 30, 2006, the Utility operating companies filed revisions to their Open Access Transmission Tariff ("OATT") with the FERC to establish a mechanism to recover from their wholesale transmission customers the (1) costs incurred to develop or join an RTO and to develop the ICT; and (2) the on-going costs that will be incurred under the ICT agreement. Several parties intervened opposing the proposed tariff revisions. On December 22, 2006 the FERC accepted for filing Entergy's proposed tariff revisions, and set them for hearing and settlement procedures. In its Order, the FERC concluded that the Utility operating companies "should be allowed the opportunity to recover its start up costs associated with its formation of the ICT and its participation in prior failed attempts to form an RTO," but that the proposed tariffs raised issues of fact that are more properly addressed through hearing and settlement procedures. Settlement discussions with the intervenors are currently ongoing.

In March 2004, the APSC initiated a proceeding to review Entergy's proposal and compare the benefits of such a proposal to the alternative of Entergy joining the Southwest Power Pool RTO. The APSC sought comments from all interested parties on this issue. Various parties, including the APSC General Staff, filed comments opposing the ICT proposal. A public hearing has not been scheduled by the APSC at this time, although Entergy Arkansas has responded to various APSC data requests. In May 2004, Entergy Mississippi filed a petition for review with the MPSC requesting MPSC support for the ICT proposal. A hearing in that proceeding was held in August 2004. Entergy New Orleans appeared before the Utility Committee of the City Council in June 2005 to provide information on the ICT proposal. Entergy Louisiana and Entergy Gulf States filed an application with the LPSC requesting that the LPSC find that the ICT proposal is a prudent and appropriate course of action. A hearing in the LPSC proceeding on the ICT proposal was held in October 2005, and the LPSC voted to approve the ICT proposal in July 2006.

33

Available Flowgate Capacity (AFC) Proceeding

On March 22, 2005, the FERC issued an order that holds Entergy's AFC hearing in abeyance pending action on Entergy's ICT filing. The order holding the hearing in abeyance further indicated that it would cancel the hearing when the ICT begins to perform its functions. On December 18, 2006, the Utility operating companies filed with the FERC a request to cancel the AFC hearing now that the ICT had been installed and assumed its responsibilities. One intervenor opposed the cancellation of the AFC hearing and other intervenors filed requesting that the FERC clarify that if the motion to cancel the hearing is granted, that such cancellation "does not affect the continuing obligation of Entergy to provide transmission meeting the standard of good utility practice."

FERC Investigations

In 2005, the Utility operating companies notified the FERC's Office of Market Oversight and Investigations (FERC enforcement) that certain historic data related to the hourly AFC models was inadvertently lost due to errors in the implementation of a data archiving process. The data at issue is hourly AFC data for the nine-month period April 27, 2004 through January 31, 2005. Subsequently, the Utility operating companies notified FERC enforcement that: (1) Entergy had identified certain instances in which transmission service either was granted when there was insufficient transmission capacity or was not granted when there was sufficient transmission capacity; and (2) Entergy had failed to timely post to Entergy's OASIS site certain curtailment and schedule information. Entergy cooperated fully and timely in the investigation of these instances. In January 2007, the FERC approved a settlement agreement between the Utility operating companies and the FERC enforcement staff resolving all issues arising out of or related to these issues. The Order accepting the Stipulation and Consent Agreement indicates that the matters "were generally the result of low-level employees' inadvertent actions, done without the knowledge or acquiescence of senior management. The matters did not reflect undue preference or undue discrimination and resulted in little or no quantifiable harm." Pursuant to the Stipulation and Consent Agreement, Entergy agreed to pay a $2 million civil penalty and to make a $1 million payment to the Nike/Entergy Green Schools for New Orleans Partnership. Additionally, the Stipulation and Consent Agreement required the establishment of a compliance plan that includes independent auditing provisions.

Following the notification of the potential loss by the Utility operating companies of AFC data, a separate, non-public investigation was initiated by the FERC to review the Utility operating companies' record retention policies and practices. In October 2006, the FERC enforcement issued an audit report addressing the Utility operating companies' compliance with the FERC's records retention regulations. The audit report notes the following: (i) one instance where the Utility operating companies' treatment of a contract failed to comply with a FERC-imposed record retention period and notification requirement; (ii) one instance where the Utility operating companies temporarily lost an individual record but were subsequently able to reproduce it; (iii) four instances where records were retained for the full period required by the FERC, but may have been inadvertently lost prior to a retention period required by a different agency or the Utility operating companies' internal retention requirements; and (iv) a limited number of instances where the Utility operating companies' internal policies could be improved. The findings and recommendations in the audit report, which were agreed to by the Utility operating companies, represent a consensual resolution of the audit. Although these findings are not indicative of any significant areas of non-compliance, the Utility operating companies believe that the audit staff's recommendations will improve the records retention program and therefore agreed to implement the audit staff's recommendations.

The FERC is currently reviewing certain wholesale sales and purchases involving EPMC that occurred during the 1998-2001 time period. EPMC was an Entergy subsidiary engaged in non-regulated wholesale marketing and trading activities prior to the formation of Entergy-Koch. Entergy is working with the FERC investigation staff to provide information regarding these transactions.

Interconnection Orders

The Utility operating companies (except Entergy New Orleans) have been parties to several proceedings before the FERC in which independent generation entities (GenCos) are seeking a refund of monies that the GenCos had previously paid to the Entergy companies for

 

34

 

 

 facilities necessary to connect their generation facilities to Entergy's transmission system. In some of these cases the Utility operating companies filed rehearing requests that challenged the FERC's decision to grant the GenCos a refund of such amounts. Recently, the FERC issued orders that denied the Utility operating companies' rehearing requests, thereby upholding the refund of monies to the GenCos that was previously directed by the FERC. These recent findings retained Entergy's obligation to refund approximately $124.0 million, including interest, in expenses and tax obligations previously paid by the GenCos, including $35.7 million for Entergy Arkansas, $32.5 million for Entergy Gulf States, $32.6 million for Entergy Louisiana, and $23.2 million for Entergy Mississippi. $56.4 million of this amount has been refunded to date, including approximately $22.3 million for Entergy Arkansas, $3.3 million for Entergy Gulf States, $21.9 million for Entergy Louisiana, and $8.9 million for Entergy Mississippi.

The FERC has also recently denied rehearing of an order that directed Entergy Mississippi to refund to SMEPA the expense it incurred in constructing certain facilities necessary for the interconnection of its Silver Creek generating unit to Entergy' transmission system. Although Entergy Mississippi does not yet know the total expense and tax obligation associated with these SMEPA facilities, such amount is estimated at approximately $10 million.

The FERC has also recently issued an order granting one of the complaints that have been pending before the FERC concerning other GenCos' requests that they receive refunds for certain facilities necessary for their interconnections with the Utility operating companies. The order requires Entergy Gulf States to refund approximately $5.4 million to the GenCo. This refund, along with those referenced above, has been and will continue to be primarily provided in the form of credits against transmission charges over time as the GenCos take transmission service from Entergy.

The Utility operating companies (except Entergy New Orleans) continue to be subject to several pending, but not acted upon, complaints where GenCos are seeking additional refunds from the Utility operating companies. While these matters concern the same issues addressed by the FERC in the cases described above, the FERC has not yet acted in these dockets, in which approximately $49.4 million in expenses previously paid by the GenCos is in dispute, including $26.8 million for Entergy Arkansas, $6.2 million for Entergy Gulf States, $8.0 million for Entergy Louisiana, and $8.4 million for Entergy Mississippi.

To the extent the Utility operating companies have been ordered to provide refunds, or may in the future be ordered to provide additional refunds, the majority of these costs will qualify for inclusion in the Utility operating companies' rates. The recovery of these costs is not automatic, however, especially at the retail level, where the majority of the cost recovery would occur. With respect to the facilities for which FERC has ordered refunds, the Utility operating companies intend to request the ICT to evaluate the classification of facilities that have produced the refunds. Any reclassification by the ICT could reduce the amount of refunds not yet credited against transmission charges.

Market-based Rate Authority

On May 5, 2005, the FERC instituted a proceeding under Section 206 of the FPA to investigate whether Entergy satisfies the FERC's transmission market power and affiliate abuse/reciprocal dealing standards for the granting of market-based rate authority, and established a refund effective date pursuant to the provisions of Section 206, for purposes of the additional issues set for hearing.  However, the FERC decided to hold that investigation in abeyance pending the outcomes of the ICT proceeding and Entergy's affiliate purchased power agreements proceeding. On June 6, 2005, Entergy sought rehearing of the May 5 Order and that request for rehearing is pending.

On July 22, 2005, Entergy notified the FERC that it was withdrawing its request for market-based rate authority for sales within its control area. Instead, the Utility operating companies and their affiliates will transact at cost-based rates for wholesale sales within the Entergy control area. On November 1, 2005, Entergy submitted proposed cost-based rates for both the Utility operating companies and Entergy's non-regulated entities that sell at wholesale within the Entergy control area. The Utility operating companies' cost-based rates were accepted for filing by the FERC, however, the non-regulated entities' cost-based rate filing was set for hearing and settlement procedures. A settlement in principle has been reached between

 

35

 

 

 the non-regulated entities and the FERC Staff concerning this issue. Separately, the FERC accepted for filing Entergy Gulf States' proposed cost-based rates for wholesale sales to three separate municipalities. Additionally, Entergy reserves its right to request market-based rate authority for sales within its control area in the future. The relinquishment of market-based rates for sales within the Entergy control area is not expected to have a material effect on the financial results of Entergy.

Energy Policy Act of 2005

The Energy Policy Act of 2005 became law in August 2005. The legislation contains electricity provisions that, among other things:

36

Market and Credit Risk Sensitive Instruments

Market risk is the risk of changes in the value of commodity and financial instruments, or in future operating results or cash flows, in response to changing market conditions. Entergy holds commodity and financial instruments that are exposed to the following significant market risks:

Entergy's commodity and financial instruments are also exposed to credit risk. Credit risk is the risk of loss from nonperformance by suppliers, customers, or financial counterparties to a contract or agreement. Credit risk also includes potential demand on liquidity due to collateral requirements within supply or sales agreements.

Commodity Price Risk

Power Generation

The sale of electricity from the power generation plants owned by Entergy's Non-Utility Nuclear business, unless otherwise contracted, is subject to the fluctuation of market power prices. Entergy's Non-Utility Nuclear business has entered into PPAs and other contracts to sell the power produced by its power plants at prices established in the PPAs. Entergy continues to pursue opportunities to extend the existing PPAs and to enter into new PPAs with other parties. Following is a summary of the amount of the Non-Utility Nuclear business' output that is currently sold forward under physical or financial contracts:

   

2007

 

2008

 

2009

 

2010

 

2011

Non-Utility Nuclear (including pending Palisades acquisition):

                   

Percent of planned generation sold forward:

                   
 

Unit-contingent

 

43%

 

45%

 

36%

 

23%

 

23%

 

Unit-contingent with guarantee of availability (1)

 

45%

 

36%

 

28%

 

22%

 

7%

 

Firm liquidated damages

 

7%

 

4%

 

0%

 

0%

 

0%

 

Total

 

95%

 

85%

 

64%

 

45%

 

30%

Planned generation (TWh)

 

38

 

41

 

41

 

41

 

41

Average contracted price per MWh

 

$49

 

$53

 

$57

 

$53

 

$47

(1)

A sale of power on a unit contingent basis coupled with a guarantee of availability provides for the payment to the power purchaser of contract damages, if incurred, in the event the seller fails to deliver power as a result of the failure of the specified generation unit to generate power at or above a specified availability threshold. All of Entergy's outstanding guarantees of availability provide for dollar limits on Entergy's maximum liability under such guarantees.

The Vermont Yankee acquisition included a 10-year PPA under which the former owners will buy most of the power produced by the plant, which is through the expiration in 2012 of the current operating license for the plant. The PPA includes an adjustment clause under which the prices specified in the PPA will be adjusted downward monthly, beginning in November 2005, if power market prices drop below PPA prices, which has not happened thus far and is not expected in the foreseeable future.

37

Non-Utility Nuclear's purchase of the Fitzpatrick and Indian Point 3 plants from NYPA included value sharing agreements with NYPA. Under the value sharing agreements, to the extent that the average annual price of the energy sales from each of the two plants exceeds specified strike prices, the Non-Utility Nuclear business will pay 50% of the amount exceeding the strike prices to NYPA. These payments, if required, will be recorded as adjustments to the purchase price of the plants. The annual energy sales subject to the value sharing agreements are limited to the lesser of actual generation or generation assuming an 85% capacity factor based on the plants' capacities at the time of the purchase. The value sharing agreements are effective through 2014. The strike prices for Fitzpatrick range from $37.51/MWh in 2005 increasing by approximately 3.5% each year to $51.30/MWh in 2014, and the strike prices for Indian Point 3 range from $42.26/MWh in 2005 increasing by approximately 3.5% each year to $57.77/MWh in 2014.

Non-Utility Nuclear calculated that no payment was owed to NYPA under the value sharing agreements for 2005. On November 1, 2006, NYPA filed a demand for arbitration claiming that $90.5 million was due to NYPA under these agreements for 2005. Non-Utility Nuclear has filed a motion in New York State court to determine whether NYPA's claim should be decided by a court as opposed to by an arbitrator. Regardless of whether a court or an arbitrator decides NYPA's claim, Non-Utility Nuclear disagrees with NYPA's interpretation of the value sharing agreements, believes it has meritorious defenses to NYPA's claims, and intends to litigate those claims vigorously.

Some of the agreements to sell the power produced by Entergy's Non-Utility Nuclear power plants contain provisions that require an Entergy subsidiary to provide collateral to secure its obligations under the agreements. The Entergy subsidiary will be required to provide collateral based upon the difference between the current market and contracted power prices in the regions where Non-Utility Nuclear sells power. The primary form of collateral to satisfy these requirements would be an Entergy Corporation guaranty.  Cash and letters of credit are also acceptable forms of collateral.  At December 31, 2006, based on power prices at that time, Entergy had in place as collateral $810 million of Entergy Corporation guarantees for wholesale transactions, including $88 million of guarantees that support letters of credit. The assurance requirement associated with Non-Utility Nuclear is estimated to increase by an amount up to $303 million if gas prices increase $1 per MMBtu in both the short- and long-term markets. In the event of a decrease in Entergy Corporation's credit rating to below investment grade, Entergy will be required to replace Entergy Corporation guarantees with cash or letters of credit under some of the agreements.

In addition to selling the power produced by its plants, the Non-Utility Nuclear business sells installed capacity to load-serving distribution companies in order for those companies to meet requirements placed on them by the ISO in their area. Following is a summary of the amount of the Non-Utility Nuclear business' installed capacity that is currently sold forward, and the blended amount of the Non-Utility Nuclear business' planned generation output and installed capacity that is currently sold forward:

   

2007

 

2008

 

2009

 

2010

 

2011

Non-Utility Nuclear (including pending Palisades acquisition):

                   

Percent of capacity sold forward:

                   
 

Bundled capacity and energy contracts

 

21%

 

27%

 

27%

 

27%

 

26%

 

Capacity contracts

 

66%

 

39%

 

26%

 

9%

 

3%

 

Total

 

87%

 

66%

 

53%

 

36%

 

29%

Planned net MW in operation (average for 2007 to reflect pending Palisades acquisition during the year)

 

4,732

 

4,998

 

4,998

 

4,998

 

4,998

Average capacity contract price per kW per month

 

$1.7

 

$1.4

 

$1.3

 

$1.7

 

$2.0

Blended Capacity and Energy (based on revenues)

                   

% of planned generation and capacity sold forward

 

93%

 

80%

 

60%

 

39%

 

23%

Average contract revenue per MWh

 

$50

 

$54

 

$58

 

$53

 

$47

As of December 31, 2006, approximately 97% of Non-Utility Nuclear's counterparty exposure from energy and capacity contracts is with counterparties with investment grade credit ratings.

38

Entergy continually monitors industry trends in order to determine whether asset impairments or other losses could result from a decline in value, or cancellation, of merchant power projects, and records provisions for impairments and losses accordingly. As discussed in "Results of Operations" above, in 2004 Entergy determined that the value of the Warren Power plant owned by the non-nuclear wholesale assets business was impaired, and recorded the appropriate provision for the loss.

Central States Compact Claim

The Low-Level Radioactive Waste Policy Act of 1980 holds each state responsible for disposal of low-level radioactive waste originating in that state, but allows states to participate in regional compacts to fulfill their responsibilities jointly.  Arkansas and Louisiana participate in the Central Interstate Low-Level Radioactive Waste Compact (Central States Compact or Compact).  Commencing in early 1988, Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana made a series of contributions to the Central States Compact to fund the Central States Compact's development of a low-level radioactive waste disposal facility to be located in Boyd County, Nebraska.  In December 1998, Nebraska, the host state for the proposed Central States Compact disposal facility, denied the compact's license application for the proposed disposal facility.  Several parties, including the commission that governs the compact (the Compact Commission), filed a lawsuit against Nebraska seeking damages resulting from Nebraska's denial of the proposed facility's license.  After a trial, the U.S. District Court concluded that Nebraska violated its good faith obligations regarding the proposed waste disposal facility and rendered a judgment against Nebraska in the amount of $151 million.  In August 2004, Nebraska agreed to pay the Compact $141 million in settlement of the judgment. In July 2005, the Compact Commission decided to distribute a substantial portion of the proceeds from the settlement to the nuclear power generators that had contributed funding for the Boyd County facility, including Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana. On August 1, 2005, Nebraska paid $145 million, including interest, to the Compact, and the Compact distributed from the settlement proceeds $23.6 million to Entergy Arkansas, $19.9 million to Entergy Gulf States, and $19.4 million to Entergy Louisiana.  The proceeds caused an increase in pre-tax earnings of $28.7 million.

Critical Accounting Estimates

The preparation of Entergy's financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and the potential for future changes in the assumptions and measurements that could produce estimates that would have a material effect on the presentation of Entergy's financial position or results of operations.

Nuclear Decommissioning Costs

Entergy owns a significant number of nuclear generation facilities in both its Utility and Non-Utility Nuclear business units. Regulations require Entergy to decommission its nuclear power plants after each facility is taken out of service, and money is collected and deposited in trust funds during the facilities' operating lives in order to provide for this obligation. Entergy conducts periodic decommissioning cost studies to estimate the costs that will be incurred to decommission the facilities. The following key assumptions have a significant effect on these estimates:

 

39

 

 

In the third quarter of 2004, Entergy Gulf States recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for River Bend that reflected an expected life extension for the plant. The revised estimate resulted in a $116.8 million reduction in decommissioning liability, along with a $31.3 million reduction in utility plant, a $40.1 million reduction in the related regulatory asset, and a regulatory liability of $17.7 million. For the portion of River Bend not subject to cost-based ratemaking, the revised estimate resulted in the elimination of the asset retirement cost that had been recorded at the time of adoption of SFAS 143 with the remainder recorded as miscellaneous income of $27.7 million ($17 million net-of-tax).

In the third quarter of 2004, Entergy's Non-Utility Nuclear business recorded a reduction of $20.3 million in its decommissioning cost liability to reflect changes in assumptions regarding the timing of when the decommissioning of a plant will begin. Entergy considered the assumptions as part of recent studies evaluating the economic effect of the plant in its region. The revised estimate resulted in miscellaneous income of $20.3 million ($11.9 million net-of-tax).

In the first quarter of 2005, Entergy's Non-Utility Nuclear business recorded a reduction of $26.0 million in its decommissioning cost liability in conjunction with a new decommissioning cost study as a result of revised decommissioning costs and changes in assumptions regarding the timing of the decommissioning of a plant. The revised estimate resulted in miscellaneous income of $26.0 million ($15.8 million net-of-tax), reflecting the excess of the reduction in the liability over the amount of undepreciated assets.

In the second quarter of 2005, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Waterford 3 that reflected an expected life extension for the plant. The revised estimate resulted in a $153.6 million reduction in its decommissioning liability, along with a $49.2 million reduction in utility plant and a $104.4 million reduction in the related regulatory asset.

In the third quarter of 2005, Entergy Arkansas recorded a revision to its estimated decommissioning cost liability for ANO 2 in accordance with the receipt of approval by the NRC of Entergy Arkansas' application for a life extension for the unit. The revised estimate resulted in an $87.2 million

 

40

 

 

 reduction in its decommissioning liability, along with a corresponding reduction in the related regulatory asset.

In the third quarter of 2005, System Energy recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Grand Gulf.  The revised estimate resulted in a $41.4 million reduction in the decommissioning cost liability for Grand Gulf, along with a $39.7 million reduction in utility plant and a $1.7 million reduction in the related regulatory asset.

In the third quarter of 2006, Entergy's Non-Utility Nuclear business recorded a reduction of $27 million in decommissioning liability for a plant as a result of a revised decommissioning cost study and changes in assumptions regarding the timing of when decommissioning of the plant will begin. The revised estimate resulted in miscellaneous income of $27 million ($16.6 million net-of-tax), reflecting the excess of the reduction in the liability over the amount of undepreciated asset retirement cost recorded at the time of adoption of SFAS 143.

Unbilled Revenue

As discussed in Note 1 to the consolidated financial statements, Entergy records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month, including fuel price. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period and fuel price fluctuations, in addition to changes in certain components of the calculation. Effective January 1, 2006, Entergy Louisiana and the Louisiana portion of Entergy Gulf States reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in the unbilled calculation, which is in accordance with regulatory treatment.

Impairment of Long-lived Assets

Entergy has significant investments in long-lived assets in all of its segments, and Entergy evaluates these assets against the market economics and under the accounting rules for impairment whenever there are indications that impairments may exist. This evaluation involves a significant degree of estimation and uncertainty, and these estimates are particularly important in Entergy's Utility business and the non-nuclear wholesale assets business. In the Utility business, portions of River Bend and Grand Gulf are not included in rate base, which could reduce the revenue that would otherwise be recovered for the applicable portions of those units' generation. In the non-nuclear wholesale assets business, Entergy's investments in merchant generation assets are subject to impairment if adverse market conditions arise.

In order to determine if Entergy should recognize an impairment of a long-lived asset that is to be held and used, accounting standards require that the sum of the expected undiscounted future cash flows from the asset be compared to the asset's carrying value. If the expected undiscounted future cash flows exceed the carrying value, no impairment is recorded; if such cash flows are less than the carrying value, Entergy is required to record an impairment charge to write the asset down to its fair value. If an asset is held for sale, an impairment is required to be recognized if the fair value (less costs to sell) of the asset is less than its carrying value.

These estimates are based on a number of key assumptions, including:

 

41

 

 

In the fourth quarter of 2005, Entergy recorded a charge of $39.8 million ($25.8 million net-of-tax) as a result of the impairment of the Competitive Retail Services business' information technology systems. Entergy decided to divest the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas and, in connection with that decision, management evaluated the carrying amount of the Competitive Retail Services business' information technology systems and determined that an impairment provision should be recorded.

In the fourth quarter of 2004, Entergy recorded a charge of approximately $55 million ($36 million net-of-tax) as a result of an impairment of the value of the Warren Power plant. Entergy concluded that the value of the plant, which is owned in the non-nuclear wholesale assets business, was impaired. Entergy reached this conclusion based on valuation studies prepared in connection with the Entergy Asset Management stock sale discussed above in "Results of Operations."

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified, defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the consolidated financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate for the Utility and Non-Utility Nuclear segments.

Assumptions

Key actuarial assumptions utilized in determining these costs include:

Entergy reviews these assumptions on an annual basis and adjusts them as necessary. The falling interest rate environment and worse-than-expected performance of the financial equity markets in previous years have impacted Entergy's funding and reported costs for these benefits. In addition, these trends have caused Entergy to make a number of adjustments to its assumptions.

In selecting an assumed discount rate to calculate benefit obligations, Entergy reviews market yields on high-quality corporate debt and matches these rates with Entergy's projected stream of benefit payments. Based on recent market trends, Entergy increased its discount rate used to calculate benefit obligations from 5.9% in 2005 to 6.00% in 2006. Entergy's assumed discount rate used to calculate the 2004 benefit obligations was 6.00%. Entergy reviews actual recent cost trends and projected future trends in establishing health care cost trend rates. Based on this review, Entergy's health care cost trend rate assumption used in calculating the December 31, 2006 accumulated postretirement benefit obligation was a 10% increase in health care costs in 2007 gradually decreasing each successive year, until it reaches a 4.5% annual increase in health care costs in 2012 and beyond.

42

In determining its expected long-term rate of return on plan assets, Entergy reviews past long-term performance, asset allocations, and long-term inflation assumptions. Entergy targets an asset allocation for its pension plan assets of roughly 65% equity securities, 31% fixed-income securities and 4% other investments. The target allocation for Entergy's other postretirement benefit assets is 51% equity securities and 49% fixed-income securities. Entergy's expected long-term rate of return on plan assets used to calculate benefit obligations was 8.5% in 2006, 2005 and 2004. The assumed rate of increase in future compensation levels used to calculate benefit obligations was 3.25% in 2006, 2005 and 2004.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 

Impact on 2006
Qualified Pension Cost

 

Impact on Qualified Projected
Benefit Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$11,746

 

$110,087

Rate of return on plan assets

 

(0.25%)

 

$5,311

 

-

Rate of increase in compensation

 

0.25%

 

$6,034

 

$33,326

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 

Impact on 2006
Postretirement Benefit
Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$5,294

 

$25,774

Discount rate

 

(0.25%)

 

$3,510

 

$31,008

Each fluctuation above assumes that the other components of the calculation are held constant.

Accounting Mechanisms

In September 2006, FASB issued SFAS 158, "Employer's Accounting for Defined Benefit Pension and Other Postretirement Plans, an amendment of FASB Statements Nos. 87, 88, 106 and 132(R)," to be effective December 31, 2006. SFAS 158 requires an employer to recognize in its balance sheet the funded status of its benefit plans. Refer to Note 11 to the financial statements for a further discussion of SFAS 158 and Entergy's funded status.

In accordance with SFAS No. 87, "Employers' Accounting for Pensions," Entergy utilizes a number of accounting mechanisms that reduce the volatility of reported pension costs. Differences between actuarial assumptions and actual plan results are deferred and are amortized into expense only when the accumulated differences exceed 10% of the greater of the projected benefit obligation or the market-related value of plan assets. If necessary, the excess is amortized over the average remaining service period of active employees.

Additionally, Entergy accounts for the effect of asset performance on pension expense over a twenty-quarter phase-in period through a "market-related" value of assets calculation. Since the market-related value of assets recognizes investment gains or losses over a twenty-quarter period, the future value of assets will be impacted as previously deferred gains or losses are recognized.

Entergy's qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, Entergy was required to recognize an additional minimum pension liability as prescribed by SFAS 87. At December 31, 2005, Entergy's qualified pension plans' additional

 

43

 

 

 minimum pension liability was $406 million ($382 million net of related pension assets). Other comprehensive income was $15 million at December 31, 2005, after reductions for the unrecognized prior service cost, amounts recoverable in rates, and taxes. Net income for 2005 and 2004 was not affected. In accordance with SFAS 158, the additional minimum pension liability has been replaced in 2006 with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Costs and Funding

In 2006, Entergy's total qualified pension cost was $131 million. Entergy anticipates 2007 qualified pension cost to decrease to $128 million (including Entergy New Orleans' cost of $2.8 million) due to an increase in the discount rate (from 5.90% to 6.00%) and 2006 actual return on plan assets greater than 8.5%. Pension funding was $318 million for 2006, including the 2005 contribution of $107 million that was delayed until 2006 as a result of the Katrina Emergency Tax Relief Act. Entergy's contributions to the pension trusts are projected to be $176 million in 2007, including Entergy New Orleans' contribution of $44 million.

The Pension Protection Act of 2006 was signed by the President on August 17, 2006. The intent of the legislation is to require companies to fund 100% of their pension liability; and then for companies to fund, on a going-forward basis, an amount generally estimated to be the amount that the pension liability increases each year due to an additional year of service by the employees eligible for pension benefits. The legislation requires that funding shortfalls be eliminated by companies over a seven-year period, beginning in 2008. The Pension Protection Act also extended the provisions of the Pension Funding Equity Act that would have expired in 2006 had the Pension Protection Act not been enacted, which increased the allowed discount rate used to calculate the pension funding liability.

Total postretirement health care and life insurance benefit costs for Entergy in 2006 were $90 million, including $28 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy expects 2007 postretirement health care and life insurance benefit costs to be $88 million (including Entergy New Orleans' costs of $5 million). This includes a projected $26 million in savings due to the estimated effect of future Medicare Part D subsidies. The decrease in postretirement health care and life insurance benefit costs is due to the increase in the discount rate (from 5.9% to 6.00%) and plan amendments in the Non-Utility Nuclear plans.

Other Contingencies

As a company with multi-state domestic utility operations and a history of international investments, Entergy is subject to a number of federal, state, and international laws and regulations and other factors and conditions in the areas in which it operates, which potentially subject it to environmental, litigation, and other risks. Entergy periodically evaluates its exposure for such risks and records a reserve for those matters which are considered probable and estimable in accordance with generally accepted accounting principles.

Environmental

Entergy must comply with environmental laws and regulations applicable to the handling and disposal of hazardous waste. Under these various laws and regulations, Entergy could incur substantial costs to restore properties consistent with the various standards. Entergy conducts studies to determine the extent of any required remediation and has recorded reserves based upon its evaluation of the likelihood of loss and expected dollar amount for each issue. Additional sites could be identified which require environmental remediation for which Entergy could be liable. The amounts of environmental reserves recorded can be significantly affected by the following external events or conditions:

 

44

 

 

Litigation

Entergy has been named as defendant in a number of lawsuits involving employment, ratepayer, and injuries and damages issues, among other matters. Entergy periodically reviews the cases in which it has been named as defendant and assesses the likelihood of loss in each case as probable, reasonably estimable, or remote and records reserves for cases which have a probable likelihood of loss and can be estimated. Notes 2 and 8 to the financial statements include more detail on ratepayer and other lawsuits and management's assessment of the adequacy of reserves recorded for these matters. Given the environment in which Entergy operates, and the unpredictable nature of many of the cases in which Entergy is named as a defendant, however, the ultimate outcome of the litigation Entergy is exposed to has the potential to materially affect the results of operations of Entergy, or its operating company subsidiaries.

Sales Warranty and Tax Reserves

Entergy's operations, including acquisitions and divestitures, require Entergy to evaluate risks such as the potential tax effects of a transaction, or warranties made in connection with such a transaction. Entergy believes that it has adequately assessed and provided for these types of risks, where applicable. Any reserves recorded for these types of issues, however, could be significantly affected by events such as claims made by third parties under warranties, additional transactions contemplated by Entergy, or completion of reviews of the tax treatment of certain transactions or issues by taxing authorities. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued in the financial statements. Entergy does not expect a material adverse effect on earnings from these matters.

New Accounting Pronouncements

FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy in the first quarter of 2007. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Additional disclosure in the footnotes to the financial statements will also be required for such liabilities. Entergy does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows.  Entergy expects that the cumulative effect of the adoption of FIN 48 will result in a reduction to consolidated retained earnings at January 1, 2007 in the range of $3 million to $5 million.

In September 2006 the FASB issued Statement of Financial Accounting Standards No. 157, "Fair Value Measurements" (SFAS 157), which defines fair value, establishes a framework for measuring fair value in GAAP, and expands disclosures about fair value measurements. SFAS 157 generally does not require any new fair value measurements. However, in some cases, the application of SFAS 157 in the future may change Entergy's practice for measuring and disclosing fair values under other accounting pronouncements that require or permit fair value measurements. SFAS 157 is effective for Entergy in the first quarter 2008 and will be applied prospectively. Entergy is currently evaluating SFAS 157 and its potential future impacts on its financial position, results of operations, and cash flows.

In February 2007 the FASB issued Statement of Financial Accounting Standards No. 159, "The Fair Value Option for Financial Assets and Financial Liabilities" (SFAS 159), which permits entities to choose to measure many financial instruments and certain other items at fair value. SFAS 159 is effective for Entergy in the first quarter 2008, and because SFAS 159 was recently issued Entergy's evaluation is in its initial stages.

45

 

 

 

 

 

 

 

 

(Page left blank intentionally)

 

 

46

ENTERGY CORPORATION AND SUBSIDIARIES
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands, Except Percentages and Per Share Amounts)
                     
Operating revenues   $10,932,158   $10,106,247   $9,685,521   $9,032,714   $8,299,052
Income from continuing operations   $1,133,098   $943,125   $909,565   $804,273 (1) $609,915
Earnings per share from continuing operations                    
  Basic   $5.46   $4.49   $4.01   $3.55   $2.73
  Diluted   $5.36   $4.40   $3.93   $3.48   $2.68
Dividends declared per share   $2.16   $2.16   $1.89   $1.60   $1.34
Return on common equity   14.21%   11.20%   10.70%   11.21%   7.85%
Book value per share, year-end   $40.45   $37.31   $38.25   $38.02   $35.24
Total assets   $31,082,731   $30,857,657   $28,310,777   $28,527,388   $27,504,366
Long-term obligations (2)   $8,996,620   $9,013,448   $7,180,291   $7,497,690   $7,488,919
                     
(1) Before cumulative effect of accounting changes.
(2) Includes long-term debt (excluding currently maturing debt), preferred stock with sinking fund, and noncurrent capital lease obligations.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Utility Electric Operating Revenues:                    
  Residential   $3,193   $2,912   $2,842   $2,683   $2,440
  Commercial   2,318   2,041   2,045   1,882   1,673
  Industrial   2,630   2,419   2,311   2,082   1,850
  Governmental   155   141   200   195   179
    Total retail   8,296   7,513   7,398   6,842   6,142
  Sales for resale (1)   612   656   390   371   330
  Other   155   278   145   184   174
    Total   $9,063   $8,447   $7,933   $7,397   $6,646
Utility Billed Electric Energy Sales (GWh):                    
  Residential   31,665   31,569   32,897   32,817   32,581
  Commercial   25,079   24,401   26,468   25,863   25,354
  Industrial   38,339   37,615   40,293   38,637   41,018
  Governmental   1,580   1,568   2,568   2,651   2,678
    Total retail   96,663   95,153   102,226   99,968   101,631
  Sales for resale (1)   10,803   11,459   8,623   9,248   9,828
    Total   107,466   106,612   110,849   109,216   111,459
                     

(1) Includes sales to Entergy New Orleans, which was deconsolidated in 2006 and 2005.  See Note 18 to the financial statements.

47

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

 

To the Board of Directors and Shareholders
Entergy Corporation and Subsidiaries:

 

We have audited the accompanying consolidated balance sheets of Entergy Corporation and Subsidiaries (the "Corporation") as of December 31, 2006 and 2005, and the related consolidated statements of income; of retained earnings, comprehensive income, and paid-in capital; and of cash flows for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Corporation's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of Entergy Corporation and Subsidiaries as of December 31, 2006 and 2005, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the consolidated financial statements, in 2006 the Corporation adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Corporation's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Corporation's internal control over financial reporting and an unqualified opinion on the effectiveness of the Corporation's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

48

 

 

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF INCOME
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands, Except Share Data)
             
OPERATING REVENUES            
Domestic electric   $9,063,135    $8,446,830    $7,932,577 
Natural gas   84,230    77,660    208,499 
Competitive businesses   1,784,793    1,581,757    1,544,445 
TOTAL   10,932,158    10,106,247    9,685,521 
             
OPERATING EXPENSES            
Operating and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   3,144,073    2,176,015    2,488,208 
  Purchased power   2,138,237    2,521,247    1,701,610 
  Nuclear refueling outage expenses   169,567    162,653    166,072 
  Provisions for asset impairments and restructuring charges       55,000 
  Other operation and maintenance   2,335,364    2,122,206    2,268,332 
Decommissioning   145,884    143,121    149,529 
Taxes other than income taxes   428,561    382,521    403,635 
Depreciation and amortization   887,792    856,377    893,574 
Other regulatory credits - net   (122,680)   (49,882)   (90,611)
TOTAL   9,126,798    8,314,258    8,035,349 
             
OPERATING INCOME   1,805,360    1,791,989    1,650,172 
             
OTHER INCOME            
Allowance for equity funds used during construction   39,894    45,736    39,582 
Interest and dividend income   198,835    150,479    109,635 
Equity in earnings (loss) of unconsolidated equity affiliates   93,744    985    (78,727)
Miscellaneous - net   16,114    14,251    55,509 
TOTAL   348,587    211,451    125,999 
              
INTEREST AND OTHER CHARGES            
Interest on long-term debt   498,451    440,334    463,384 
Other interest - net   75,502    64,646    40,133 
Allowance for borrowed funds used during construction   (23,931)   (29,376)   (25,741)
Preferred dividend requirements and other   27,783    25,427    23,525 
TOTAL   577,805    501,031    501,301 
             
INCOME FROM CONTINUING OPERATIONS BEFORE INCOME TAXES   1,576,142    1,502,409    1,274,870 
              
Income taxes   443,044    559,284    365,305 
             
INCOME FROM CONTINUING OPERATIONS   1,133,098    943,125    909,565 
             
LOSS FROM DISCONTINUED OPERATIONS (net of income tax expense            
(benefit) of $67 , ($24,051), and $603, respectively)   (496)   (44,794)   (41)
             
CONSOLIDATED NET INCOME   $1,132,602    $898,331    $909,524 
             
             
Basic earnings (loss) per average common share:            
  Continuing operations   $5.46    $4.49    $4.01 
  Discontinued operations     ($0.21)  
  Basic earnings per average common share   $5.46    $4.27    $4.01 
Diluted earnings (loss) per average common share:            
  Continuing operations   $5.36    $4.40    $3.93 
  Discontinued operations     ($0.21)  
  Diluted earnings per average common share   $5.36    $4.19    $3.93 
Dividends declared per common share   $2.16    $2.16    $1.89 
             
Basic average number of common shares outstanding   207,456,838    210,141,887    226,863,758 
Diluted average number of common shares outstanding   211,452,455    214,441,362    231,193,686 
             
See Notes to Financial Statements.            

 

49

 

 

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
   
OPERATING ACTIVITIES            
Consolidated net income   $1,132,602    $898,331    $909,524 
Adjustments to reconcile consolidated net income to net cash flow            
 provided by operating activities:            
  Reserve for regulatory adjustments   36,352    (82,033)   33,533 
  Other regulatory credits - net   (122,680)   (49,882)   (90,611)
  Depreciation, amortization, and decommissioning   1,035,153    1,001,852    1,045,122 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   738,643    487,804    352,094 
  Equity in earnings (loss) of unconsolidated equity affiliates - net of dividends   4,436    4,315    608,141 
  Provisions for asset impairments and restructuring charges     39,767    55,000 
  Changes in working capital:            
    Receivables   408,042    (367,351)   (210,419)
    Fuel inventory   13,097    (83,125)   (16,769)
    Accounts payable   (83,884)   303,194    95,306 
    Taxes accrued   (835)   (33,306)   (1,581)
    Interest accrued   5,975    15,133    5,269 
    Deferred fuel   582,947    (236,801)   213,627 
    Other working capital accounts   64,479    (45,653)   41,008 
  Provision for estimated losses and reserves   39,822    (3,704)   (18,041)
  Changes in other regulatory assets   (127,305)   (311,934)   48,626 
  Other   (307,429)   (68,799)   (140,510)
Net cash flow provided by operating activities   3,419,415    1,467,808    2,929,319 
             
INVESTING ACTIVITIES            
Construction/capital expenditures   (1,586,016)   (1,458,086)   (1,410,610)
Allowance for equity funds used during construction   39,894    45,736    39,582 
Nuclear fuel purchases   (326,248)   (314,414)   (238,170)
Proceeds from sale/leaseback of nuclear fuel   135,190    184,403    109,988 
Proceeds from sale of assets and businesses   77,159      75,430 
Payment for purchase of plant   (88,199)   (162,075)  
Investment in nonutility properties       (6,420)
Decrease in other investments   (6,353)   9,905    383,498 
Purchases of other temporary investments     (1,591,025)   (1,629,500)
Liquidation of other temporary investments     1,778,975    1,676,350 
Proceeds from nuclear decommissioning trust fund sales   777,584    944,253    679,466 
Investment in nuclear decommissioning trust funds   (884,123)   (1,039,824)   (769,273)
Other regulatory investments   (38,037)   (390,456)   (53,566)
Net cash flow used in investing activities   (1,899,149)   (1,992,608)   (1,143,225)
             
See Notes to Financial Statements.            
             
             
             

50

 
             
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
     
FINANCING ACTIVITIES            
Proceeds from the issuance of:            
  Long-term debt   1,837,713    4,302,570    3,653,478 
  Preferred stock   73,354    127,995   
  Common stock and treasury stock   70,455    106,068    170,237 
Retirement of long-term debt   (1,804,373)   (2,689,206)   (4,022,548)
Repurchase of common stock   (584,193)   (878,188)   (1,017,996)
Redemption of preferred stock   (183,881)   (33,719)   (3,450)
Changes in credit line borrowings - net   (15,000)   39,850    (154)
Dividends paid:            
  Common stock   (448,954)   (453,508)   (427,901)
  Preferred stock   (28,848)   (25,472)   (23,525)
Net cash flow provided by (used in) financing activities   (1,083,727)   496,390    (1,671,859)
             
Effect of exchange rates on cash and cash equivalents   (3,207)   (602)   (1,882)
             
Net increase (decrease) in cash and cash equivalents   433,332    (29,012)   112,353 
             
Cash and cash equivalents at beginning of period   582,820    619,786    507,433 
             
Effect of the deconsolidation of Entergy New Orleans on cash and cash equivalents     (7,954)  
             
Cash and cash equivalents at end of period   $1,016,152    $582,820    $619,786 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
  Cash paid/(received) during the period for:            
    Interest - net of amount capitalized   $526,424    $461,345    $477,768 
    Income taxes   ($147,435)   $116,072    $28,241 
             
See Notes to Financial Statements.            
             

 

51

 

 

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
 
    December 31,
    2006   2005
    (In Thousands)
         
CURRENT ASSETS        
Cash and cash equivalents:        
  Cash   $117,379    $221,773 
  Temporary cash investments - at cost,         
   which approximates market   898,773    361,047 
     Total cash and cash equivalents   1,016,152    582,820 
Note receivable - Entergy New Orleans DIP loan   51,934    90,000 
Notes receivable   699    3,227 
Accounts receivable:        
  Customer   410,512    629,717 
  Allowance for doubtful accounts   (19,348)   (30,805)
  Other   487,264    459,152 
  Accrued unbilled revenues   249,165    477,570 
     Total receivables   1,127,593    1,535,634 
Deferred fuel costs     543,927 
Accumulated deferred income taxes   11,680   
Fuel inventory - at average cost   193,098    206,195 
Materials and supplies - at average cost   604,998    610,932 
Deferred nuclear refueling outage costs   147,521    164,152 
Prepayments and other   171,759    325,795 
TOTAL   3,325,434    4,062,682 
         
OTHER PROPERTY AND INVESTMENTS        
Investment in affiliates - at equity   229,089    296,784 
Decommissioning trust funds   2,858,523    2,606,765 
Non-utility property - at cost (less accumulated depreciation)   212,726    228,833 
Other   47,115    81,535 
TOTAL   3,347,453    3,213,917 
         
PROPERTY, PLANT AND EQUIPMENT        
Electric   30,713,284    29,161,027 
Property under capital lease   730,182    727,565 
Natural gas   92,787    86,794 
Construction work in progress   786,147    1,524,085 
Nuclear fuel under capital lease   269,485    271,615 
Nuclear fuel   561,291    436,646 
TOTAL PROPERTY, PLANT AND EQUIPMENT   33,153,176    32,207,732 
Less - accumulated depreciation and amortization   13,715,099    13,010,687 
PROPERTY, PLANT AND EQUIPMENT - NET   19,438,077    19,197,045 
         
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:        
  SFAS 109 regulatory asset - net   740,110    735,221 
  Other regulatory assets   2,768,352    2,133,724 
  Deferred fuel costs   168,122    120,489 
Long-term receivables   19,349    25,572 
Goodwill   377,172    377,172 
Other   898,662    991,835 
TOTAL   4,971,767    4,384,013 
          
TOTAL ASSETS   $31,082,731    $30,857,657 
         
See Notes to Financial Statements.        
 
 
52
 
 
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND SHAREHOLDERS' EQUITY
 
    December 31,
    2006   2005
    (In Thousands)
         
CURRENT LIABILITIES        
Currently maturing long-term debt   $181,576    $103,517 
Notes payable   25,039    40,041 
Accounts payable   1,122,596    1,655,787 
Customer deposits   248,031    222,206 
Taxes accrued   187,324    188,159 
Accumulated deferred income taxes     143,409 
Interest accrued   160,831    154,855 
Deferred fuel costs   73,031   
Obligations under capital leases   153,246    130,882 
Pension and other postretirement liabilities   41,912   
Other   271,544    473,510 
TOTAL   2,465,130    3,112,366 
         
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued   5,820,700    5,282,759 
Accumulated deferred investment tax credits   358,550    376,550 
Obligations under capital leases   188,033    175,005 
Other regulatory liabilities   449,237    408,667 
Decommissioning and asset retirement cost liabilities   2,023,846    1,923,971 
Transition to competition   79,098    79,101 
Regulatory reserves   219    18,624 
Accumulated provisions   88,902    144,880 
Pension and other postretirement liabilities   1,410,433    1,118,964 
Long-term debt   8,798,087    8,824,493 
Preferred stock with sinking fund   10,500    13,950 
Other   847,196    1,184,082 
TOTAL   20,074,801    19,551,046 
         
Commitments and Contingencies        
         
Preferred stock without sinking fund   344,913    445,974 
         
SHAREHOLDERS' EQUITY        
Common stock, $.01 par value, authorized 500,000,000        
 shares; issued 248,174,087 shares in 2006 and in 2005   2,482    2,482 
Paid-in capital   4,827,265    4,817,637 
Retained earnings   6,113,042    5,433,931 
Accumulated other comprehensive loss   (100,512)   (343,819)
Less - treasury stock, at cost (45,506,311 shares in 2006 and        
 40,644,602 shares in 2005)   2,644,390    2,161,960 
TOTAL   8,197,887    7,748,271 
         
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY   $31,082,731    $30,857,657 
         
See Notes to Financial Statements.        

 

53

 

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF RETAINED EARNINGS, COMPREHENSIVE INCOME, AND PAID-IN CAPITAL
 
                             
        For the Years Ended December 31,
        2006   2005   2004
        (In Thousands)
                             
RETAINED EARNINGS                            
                             
Retained Earnings - Beginning of period       $5,433,931        $4,989,826        $4,502,508     
                             
  Add:                            
    Consolidated net income       1,132,602    $1,132,602    898,331    $898,331    909,524    $909,524 
    Adjustment for change in accounting method                   5,524     
      Total       1,132,602        898,331        915,048     
                             
  Deduct:                            
    Dividends declared on common stock       448,572        453,657        427,740     
    Capital stock and other expenses       4,919        569        (10)    
      Total       453,491        454,226        427,730     
                             
Retained Earnings - End of period       $6,113,042        $5,433,931        $4,989,826     
                             
                             
                             
                             
                             
ACCUMULATED OTHER COMPREHENSIVE LOSS                            
Balance at beginning of period:                            
  Accumulated derivative instrument fair value changes       ($392,614)       ($141,411)       ($25,811)    
  Other accumulated comprehensive income (loss) items       48,795        47,958        18,016     
     Total       (343,819)       (93,453)       (7,795)    
                             
                             
Net derivative instrument fair value changes                            
  arising during the period (net of tax expense (benefit) of $187,462,                            

  ($159,236) and ($74,082))

      287,036    287,036    (251,203)   (251,203)   (115,600)   (115,600)
                             
Foreign currency translation (net of tax expense of $1,122, $211, and $659)       3,207    3,207    602    602    1,882    1,882 
                             
Minimum pension liability (net of tax expense (benefit) of ($5,911),                             

  ($9,176), and $1,875) 

      (7,759)   (7,759)   (15,773)   (15,773)   2,762    2,762 
                             
Pension and other postretirement liabilities (net of tax (benefit) of ($92,419))       (75,805)          
                             
Net unrealized investment gains (net of tax expense of $28,428,                            

  $10,573, and $16,599)

      36,628    36,628    16,008    16,008    25,298    25,298 
                             
Balance at end of period:                            
  Accumulated derivative instrument fair value changes       (105,578)       (392,614)       (141,411)    
  Other accumulated comprehensive income items       5,066        48,795        47,958     
     Total       ($100,512)       ($343,819)       ($93,453)    
Comprehensive Income           $1,451,714        $647,965        $823,866 
                             
                             
PAID-IN CAPITAL                            
                             
Paid-in Capital - Beginning of period       $4,817,637        $4,835,375        $4,767,615     
                             
  Add (Deduct):                            
    Issuance of equity units             (39,904)          
    Common stock issuances related to stock plans       9,628        22,166        67,760     
                             
                             
Paid-in Capital - End of period       $4,827,265        $4,817,637        $4,835,375     
                             
                             
                             
See Notes to Financial Statements.                            
                             

54

ENTERGY CORPORATION AND SUBSIDIARIES

NOTES TO FINANCIAL STATEMENTS

NOTE 1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

The accompanying consolidated financial statements include the accounts of Entergy Corporation and its direct and indirect subsidiaries. As required by generally accepted accounting principles, all significant intercompany transactions have been eliminated in the consolidated financial statements. Entergy's Registrant Subsidiaries (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy) also include their separate financial statements in this Form 10-K because those companies have registered securities with the SEC. The Registrant Subsidiaries and many other Entergy subsidiaries maintain accounts in accordance with FERC and other regulatory guidelines. Certain previously reported amounts have been reclassified to conform to current classifications, with no effect on net income or shareholders' equity.

Use of Estimates in the Preparation of Financial Statements

In conformity with generally accepted accounting principles, the preparation of Entergy Corporation's consolidated financial statements and the separate financial statements of the Registrant Subsidiaries requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, and expenses and the disclosure of contingent assets and liabilities. Adjustments to the reported amounts of assets and liabilities may be necessary in the future to the extent that future estimates or actual results are different from the estimates used.

Revenues and Fuel Costs

Entergy Arkansas, Entergy Louisiana, and Entergy Mississippi generate, transmit, and distribute electric power primarily to retail customers in Arkansas, Louisiana, and Mississippi, respectively. Entergy Gulf States generates, transmits, and distributes electric power primarily to retail customers in Texas and Louisiana. Entergy Gulf States also distributes gas to retail customers in and around Baton Rouge, Louisiana. Entergy New Orleans sells both electric power and gas to retail customers in the City of New Orleans, except for Algiers, where Entergy Louisiana is the electric power supplier. Entergy's Non-Utility Nuclear segment derives almost all of its revenue from sales of electric power generated by plants owned by the Non-Utility Nuclear segment.

Entergy recognizes revenue from electric power and gas sales when power or gas is delivered to customers. To the extent that deliveries have occurred but a bill has not been issued, Entergy's Utility operating companies accrue an estimate of the revenues for energy delivered since the latest billings. The Utility operating companies calculate the estimate based upon several factors including billings through the last billing cycle in a month, actual generation in the month, historical line loss factors, and prices in effect in Entergy's Utility operating companies' various jurisdictions. Changes are made to the inputs in the estimate as needed to reflect changes in billing practices. Each month the estimated unbilled revenue amounts are recorded as revenue and unbilled accounts receivable, and the prior month's estimate is reversed. Therefore, changes in price and volume differences resulting from factors such as weather affect the calculation of unbilled revenues from one period to the next, and may result in variability in reported revenues from one period to the next as prior estimates are reversed and new estimates recorded.

Entergy's Utility operating companies' rate schedules include either fuel adjustment clauses or fixed fuel factors, which allow either current recovery in billings to customers or deferral of fuel costs until the costs are billed to customers. Because the fuel adjustment clause mechanism allows monthly adjustments to recover fuel costs, Entergy New Orleans and, prior to 2006, Entergy Louisiana and the Louisiana portion of Entergy Gulf States include a component of fuel cost recovery in their unbilled revenue calculations. Effective January 1, 2006, however, for Entergy Louisiana and the Louisiana portion of Entergy Gulf States this fuel component of unbilled accounts receivable was reclassified to a deferred fuel asset and is no longer

 

55

 

 

 included in the unbilled revenue calculations, which is in accordance with regulatory treatment. Where the fuel component of revenues is billed based on a pre-determined fuel cost (fixed fuel factor), the fuel factor remains in effect until changed as part of a general rate case, fuel reconciliation, or fixed fuel factor filing. Entergy Mississippi's fuel factor includes an energy cost rider that is adjusted quarterly. In the case of Entergy Arkansas and the Texas portion of Entergy Gulf States, a portion of their fuel under-recoveries are treated in the cash flow statements as regulatory investments because those companies are allowed by their regulatory jurisdictions to recover the fuel cost regulatory asset over longer than a twelve-month period, and the companies earn a carrying charge on the under-recovered balances.

System Energy's operating revenues are intended to recover from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans operating expenses and capital costs attributable to Grand Gulf. The capital costs are computed by allowing a return on System Energy's common equity funds allocable to its net investment in Grand Gulf, plus System Energy's effective interest cost for its debt allocable to its investment in Grand Gulf.

Property, Plant, and Equipment

Property, plant, and equipment is stated at original cost. Depreciation is computed on the straight-line basis at rates based on the estimated service lives of the various classes of property. For the Registrant Subsidiaries, the original cost of plant retired or removed, less salvage, is charged to accumulated depreciation. Normal maintenance, repairs, and minor replacement costs are charged to operating expenses. Substantially all of the Registrant Subsidiaries' plant is subject to mortgage liens.

Electric plant includes the portions of Grand Gulf and Waterford 3 that have been sold and leased back. For financial reporting purposes, these sale and leaseback arrangements are reflected as financing transactions.

Net property, plant, and equipment for Entergy (including property under capital lease and associated accumulated amortization) by business segment and functional category, as of December 31, 2006 and 2005, is shown below:



2006

 



Entergy

 



Utility

 


Non-Utility
Nuclear

 


All
Other

(In Millions)

Production

 

 

 

 

 

 

 

 

   Nuclear

 

$7,558

 

$5,835

 

$1,723

 

$-

   Other

 

1,610

 

1,373

 

-

 

237

Transmission

 

2,500

 

2,500

 

-

 

-

Distribution

 

5,041

 

5,041

 

-

 

-

Other

 

1,113

 

1,111

 

-

 

2

Construction work in progress

 

786

 

602

 

175

 

9

Nuclear fuel (leased and owned)

 

830

 

476

 

354

 

-

Property, plant, and equipment - net

 

$19,438

 

$16,938

 

$2,252

 

$248

56



2005



Entergy

 



Utility

 


Non-Utility
Nuclear

 


All
Other

(In Millions)

Production

 

 

 

 

 

 

 

 

  Nuclear

 

$7,390

 

$5,955

 

$1,435

 

$-

  Other

 

1,590

 

1,321

 

-

 

269

Transmission

 

2,394

 

2,394

 

-

 

-

Distribution

 

4,599

 

4,599

 

-

 

-

Other

 

992

 

989

 

-

 

3

Construction work in progress

 

1,524

 

1,268

 

232

 

24

Nuclear fuel (leased and owned)

 

708

 

373

 

335

 

-

Property, plant, and equipment - net

 

$19,197

 

$16,899

 

$2,002

 

$296

Depreciation rates on average depreciable property for Entergy approximated 2.7% in 2006, 2.7% in 2005, and 2.8% in 2004. Included in these rates are the depreciation rates on average depreciable utility property of 2.6% in 2006, 2.6% in 2005, and 2.7% in 2004 and the depreciation rates on average depreciable non-utility property of 3.6% in 2006, 3.2% in 2005, and 3.8% in 2004.

"Non-utility property - at cost (less accumulated depreciation)" for Entergy is reported net of accumulated depreciation of $167.5 million and $162.2 million as of December 31, 2006 and 2005, respectively.

Net property, plant, and equipment for the Registrant Subsidiaries (including property under capital lease and associated accumulated amortization) by company and functional category, as of December 31, 2006 and 2005, is shown below:


2006

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Millions)

Production

                       

  Nuclear

 

$1,101

 

$1,540

 

$1,495

 

$-

 

$-

 

$1,699

  Other

 

246

 

481

 

356

 

290

 

2

 

-

Transmission

 

690

 

872

 

502

 

429

 

23

 

7

Distribution

 

1,384

 

1,496

 

1,324

 

837

 

256

 

-

Other

 

197

 

298

 

311

 

191

 

157

 

14

Construction work in progress

 

113

 

149

 

190

 

80

 

22

 

38

Nuclear fuel (leased and owned)

 

146

 

84

 

82

 

-

 

-

 

66

Property, plant, and equipment - net

 

$3,877

 

$4,920

 

$4,260

 

$1,827

 

$460

 

$1,824


2005

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

(In Millions)

Production

                       

  Nuclear

 

$1,065

 

$1,597

 

$1,526

 

$-

 

$-

 

$1,767

  Other

 

253

 

510

 

359

 

199

 

7

 

-

Transmission

 

681

 

831

 

454

 

420

 

29

 

8

Distribution

 

1,322

 

1,461

 

1,039

 

777

 

349

 

-

Other

 

189

 

181

 

301

 

191

 

68

 

14

Construction work in progress

 

139

 

526

 

415

 

119

 

202

 

47

Nuclear fuel (leased and owned)

 

115

 

66

 

58

 

-

 

-

 

88

Property, plant, and equipment - net

 

$3,764

 

$5,172

 

$4,152

 

$1,706

 

$655

 

$1,924

57

Depreciation rates on average depreciable property for the Registrant Subsidiaries are shown below:

   

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

                         

2006

 

3.2%

 

2.1%

 

2.5%

 

2.6%

 

3.0%

 

2.9%

2005

 

3.1%

 

2.1%

 

2.6%

 

2.6%

 

3.1%

 

2.8%

2004

 

3.2%

 

2.1%

 

2.9%

 

2.5%

 

2.8%

 

2.9%

Non-utility property - at cost (less accumulated depreciation) for Entergy Gulf States is reported net of accumulated depreciation of $127.4 million and $128.0 million as of December 31, 2006 and 2005, respectively.

Jointly-Owned Generating Stations

Certain Entergy subsidiaries jointly own electric generating facilities with third parties. The investments and expenses associated with these generating stations are recorded by the Entergy subsidiaries to the extent of their respective undivided ownership interests. As of December 31, 2006, the subsidiaries' investment and accumulated depreciation in each of these generating stations were as follows:



Generating Stations

 



Fuel-Type

 

Total
Megawatt
Capability (1)

 



Ownership

 



Investment

 


Accumulated
Depreciation

 

 

 

 

 

 

 

 

 

(In Millions)

Utility business:

 

 

 

 

 

 

 

 

 

 

 

Entergy Arkansas -

                     

  Independence

Unit 1

 

Coal

 

815

 

31.50%

 

$119

 

$82

 

Common Facilities

 

Coal

     

15.75%

 

$31

 

$20

  White Bluff

Units 1 and 2

 

Coal

 

1,635

 

57.00%

 

$440

 

$293

Entergy Gulf States -

                     

  Roy S. Nelson

Unit 6

 

Coal

 

550

 

70.00%

 

$405

 

$258

  Big Cajun 2

Unit 3

 

Coal

 

575

 

42.00%

 

$233

 

$140

Entergy Mississippi -

                     

  Independence

Units 1 and 2 and Common Facilities

 

Coal

 

1,630

 

25.00%

 

$235

 

$125

System Energy -

                     

  Grand Gulf

Unit 1

 

Nuclear

 

1,270

 

90.00%(2)

 

$3,824

 

$2,000

                       

Non-nuclear wholesale assets:

                     

Harrison County

 

 

Gas

 

550

 

60.90%

 

$210

 

$15

Warren

   

Gas

 

300

 

75.00%

 

$21

 

$7

(1)

"Total Megawatt Capability" is the dependable load carrying capability as demonstrated under actual operating conditions based on the primary fuel (assuming no curtailments) that each station was designed to utilize.

(2)

Includes an 11.5% leasehold interest held by System Energy. System Energy's Grand Gulf lease obligations are discussed in Note 10 to the financial statements.

58

Nuclear Refueling Outage Costs

Nuclear refueling outage costs are deferred during the outage and amortized over the period to the next outage because these refueling outage expenses are incurred to prepare the units to operate for the next operating cycle without having to be taken off line. Prior to 2006, River Bend's costs were accrued in advance of the outage and included in the cost of service used to establish retail rates. Entergy Gulf States relieved the accrued liability when it incurred costs during the next River Bend outage. In 2006, Entergy Gulf States adopted FSP No. AUG AIR-1, "Accounting for Planned Major Maintenance Activities," for its River Bend nuclear refueling outage costs and now accounts for these costs in the same manner as Entergy's other subsidiaries. Adoption of FSP No. AUG AIR-1 resulted in an immaterial retrospective adjustment to Entergy's and Entergy Gulf States' retained earnings balance.

Allowance for Funds Used During Construction (AFUDC)

AFUDC represents the approximate net composite interest cost of borrowed funds and a reasonable return on the equity funds used for construction by the Registrant Subsidiaries. Although AFUDC increases both the plant balance and earnings, it is realized in cash through depreciation provisions included in rates.

Income Taxes

Entergy Corporation and the majority of its subsidiaries file a United States consolidated federal income tax return. Entergy Louisiana, formed December 31, 2005, is not a member of the consolidated group and files a separate federal income tax return. Income taxes are allocated to the subsidiaries in proportion to their contribution to consolidated taxable income. In accordance with SFAS 109, "Accounting for Income Taxes," deferred income taxes are recorded for all temporary differences between the book and tax basis of assets and liabilities, and for certain credits available for carryforward.

Deferred tax assets are reduced by a valuation allowance when, in the opinion of management, it is more likely than not that some portion of the deferred tax assets will not be realized. Deferred tax assets and liabilities are adjusted for the effects of changes in tax laws and rates in the period in which the tax or rate was enacted.

Investment tax credits are deferred and amortized based upon the average useful life of the related property, in accordance with ratemaking treatment.

 

59

 

Earnings per Share

The following table presents Entergy's basic and diluted earnings per share (EPS) calculation included on the consolidated income statement:

For the Years Ended December 31,

 

 

2006

 

2005

 

2004

(In Millions, Except Per Share Data)

 

 

 

 

$/share

 

 

 

$/share

 

 

 

$/share

Income from continuing operations

 

$1,133.1

 

 

 

$943.1

 

 

 

$909.6

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

Average number of common shares outstanding - basic

 


207.5

 


$5.46 

 


210.1

 


$4.49 

 


226.9

 


$4.01 

Average dilutive effect of:

 

 

 

 

 

 

 

 

 

 

 

 

  Stock Options (1)

 

3.8

 

(0.098)

 

4.0

 

(0.085)

 

4.1

 

(0.071)

  Deferred Units

 

0.2

 

(0.005)

 

0.3

 

(0.006)

 

0.2

 

(0.004)

Average number of common shares outstanding - diluted

 


211.5

 


$5.36 

 


214.4

 


$4.40 

 


231.2

 


$3.93 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Consolidated Net Income

 

$1,132.6

 

 

 

$898.3

 

 

 

$909.5

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

Average number of common shares outstanding - basic

 


207.5

 


$5.46 

 


210.1

 


$4.27 

 


226.9

 


$4.01 

Average dilutive effect of:

 

 

 

 

 

 

 

 

 

 

 

 

  Stock Options (1)

 

3.8

 

(0.098)

 

4.0

 

(0.081)

 

4.1

 

(0.071)

  Deferred Units

 

0.2

 

(0.005)

 

0.3

 

(0.005)

 

0.2

 

(0.004)

Average number of common shares outstanding - diluted

 


211.5

 


$5.36 

 


214.4

 


$4.19 

 


231.2

 


$3.93 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)

Options to purchase approximately 1,727,579 common stock shares in 2005 and 3,319 common stock shares in 2004 at various prices were outstanding at the end of those years that were not included in the computation of diluted earnings per share because the exercise prices of those options were greater than the common share average market price at the end of each of the years presented. All options to purchase common stock shares in 2006 were included in the computation of diluted earnings per share because the common share average market price at the end of 2006 was greater than the exercise prices of all of the options outstanding.

Entergy has 10,000,000 equity units outstanding as of December 31, 2006 that obligate the holders to purchase a certain number of shares of Entergy common stock for a stated price no later than February 17, 2009.  Each contract executed prior to February 17, 2009 would be equal to 0.5705 common stock shares.  The equity units were not included in the calculation at December 31, 2006 and 2005 because Entergy's average stock price for the year was less than the threshold appreciation price of the equity units.

60

Stock-based Compensation Plans

Entergy grants stock options to key employees of the Entergy subsidiaries, which is described more fully in Note 12 to the financial statements. Effective January 1, 2003, Entergy prospectively adopted the fair value based method of accounting for stock options prescribed by SFAS 123, "Accounting for Stock-Based Compensation." Awards under Entergy's plans vest over three years. Therefore, the cost related to stock-based employee compensation included in the determination of net income for 2004 is less than that which would have been recognized if the fair value based method had been applied to all awards since the original effective date of SFAS 123. There is no pro forma effect for 2006 and 2005 because all non-vested awards are accounted for at fair value. Stock-based compensation expense included in consolidated net income, net of related tax effects, for 2006 is $6.8 million and for 2005 is $7.8 million. The following table illustrates the effect on net income and earnings per share for 2004 if Entergy would have historically applied the fair value based method of accounting to stock-based employee compensation.

   

For the Year Ended
December 31, 2004

 

 

(In Thousands, Except
Per Share Data)

 

 

 

Consolidated Net Income

 

$909,524

Add back: Stock-based compensation expense
  included in earnings applicable to common stock,
  net of related tax effects

  



5,141

Deduct: Total stock-based employee compensation
  expense determined under fair value method for all
  awards, net of related tax effects

 



16,668

Pro forma consolidated net income

 

$897,997

 

 

 

Earnings per average common share:

 

 

  Basic

 

$4.01

  Basic - pro forma

 

$3.96

 

 

 

  Diluted

 

$3.93

  Diluted - pro forma

 

$3.88

Application of SFAS 71

Entergy's Utility operating companies and System Energy currently account for the effects of regulation pursuant to SFAS 71, "Accounting for the Effects of Certain Types of Regulation." This statement applies to the financial statements of a rate-regulated enterprise that meets three criteria. The enterprise must have rates that (i) are approved by a body empowered to set rates that bind customers (its regulator); (ii) are cost-based; and (iii) can be charged to and collected from customers. These criteria may also be applied to separable portions of a utility's business, such as the generation or transmission functions, or to specific classes of customers. If an enterprise meets these criteria, it capitalizes costs that would otherwise be charged to expense if the rate actions of its regulator make it probable that those costs will be recovered in future revenue. Such capitalized costs are reflected as regulatory assets in the accompanying financial statements. A significant majority of Entergy's regulatory assets, net of related regulatory and deferred tax liabilities, earn a return on investment during their recovery periods, or Entergy expects that they will earn a return. SFAS 71 requires that rate-regulated enterprises continue to assess the probability of recovering their regulatory assets. When an enterprise concludes that recovery of a regulatory asset is no longer probable, the regulatory asset must be removed from the entity's balance sheet.

61

SFAS 101, "Accounting for the Discontinuation of Application of FASB Statement No. 71," specifies how an enterprise that ceases to meet the criteria for application of SFAS 71 for all or part of its operations should report that event in its financial statements. In general, SFAS 101 requires that the enterprise report the discontinuation of the application of SFAS 71 by eliminating from its balance sheet all regulatory assets and liabilities related to the applicable segment. Additionally, if it is determined that a regulated enterprise is no longer recovering all of its costs and therefore no longer qualifies for SFAS 71 accounting, it is possible that an impairment may exist that could require further write-offs of plant assets.

EITF 97-4: "Deregulation of the Pricing of Electricity - Issues Related to the Application of FASB Statements No. 71 and 101" specifies that SFAS 71 should be discontinued at a date no later than when the effects of a transition to competition plan for all or a portion of the entity subject to such plan are reasonably determinable. Additionally, EITF 97-4 promulgates that regulatory assets to be recovered through cash flows derived from another portion of the entity that continues to apply SFAS 71 should not be written off; rather, they should be considered regulatory assets of the segment that will continue to apply SFAS 71.

See Note 2 to the financial statements for discussion of transition to competition activity in the retail regulatory jurisdictions served by Entergy's Utility operating companies.

Cash and Cash Equivalents

Entergy considers all unrestricted highly liquid debt instruments with an original or remaining maturity of three months or less at date of purchase to be cash equivalents. Investments with original maturities of more than three months are classified as other temporary investments on the balance sheet.

Investments

Entergy applies the provisions of SFAS 115, "Accounting for Investments for Certain Debt and Equity Securities," in accounting for investments in decommissioning trust funds. As a result, Entergy records the decommissioning trust funds at their fair value on the consolidated balance sheet. Because of the ability of the Registrant Subsidiaries to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, the Registrant Subsidiaries have recorded an offsetting amount of unrealized gains/(losses) on investment securities in other regulatory liabilities/assets. For the nonregulated portion of River Bend, Entergy Gulf States has recorded an offsetting amount of unrealized gains/(losses) in other deferred credits. Decommissioning trust funds for Pilgrim, Indian Point 2, and Vermont Yankee do not receive regulatory treatment. Accordingly, unrealized gains recorded on the assets in these trust funds are recognized in the accumulated other comprehensive income component of shareholders' equity because these assets are classified as available for sale. Unrealized losses (where cost exceeds fair market value) on the assets in these trust funds are also recorded in the accumulated other comprehensive income component of shareholders' equity unless the unrealized loss is other than temporary and therefore recorded in earnings. The assessment of whether an investment has suffered an other than temporary impairment is based on a number of factors including, first, whether Entergy has the ability and intent to hold the investment to recover its value and, then, whether it is expected that the investment will recover its value within a reasonable period of time. See Note 17 to the financial statements for details on the decommissioning trust funds.

Equity Method Investees

Entergy owns investments that are accounted for under the equity method of accounting because Entergy's ownership level results in significant influence, but not control, over the investee and its operations. Entergy records its share of earnings or losses of the investee based on the change during the period in the estimated liquidation value of the investment, assuming that the investee's assets were to be liquidated at book value. In accordance with this method, earnings are allocated to owners or members based on what each partner would receive from its capital account if, hypothetically, liquidation were to occur at the balance sheet date and amounts distributed were based on recorded book values. Entergy

 

62

 

 

discontinues the recognition of losses on equity investments when its share of losses equals or exceeds its carrying amount for an investee plus any advances made or commitments to provide additional financial support. See Note 14 to the financial statements for additional information regarding Entergy's equity method investments.

Derivative Financial Instruments and Commodity Derivatives

SFAS 133, "Accounting for Derivative Instruments and Hedging Activities," requires that all derivatives be recognized in the balance sheet, either as assets or liabilities, at fair value, unless they meet the normal purchase, normal sales criteria. The changes in the fair value of recognized derivatives are recorded each period in current earnings or other comprehensive income, depending on whether a derivative is designated as part of a hedge transaction and the type of hedge transaction.

Contracts for commodities that will be delivered in quantities expected to be used or sold in the ordinary course of business, including certain purchases and sales of power and fuel, are not classified as derivatives. These contracts are exempted under the normal purchase, normal sales criteria of SFAS 133. Revenues and expenses from these contracts are reported on a gross basis in the appropriate revenue and expense categories as the commodities are received or delivered.

For other contracts for commodities in which Entergy is hedging the variability of cash flows related to a variable-rate asset, liability, or forecasted transactions that qualify as cash flow hedges, the changes in the fair value of such derivative instruments are reported in other comprehensive income. To qualify for hedge accounting, the relationship between the hedging instrument and the hedged item must be documented to include the risk management objective and strategy and, at inception and on an ongoing basis, the effectiveness of the hedge in offsetting the changes in the cash flows of the item being hedged. Gains or losses accumulated in other comprehensive income are reclassified as earnings in the periods in which earnings are affected by the variability of the cash flows of the hedged item. The ineffective portions of all hedges are recognized in current-period earnings.

Fair Values

The estimated fair values of Entergy's financial instruments and derivatives are determined using bid prices and market quotes. Considerable judgment is required in developing the estimates of fair value. Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange. Gains or losses realized on financial instruments held by regulated businesses may be reflected in future rates and therefore do not accrue to the benefit or detriment of stockholders. Entergy considers the carrying amounts of most financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments.

Impairment of Long-Lived Assets

Entergy periodically reviews long-lived assets held in all of its business segments whenever events or changes in circumstances indicate that recoverability of these assets is uncertain. Generally, the determination of recoverability is based on the undiscounted net cash flows expected to result from such operations and assets. Projected net cash flows depend on the future operating costs associated with the assets, the efficiency and availability of the assets and generating units, and the future market and price for energy over the remaining life of the assets. See Note 13 to the financial statements for a discussion of asset impairments recognized by Entergy in 2005 and 2004.

River Bend AFUDC

The River Bend AFUDC gross-up is a regulatory asset that represents the incremental difference imputed by the LPSC between the AFUDC actually recorded by Entergy Gulf States on a net-of-tax basis during the construction of River Bend and what the AFUDC would have been on a

 

63

 

 

 pre-tax basis. The imputed amount was only calculated on that portion of River Bend that the LPSC allowed in rate base and is being amortized over the estimated remaining economic life of River Bend.

Transition to Competition Liabilities

In conjunction with electric utility industry restructuring activity in Texas, regulatory mechanisms were established to mitigate potential stranded costs. Texas restructuring legislation allowed depreciation on transmission and distribution assets to be directed toward generation assets. The liability recorded by Entergy Gulf States as a result of this mechanism is classified as "transition to competition" deferred credits on the balance sheet. Entergy Gulf States has also recorded a corresponding regulatory asset.

Reacquired Debt

The premiums and costs associated with reacquired debt of Entergy's Utility operating companies and System Energy (except that portion allocable to the deregulated operations of Entergy Gulf States) are included in regulatory assets and are being amortized over the life of the related new issuances, in accordance with ratemaking treatment.

New Accounting Pronouncements

FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy in the first quarter of 2007. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Additional disclosure in the footnotes to the financial statements will also be required for such liabilities. Entergy does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows. Entergy expects that the cumulative effect of the adoption of FIN 48 will result in a reduction to consolidated retained earnings at January 1, 2007 in the range of $3 million to $5 million.

In September 2006 the FASB issued Statement of Financial Accounting Standards No. 157, "Fair Value Measurements" (SFAS 157), which defines fair value, establishes a framework for measuring fair value in GAAP, and expands disclosures about fair value measurements. SFAS 157 generally does not require any new fair value measurements. However, in some cases, the application of SFAS 157 in the future may change Entergy's practice for measuring and disclosing fair values under other accounting pronouncements that require or permit fair value measurements. SFAS 157 is effective for Entergy in the first quarter 2008 and will be applied prospectively. Entergy is currently evaluating SFAS 157 and its potential future impacts on its financial position, results of operations, and cash flows.

In February 2007 the FASB issued Statement of Financial Accounting Standards No. 159, "The Fair Value Option for Financial Assets and Financial Liabilities" (SFAS 159), which permits entities to choose to measure many financial instruments and certain other items at fair value. SFAS 159 is effective for Entergy in the first quarter 2008, and because of SFAS 159's recent issuance Entergy's evaluation is in its initial stages.

Entergy Louisiana Basis of Presentation (Entergy Louisiana)

Effective December 31, 2005, Entergy Louisiana organized under the laws of the State of Texas as a limited liability company as part of a restructuring involving a Texas statutory merger-by-division and succeeded to all of the regulated utility operations of Entergy Louisiana, Inc. Entergy Louisiana was allocated substantially all of the property and other assets of Entergy Louisiana, Inc., including all assets used to provide retail and wholesale electric service to Entergy Louisiana, Inc.'s customers. Entergy Louisiana also assumed substantially all of the liabilities of Entergy Louisiana, Inc., including all of its debt securities and leases but excluding the outstanding preferred stock of Entergy Louisiana, Inc. 

64

On December 31, 2005, and immediately prior to the formation of Entergy Louisiana, Entergy Louisiana, Inc. changed its state of incorporation from Louisiana to Texas and its name to Entergy Louisiana Holdings, Inc. Upon the effectiveness of the statutory merger-by-division on December 31, 2005, Entergy Louisiana was organized and Entergy Louisiana Holdings held all of Entergy Louisiana's common membership interests. All of the common membership interests of Entergy Louisiana continue to be held by Entergy Louisiana Holdings and all of the common stock of Entergy Louisiana Holdings continues to be held by Entergy Corporation.

Because the merger-by-division was a transaction involving entities under common control, Entergy Louisiana initially recognized the assets and liabilities transferred at their carrying amounts in the accounts of Entergy Louisiana Holdings at the time of the transfer. Entergy Louisiana's financial statements report results of operations for 2005 as though the merger-by-division had occurred at the beginning of 2005, and presents its 2005 balance sheet and other financial information as of the beginning of 2005 as though the assets and liabilities had been transferred at that date.  Financial statements and financial information presented for prior periods have also been presented on that basis to furnish comparative information.

Entergy Gulf States' Deregulated Operations (Entergy Gulf States)

Entergy Gulf States does not apply regulatory accounting principles to the Louisiana retail deregulated portion of River Bend, the 30% interest in River Bend formerly owned by Cajun, and its steam business. The Louisiana retail deregulated portion of River Bend is operated under a deregulated asset plan representing a portion (approximately 15%) of River Bend plant costs, generation, revenues, and expenses established under a 1992 LPSC order. The plan allows Entergy Gulf States to sell the electricity from the deregulated assets to Louisiana retail customers at 4.6 cents per kWh or off-system at higher prices, with certain provisions for sharing such incremental revenue above 4.6 cents per kWh between ratepayers and shareholders.

During 2005 and 2006, Entergy filed notices with the FERC to withdraw its market-based rate authority for wholesale transactions in the Entergy control area and submitted new cost-based rates to the FERC for approval. During the second quarter of 2006, the FERC issued an order accepting the cost-based rates filed by Entergy. As described above in "Application of SFAS 71", the Utility operating companies and System Energy apply the provisions of SFAS 71 to operations that meet three criteria: that rates are approved by a regulator, are cost-based, and can be charged to and collected from customers. Prior to this FERC decision, Entergy Gulf States did not apply regulatory accounting principles to its wholesale jurisdiction. The FERC decision in the second quarter of 2006 results in Entergy Gulf States meeting the SFAS 71 criteria discussed above for its wholesale jurisdiction and, therefore, Entergy Gulf States reinstated the application of regulatory accounting principles to its wholesale business which resulted in a regulatory credit of approximately $4.5 million during the second quarter of 2006. The FERC jurisdictional amounts are not included in the results below for the year ended December 31, 2006 in order to produce a better indication of ongoing deregulated operations.

The results of these deregulated operations before interest charges for the years ended December 31, 2006, 2005, and 2004 are as follows:

 

2006

 

2005

 

2004

 

(In Thousands)

           

Operating revenues

$145,858

 

$321,662

 

$280,279

Operating expenses

         

  Fuel, operation, and maintenance

104,260

 

205,673

 

197,275

  Depreciation and accretion

20,265

 

29,602

 

30,653

Total operating expense

124,525

 

235,275

 

227,928

Operating income

21,333

 

86,387

 

53,351

Income tax expense

8,463

 

32,642

 

20,414

Net income from deregulated utility operations

$12,870

 

$53,745

 

$31,937

65

The net investment associated with these deregulated operations as of December 31, 2006 and 2005 was approximately $547 million and $747 million, respectively.

 

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Regulatory Assets

Other Regulatory Assets

The Utility business is subject to the provisions of SFAS 71, "Accounting for the Effects of Certain Types of Regulation." Regulatory assets represent probable future revenues associated with certain costs that are expected to be recovered from customers through the ratemaking process. In addition to the regulatory assets that are specifically disclosed on the face of the balance sheets, the table below provides detail of "Other regulatory assets" that are included on Entergy's balance sheets as of December 31, 2006 and 2005:

   

2006

 

2005

   

(In Millions)

Asset Retirement Obligation - recovery dependent upon timing of
  decommissioning (Note 9)

 


$303.2

 


$271.7

Deferred capacity - recovery timing will be determined by the LPSC in
  the formula rate plan filings (Note 2)

 


127.5

 


93.8

Deferred fuel - non-current - recovered through rate riders when rates are
  redetermined periodically (Note 2)

 


30.9

 


6.1

Depreciation re-direct - recovery begins at start of retail open access
  (Note 1)

 


79.1

 


79.1

DOE Decommissioning and Decontamination Fees - recovered through
  fuel rates until December 2007 (Note 9)

 


9.1

 


17.5

Gas hedging costs - recovered through fuel rates

 

47.6

 

Certain Hurricane Rita costs - recovered through securitization (until
  2021) and insurance proceeds (Note 2) (a)

 


405.6

 


Pension & postretirement costs (Note 11)

 

700.7

 

396.1

Postretirement benefits - recovered through 2012 (Note 11)

 

14.4

 

16.8

Provision for storm damages - recovered through cost of service (a)

 

421.8

 

695.8

Removal costs - recovered through depreciation rates (Note 9)

 

113.2

 

140.4

River Bend AFUDC - recovered through August 2025 (Note 1)

 

33.7

 

35.6

Sale-leaseback deferral - recovered through June 2014 (Note 10)

 

114.0

 

121.4

Spindletop gas storage facility - recovered through December 2032

 

39.0

 

40.6

Transition to competition - recovered through February 2021 (Note 2)

 

117.8

 

Unamortized loss on reacquired debt - recovered over term of debt

 

150.1

 

165.1

Other

 

60.7

 

53.7

Total

 

$2,768.4

 

$2,133.7

(a)

As a result of Hurricane Katrina and Hurricane Rita that hit Entergy's Utility service territories in August and September 2005, the Utility operating companies recorded accruals for the estimated storm restoration costs and recorded some of these costs as regulatory assets because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable. Entergy is pursuing a broad range of initiatives to recover storm restoration costs. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for Hurricanes Katrina and Rita including Community Development Block Grants (CDBG), pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, and securitization. The cost recovery mechanisms and approvals are discussed below.

66

The table below provides detail of "Other regulatory assets" that are included on the Registrant Subsidiaries' balance sheets as of December 31, 2006 and 2005:


2006

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans (b)

 

System
Energy

   

(In Millions)

Asset Retirement Obligation -
  recovery dependent upon timing of
  decommissioning (Note 9)

 



$124.7

 



$11.3

 



$65.0

 



$4.0

 



$2.5

 



$98.2

Removal costs - recovered through
  depreciation rates (Note 9)

 


45.0

 


3.8

 


2.3

 


41.2

 


13.9

 


20.7

Deferred distribution expenses -
  recovered through May 2008

 


-

 


-

 


-

 


-

 


2.3

 


-

Deferred fossil plant maintenance
  expenses
- recovered through
  December 2007

 



-

 



-

 



-

 



-

 



2.4

 



-

Deferred fuel - non-current - recovered
  through rate riders when rates are
  redetermined periodically (Note 2)

 



-

 



-

 



-

 



30.9

 



-

 



-

Depreciation re-direct -recovery begins
  at start of retail open access (Note 1)

 


-

 


79.1

 


-

 


-

 


-

 


-

DOE Decom. and Decontamination Fees
 
- recovered through fuel rates until
  December 2007 (Note 9)

 



4.7

 



0.8

 



1.8

 



-

 



-

 



1.8

Gas hedging costs - recovered through
  fuel rates

 


-

 


18.7

 


16.2

 


12.7

 


2.4

 


-

Incremental ice storm costs - recovered
  through 2032

 


13.2

 


-

 


-

 


-

 


-

 


-

Pension & postretirement costs
 
(Note 11)

 


241.3

 


70.3

 


84.7

 


76.3

 


47.1

 


23.3

Postretirement benefits - recovered
  through 2012 (Note 11)

 


14.4

 


-

 


-

 


-

 


-

 

-

Provision for storm damages -
  recovered through cost of service (a)

 


53.4

 


164.9

 


203.3

 


-

 


135.0

 


-

Certain Hurricane Rita costs -
  recovered through securitization (until
  2021) and insurance proceeds (Note
  2)(a)

 




-

 




405.5

 




-

 




-

 




-

 




-

Certain Hurricane Katrina costs -
  expected recovery through CDBG
  funds, insurance and retail rates (Note
  2) (a)

 




-

 




-

 




-

 



-

 




81.6

 




-

Transition to competition - recovered
  through February 2021 (Note 2)

 


-

 


117.8

 


-

 


-

 


-

 


-

Deferred capacity - recovery timing will
  be determined by the LPSC in the
  formula rate plan filings (Note 2)

 



-

 



13.2

 



114.3

 



-

 



-

 



-

River Bend AFUDC - recovered through
  August 2025 (Note 1)

 


-

 


33.7

 


-

 


-

 


-

 


-

Sale-leaseback deferral - recovered
  through June 2014 (Note 10)

 


-

 


-

 


-

 


-

 


-

 


114.0

Spindletop gas storage facility -
  recovered through December 2032

 


-

 


39.0

 


-

 


-

 


-

 


-

Voluntary severance deferrals -
  recovered through December 2007

 


-

 


-

 


3.8

 


-

 


-

 


-

Unamortized loss on reacquired debt -
  recovered over term of debt

 


38.7

 


37.4

 


26.0

 


13.2

 


3.9

 


34.9

Other

 

6.7

 

5.5

 

21.9

 

8.7

 

4.3

 

0.4

Total

 

$542.1

 

$1,001.0

 

$539.3

 

$187.0

 

$295.4

 

$293.3

67


2005

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans (b)

 

System
Energy

   

(In Millions)

Asset Retirement Obligation

 

$104.7

 

$7.3

 

$56.5

 

$3.8

 

$2.3

 

$99.4

Removal costs

 

86.2

 

17.9

 

-

 

40.9

 

5.4

 

17.9

Deferred distribution expenses

 

-

 

-

 

-

 

-

 

3.5

 

-

Deferred fossil plant maintenance
  expenses

 


-

 


-

 


-

 


-

 


3.6

 


-

Deferred fuel - non-current

 

-

 

-

 

-

 

6.1

 

-

 

-

Depreciation re-direct

 

-

 

79.1

 

-

 

-

 

-

 

-

DOE Decom. and Decontamination
  Fees

 


9.1

 


1.6

 


3.5

 


-

 


-

 


3.4

Incremental ice storm costs

 

13.7

 

-

 

-

 

-

 

-

 

-

Pension costs

 

139.3

 

14.4

 

72.1

 

41.1

 

23.8

 

12.0

Postretirement benefits

 

16.8

 

-

 

-

 

-

 

-

 

-

Provision for storm damages (a)

 

46.5

 

342.2

 

232.6

 

78.7

 

116.9

 

-

Deferred capacity

 

-

 

10.1

 

83.7

 

-

 

-

 

-

River Bend AFUDC

 

-

 

35.6

 

-

 

-

 

-

 

-

Sale-leaseback deferral

 

-

 

-

 

-

 

-

 

-

 

121.4

Spindletop gas storage facility

 

-

 

40.6

 

-

 

-

 

-

 

-

Voluntary severance deferrals

 

-

 

-

 

7.7

 

-

 

-

 

-

Unamortized loss on reacquired debt

 

41.7

 

42.1

 

28.5

 

14.4

 

4.3

 

38.4

Other

 

3.0

 

13.5

 

13.9

 

1.2

 

6.3

 

0.5

Total

 

$461.0

 

$604.4

 

$498.5

 

$186.2

 

$166.1

 

$293.0

(a)

As a result of Hurricane Katrina and Hurricane Rita that hit Entergy's Utility service territories in August and September 2005, the Utility operating companies recorded accruals for the estimated storm restoration costs and originally recorded some of these costs as regulatory assets because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable. Entergy is pursuing a broad range of initiatives to recover storm restoration costs. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for Hurricanes Katrina and Rita including Community Development Block Grants (CDBG), pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, and securitization. Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans have received approval from state regulators for recovery of a portion of the storm restoration costs. In addition, these companies have received insurance proceeds and Entergy New Orleans has approval from state lawmakers for CDBG funding. The cost recovery mechanisms and approvals are discussed below.

(b)

As a result of the Entergy New Orleans bankruptcy proceeding, the timing of recovery of its deferred costs may be affected. Refer to Note 18 to the financial statements for details of the bankruptcy proceeding.

68

Deferred fuel costs

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are allowed to recover certain fuel and purchased power costs through fuel mechanisms included in electric and gas rates that are recorded as fuel cost recovery revenues. The difference between revenues collected and the current fuel and purchased power costs is recorded as "Deferred fuel costs" on the Utility operating companies' financial statements. The table below shows the amount of deferred fuel costs as of December 31, 2006 and 2005 that Entergy expects to recover or (refund) through fuel mechanisms, subject to subsequent regulatory review.

 

2006

 

2005

 

(In Millions)

 

 

 

 

Entergy Arkansas

$2.2 

 

$204.2

Entergy Gulf States (a)

$73.9 

 

$324.4

Entergy Louisiana (a)

$114.3 

 

$21.9

Entergy Mississippi

($95.2)

 

$114.0

Entergy New Orleans (b)

$19.0 

 

$30.6

(a)

Includes fuel, purchased power, and capacity costs that are expected to be recovered over a period greater than twelve months.

(b)

Not included in "Deferred Fuel Costs" on Entergy's consolidated financial statements due to the deconsolidation of Entergy New Orleans effective in 2005.

Entergy Arkansas

In March 2005, Entergy Arkansas filed with the APSC its energy cost recovery rider for the period April 2005 through March 2006. The filed energy cost rate, which accounts for 15 percent of a typical residential customer's bill using 1,000 kWh per month, increased 31 percent primarily attributable to a true-up adjustment for an under-recovery balance of $11.2 million and a nuclear refueling adjustment resulting from outages scheduled in 2005 at ANO 1 and 2 and Grand Gulf.

In September 2005, Entergy Arkansas filed with the APSC an interim energy cost rate per the energy cost recovery rider that provides for an interim adjustment should the cumulative over- or under-recovery for the energy period exceed 10 percent of the energy costs for that period. As of the end of July 2005, the cumulative under-recovery of fuel and purchased power expenses had exceeded the 10 percent threshold due to increases in purchased power expenditures resulting from higher natural gas prices. The interim cost rate of $0.01900 per kWh became effective the first billing cycle in October 2005.

In early October 2005, the APSC initiated an investigation into Entergy Arkansas' interim rate. The investigation is focused on Entergy Arkansas' 1) gas contracting, portfolio, and hedging practices; 2) wholesale purchases during the period; 3) management of the coal inventory at its coal generation plants; and 4) response to the contractual failure of the railroads to provide coal deliveries. In March 2006, the APSC extended its investigation to cover the costs included in Entergy Arkansas' March 2006 filing requesting an energy cost rate of $0.02827 per kWh, which is discussed below. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

On June 7, 2006, Entergy Arkansas filed a cost of service study and testimony supporting the redetermined energy cost rate and testimony addressing the prospective elimination of the energy cost recovery rider as ordered by the APSC. A hearing was held in the APSC energy cost recovery investigation on October 12, 2006 and post-hearing briefs were filed by Entergy Arkansas, the APSC General Staff, the Arkansas Attorney

 

69

 

 

 General, and the Arkansas Electric Energy Consumers. No party recommended termination of the energy cost recovery rider. In the January 16, 2007 order referenced below, the APSC stated the issue of whether Entergy Arkansas' energy cost recovery rider should be terminated, modified, or continued will be deferred and addressed in Entergy Arkansas' pending rate case.

As discussed above, in March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005, as discussed above. The increase in the energy cost rate was due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to railroad delivery problems. On March 31, 2006, the APSC suspended implementation of the $0.02827 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings discussed above. In June 2006, Entergy Arkansas filed a motion with the APSC seeking again to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing, the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation.

On January 16, 2007, the APSC issued an order in its review of Entergy Arkansas' interim rate, mentioned above. The APSC found that Entergy Arkansas failed to maintain an adequate coal inventory level going into the summer of 2005 and that Entergy Arkansas should be responsible for any incremental energy costs resulting from two outages caused by employee and contractor error. As stated above, the coal plant generation curtailments were caused by railroad delivery problems. The APSC staff was directed to perform an analysis with Entergy Arkansas' assistance to determine the additional fuel and purchased energy costs associated with these findings and file the analysis within 60 days of the order. After a final determination of the costs is made by the APSC, Entergy Arkansas would be directed to refund that amount with interest to its customers as a credit on the energy cost recovery rider that collects fuel and purchased energy costs. The order also stated that the APSC would address any additional issues regarding the energy cost recovery rider in the pending Entergy Arkansas rate case. Entergy Arkansas has requested rehearing of the order.

Entergy Gulf States (Texas)

In the Texas jurisdiction, Entergy Gulf States' rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including carrying charges, not recovered in base rates. The fixed fuel factor formula was revised and approved by a PUCT order in August 2006. The new formula was implemented in September 2006. Under the new methodology, semi-annual revisions of the fixed fuel factor will continue to be made in March and September based on the market price of natural gas and changes in fuel mix. Entergy Gulf States will likely continue to use this methodology until the start of retail open access, which has been delayed. The amounts collected under Entergy Gulf States' fixed fuel factor and any interim surcharge implemented until the date retail open access commences are subject to fuel reconciliation proceedings before the PUCT.

Entergy Gulf States filed with the PUCT in July 2005 a request for implementation of an incremental purchased capacity recovery rider, consistent with the Texas legislation discussed below under "Electric Industry Restructuring and the Continued Application of SFAS 71." Through this rider, Entergy Gulf States sought to recover $23.1 million annually in incremental revenues on a Texas retail basis which represents the incremental purchased capacity costs, including Entergy Gulf States' obligation to purchase power from Entergy Louisiana's recently acquired Perryville plant, over what is already in Entergy Gulf States' base rates. Entergy Gulf States reached an initial agreement with parties that the date upon which cost recovery and cost reconciliation would begin is September 1, 2005.  A further non-unanimous settlement was reached with most of the parties that allowed for the implementation of the $18 million annual rider effective December 1, 2005. The settlement also provided for a fuel reconciliation to be filed by Entergy Gulf States by May 15, 2006, which has been filed as discussed below, that would resolve the remaining issues in the case with the

 

70

 

 

 exception of the amount of purchased power in current base rates and the costs to which load growth is attributed, both of which were settled. The hearing with respect to the non-unanimous settlement, which was opposed by the Office of Public Utility Counsel, was conducted on October 19, 2005 before the ALJ, who issued a Proposal for Decision supporting the settlement. In December 2005, the PUCT approved the settlement. The amounts collected by the purchased capacity recovery rider are subject to reconciliation.

In May 2006, Entergy Gulf States filed with the PUCT a fuel and purchased power reconciliation case covering the period September 2003 through December 2005 for costs recoverable through the Texas fixed fuel factor rate and the incremental purchased capacity recovery rider. Entergy Gulf States is reconciling $1.6 billion of fuel and purchased power costs on a Texas retail basis. Hearings are scheduled for April 2007 and a PUCT decision is expected by the third quarter of 2007.

In January 2006, Entergy Gulf States implemented a $46.1 million interim fuel surcharge, including interest, to collect under-recovered fuel and purchased power expenses incurred from August 2004 through July 2005 as approved by the PUCT. The surcharge was to be collected over a twelve-month period. In addition, in March 2006, Entergy Gulf States filed with the PUCT an application to implement an interim fuel surcharge in connection with the under-recovery of $97 million, including interest, of eligible fuel costs for the period August 2005 through January 2006. Entergy Gulf States entered into a unanimous settlement that reduced the requested surcharge for actual over-collections from the months of February and March 2006, resulting in a surcharge of $78.8 million to be implemented over a twelve-month period beginning in June 2006. The PUCT approved the surcharge in June 2006. Subsequently, as a result of over-recoveries in the months following the implementation of the June 2006 surcharge, Entergy Gulf States entered into a joint agreement with several parties, which was approved by the PUCT, to remove the first interim fuel surcharge (the January 2006 surcharge) effective with the first billing cycle in November 2006. Additionally, Entergy Gulf States requested that the PUCT remove the second interim surcharge (the June 2006 surcharge) as of November 2006 as well, which the PUCT has approved. Amounts collected through the interim fuel surcharges are subject to final reconciliation in a future fuel reconciliation proceeding.

In March 2004, Entergy Gulf States filed with the PUCT a fuel reconciliation case covering the period September 2000 through August 2003 reconciling $1.43 billion of fuel and purchased power costs on a Texas retail basis. This amount included $8.6 million of under-recovered costs that Entergy Gulf States asked to reconcile and roll into its fuel over/under-recovery balance to be addressed in the next appropriate fuel proceeding. This case involved imputed capacity and River Bend payment issues similar to those decided adversely in the January 2001 proceeding, which is discussed below. On January 31, 2005, the ALJ issued a Proposal for Decision that recommended disallowing $10.7 million (excluding interest) related to these two issues. In April 2005, the PUCT issued an order reversing in part the ALJ's Proposal for Decision and allowing Entergy Gulf States to recover a part of its request related to the imputed capacity and River Bend payment issues. The PUCT's order reduced the disallowance in the case to $8.3 million. Both Entergy Gulf States and certain cities served by Entergy Gulf States filed motions for rehearing on these issues which were denied by the PUCT. Entergy Gulf States and certain cities filed appeals to the Travis County District Court. Based on the Texas Supreme Court decision described below covering these issues for previous periods, Entergy Gulf States is withdrawing its appeal of this decision.

In January 2001, Entergy Gulf States filed with the PUCT a fuel reconciliation case covering the period from March 1999 through August 2000. Entergy Gulf States was reconciling approximately $583 million of fuel and purchased power costs. As part of this filing, Entergy Gulf States requested authority to collect $28 million, plus interest, of under-recovered fuel and purchased power costs. In August 2002, the PUCT reduced Entergy Gulf States' request to approximately $6.3 million, including interest through July 31, 2002. Approximately $4.7 million of the total reduction to the requested surcharge relates to nuclear fuel costs that the PUCT deferred ruling on at that time. In October 2002, Entergy Gulf States appealed the PUCT's final order in Texas District Court. In its appeal, Entergy Gulf States challenged the PUCT's disallowance of approximately $4.2 million related to imputed capacity costs and its disallowance related to costs for energy delivered from the 30% non-regulated share of River Bend. The case was argued before the Travis County District Court in August 2003 and the Travis County District Court judge affirmed the PUCT's order. In

 

71

 

 

 October 2003, Entergy Gulf States appealed this decision to the Court of Appeals. Oral argument before the appellate court occurred in September 2004, and the Court denied Entergy Gulf States' appeal. In October 2005, Entergy Gulf States filed a petition for review by the Texas Supreme Court, and in December 2005, the Texas Supreme Court requested that responses be filed to Entergy Gulf States' petition as part of its ongoing consideration of whether to exercise its discretion to grant review of this matter. Those responses and Entergy Gulf States' reply to those responses were filed in January 2006. In September 2006, the Texas Supreme Court denied the appeal. Entergy Gulf States has decided not to continue to pursue this appeal. Entergy Gulf States recorded reserves for the amounts at issue in this appeal and the appeal of the subsequent case with identical issues and they have been written off.

Entergy Gulf States (Louisiana) and Entergy Louisiana

In Louisiana, Entergy Gulf States and Entergy Louisiana recover electric fuel and purchased power costs for the upcoming month based upon the level of such costs from the prior month. In Louisiana, Entergy Gulf States' purchased gas adjustments include estimates for the billing month adjusted by a surcharge or credit for deferred fuel expense arising from monthly reconciliations of actual fuel costs incurred with fuel cost revenues billed to customers.

In August 2000, the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Louisiana pursuant to a November 1997 LPSC general order. The time period that is the subject of the audit is January 1, 2000 through December 31, 2001. In September 2003, the LPSC staff issued its audit report and recommended a disallowance with regard to an alleged failure to uprate Waterford 3 in a timely manner. This issue was resolved with the March 2005 global settlement. Subsequent to the issuance of the audit report, the scope of this docket was expanded to include a review of annual reports on fuel and purchased power transactions with affiliates and a prudence review of transmission planning issues and to include the years 2002 through 2004. Hearings were held in November 2006 and post-hearing briefs were filed in January and February 2007.

In January 2003, the LPSC authorized its staff to initiate a proceeding to audit the fuel adjustment clause filings of Entergy Gulf States and its affiliates pursuant to a November 1997 LPSC general order. The audit will include a review of the reasonableness of charges flowed by Entergy Gulf States through its fuel adjustment clause in Louisiana for the period January 1, 1995 through December 31, 2002. Discovery is underway, but a detailed procedural schedule extending beyond the discovery stage has not yet been established, and the LPSC staff has not yet issued its audit report. In June 2005, the LPSC expanded the audit to include the years through 2004.

In November 2005, the LPSC authorized its staff to initiate an expedited proceeding to audit the fuel and power procurement activities of Entergy Louisiana and Entergy Gulf States for the period January 1, 2005 through October 31, 2005. In April 2006, the LPSC accepted the LPSC Staff's audit report finding that the prices paid for natural gas and purchased power were reasonable and that given the market conditions surrounding Hurricanes Katrina and Rita, Entergy Louisiana and Entergy Gulf States acted reasonably and prudently in response to an extremely difficult environment.

Entergy Mississippi

Entergy Mississippi's rate schedules include an energy cost recovery rider which is adjusted quarterly to reflect accumulated over- or under-recoveries from the second prior quarter. In January 2005, the MPSC approved a change in Entergy Mississippi's energy cost recovery rider. Entergy Mississippi's fuel over-recoveries for the third quarter of 2004 of $21.3 million were deferred from the first quarter 2005 energy cost recovery rider adjustment calculation. The deferred amount of $21.3 million plus carrying charges was refunded through the energy cost recovery rider in the second and third quarters of 2005.

72

Entergy New Orleans

In June and November 2004, the City Council passed resolutions implementing a package of measures developed by Entergy New Orleans and the Council Advisors to protect customers from potential gas price spikes during the 2004 - 2005 winter heating season. These measures include: maintaining Entergy New Orleans' financial hedging plan for its purchase of wholesale gas, and deferral of collection of up to $6.2 million of gas costs associated with a cap on the purchased gas adjustment in November and December 2004 and in the event that the average residential customer's gas bill were to exceed a threshold level. The deferral of $1.7 million resulting from these caps was recovered over a seven-month period that began in April 2005.

In November 2004, the City Council directed Entergy New Orleans to confer with the Council Advisors regarding possible modification of the gas cost collection mechanism in order to address concerns regarding its fluctuations, particularly during the winter heating season. In June 2005, Entergy New Orleans filed a new purchased gas adjustment tariff (PGA tariff) with the City Council. The City Council approved the PGA tariff which became effective with billings in October 2005. In October 2005, the City Council approved modifications to the PGA tariff that became effective in November 2005. The modifications are intended to minimize fluctuations in PGA rates during the winter months.

Storm Cost Recovery Filings with Retail Regulators

Entergy Gulf States - Texas

In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas retail jurisdiction through March 31, 2006. The filing asked the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States allocates those costs among its Texas retail customer classes.  This was the first of two filings authorized by a law passed earlier in 2006 in a special session of the Texas Legislature. In December 2006, the PUCT approved $381 million of reasonable and necessary hurricane reconstruction costs incurred through March 31, 2006, plus carrying costs, as eligible for recovery. After netting expected insurance proceeds, the amount is $353 million. In February 2007, the PUCT voted to approve securitization of the $353 million in storm cost recovery expenses, but it also offset the securitization amount by $31.6 million, which the PUCT Commissioners determined was the net present value of the accumulated deferred income tax benefits related to the storm costs. The PUCT also voted to impose certain caps on the amount of qualified transaction costs that can be included in the total securitization amount. The PUCT is expected to issue a financing order authorizing the issuance of securitization bonds by early-March 2007, and Entergy Gulf States intends to implement rates to recover revenues to pay the securitization bonds by mid-2007. Entergy Gulf States will file a semi-annual report with the PUCT to reflect any additional insurance proceeds or other government grant money received, which would be applied against the storm cost recovery balance.

Entergy Gulf States - Louisiana and Entergy Louisiana

In May 2006, Entergy Gulf States completed the $6 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, Entergy Gulf States' interim storm cost recovery of $0.85 million per month was instituted via the formula rate plan.  Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Gulf States' supplemental and amending storm cost recovery application, which is discussed below.

In April 2006, Entergy Louisiana completed the $14 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, Entergy Louisiana's interim storm cost recovery of $2 million per month was instituted via the formula rate plan.  Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Louisiana's supplemental and amending storm cost recovery application, which is discussed below.

73

On July 31, 2006, Entergy Louisiana and Entergy Gulf States filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in the Louisiana jurisdiction and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, including carrying costs, based on a ten-year levelized rate, are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Securitized Storm Cost Recovery Riders (SSCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SSCRRs be adjusted annually (or semi-annually if needed) to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SSCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States.

On February 28, 2007, Entergy Louisiana and Entergy Gulf States filed rebuttal testimony and filed a second supplemental and amending application by which they seek authority from the LPSC to securitize their storm cost recovery and storm reserve amounts, together with certain debt retirement costs and upfront and ongoing costs of the securitized debt issued. The filing updates actual storm-related costs through January 2007 and estimated future costs, declaring that Entergy Louisiana's costs are $561 million and Entergy Gulf States' costs are $219 million. The filing also updates the requested storm reserve amounts, requesting $141 million for Entergy Louisiana and $87 million for Entergy Gulf States. Securitization is authorized by a law signed by the Governor of Louisiana in May 2006. Hearings are scheduled for April 2007.

Entergy Mississippi

In March 2006, the Governor of Mississippi signed a law that established a mechanism by which the MPSC could authorize and certify an electric utility financing order and the state could issue bonds to finance the costs of repairing damage caused by Hurricane Katrina to the systems of investor-owned electric utilities.  Because of the passage of this law and the possibility of Entergy Mississippi obtaining CDBG funds for Hurricane Katrina storm restoration costs, in March 2006, the MPSC issued an order approving a Joint Stipulation between Entergy Mississippi and the Mississippi Public Utilities Staff that provided for a review of Entergy Mississippi's total storm restoration costs in an Application for an Accounting Order proceeding.  The Stipulation stated that the procedural schedule of Entergy Mississippi's December 2005 filing seeking recovery of hurricane costs through an existing Entergy Mississippi storm damage rider should be suspended until the MPSC issues a final order in the Application for an Accounting Order proceeding. 

In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later, Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its Hurricane Katrina infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount included the $89 million of Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. Entergy Mississippi's filing stated that the amount actually financed through the state bonds would be net of any CDBG funds that Entergy Mississippi received.

74

In October 2006, the Mississippi Development Authority approved for payment and Entergy Mississippi received $81 million in CDBG funding for Hurricane Katrina costs. The MPSC then issued a financing order authorizing the issuance of $48 million of state bonds, with $8 million for the remainder of Entergy Mississippi's certified Hurricane Katrina restoration costs and $40 million for the increase in Entergy Mississippi's storm damage reserve. $30 million of the storm reserve will be set aside in a restricted account. Entergy Mississippi forwarded the financing order to the state bond commission, as per the March 2006 law, and expects to receive the proceeds from the state bond issuance in the second quarter of 2007.

Entergy New Orleans

In March 2006, Entergy New Orleans provided a justification statement to state and local officials in connection with its pursuit of CDBG funds to mitigate costs that otherwise would be borne by ratepayers. The statement included all the estimated costs of Hurricane Katrina damage, as well as a lost customer base component intended to help offset the need for storm-related rate increases. The statement included justification for a request for $718 million in CDBG funding. In September 2006, Entergy New Orleans presented a revised CDBG request to the Louisiana Recovery Authority's Infrastructure Committee. The updated request of $592 million takes into account the sale of output of Entergy New Orleans' share of Grand Gulf nuclear power into the wholesale market for a period of time longer than originally anticipated, lower operation and maintenance expenses, and the cessation of interest payments on long-term debt for an agreed-upon period of one year. In October 2006, the Louisiana Recovery Authority (LRA) Board endorsed a resolution proposing to allocate $200 million in CDBG funds to Entergy New Orleans to defray gas and electric utility system repair costs in an effort to provide rate relief for Entergy New Orleans customers. The proposal was developed as an action plan amendment and published for public comment. State lawmakers approved the action plan in December 2006, and the U. S. Department of Housing and Urban Development approved it in February 2007. In addition, the City Council must review and certify the amount of Entergy New Orleans' eligible storm costs before an application can be filed with the LRA and CDBG funding can be released to Entergy New Orleans. Entergy New Orleans filed applications seeking City Council certification of $210 million in storm-related costs incurred through December 2006. Entergy New Orleans has supplemented this request to include the estimated future cost of the gas system rebuild. In January 2007, the City Council passed a resolution in which it stated its intent to render a decision in the certification proceeding by March 2007.

In the first quarter 2006, Entergy New Orleans reduced its accrued accounts payable for storm restoration costs by $97.4 million, with corresponding reductions of $88.7 million in construction work in progress and $8.7 million in regulatory assets, based on a reassessment of the nature and timing of expected restoration and rebuilding costs and the obligations associated with restoring service. Although Entergy New Orleans reduced its accrual for restoration spending by these amounts, it continues to expect to incur the related costs over time and Entergy New Orleans still expects its storm restoration and business continuity costs to total approximately $275 million, including $80 million related to the gas rebuild project discussed below.

The estimated storm restoration costs do not include the longer-term accelerated rebuilding of the gas system in New Orleans that Entergy New Orleans expects will be necessary due to the massive salt water intrusion into the system caused by the flooding in New Orleans. The salt water intrusion is expected to shorten the life of the gas system, making it necessary to rebuild that system over time, earlier than otherwise would be expected. Entergy New Orleans currently expects the additional longer-term cost to rebuild the gas system to be $385 million, with the project extending many years into the future.

Retail Rate Proceedings

Filings with the APSC (Entergy Arkansas)

Retail Rates

In August 2006, Entergy Arkansas filed with the APSC a request for a change in base rates. Entergy Arkansas requested a general base rate increase of $150 million (using an ROE of 11.25%), as well as recovery of FERC-allocated costs pursuant to the FERC decision on the System

 

75

 

 

 Agreement. Entergy Arkansas also requested a capacity management rider to recover incremental capacity costs. In February 2007, the APSC Staff and intervenors filed testimony in the case indicating that the parties generally favor recovery of the FERC-allocated System Agreement costs through a new rider.  Moreover, the parties commenting on the energy cost recovery rider supported retention of the energy cost recovery rider to recover fuel and purchased energy expense. Regarding the level of base rates, the APSC staff found a revenue requirement excess of $13.5 million.  The parties generally opposed recovering incremental capacity purchase charges through the proposed capacity management rider, although the APSC staff indicated such a rider might be appropriate for a proposed power plant acquisition once more facts were known.  EAI rebuttal testimony is scheduled to be filed in March 2007. The procedural schedule calls for hearings to begin in April 2007.

In November 2006, Entergy Arkansas filed with the APSC a request to approve Entergy Arkansas' need for load-following generation resources. In January 2007, the APSC staff recommended that the APSC issue an order declaring that Entergy Arkansas has demonstrated a need to acquire capacity for load-following generation. Upon completion of negotiations with the final selected bidder, which is expected in third quarter 2007, Entergy Arkansas will file with the APSC a request to approve the specific capacity acquisition. Cost recovery for the new resource is being addressed in the general rate case.

See Entergy Corporation and Subsidiaries' "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Federal Regulation - System Agreement Litigation" for a discussion of Entergy's compliance filing in that proceeding. If the FERC approves the compliance tariff as filed, then payments under that tariff will be classified as energy costs, which would then be included in setting the retail energy cost rate as part of the normal working of the energy cost recovery rider.  As noted above under "Deferred fuel costs," the APSC has given notice that it is considering the prospective elimination of the energy cost recovery rider.  Therefore, Entergy Arkansas proposed in the August 2006 base rate case an alternative to the energy cost recovery rider for recovery of the costs allocated to it as a result of the System Agreement litigation should the energy cost recovery rider be lawfully terminated by the APSC.  A separate exact recovery rider, similar to the energy cost recovery rider, would ensure that Entergy Arkansas customers pay only the amount allocated by the FERC.

Filings with the PUCT and Texas Cities (Entergy Gulf States)

Retail Rates

Entergy Gulf States is operating in Texas under a base rate freeze that has remained in effect during the delay in the implementation of retail open access in Entergy Gulf States' Texas service territory. As discussed in "Electric Industry Restructuring and the Continued Application of SFAS 71" below, a Texas law was enacted in June 2005 which includes provisions in the Texas legislation regarding Entergy Gulf States' ability to file a general rate case and to file for recovery of transition to competition costs. As authorized by the legislation, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for competition in its Texas service area, including attendant AFUDC, and all carrying costs projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement, which the PUCT approved in June 2006, on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented rates based on this revenue level on March 1, 2006. The formal settlement agreement was approved by the PUCT in June 2006.

 

76

 

 

The Texas law enacted also allowed Entergy Gulf States to file with the PUCT for recovery of certain incremental purchased capacity costs which was implemented effective December 1, 2005. This proceeding is discussed above under "Deferred Fuel Costs."

Filings with the LPSC

Global Settlement (Entergy Gulf States and Entergy Louisiana)

In March 2005, the LPSC approved a settlement proposal to resolve various dockets covering a range of issues for Entergy Gulf States and Entergy Louisiana. The settlement resulted in credits totaling $76 million for retail electricity customers in Entergy Gulf States' Louisiana service territory and credits totaling $14 million for retail electricity customers of Entergy Louisiana. The net income effect of $48.6 million for Entergy Gulf States and $8.6 million for Entergy Louisiana was recognized primarily in 2004 when Entergy Gulf States and Entergy Louisiana recorded provisions for the expected outcome of the proceeding. The settlement dismissed Entergy Gulf States' fourth, fifth, sixth, seventh, and eighth annual earnings reviews, Entergy Gulf States' ninth post-merger earnings review and revenue requirement analysis, the continuation of a fuel review for Entergy Gulf States, dockets established to consider issues concerning power purchases for Entergy Gulf States and Entergy Louisiana for the summers of 2001, 2002, 2003, and 2004, all prudence issues associated with decisions made through May 2005 related to the nuclear plant uprates at issue in these cases, and an LPSC docket concerning retail issues arising under the System Agreement. The settlement does not include the System Agreement case at FERC. In addition, Entergy Gulf States agreed not to seek recovery from customers of $2 million of excess refund amounts associated with the fourth through the eighth annual earnings reviews and Entergy Louisiana agreed to forgo recovery of $3.5 million of deferred 2003 capacity costs associated with certain power purchase agreements. The credits were issued to customers in connection with April 2005 billings.

The settlement includes the establishment of a three-year formula rate plan for Entergy Gulf States that, among other provisions, establishes an ROE mid-point of 10.65% for the initial three-year term of the plan and permits Entergy Gulf States to recover incremental capacity costs outside of a traditional base rate proceeding. Under the formula rate plan, over- and under-earnings outside an allowed range of 9.9% to 11.4% will be allocated 60% to customers and 40% to Entergy Gulf States. Entergy Gulf States made its initial formula rate plan filing in June 2005, as discussed below. In addition, there is the potential to extend the formula rate plan beyond the initial three-year effective period by mutual agreement of the LPSC and Entergy Gulf States.

Retail Rates - Electric

(Entergy Louisiana)

Entergy Louisiana made a rate filing with the LPSC requesting a base rate increase in January 2004. In March 2005, the LPSC staff and Entergy Louisiana filed a proposed settlement that included an annual base rate increase of approximately $18.3 million that was implemented, subject to refund, effective with May 2005 billings. In May 2005, the LPSC approved a modified settlement which, among other things, reduces depreciation and decommissioning expense due to assuming a life extension of Waterford 3 and results in no change in rates. Subsequently, in June 2005, Entergy Louisiana made a revised compliance filing with the LPSC supporting a revised depreciation rate for Waterford 3, which reflects the removal of interim additions, and a rate increase from the purchase of the Perryville power plant, which results in a net $0.8 million annual rate reduction. Entergy Louisiana reduced rates effective with the first billing cycle in July 2005 and refunded excess revenue collected during May 2005, including interest, in August 2005.

The May 2005 rate settlement includes the adoption of a three-year formula rate plan, the terms of which include an ROE mid-point of 10.25% for the initial three-year term of the plan and permit Entergy Louisiana to recover incremental capacity costs outside of a traditional base rate proceeding. Under the formula rate plan, over- and under-earnings outside an allowed regulatory range of 9.45% to 11.05% will be allocated 60% to customers

 

77

 

 

 and 40% to Entergy Louisiana. The initial formula rate plan filing was made in May 2006 as discussed below. In addition, there is the potential to extend the formula rate plan beyond the initial three-year effective period by mutual agreement of the LPSC and Entergy Louisiana.

In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Louisiana modified the filing in August 2006 to reflect a 9.45% return on equity which is within the allowed bandwidth. The modified filing includes an increase of $24.2 million for interim recovery of storm costs from Hurricanes Katrina and Rita and a $119.2 million rate increase to recover LPSC-approved incremental deferred and ongoing capacity costs. The filing requested recovery of approximately $50 million for the amortization of capacity deferrals over a three-year period, including carrying charges, and approximately $70 million for ongoing capacity costs. The increase was implemented, subject to refund, with the first billing cycle of September 2006. Entergy Louisiana subsequently updated its formula rate plan rider to reflect adjustments proposed by the LPSC Staff with which it agrees. The adjusted return on equity of 9.56% remains within the allowed bandwidth. Ongoing and deferred incremental capacity costs were reduced to $118.7 million. The updated formula rate plan rider was implemented, subject to refund, with the first billing cycle of October 2006.

(Entergy Gulf States)

In June 2005, Entergy Gulf States made its formula rate plan filing with the LPSC for the test year ending December 31, 2004. The filing shows a net revenue deficiency of $2.58 million indicating that no refund liability exists. The filing also indicates that a prospective rate increase of $23.8 million is required in order for Entergy Gulf States to earn the authorized ROE mid-point of 10.65%. A revision to the filing was made in September 2005 resulting in a $37.2 million base rate increase effective with the first billing cycle of October 2005, subject to refund. The base rate increase consists of two components. The first is a base rate increase of approximately $21.1 million due to the formula rate plan 2004 test year revenue requirement. The second component of the increase is the recovery of the annual revenue requirement of $16.1 million associated with the purchase of power from the Perryville generating station, which purchase was approved by the LPSC. In March 2006, the LPSC approved an uncontested stipulated settlement that includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.2 million revenue increase was in place.

In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Gulf States modified the filing in August 2006 to reflect an 11.1% return on equity which is within the allowed bandwidth. The modified filing includes a formula rate plan increase of $17.2 million annually which provides for 1) interim recovery of $10.5 million of storm costs from Hurricanes Katrina and Rita and 2) recovery of $6.7 million of LPSC-approved incremental deferred and ongoing capacity costs. The increase was implemented, subject to refund, with the first billing cycle of September 2006.

Retail Rates - Gas (Entergy Gulf States)

In July 2004, Entergy Gulf States filed with the LPSC an application for a change in its rates and charges seeking an increase of $9.1 million in gas base rates in order to allow Entergy Gulf States an opportunity to earn a fair and reasonable rate of return. In June 2005, the LPSC unanimously approved Entergy Gulf States' proposed settlement that included a $5.8 million gas base rate increase effective the first billing cycle of July 2005 and a rate stabilization plan with an ROE mid-point of 10.5%.

In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. In May 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

78

In January 2007, Entergy Gulf States filed with the LPSC its gas rate stabilization plan for the test year ending September 30, 2006.  The filing showed a revenue deficiency of $3.5 million based on an ROE mid-point of 10.5%. A decision by the LPSC and implementation is not expected until the second quarter of 2007.

Filings with the MPSC (Entergy Mississippi)

Formula Rate Plan Filings

In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues is warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which was implemented in August 2006.

Power Management Rider

In November 2005, the MPSC approved the purchase of the 480MW Attala power plant. In December 2005, the MPSC issued an order approving the investment cost recovery through its power management rider and limited the recovery to a period that begins with the closing date of the purchase and ends the earlier of the date costs are incorporated into base rates or December 31, 2006. As a consequence of the events surrounding Entergy Mississippi's ongoing efforts to recover storm restoration costs associated with Hurricane Katrina, in October 2006, the MPSC approved a revision to Entergy Mississippi's power management rider. The revision has the effect of allowing Entergy Mississippi to recover the annual ownership costs of the Attala plant until such time as there has been a resolution of Entergy Mississippi's recovery of its storm restoration costs and a general rate case can be filed.

Filings with the City Council (Entergy New Orleans)

Formula Rate Plans and Storm-related Riders

In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings presented various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue following Hurricane Katrina. The alternative that Entergy New Orleans recommended adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place during the rate-effective period (a significant portion of Grand Gulf costs was previously recovered through base rates).

At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans sought to recover the electric and gas restoration costs that it had actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans sought to establish a storm reserve to provide for the risk of another storm.

In October 2006, the City Council approved a settlement agreement that resolves Entergy New Orleans' rate and storm-related rider filings by providing for phased-in rate increases, while taking into account with respect to storm restoration costs the anticipated receipt of CDBG funding as recommended by the Louisiana Recovery Authority. The settlement provides for a 0% increase in electric base rates through December 2007, with a $3.9 million increase implemented in January 2008. Recovery of all Grand Gulf costs through the fuel adjustment clause will continue. Gas base rates increased by $4.75 million in November 2006 and will increase by additional $1.5 million in March 2007 and an additional $4.75 million in November 2007. The settlement calls for Entergy New Orleans to file a base rate case by July 31, 2008. The settlement agreement discontinues the formula rate plan and the generation performance-based plan but permits Entergy New Orleans to file an application to seek authority to implement formula rate plan mechanisms no sooner than six months following the effective date of the implementation of the base rates resulting from the July 31, 2008 base rate case. Any storm costs in excess of CDBG funding and insurance proceeds will be addressed in that base rate case. The settlement

 

79

 

 

 also authorizes a $75 million storm reserve for damage from future storms, which will be created over a ten-year period through a storm reserve rider beginning in March 2007. These storm reserve funds will be held in a restricted escrow account.

Fuel Adjustment Clause Litigation

In April 1999, a group of ratepayers filed a complaint against Entergy New Orleans, Entergy Corporation, Entergy Services, and Entergy Power in state court in Orleans Parish purportedly on behalf of all Entergy New Orleans ratepayers. The plaintiffs seek treble damages for alleged injuries arising from the defendants' alleged violations of Louisiana's antitrust laws in connection with certain costs passed on to ratepayers in Entergy New Orleans' fuel adjustment filings with the City Council. In particular, plaintiffs allege that Entergy New Orleans improperly included certain costs in the calculation of fuel charges and that Entergy New Orleans imprudently purchased high-cost fuel from other Entergy affiliates. Plaintiffs allege that Entergy New Orleans and the other defendant Entergy companies conspired to make these purchases to the detriment of Entergy New Orleans' ratepayers and to the benefit of Entergy's shareholders, in violation of Louisiana's antitrust laws. Plaintiffs also seek to recover interest and attorneys' fees. Entergy filed exceptions to the plaintiffs' allegations, asserting, among other things, that jurisdiction over these issues rests with the City Council and the FERC. In March 2004, the plaintiffs supplemented and amended their petition. If necessary, at the appropriate time, Entergy will also raise its defenses to the antitrust claims. The suit in state court has been stayed by stipulation of the parties pending review of the decision by the City Council in the proceeding discussed in the next paragraph.

Plaintiffs also filed a corresponding complaint with the City Council in order to initiate a review by the City Council of the plaintiffs' allegations and to force restitution to ratepayers of all costs they allege were improperly and imprudently included in the fuel adjustment filings. Testimony was filed on behalf of the plaintiffs in this proceeding asserting, among other things, that Entergy New Orleans and other defendants have engaged in fuel procurement and power purchasing practices and included costs in Entergy New Orleans' fuel adjustment that could have resulted in Entergy New Orleans customers being overcharged by more than $100 million over a period of years. Hearings were held in February and March 2002. In February 2004, the City Council approved a resolution that resulted in a refund to customers of $11.3 million, including interest, during the months of June through September 2004. The resolution concludes, among other things, that the record does not support an allegation that Entergy New Orleans' actions or inactions, either alone or in concert with Entergy or any of its affiliates, constituted a misrepresentation or a suppression of the truth made in order to obtain an unjust advantage of Entergy New Orleans, or to cause loss, inconvenience or harm to its ratepayers. Management believes that it has adequately provided for the liability associated with this proceeding. The plaintiffs appealed the City Council resolution to the state courts. On May 26, 2005, the Civil District Court for the Parish of Orleans affirmed the City Council resolution that resulted in a refund to customers of $11.3 million, including interest, during the months of June through September 2004, finding no support for the plaintiffs' claim that the refund amount should be higher.

In June 2005, the plaintiffs appealed the Civil District Court decision to the Louisiana Fourth Circuit Court of Appeal. Subsequent to Entergy New Orleans' filing of a bankruptcy petition in the Eastern District of Louisiana, Entergy New Orleans filed a Notice of Stay with the Court of Appeal. The Bankruptcy Court lifted the stay with respect to the plaintiffs' appeal of the Civil District Court decision, but the class action lawsuit remains stayed. In February 2006, Entergy New Orleans filed a notice removing the class action lawsuit from the Civil District Court to the U.S. District Court for the Eastern District of Louisiana.  Additionally, in the Entergy New Orleans bankruptcy proceeding, the named plaintiffs in the Entergy New Orleans fuel adjustment clause lawsuit, together with the named plaintiffs in the Entergy New Orleans rate of return lawsuit, filed a Complaint for Declaratory Judgment asking the court to declare that Entergy New Orleans, Entergy Corporation, and Entergy Services are a single business enterprise, and as such, are liable in solido with Entergy New Orleans for any claims asserted in the Entergy New Orleans fuel adjustment clause lawsuit and the Entergy New Orleans rate of return lawsuit, and alternatively, that the automatic stay be lifted to permit the movants to pursue the same relief in state court.  The bankruptcy court dismissed the action on April 26, 2006. The matter was appealed to the U.S. District Court for the Eastern District of Louisiana, and the district court affirmed the dismissal in October 2006, but on different grounds, concluding that the lawsuit was premature. In

 

80

 

 

 addition, in April 2006, proofs of claim were filed by the plaintiffs in the Entergy New Orleans rate of return lawsuit and by the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation relating to both the City Council and class action proceedings. The plaintiffs in the Entergy New Orleans rate of return lawsuit and the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation also filed for class certification. In July 2006, the bankruptcy court denied the request for class certification. The individual claims of the approximately 14 individual named plaintiffs remain pending in the bankruptcy proceeding, and it is uncertain whether the bankruptcy judge will re-open the bar date for other ratepayers to file individual proofs of claim based on the allegations in the two lawsuits.

Electric Industry Restructuring

Texas

(Entergy Gulf States)

In June 2005, a Texas law was enacted which provides that:

Entergy Gulf States made the January 2006 filing regarding the identification of power region(s) required by the 2005 legislation, and based on the statutory requirements for the certification of a qualified power region (QPR), previous PUCT rulings, and Entergy Gulf States' geographical location, Entergy Gulf States identified three potential power regions:

  1. Electric Reliability Council of Texas (ERCOT) as the power region and Independent Organization (IO);
  2. Southwest Power Pool (SPP) as the power region and IO; and
  3. the Entergy market as the power region and the Independent Coordinator of Transmission (ICT) as the IO.

81

Based on previous rulings of the PUCT, and absent reconsideration of those rulings, Entergy Gulf States believes that the third alternative, an ICT operating in Entergy's market area, is not likely to be a viable QPR alternative at this time. Accordingly, while noting this alternative, Entergy Gulf States' January 2006 filing focused on the first two alternatives, which were expected to meet the statutory requirements for certification so long as certain key implementation issues could be resolved. Entergy Gulf States' filing enumerated and discussed the corresponding steps and included a high-level schedule associated with certifying either of these two power regions.

Entergy Gulf States' filing did not make a recommendation between ERCOT and the SPP as a power region. Rather, the filing discussed the major issues that must be resolved for either of those alternatives to be implemented. In the case of ERCOT, the major issue is the cost and time related to the construction of facilities to interconnect Entergy Gulf States' Texas operations with ERCOT, while addressing the interest of Entergy Gulf States' retail customers and certain wholesale customers in access to generation outside of Texas. With respect to the SPP, the major issue is the development of protocols that would ultimately be necessary to implement retail open access. Entergy Gulf States recommended that the PUCT open a project for the purpose of involving stakeholders in the selection of the single power region that Entergy Gulf States should request for certification. In August 2006, the PUCT staff recommended that Entergy Gulf States be required to provide additional information on both the ERCOT option and the SPP option. The PUCT accepted the PUCT staff's recommendation and stated the need for a "robust record" to make a decision on the applicable power region.

As required by the June 2005 legislation, Entergy Gulf States filed its proposed transition to competition plan in December 2006 and maintained that to achieve full customer choice, Entergy Gulf States should join ERCOT since it already has all of the prerequisites for retail choice. The plan contains several conditions, including cost recovery mechanisms, that must be met before Entergy Gulf States could proceed with the plan, and identifies several legislative requirements needed to accomplish the required infrastructure improvements. Assuming that these conditions can be met, retail open access could commence in 2013. Entergy Gulf States' filing includes an estimate that construction costs for facilities to interconnect Entergy Gulf States' Texas operations with ERCOT could be approximately $1 billion. The PUCT has 180 days to accept, reject, or modify the plan. The Texas Legislature began its session on January 9, 2007.

In December 2006, the PUCT asked for parties to brief the effects of the 2005 legislation on the competition dockets of Entergy Gulf States, most notably, the settlement that the parties entered with respect to the unbundling of Entergy Gulf States for retail open access. Finding that the 2005 legislation now provides the mechanism by which Entergy Gulf States will transition to competition, the PUCT, on February 1, 2007, dismissed Entergy Gulf States' unbundled cost of service proceeding.

Co-Owner-Initiated Proceeding at the FERC (Entergy Arkansas)

In September 2004, East Texas Electric Cooperative (ETEC) filed a complaint at the FERC against Entergy Arkansas relating to a contract dispute over the pricing of substitute energy at the co-owned Independence coal unit.  In October 2004, Arkansas Electric Cooperative (AECC) filed a similar complaint at the FERC against Entergy Arkansas, addressing the same issue with respect to Independence and another co-owned coal unit, White Bluff. FERC consolidated these cases, ordered a hearing in the consolidated proceeding, and established refund effective dates.  The main issue in the consolidated case relates to the consequences under the governing contracts when the dispatch of the coal units is constrained due to system operating conditions.  In August 2005, Entergy Arkansas and ETEC filed a settlement at the FERC that resolved all issues in dispute between ETEC and Entergy Arkansas. As part of the settlement, ETEC dismissed its complaint. A hearing was held on the AECC complaint and an ALJ Initial Decision was issued in January 2006 in which the ALJ found AECC's claims to be without merit. On October 25, 2006, the FERC issued its order in the proceeding. In the order, the FERC reversed the ALJ's findings. Specifically, the FERC found that the governing contracts do not recognize the effects of dispatch constraints on the co-owned units. The FERC explained that for over twenty-three years the course of conduct of the parties was such that AECC received its full entitlement to the two coal units, regardless of any reduced output caused by system operating constraints. Based on the order, Entergy Arkansas is required to refund to AECC all excess amounts billed to AECC as a result of the system

 

82

 

 

 operating constraints. Entergy Arkansas estimates currently that this will result in a refund to AECC of approximately $26 million, although Entergy Arkansas is still refining the estimate. In November 2006 Entergy Arkansas filed with the FERC a request for rehearing.

 

NOTE 3. INCOME TAXES (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

 

Income tax expenses from continuing operations for 2006, 2005, and 2004 for Entergy Corporation and subsidiaries consist of the following:

 

 

2006

2005

 

2004

 

 

(In Thousands)

Current:

 

 

  

 

 

 

  Federal

 

($266,464)

 

($306,524)

 

$67,924 

  Foreign

 

64 

 

13,290 

 

(2,231)

  State

 

(74,319)

 

(27,212)

 

38,324 

     Total

 

(340,719)

 

(320,446)

 

104,017 

Deferred - net

 

801,745 

 

898,384 

 

282,275 

Investment tax credit

 

 

 

 

 

 

  adjustments - net

 

(17,982)

  

(18,654)

 

(20,987)

    Income tax expense from continuing operations

 

$443,044 

 

$559,284 

 

$365,305 

Income tax expenses for 2006, 2005, and 2004 for Entergy's Registrant Subsidiaries consist of the following:


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Current:

  Federal (a)

($10,181)

($87,515)

($134,141)

$4,208 

($33,283)

($28,332)

  State (a)

4,864 

(15,553)

(22,874)

7,024 

(500)

(142)

     Total (a)

(5,317)

(103,068)

(157,015)

11,232 

(33,783)

(28,474)

Deferred - net

66,333 

215,877 

238,581 

18,661 

39,258 

86,482 

Investment tax credit

 adjustments - net

(4,192)

(5,742)

(3,228)

(1,326)

(424)

(3,479)

   Recorded income tax expense

$56,824 

$107,067 

$78,338 

$28,567 

$5,051 

$54,529 


2005

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Current:

  Federal

($5,534)

($256,561)

($38,109)

($115,504)

($141,249)

$171,318 

  State

36 

(37,962)

10,249 

(8,547)

(13,115)

10,566 

     Total

(5,498)

(294,523)

(27,860)

(124,051)

(154,364)

181,884 

Deferred - net

106,899 

410,500 

128,370 

159,332 

156,581 

(109,065)

Investment tax credit

 adjustments - net

(4,452)

(5,707)

(3,691)

(1,329)

(427)

(3,476)

    Recorded income tax expense

$96,949 

$110,270 

$96,819 

$33,952 

$1,790 

$69,343 

83


2004

Entergy
Arkansas

Entergy
Gulf States

Entergy Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Current:

  Federal

$14,490 

$42,436 

$2,439 

($23,568)

($19,259)

$222,622 

  State

8,727 

7,944 

1,957 

(1,221)

(3,655)

33,926 

     Total

23,217 

50,380 

4,396 

(24,789)

(22,914)

256,548 

Deferred - net

70,674 

63,615 

80,207 

63,234 

40,226 

(175,059)

Investment tax credit

 adjustments - net

(4,827)

(5,707)

(5,128)

(1,405)

(444)

(3,476)

    Recorded income tax expense

$89,064 

$108,288 

$79,475 

$37,040 

$16,868 

$78,013 

(a)

In 2003, Entergy's Registrant Subsidiaries filed with the IRS a notification of change in tax accounting method for their respective calculations of cost of goods sold. The adjustment implemented a simplified method of overhead allocation to the production of electricity, which is provided for under IRS capitalization regulations. The cumulative adjustment to place these companies on the new methodology resulted in a $2.8 billion deduction on Entergy's 2003 income tax return: including $1.13 billion at Entergy Arkansas; $641 million at Entergy Gulf States; $111 million at Entergy Mississippi; $32 million at Entergy New Orleans; and $440 million at System Energy. New IRS proposed regulations, effective in 2005, may preclude a significant portion of the benefit of this tax accounting change. In response, Entergy revised its capitalization method, consistent with the proposed regulations. As Entergy is in a consolidated net operating loss position, the adjustment required by the new regulations has the effect of reducing the consolidated net operating loss carryforward and does not require a payment to the IRS at this time. The new capitalization method is subject to IRS scrutiny. On a consolidated basis, using a with and without methodology, there has been an estimated $24 million state cash tax benefit, but no federal cash tax benefit from the method change. On a separate company basis, however, Entergy currently estimates the cumulative federal and state cash tax benefit through 2006 to be $313 million at Entergy Arkansas; $27 million at Entergy Gulf States; $27 million at Entergy Mississippi; and $225 million at System Energy. The estimates of cumulative cash tax benefit are dependent on the outcome of several tax items (including mark to market elections and storm cost deductions). Should these other items fail to be sustained on audit, the estimated cash tax impact of this tax accounting method change would be significantly greater. Were the IRS to successfully deny the use of Entergy's tax accounting method for cost of goods sold, the companies would have to pay back under Entergy's intercompany tax allocation agreement the benefits received.

84

Total income taxes from continuing operations for Entergy Corporation and subsidiaries differ from the amounts computed by applying the statutory income tax rate to income before taxes. The reasons for the differences for the years 2006, 2005, and 2004 are:

2006

2005

2004

(In Thousands)

Computed at statutory rate (35%)

$551,650 

$525,843 

$446,205 

Increases (reductions) in tax

 resulting from:

  State income taxes net of

   federal income tax effect

44,230 

44,282 

36,149 

  Regulatory differences-

   utility plant items

50,211 

28,983 

41,240 

  Amortization of investment

   tax credits

(17,460)

(18,691)

(20,596)

  Capital losses

(79,427)

(792)

(86,426)

  Flow-through/permanent

   Differences

(52,866)

(23,618)

(34,804)

  Tax Reserves

(53,610)

(9,600)

   Valuation allowance

22,300 

  Other -- net

(21,984)

3,277 

(6,863)

      Total income taxes from continuing operations

$443,044 

$559,284 

$365,305 

Effective Income Tax Rate

28.1%

37.2%

28.7%

The capital loss for 2006 includes a loss for tax purposes recorded in the fourth quarter 2006 resulting from the liquidation of Entergy Power International Holdings, Entergy's holding company for Entergy-Koch, LP. The $79.4 million tax benefit is net of other capital gains. The capital loss for 2004 is a tax benefit resulting from the sale of preferred stock and less than 1% of the common stock of Entergy Asset Management, an Entergy subsidiary. In December 2004, an Entergy subsidiary sold the stock to a third party for $29.75 million. The sale resulted in a capital loss for tax purposes of $370 million, producing a federal and state net tax benefit of $97 million that Entergy recorded in the fourth quarter of 2004. Entergy has established a contingency provision in its financial statements that management believes will sufficiently cover the risk associated with these issues.

85

Total income taxes for the Registrant Subsidiaries differ from the amounts computed by applying the statutory income tax rate to income before taxes. The reasons for the differences for the years 2006, 2005, and 2004 are:

Entergy

Entergy

Entergy

Entergy

Entergy

System

2006

Arkansas

Gulf States

Louisiana

Mississippi

New Orleans

Energy

(In Thousands)

Computed at statutory rate (35%)

$80,492 

$111,669 

$75,585 

$28,298 

$3,638 

$68,175 

Increases (reductions) in tax

 resulting from:

  State income taxes net of

   federal income tax effect

7,047 

7,997 

(1,359)

1,844 

422 

7,086 

  Regulatory differences -

   utility plant items

17,326 

7,531 

16,452 

(1,103)

3,842 

10,005 

  Amortization of investment

   tax credits

(4,164)

(5,316)

(3,192)

(1,308)

(409)

(3,480)

  Flow-through/permanent

   Differences

(38,024)

(9,088)

(5,647)

(2,245)

(1,284)

(1,229)

  Benefit of Entergy Corporation
   Expenses






(32,041)

  Other - net

(5,853)

(5,726)

(3,501)

3,081 

(1,158)

6,013 

     Total income taxes

$56,824 

$107,067 

$78,338 

$28,567 

$5,051 

$54,529 

Effective Income Tax Rate

24.7%

33.6%

36.3%

35.3%

48.6%

28.0%

The flow-through/permanent differences for Entergy Arkansas in 2006 primarily result from the regulatory and tax accounting applied to its pension payments.

Entergy

Entergy

Entergy

Entergy

Entergy

System

2005

Arkansas

Gulf States

Louisiana

Mississippi

New Orleans

Energy

(In Thousands)

Computed at statutory rate (35%)

$95,054 

$110,868 

$78,715 

$33,619 

$1,064 

$63,345 

Increases (reductions) in tax

 resulting from:

  State income taxes net of

   federal income tax effect

11,318 

10,204 

7,213 

3,154 

221 

6,567 

  Regulatory differences -

   utility plant items

540 

5,087 

11,135 

255 

2,441 

9,525 

  Amortization of investment

   tax credits

(4,452)

(5,316)

(3,691)

(1,332)

(424)

(3,476)

  Flow-through/permanent

   Differences

(3,148)

(8,843)

(4,420)

(1,344)

(1,439)

(6,626)

  Other - net

(2,363)

(1,730)

7,867 

(400)

(73)

     Total income taxes

$96,949 

$110,270 

$96,819 

$33,952 

$1,790 

$69,343 

Effective Income Tax Rate

35.7%

34.8%

43.0%

35.3%

58.9%

38.3%

86

Entergy

Entergy

Entergy

Entergy

Entergy

System

2004

Arkansas

Gulf States

Louisiana

Mississippi

New Orleans

Energy

(In Thousands)

Computed at statutory rate (35%)

$80,946 

$105,194 

$72,440 

$38,688 

$15,729 

$64,386 

Increases (reductions) in tax

 resulting from:

  State income taxes net of

   federal income tax effect

12,204 

8,289 

6,411 

3,845 

1,158 

7,665 

  Regulatory differences -

   utility plant items

13,775 

6,951 

10,052 

(1,482)

1,373 

10,528 

  Amortization of investment

   tax credits

(4,827)

(5,316)

(5,128)

(1,405)

(444)

(3,476)

  Flow-through/permanent

   Differences

(9,127)

(7,080)

(3,576)

(2,114)

(878)

(993)

  Other - net

(3,907)

250 

(724)

(492)

 (70)

(97)

     Total income taxes

$89,064 

$108,288 

$79,475 

$37,040 

$16,868 

$78,013 

Effective Income Tax Rate

38.5%

36.0%

38.4%

33.5%

37.5%

42.4%

Significant components of net deferred and noncurrent accrued tax liabilities for Entergy Corporation and subsidiaries as of December 31, 2006 and 2005 are as follows:

 

 

2006

 

2005

 

 

(In Thousands)

Deferred and Noncurrent Accrued Tax Liabilities:

 

 

 

 

  Net regulatory assets/liabilities

 

($1,334,341)

 

($1,150,210)

  Plant-related basis differences

 

(5,992,434)

 

(5,487,161)

  Power purchase agreements

 

(1,755,345)

 

(2,422,967)

  Nuclear decommissioning trusts

 

(915,380)

 

(859,712)

  Other

 

(615,371)

 

(643,793)

     Total

 

(10,612,871)

 

(10,563,843)

 

 

 

 

 

Deferred Tax Assets:

 

 

 

 

  Accumulated deferred investment

 

 

 

 

   tax credit

 

118,990 

 

125,521 

  Capital losses

 

256,089 

 

119,003 

  Net operating loss carryforwards

 

2,002,541 

 

2,788,864 

  Sale and leaseback

 

242,630 

 

238,557 

  Unbilled/deferred revenues

 

39,566 

 

25,455 

  Pension-related items

 

790,383 

 

406,346 

  Reserve for regulatory adjustments

 

114,451 

 

120,792 

  Customer deposits

 

77,166 

 

70,222 

  Nuclear decommissioning liabilities

 

790,052 

 

720,464 

  Other

 

405,490 

 

561,242 

  Valuation allowance

 

(33,507)

 

(38,791)

     Total

 

4,803,851 

 

5,137,675 

 

 

 

 

 

Net deferred and noncurrent accrued tax liability

 

($5,809,020)

 

($5,426,168)

87

At December 31, 2006, Entergy had $713.1 million in net realized federal capital loss carryforwards that will expire as follows: $75.9 million in 2007, $0.8 million in 2008, $230.2 million in 2009, and $406.2 million in 2011.

At December 31, 2006, Entergy had estimated federal net operating loss carryforwards of $4.8 billion primarily resulting from changes in tax accounting methods relating to (a) the Registrant Subsidiaries' calculation of cost of goods sold and (b) Non-Utility Nuclear's 2005 mark-to-market tax accounting election, and (c) losses due to Hurricane Rita. Both tax accounting method changes produce temporary book tax differences, which will reverse in the future. Approximately $2.0 billion of the net operating loss, attributable to the two tax accounting method changes, is expected to reverse within two years. The timing of the reversal depends on several variables, including the price of power. If the federal net operating loss carryforwards are not utilized, they will expire in the years 2023 through 2026.

At December 31, 2006, Entergy had estimated state net operating loss carryforwards of $4.8 billion, primarily resulting from Entergy Louisiana Holdings' mark-to-market tax election, the Utility companies' change in method of accounting for tax purposes related to cost of goods sold, and Non-Utility Nuclear's 2005 mark-to-market tax accounting election. If the state net operating loss carryforwards are not utilized, they will expire in the years 2008 through 2021.

For 2006 and 2005, valuation allowances are provided against UK capital loss and UK net operating loss carryforwards, federal and state capital loss carryforwards, and certain state net operating loss carryforwards.

On October 22, 2004, the American Jobs Creation Act of 2004 (the Act) was enacted. The Act promotes domestic production and investing activities by providing a number of tax incentives including a temporary incentive to repatriate accumulated foreign earnings, subject to certain limitations, by providing an 85% dividends received deduction for certain repatriated earnings and also providing a tax deduction of up to 9% of qualifying production activities. In 2004, Entergy repatriated $59.1 million of accumulated foreign earnings, which resulted in approximately $11.0 million of tax benefit. At December 31, 2006 and December 31, 2005, Entergy had no undistributed earnings from subsidiary companies outside the United States that are being considered for repatriation. In accordance with FSP 109-1, which was issued by the FASB to address the accounting for the impacts of the Act, the allowable production tax credit will be treated as a special deduction in the period in which it is deducted rather than treated as a tax rate change during 2004. The adoption of FSP 109-1 and FSP 109-2, also issued by the FASB to address the accounting for the repatriation provisions of the Act, did not have a material effect on Entergy's financial statements.

88

Significant components of net deferred and long-term accrued tax liabilities for the Registrant Subsidiaries as of December 31, 2006 and 2005 are as follows:

Entergy

Entergy

Entergy

Entergy

Entergy

System

2006

Arkansas

Gulf States

Louisiana

Mississippi

New Orleans

Energy

(In Thousands)

Deferred and Long-term Accrued Tax Liabilities:

  Net regulatory assets/liabilities

($230,946)

($535,242)

($154,836)

($66,643)

$50,489 

($217,394)

  Plant-related basis differences - net

(1,283,165)

(1,716,700)

(1,110,307)

(456,210)

(253,782)

(480,188)

  Power purchase agreements

(848,723)

-

  Rate refunds

  Deferred fuel

(855)

(44,977)

(43,986)

(24,176)

(7,727)

(1,930)

  Other reserves

  Nuclear decommissioning trusts

(155,319)

(63,131)

(80,395)

(112,134)

  Other

(87,412)

(29,710)

(112,203)

(53,019)

(1,333)

(8,917)

     Total

(1,757,697)

(2,389,760)

(2,350,450)

(600,048)

(212,353)

(820,563)

Deferred Tax Assets:

  Accumulated deferred investment tax credit

23,473 

30,691 

34,339 

4,225 

1,215 

26,262 

  Sale and leaseback

88,646 

153,984 

  Purchased power agreements

95,598 

  NOL carryforward

150,055 

217,430 

127,289 

17,001 

68,515 

  Unbilled/Deferred revenues

6,175 

27,379 

4,349 

  Pension-related items

127,222 

93,772 

93,666 

33,363 

33,008 

19,099 

  Reserve for regulatory adjustments

114,451 

  Rate refund

88 

67,273 

  Customer deposits

10,580 

34,758 

16,804 

15,024 

273 

  Nuclear decommissioning liabilities

195,325 

69,694 

90,999 

134,298 

  Other

20,244 

18,388 

38,781 

5,565 

7,533 

17,530 

     Total

533,074 

606,651 

490,524 

79,527 

110,544 

514,044 

     Net deferred tax liability

($1,224,623)

($1,783,109)

($1,859,926)

($520,521)

($101,809)

($306,519)

Entergy

Entergy

Entergy

Entergy

Entergy

System

2005

Arkansas

Gulf States

Louisiana

Mississippi

New Orleans

Energy

(In Thousands)

Deferred and Long-term Accrued Tax Liabilities:

  Net regulatory assets/liabilities

($163,482)

($499,595)

($186,296)

($39,274)

$40,806 

($219,117)

  Plant-related basis differences - net

(1,291,435)

(1,684,872)

(1,086,571)

(415,259)

(182,209)

(545,848)

  Power purchase agreements

(4,075)

(1,141)

(964,086)

(75)

  Rate refunds

(40,429)

(23,186)

(49,336)

(14,448)

  Deferred fuel

(80,109)

(132,096)

(2,139)

(29,978)

(12,881)

(6,885)

  Other reserves

(10,442)

(27,457)

(40,477)

  Nuclear decommissioning trusts

(141,294)

(52,226)

(71.996)

(94,888)

  Other

(73,391)

(4,871)

(167,078)

(16,909)

(3,567)

(9,799)

     Total

(1,794,215)

(2,385,243)

(2,501,352)

(578,288)

(212,776)

(876,537)

Deferred Tax Assets:

  Accumulated deferred investment tax credit

25,108 

32,525 

35,569 

4,727 

1,374 

27,592 

  Sale and leaseback

89,140 

149,417 

  Purchased power agreements

100,909 

  NOL carryforward

311,609 

418,903 

162,393 

54,096 

66,267 

  Unbilled/Deferred revenues

24,043 

1,212 

  Pension-related items

64,018 

21,699 

49,149 

12,739 

15,244 

11,529 

  Reserve for regulatory adjustments

120,792 

  Rate refund

6,530 

170,222 

  Customer deposits

30,882 

23,189 

16,151 

120 

  Nuclear decommissioning liabilities

183,409 

22,630 

84,568 

125,660 

  Other

17,291 

20,315 

13,183 

424 

193 

16,617 

     Total

632,317 

690,626 

450,153 

73,198 

83,198 

601,946 

     Net deferred tax liability

($1,161,898)

($1,694,617)

($2,051,199)

($505,090)

($129,578)

($274,591)

89

As of December 31, 2006, estimated federal net operating loss carryforwards were $335.1 million for Entergy Arkansas, $635.8 million for Entergy Gulf States, $75 million for Entergy Louisiana, $50.7 million for Entergy Mississippi, and $145.0 million for Entergy New Orleans, primarily resulting from a change in tax accounting method relating to the calculation of cost of goods sold and losses due to Hurricane Rita. The tax accounting method change produces temporary book tax differences, which will reverse in the future. If the federal net operating loss carryforwards are not utilized, they will expire in the years 2023 through 2026.

As of December 31, 2006, estimated state net operating loss carryforwards were $581.6 million for Entergy Arkansas, $83.1 million for Entergy Gulf States, $75 million for Entergy Louisiana, and $372.4 million for Entergy New Orleans. Entergy Louisiana's deferred tax balances reflect the effects of Entergy Louisiana's tax sharing agreement with its parent, Entergy Louisiana Holdings. If the state net operating loss carryforwards are not utilized, they will expire in the years 2008 through 2010 for Entergy Arkansas, 2018 through 2020 for Entergy Gulf States, 2021 for Entergy Louisiana, and 2018 through 2021 for Entergy New Orleans.

Income Tax Audits

Entergy is currently under audit by the IRS with respect to tax returns for tax periods 1999 through 2003, and is subject to audit by the IRS and other taxing authorities for subsequent tax periods.  The amount and timing of any tax assessments resulting from these audits are uncertain, and could have a material effect on Entergy's financial position and results of operations.  Entergy believes that the contingency provisions established in its financial statements will sufficiently cover the liabilities that are reasonably estimable associated with tax matters. Certain material audit matters as to which management believes there is a reasonable possibility of a future tax payment are discussed below.

Depreciable Property Lives

In October 2006, Entergy Arkansas, Entergy Louisiana Holdings, Entergy Mississippi, Entergy New Orleans, and System Energy satisfied their tax liabilities related to the 1996 - 1998 IRS audit cycle. The most significant issue in the audit involved the classification of certain depreciable property using shortened lives for tax purposes. Entergy Arkansas, Entergy Louisiana Holdings, Entergy Mississippi, and Entergy New Orleans partially conceded accelerated tax depreciation associated with these assets. Entergy Gulf States was not part of the settlement and did not change its accounting method for these certain assets until 1999. Also in October 2006, Entergy concluded settlement discussions with IRS Appeals related to the 1999 - 2001 audit cycle. The settlement was substantially similar to the settlement that was reached for the 1996 - 1998 audit cycle. The total cash concession related to these deductions for all years subsequent to 1998 is $38 million plus interest of $9 million.

Because this issue relates to the timing of when depreciation expense is deducted, the conceded amount will be recovered in future periods.

Mark-to-Market of Certain Power Contracts

In 2001, Entergy Louisiana Holdings changed its method of accounting for income tax purposes related to its wholesale electric power contracts. The most significant of these is the contract to purchase power from the Vidalia hydroelectric project. On audit of Entergy Louisiana Holdings' 2001 tax return, the IRS made an adjustment reducing the amount of the deduction associated with this method change. The adjustment had no material effect on Entergy Louisiana Holdings' earnings and required no additional payment of 2001 income tax. The Vidalia contract method change has resulted in estimated cumulative cash flow tax benefits of approximately $655 million through December 31, 2006. This benefit could reverse in the years 2007 through 2031 depending on several variables, including the price of power. The tax accounting election has had no effect on total book income tax expense.

90

Income Tax Litigation

On November 16, 2006, the IRS issued a Notice of Deficiency to Entergy for the tax years 1997 and 1998. The Notice asserts that Entergy owes additional tax of $17.3 million for 1997 and $61.7 million for 1998. Entergy and the IRS have settled all issues for 1997 and 1998 except for those raised in the Notice, which are described as follows: 1) The IRS believes that U.K. Windfall Tax paid by London Electricity, a former subsidiary of Entergy, was not an eligible tax under the foreign tax credit provisions of the Internal Revenue Code. Entergy believes that it properly claimed a foreign tax credit for the tax year 1998 attributable to the Windfall Tax paid by London Electricity. This issue accounts for $59.7 million of the 1998 deficiency and results in interest exposure of $49.1 million. 2) The IRS denied Entergy's change in method of accounting for street lighting assets and the related increase in depreciation deductions for 1997 and 1998. Entergy believes that street lighting assets are a separate line of business not subject to the same 20-year depreciable life as distribution assets, but rather are properly classified as having a 7-year depreciable life. This issue accounts for all of the 1997 deficiency of $17.3 million and $2 million of the 1998 deficiency and results in interest exposure of $13.5 million. On December 6, 2006, Entergy filed a petition in the U.S. Tax Court requesting a redetermination of these issues and the resulting deficiencies.

FASB Interpretation No. 48

FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes" (FIN 48) was issued in July 2006 and is effective for Entergy in the first quarter of 2007. FIN 48 establishes a "more-likely-than-not" recognition threshold that must be met before a tax benefit can be recognized in the financial statements. If a tax deduction is taken on a tax return, but does not meet the more-likely-than-not recognition threshold, an increase in income tax liability, above what is payable on the tax return, is required to be recorded. Additional disclosure in the footnotes to the financial statements will also be required for such liabilities. Entergy does not expect that the adoption of FIN 48 will materially affect its financial position, results of operations, or cash flows. Entergy expects that the cumulative effect of the adoption of FIN 48 will result in a reduction to consolidated retained earnings at January 1, 2007 in the range of $3 million to $5 million.

 

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT AND SHORT-TERM BORROWINGS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Corporation has in place two separate revolving credit facilities, a five-year credit facility and a three-year credit facility. The five-year credit facility, which expires in May 2010, has a borrowing capacity of $2 billion and the three-year facility, which expires in December 2008, has a borrowing capacity of $1.5 billion. Entergy also has the ability to issue letters of credit against the total borrowing capacity of both credit facilities. The commitment fee for these facilities is currently 0.13% per annum of the unused amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior debt ratings of the Utility operating companies. Following is a summary of the borrowings outstanding and capacity available under these facilities as of December 31, 2006.


Facility

 


Capacity

 


Borrowings

 

Letters
of Credit

 

Capacity
Available

   

(In Millions)

                 

5-Year Facility

 

$2,000 

 

$820 

 

$94 

 

$1,086

3-Year Facility

 

$1,500 

 

$- 

 

$- 

 

$1,500

Entergy Corporation's facilities require it to maintain a consolidated debt ratio of 65% or less of its total capitalization. If Entergy fails to meet this ratio, or if Entergy or the Utility operating companies (except Entergy New Orleans) and System Energy default on other indebtedness or are in bankruptcy or insolvency proceedings, an acceleration of the facilities' maturity dates may occur.

91

Entergy Arkansas, Entergy Gulf States, and Entergy Mississippi each has credit facilities available as of December 31, 2006 as follows:


Company

 


Expiration Date

 

Amount of
Facility

 

Amount Drawn as
of Dec. 31, 2006

 

 

 

 

 

 

 

Entergy Arkansas

 

April 2007

 

$85 million

 

-

Entergy Gulf States

 

February 2011

 

$50 million (a)

 

-

Entergy Mississippi

 

May 2007

 

$30 million (b)

 

-

Entergy Mississippi

 

May 2007

 

$20 million (b)

 

-

(a)

The credit facility allows Entergy Gulf States to issue letters of credit against the borrowing capacity of the facility. As of December 31, 2006, $1.4 million in letters of credit had been issued.

(b)

Borrowings under the Entergy Mississippi facilities may be secured by a security interest in its accounts receivable.

The credit facilities have variable interest rates and the average commitment fee is 0.13%. The Entergy Arkansas credit facility requires that it maintain total shareholders' equity of at least 25% of its total assets.

The short-term borrowings of the Registrant Subsidiaries (other than Entergy New Orleans) and certain other Entergy subsidiaries are limited to amounts authorized by the FERC. The current FERC-authorized limits are effective through March 31, 2008. In addition to borrowings from commercial banks, these companies are authorized under a FERC order to borrow from the Entergy System money pool. The money pool is an inter-company borrowing arrangement designed to reduce Entergy's subsidiaries' dependence on external short-term borrowings. Borrowings from the money pool and external borrowings combined may not exceed the FERC authorized limits. As of December 31, 2006, Entergy's subsidiaries' aggregate money pool and external short-term borrowings authorized limit was $2.0 billion, the aggregate outstanding borrowing from the money pool was $251.6 million, and Entergy's subsidiaries' had no outstanding short-term borrowing from external sources.

The following are the FERC-authorized limits for short-term borrowings effective February 8, 2006 and the outstanding short-term borrowings from the money pool for the Registrant Subsidiaries (other than Entergy New Orleans) as of December 31, 2006:

 

Authorized

 

Borrowings

 

(In Millions)

Entergy Arkansas

$250

 

-

Entergy Gulf States

$350

 

-

Entergy Louisiana

$250

 

$54.1

Entergy Mississippi

$175

 

-

System Energy

$200

 

-

Under a savings provision in PUHCA 2005, which repealed PUHCA 1935, Entergy New Orleans may continue to be a participant in the money pool to the extent authorized by its SEC PUHCA 1935 order. However, Entergy New Orleans has not, and does not expect to make, any additional money pool borrowings while it is in bankruptcy proceedings. Entergy New Orleans had $37.2 million in borrowings outstanding from the money pool as of its bankruptcy filing date, September 23, 2005.

The credit facilities have variable interest rates and the average commitment fee is 0.13%. The Entergy Arkansas credit facility requires that it maintain total shareholders' equity of at least 25% of its total assets.

92

Entergy New Orleans Debtor-in-Possession Credit Agreement

On September 26, 2005, Entergy New Orleans, as borrower, and Entergy Corporation, as lender, entered into the Debtor-in-Possession (DIP) credit agreement, a debtor-in-possession credit facility to provide funding to Entergy New Orleans during its business restoration efforts. On December 9, 2005, the bankruptcy court issued its final order approving the DIP Credit Agreement. The credit facility provides for up to $200 million in loans. The facility enables Entergy New Orleans to request funding from Entergy Corporation, but the decision to lend money is at the sole discretion of Entergy Corporation. As of December 31, 2006, Entergy New Orleans had $52 million of outstanding borrowings under the DIP credit agreement.

Borrowings under the DIP credit agreement are due in full, and the agreement will terminate, at the earliest of (i) August 23, 2007, (ii) the acceleration of the loans and the termination of the DIP credit agreement in accordance with its terms, (iii) the date of the closing of a sale of all or substantially all of Entergy New Orleans' assets pursuant to either section 363 of the United States Bankruptcy Code or a confirmed plan of reorganization, or (iv) the effective date of a plan of reorganization in Entergy New Orleans' bankruptcy case.

As security for Entergy Corporation as the lender, the terms of the December 9, 2005 bankruptcy court order provide that all borrowings by Entergy New Orleans under the DIP Credit Agreement are: (i) entitled to superpriority administrative claim status pursuant to section 364(c)(1) of the Bankruptcy Code; (ii) secured by a perfected first priority lien on all property of Entergy New Orleans pursuant to sections 364(c)(2) and 364(d) of the Bankruptcy Code, except on any property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition; and (iii) secured by a perfected junior lien pursuant to section 364(c)(3) of the Bankruptcy Code on all property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens in favor of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition.

The interest rate on borrowings under the DIP credit agreement will be the average interest rate of borrowings outstanding under Entergy Corporation's $2 billion revolving credit facility, which was approximately 5.7% per annum at December 31, 2006.

The lien granted by the bankruptcy court under sections 364(c)(2) and 364(d) primes the liens that secure Entergy New Orleans' obligations under its mortgage bond indenture that existed as of the date Entergy New Orleans filed its bankruptcy petition. To secure Entergy New Orleans' obligations under its mortgage bond indenture, the bankruptcy court's December 9, 2005 order grants in favor of the bond trustee, for the benefit of itself and the bondholders, a lien on all Entergy New Orleans property that secures its obligations under the DIP Credit Agreement. The lien in favor of the bond trustee is senior to all other liens except for the liens in favor of Entergy Corporation and the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition.

Events of default under the DIP credit agreement include: failure to make payment of any installment of principal or interest when due and payable; the occurrence of a change of control of Entergy New Orleans; failure by either Entergy New Orleans or Entergy Corporation to receive other necessary governmental approvals and consents; the occurrence of an event having a materially adverse effect on Entergy New Orleans or its prospects; and customary bankruptcy-related defaults, including, without limitation, appointment of a trustee, "responsible person," or examiner with expanded powers, conversion of Entergy New Orleans' chapter 11 case to a case under chapter 7 of the Bankruptcy Code, and the interim or final orders approving the DIP Credit Agreement being stayed or modified or ceasing to be in full force and effect.

93

 

NOTE 5. LONG - TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Long-term debt for Entergy Corporation and subsidiaries as of December 31, 2006 and 2005 consisted of:

 

2006

 

2005

 

(In Thousands)

Mortgage Bonds:

     

   4.875% Series due October 2007 - System Energy

$70,000

 

$70,000

   4.35% Series due April 2008 - Entergy Mississippi

100,000

 

100,000

   3.6% Series due June 2008 - Entergy Gulf States

325,000

 

325,000

   Libor + 0.75% Series due December 2008 - Entergy Gulf States

350,000

 

350,000

   Libor + 0.40% Series due December 2009 - Entergy Gulf States

225,000

 

225,000

   4.5% Series due June 2010 - Entergy Arkansas

100,000

 

100,000

   4.67% Series due June 2010 - Entergy Louisiana

55,000

 

55,000

   5.12% Series due August 2010 - Entergy Gulf States

100,000

 

100,000

   5.83% Series due November 2010 - Entergy Louisiana

150,000

 

150,000

   4.65% Series due May 2011 - Entergy Mississippi

80,000

 

80,000

   4.875% Series due November 2011 - Entergy Gulf States

200,000

 

200,000

   6.0% Series due December 2012 - Entergy Gulf States

140,000

 

140,000

   5.15% Series due February 2013 - Entergy Mississippi

100,000

 

100,000

   5.09% Series due November 2014 - Entergy Louisiana

115,000

 

115,000

   5.6% Series due December 2014 - Entergy Gulf States

50,000

 

50,000

   5.25% Series due August 2015 - Entergy Gulf States

200,000

 

200,000

   5.70% Series due June 2015 - Entergy Gulf States

200,000

 

200,000

   5.56% Series due September 2015 - Entergy Louisiana

100,000

 

100,000

   5.92% Series due February 2016 - Entergy Mississippi

100,000

 

-

   5.4% Series due May 2018 - Entergy Arkansas

150,000

 

150,000

   4.95% Series due June 2018 - Entergy Mississippi

95,000

 

95,000

   5.0% Series due July 2018 - Entergy Arkansas

115,000

 

115,000

   5.5% Series due April 2019 - Entergy Louisiana

100,000

 

100,000

   5.66% Series due February 2025 - Entergy Arkansas

175,000

 

175,000

   6.7% Series due April 2032 - Entergy Arkansas

100,000

 

100,000

   7.6% Series due April 2032 - Entergy Louisiana

150,000

 

150,000

   6.0% Series due November 2032 - Entergy Arkansas

100,000

 

100,000

   6.0% Series due November 2032 - Entergy Mississippi

75,000

 

75,000

   7.25% Series due December 2032 - Entergy Mississippi

100,000

 

100,000

   5.9% Series due June 2033 - Entergy Arkansas

100,000

 

100,000

   6.20% Series due July 2033 - Entergy Gulf States

240,000

 

240,000

   6.25% Series due April 2034 - Entergy Mississippi

100,000

 

100,000

   6.4% Series due October 2034 - Entergy Louisiana

70,000

 

70,000

   6.38% Series due November 2034 - Entergy Arkansas

60,000

 

60,000

   6.18% Series due March 2035 - Entergy Gulf States

85,000

 

85,000

   6.30% Series due September 2035 - Entergy Louisiana

100,000

 

100,000

   Total mortgage bonds

$4,675,000

 

$4,575,000

94

 

 

2006

 

2005

 

(In Thousands)

       

Governmental Bonds (a):

     

   5.45% Series due 2010, Calcasieu Parish - Louisiana

$22,095

 

$22,095

   6.75% Series due 2012, Calcasieu Parish - Louisiana

48,285

 

48,285

   6.7% Series due 2013, Pointe Coupee Parish - Louisiana

17,450

 

17,450

   5.7% Series due 2014, Iberville Parish - Louisiana

21,600

 

21,600

   5.8% Series due 2015, West Feliciana Parish - Louisiana

28,400

 

28,400

   7.0% Series due 2015, West Feliciana Parish - Louisiana

39,000

 

39,000

   5.8% Series due 2016, West Feliciana Parish - Louisiana

20,000

 

20,000

   6.3% Series due 2016, Pope County - Arkansas (b)

19,500

 

19,500

   4.6% Series due 2017, Jefferson County - Arkansas (b)

54,700

 

-

   5.6% Series due 2017, Jefferson County - Arkansas

-

 

45,500

   6.3% Series due 2018, Jefferson County - Arkansas (b)

-

 

9,200

   6.3% Series due 2020, Pope County - Arkansas

120,000

 

120,000

   5.0% Series due 2021, Independence County - Arkansas

45,000

 

45,000

   5.875% Series due 2022, Mississippi Business Finance Corp.

216,000

 

216,000

   5.9% Series due 2022, Mississippi Business Finance Corp.

102,975

 

102,975

   Auction Rate due 2022, Independence County - Mississippi (b)

30,000

 

30,000

   4.6% Series due 2022, Mississippi Business Finance Corp. (b)

16,030

 

16,030

   5.95% Series due 2023, St. Charles Parish - Louisiana (b)

-

 

25,000

   6.2% Series due 2026, Claiborne County - Mississippi

90,000

 

90,000

   6.6% Series due 2028, West Feliciana Parish - Louisiana

40,000

 

40,000

   Auction Rate due 2030, St. Charles Parish - Louisiana (b)

60,000

 

60,000

   Total governmental bonds

991,035

 

1,016,035

       

Other Long-Term Debt:

     

   Note Payable to NYPA, non-interest bearing, 4.8% implicit rate

$297,289

 

$373,186

   5 year Bank Credit Facility, weighted avg rate 5.30% (Note 4)

820,000

 

785,000

   Bank term loan, Entergy Corporation, avg rate 2.98%, due 2010

60,000

 

60,000

   Bank term loan, Entergy Corporation, avg rate 3.08%, due 2008

35,000

 

35,000

   6.17% Notes due March 2008, Entergy Corporation

72,000

 

72,000

   6.23% Notes due March 2008, Entergy Corporation

15,000

 

15,000

   6.13% Notes due September 2008, Entergy Corporation

150,000

 

150,000

   7.75% Notes due December 2009, Entergy Corporation

267,000

 

267,000

   6.58% Notes due May 2010, Entergy Corporation

75,000

 

75,000

   6.9% Notes due November 2010, Entergy Corporation

140,000

 

140,000

   7.625% Notes initially due February 2011, Entergy Corporation (c)

500,000

 

500,000

   7.06% Notes due March 2011, Entergy Corporation

86,000

 

86,000

   Long-term DOE Obligation (d)

168,723

 

161,048

   Waterford 3 Lease Obligation
      7.45% (Note 10)

247,725

 

247,725

95

 

 

2006

 

2005

 

(In Thousands)

Other Long-Term Debt (continued):

     

  Grand Gulf Lease Obligation
    5.62% (Note 10)

345,340 

 

364,806 

  Unamortized Premium and Discount - Net

(5,991)

 

(6,886)

  Other

40,542 

 

12,096 

Total Long-Term Debt

8,979,663 

 

8,928,010 

Less Amount Due Within One Year

181,576 

 

103,517 

Long-Term Debt Excluding Amount Due Within One Year

$8,798,087 

 

$8,824,493 

       

Fair Value of Long-Term Debt (e)

$8,106,540 

 

$8,009,388 

(a)

Consists of pollution control revenue bonds and environmental revenue bonds.

(b)

The bonds are secured by a series of collateral first mortgage bonds.

(c)

In December 2005, Entergy Corporation sold 10 million equity units with a stated amount of $50 each. An equity unit consists of (1) a note, initially due February 2011 and initially bearing interest at an annual rate of 5.75%, and (2) a purchase contract that obligates the holder of the equity unit to purchase for $50 between 0.5705 and 0.7074 shares of Entergy Corporation common stock on or before February 17, 2009. Entergy will pay the holders quarterly contract adjustment payments of 1.875% per year on the stated amount of $50 per equity unit. Under the terms of the purchase contracts, Entergy Corporation will issue between 5,705,000 and 7,074,000 shares of common stock in the settlement of the purchase contracts (subject to adjustment under certain circumstances).

(d)

Pursuant to the Nuclear Waste Policy Act of 1982, Entergy's nuclear owner/licensee subsidiaries have contracts with the DOE for spent nuclear fuel disposal service. The contracts include a one-time fee for generation prior to April 7, 1983. Entergy Arkansas is the only Entergy company that generated electric power with nuclear fuel prior to that date and includes the one-time fee, plus accrued interest, in long-term debt.

(e)

The fair value excludes lease obligations and long-term DOE obligations, and includes debt due within one year. It is determined using bid prices reported by dealer markets and by nationally recognized investment banking firms.

The annual long-term debt maturities (excluding lease obligations) for debt outstanding as of December 31, 2006, for the next five years are as follows:

 

Amount

 

(In Thousands)

 

 

2007

$158,241

2008

$1,071,413

2009

$517,659

2010

$1,488,537

2011

$893,747

In November 2000, Entergy's Non-Utility Nuclear business purchased the FitzPatrick and Indian Point 3 power plants in a seller-financed transaction. Entergy issued notes to NYPA with seven annual installments of approximately $108 million commencing one year from the date of the closing, and eight annual installments of $20 million commencing eight years from the date of the closing. These notes do not have a stated interest rate, but have an implicit interest rate of 4.8%. In accordance with the purchase agreement with NYPA, the purchase of Indian Point 2 in 2001 resulted in Entergy's Non-Utility Nuclear business becoming liable to NYPA for an additional $10 million per year for 10 years, beginning in September 2003. This liability was recorded upon the purchase of Indian Point 2 in September 2001, and is included in the note payable to NYPA balance above. In July 2003, a payment of $102 million was made prior to maturity on the note payable to NYPA. Under a provision in a letter of

 

96

 

 

credit supporting these notes, if certain of the Utility operating companies or System Energy were to default on other indebtedness, Entergy could be required to post collateral to support the letter of credit.

Covenants in the Entergy Corporation notes require it to maintain a consolidated debt ratio of 65% or less of its total capitalization. If Entergy's debt ratio exceeds this limit, or if Entergy or certain of the Utility operating companies default on other indebtedness or are in bankruptcy or insolvency proceedings, an acceleration of the notes' maturity dates may occur.

The long-term securities issuances of Entergy Mississippi and System Energy are limited to amounts authorized by the SEC under PUHCA 1935. After the repeal of PUHCA 1935 on February 8, 2006, the FERC, under the Federal Power Act, has jurisdiction over the securities issuances of these companies. Under a savings provision in the PUHCA 1935 repeal legislation, these companies can rely on the authority of their existing SEC orders until each obtains new orders from the FERC. The SEC PUHCA 1935 financing order of Entergy Mississippi limits securities issuances unless certain capitalization and investment grade ratings conditions are met. Entergy Gulf States and Entergy Louisiana have received FERC long-term financing orders that do not have such conditions. The long-term securities issuances of Entergy Arkansas are limited to amounts authorized by the APSC.

Capital Funds Agreement

Pursuant to an agreement with certain creditors, Entergy Corporation has agreed to supply System Energy with sufficient capital to:

97

Long-term debt for the Registrant Subsidiaries as of December 31, 2006 and 2005 consisted of:

 

2006

 

2005

 

(In Thousands)

Entergy Arkansas

     

  Mortgage Bonds:

     

    4.50% Series due June 2010

$100,000 

 

$100,000 

    5.4% Series due May 2018

150,000 

 

150,000 

    5.0% Series due July 2018

115,000 

 

115,000 

    5.66% Series due February 2025

175,000 

 

175,000 

    6.7% Series due April 2032

100,000 

 

100,000 

    6.0% Series due November 2032

100,000 

 

100,000 

    5.9% Series due June 2033

100,000 

 

100,000 

    6.38% Series due November 2034

60,000 

 

60,000 

    Total mortgage bonds

900,000 

 

900,000 

       

  Governmental Bonds (a):

     

    6.3% Series due 2016, Pope County (d)

19,500 

 

19,500 

    4.6% Series due 2017, Jefferson County (d)

54,700 

 

    5.6% Series due 2017, Jefferson County

 

45,500 

    6.3% Series due 2018, Jefferson County (d)

 

9,200 

    6.3% Series due 2020, Pope County

120,000 

 

120,000 

    5.0% Series due 2021, Independence County (d)

45,000 

 

45,000 

    Total governmental bonds

239,200 

 

239,200 

       

  Other Long-Term Debt

     

    Long-term DOE Obligation (b)

168,723 

 

161,048 

    Unamortized Premium and Discount - Net

(1,722)

 

(2,010)

       

  Total Long-Term Debt

1,306,201 

 

1,298,238 

  Less Amount Due Within One Year

 

  Long-Term Debt Excluding Amount Due Within One Year

$1,306,201 

 

$1,298,238 

       

  Fair Value of Long-Term Debt (c)

$1,113,055 

 

$1,141,332 

       

98

 

2006

 

2005

 

(In Thousands)

Entergy Gulf States

     

  Mortgage Bonds:

     

    3.6% Series due June 2008

$325,000 

 

$325,000 

    Libor + 0.75% Series due December 2008

350,000 

 

350,000 

    Libor + 0.4% Series due December 2009

225,000 

 

225,000 

    5.12 % Series due August 2010

100,000 

 

100,000 

    4.875% Series due November 2011

200,000 

 

200,000 

    6.0% Series due December 2012

140,000 

 

140,000 

    5.6% Series due December 2014

50,000 

 

50,000 

    5.70% Series due June 2015

200,000 

 

200,000 

    5.25% Series due August 2015

200,000 

 

200,000 

    6.2% Series due July 2033

240,000 

 

240,000 

    6.18% Series due March 2035

85,000 

 

85,000 

    Total mortgage bonds

2,115,000 

 

2,115,000 

       

  Governmental Bonds (a):

     

    5.45% Series due 2010, Calcasieu Parish

22,095 

 

22,095 

    6.75% Series due 2012, Calcasieu Parish

48,285 

 

48,285 

    6.7% Series due 2013, Pointe Coupee Parish

17,450 

 

17,450 

    5.7% Series due 2014, Iberville Parish

21,600 

 

21,600 

    5.8% Series due 2015, West Feliciana Parish

28,400 

 

28,400 

    7.0% Series due 2015, West Feliciana Parish

39,000 

 

39,000 

    5.8% Series due 2016, West Feliciana Parish

20,000 

 

20,000 

    6.6% Series due 2028, West Feliciana Parish

40,000 

 

40,000 

    Total governmental bonds

236,830 

 

236,830 

       

  Other Long-Term Debt

     

    Unamortized Premium and Discount - Net

(2,284)

 

(2,516)

    Other

8,781 

 

8,816 

       

  Total Long-Term Debt

2,358,327 

 

2,358,130 

  Less Amount Due Within One Year

 

  Long-Term Debt Excluding Amount Due Within One Year

$2,358,327 

 

$2,358,130 

       

  Fair Value of Long-Term Debt (c)

$2,323,973 

 

$2,364,695 

       

99

 

2006

 

2005

 

(In Thousands)

Entergy Louisiana

     

  Mortgage Bonds:

     

    4.67% Series due June 2010

$55,000 

 

$55,000 

    5.83% Series due November 2010

150,000 

 

150,000 

    5.09% Series due November 2014

115,000 

 

115,000 

    5.56% Series due September 2015

100,000 

 

100,000 

    5.5% Series due April 2019

100,000 

 

100,000 

    7.6% Series due April 2032

150,000 

 

150,000 

    6.4% Series due October 2034

70,000 

 

70,000 

    6.3% Series due September 2035

100,000 

 

100,000 

    Total mortgage bonds

840,000 

 

840,000 

       

  Governmental Bonds (a):

     

    5.95% Series due 2023, St. Charles Parish (d)

 

25,000 

    Auction Rate due 2030, St. Charles Parish (d)

60,000 

 

60,000 

    Total governmental bonds

60,000 

 

85,000 

       

  Other Long-Term Debt:

     

    Waterford 3 Lease Obligation 7.45% (Note 10)

247,725 

 

247,725 

    Unamortized Premium and Discount - Net

(78)

 

(325)

       

  Total Long-Term Debt

1,147,647 

 

1,172,400 

  Less Amount Due Within One Year

 

  Long-Term Debt Excluding Amount Due Within One Year

$1,147,647 

 

$1,172,400 

 

 

 

 

  Fair Value of Long-Term Debt (c)

$869,941 

 

$934,821 

100

 

2006

 

2005

 

(In Thousands)

Entergy Mississippi

     

  Mortgage Bonds:

     

    4.35% Series due April 2008

$100,000 

 

$100,000 

    4.65% Series due May 2011

80,000 

 

80,000 

    5.15% Series due February 2013

100,000 

 

100,000 

    5.92% Series due February 2016

100,000 

 

    4.95% Series due June 2018

95,000 

 

95,000 

    6.0% Series due November 2032

75,000 

 

75,000 

    7.25% Series due December 2032

100,000 

 

100,000 

    6.25% Series due April 2034

100,000 

 

100,000 

    Total mortgage bonds

750,000 

 

650,000 

       

  Governmental Bonds (a):

     

    4.60% Series due 2022, Mississippi Business Finance Corp.(d)

16,030 

 

16,030 

    Auction Rate due 2022, Independence County (d)

30,000 

 

30,000 

    Total governmental bonds

46,030 

 

46,030 

       

  Other Long-Term Debt:

     

    Unamortized Premium and Discount - Net

(843)

 

(884)

       

  Total Long-Term Debt

795,187 

 

695,146 

  Less Amount Due Within One Year

-

 

  Long-Term Debt Excluding Amount Due Within One Year

$795,187 

 

$695,146 

       

  Fair Value of Long-Term Debt (d)

$778,757 

 

$697,772 

 

2006

 

2005

 

(In Thousands)

Entergy New Orleans

     

  Mortgage Bonds(e):

     

    3.875% Series due August 2008

$30,000 

 

$30,000 

    4.98% Series due July 2010

30,000 

 

30,000 

    5.25% Series due August 2013

70,000 

 

70,000 

    6.75% Series due October 2017

25,000 

 

25,000 

    5.6% Series due September 2024

34,975 

 

34,975 

    5.65% Series due September 2029

39,960 

 

39,960 

    Total mortgage bonds

229,935 

 

229,935 

       

  Other Long-Term Debt:

     

    Unamortized Premium and Discount - Net

(60)

 

(76)

       

  Total Long-Term Debt (f)

229,875 

 

229,859 

  Less Amount Due Within One Year

 

  Long-Term Debt Excluding Amount Due Within One Year

$229,875 

 

$229,859 

     

 

  Fair Value of Long-Term Debt (c)

$218,500 

 

$199,100 

101

 

 

2006

 

2005

 

(In Thousands)

System Energy

     

  Mortgage Bonds:

     

    4.875% Series due October 2007

$70,000 

$70,000 

    Total mortgage bonds

70,000 

 

70,000 

       

  Governmental Bonds (a):

     

    5.875% Series due 2022, Mississippi Business Finance Corp.

216,000 

 

216,000 

    5.9% Series due 2022, Mississippi Business Finance Corp.

102,975 

 

102,975 

    6.2% Series due 2026, Claiborne County

90,000 

 

90,000 

    Total governmental bonds

408,975 

 

408,975 

       

  Other Long-Term Debt:

     

    Grand Gulf Lease Obligation 5.62% (Note 10)

345,340 

 

364,806 

    Unamortized Premium and Discount - Net

(1,066)

 

(1,150)

       

  Total Long-Term Debt

823,249 

 

842,631 

  Less Amount Due Within One Year

93,335 

 

22,989 

  Long-Term Debt Excluding Amount Due Within One Year

$729,914 

 

$819,642 

 

 

 

 

  Fair Value of Long-Term Debt (c)

$479,649 

 

$474,508 

(a)

Consists of pollution control revenue bonds and environmental revenue bonds.

(b)

Pursuant to the Nuclear Waste Policy Act of 1982, Entergy's nuclear owner/licensee subsidiaries have contracts with the DOE for spent nuclear fuel disposal service. The contracts include a one-time fee for generation prior to April 7, 1983. Entergy Arkansas is the only Entergy company that generated electric power with nuclear fuel prior to that date and includes the one-time fee, plus accrued interest, in long-term debt.

(c)

The fair value excludes lease obligations and long-term DOE obligations, and includes debt due within one year. It is determined using bid prices reported by dealer markets and by nationally recognized investment banking firms.

(d)

The bonds are secured by a series of collateral first mortgage bonds.

(e)

Under a settlement agreement currently pending approval of the bankruptcy court, the holders agreed to forego interest on the bonds for one year beginning September 23, 2005.

(f)

The long-term debt is classified as Liabilities Subject to Compromise on the 2005 Balance Sheet.

The annual long-term debt maturities (excluding lease obligations) for debt outstanding as of December 31, 2006, for the next five years are as follows:

   

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

                         

2007

 

-

 

-

 

-

 

-

 

-

 

$70,000

2008

 

-

 

$675,000

 

-

 

$100,000

 

$30,000

 

-

2009

 

-

 

$225,000

 

-

 

-

 

-

 

-

2010

 

$100,000

 

$122,095

 

$205,000

 

-

 

$30,000

 

-

2011

 

-

 

$200,000

 

-

 

$80,000

 

-

 

-

Prior to February 8, 2006, the long-term securities issuances of Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and System Energy were authorized by the SEC under PUHCA 1935. Effective on that date, the FERC has jurisdiction over these issuances. Entergy Gulf States and Entergy

 

102

 

 

 Louisiana have obtained FERC authorization for their long-term financing. The long-term securities issuances of Entergy Arkansas are limited to amounts authorized by the APSC.

Under a savings provision contained in PUHCA 2005, which repealed PUHCA 1935, Entergy Mississippi and System Energy can each rely, after the repeal, on the long-term securities issuance authority in its SEC PUHCA 1935 order or orders unless superseded by FERC authorization. Under its SEC order, Entergy Mississippi cannot incur additional indebtedness or issue other securities unless (a) the issuer and Entergy Corporation maintain a common equity ratio of at least 30% and (b) the security to be issued (if rated) and all its outstanding securities of the issuer, as well as all outstanding securities of Entergy Corporation, that are rated, are rated investment grade.

In January 2007, Entergy Mississippi redeemed, prior to maturity, $100 million of 4.35% Series First Mortgage Bonds.

Tax Exempt Bond Audit (Entergy Louisiana)

The Internal Revenue Service (IRS) is auditing certain Tax Exempt Bonds (Bonds) issued by St. Charles Parish, State of Louisiana (the Issuer). The Bonds were issued to finance previously unfinanced acquisition costs expended by Entergy Louisiana to acquire certain radioactive solid waste disposal facilities (the Facilities) at the Waterford Steam Electric Generating Station. In March and April 2005, the IRS issued proposed adverse determinations that the Issuer's 7.0% Series bonds due 2022, 7.5% Series bonds due 2021, and 7.05% Series bonds due 2022 are not tax exempt. The stated basis for these determinations was that radioactive waste did not constitute "solid waste" within the provisions of the Internal Revenue Code and therefore the Facilities did not qualify as solid waste disposal facilities. The Issuer has requested administrative appeals of the proposed adverse determinations with respect to the Bonds to the IRS Office of Appeals. The Issuer and Entergy Louisiana intend to continue to contest vigorously these matters. The three series of Bonds are the only series of bonds issued by the Issuer for the benefit of Entergy Louisiana that are the subject of audits by the IRS.

103

 

NOTE 6. PREFERRED EQUITY (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

The number of shares and units authorized and outstanding and dollar value of preferred stock, preferred membership interests, and interest for Entergy Corporation subsidiaries as of December 31, 2006 and 2005 are presented below. Only the Entergy Gulf States series "with sinking fund" contains mandatory redemption requirements. All other series of the Utility preferred stock are redeemable at Entergy's option.

   

Shares
Authorized

 

Shares
Outstanding

       
   

2006

 

2005

 

2006

 

2005

 

2006

 

2005

Entergy Corporation

                 

(Dollars in Thousands)

  Utility:

                       

    Preferred Stock or Membership Interests
     without sinking fund:

                       

      Entergy Arkansas, 4.32%-7.88% Series

 

3,413,500

 

1,613,500

 

3,413,500

 

1,613,500

 

$116,350

 

$116,350

      Entergy Gulf States, 4.20%-7.56% Series

 

473,268

 

473,268

 

473,268

 

473,268

 

47,327

 

47,327

      Entergy Louisiana Holdings, 4.16%-8.00% Series

 

-

 

2,115,000

 

-

 

2,115,000

 

-

 

100,500

      Entergy Louisiana, LLC 6.95% Series

 

1,000,000

 

1,000,000

 

1,000,000

 

1,000,000

 

100,000

 

100,000

      Entergy Mississippi, 4.36%-6.25% Series

 

1,403,807

 

1,403,807

 

1,403,807

 

1,403,807

 

50,381

 

50,381

Total Utility Preferred Stock without sinking fund

 

6,290,575

 

6,605,575

 

6,290,575

 

6,605,575

 

314,058

 

414,558

                         

  Energy Commodity Services:

                       

    Preferred Stock without sinking fund:

                       

      Entergy Asset Management, 11.50% rate

 

1,000,000

 

1,000,000

 

297,376

 

297,376

 

29,738

 

29,738

      Other

 

-

 

-

 

-

 

-

 

1,117

 

1,678

                         

Total Preferred Stock without sinking fund

 

7,290,575

 

7,605,575

 

6,587,951

 

6,902,951

 

$344,913

 

$445,974

                         

  Utility:

                       

    Preferred Stock with sinking fund:

                       

      Entergy Gulf States, Adjustable

                       

        Rate 7.0% (a)

 

105,000

 

139,500

 

105,000

 

139,500

 

$10,500

 

$13,950

Total Preferred Stock with sinking fund

 

105,000

 

139,500

 

105,000

 

139,500

 

$10,500

 

$13,950

                         

Fair Value of Preferred Stock with

                       

  sinking fund (b)

                 

$7,950

 

$15,286

(a)

Represents weighted-average annualized rate for 2006 and 2005.

(b)

Fair values were determined using bid prices reported by dealer markets and by nationally recognized investment banking firms. There is additional disclosure of fair value of financial instruments in Note 16 to the financial statements.

All outstanding preferred stock and membership interests are cumulative.

Entergy Gulf States' preferred stock with sinking fund retirements were 34,500 shares in 2006, 2005, and 2004. Entergy Gulf States has annual sinking fund requirements of $3.45 million through 2008 for its preferred stock outstanding.

104

In March 2006, Entergy Arkansas issued 3,000,000 shares of $25 par value 6.45% Series Preferred Stock, all of which were outstanding as of December 31, 2006. The dividends are cumulative and payable quarterly beginning July 1, 2006. The preferred stock is redeemable on or after April 1, 2011, at Entergy Arkansas' option, at the call price of $25 per share. In April 2006, Entergy Arkansas used the proceeds from this issuance to redeem the following preferred stock:

Series of Entergy Arkansas Preferred Stock

 

Redemption Price Per Share

     

7.32% Preferred Stock, Cumulative, $100.00 par value

 

$103.17

7.80% Preferred Stock, Cumulative, $100.00 par value

 

$103.25

7.40% Preferred Stock, Cumulative, $100.00 par value

 

$102.80

7.88% Preferred Stock, Cumulative, $100.00 par value

 

$103.00

$1.96 Preferred Stock, Cumulative, $0.01 par value

 

$ 25.00

In June 2006, Entergy Louisiana Holdings redeemed all of its preferred stock and amended its charter to eliminate authority to issue any future series of preferred stock. The redemption was made at the following respective redemption prices as provided in the Entergy Louisiana Holdings amended and restated articles of incorporation:

Series of Entergy Louisiana Holdings Preferred Stock

 

Redemption Price Per Share

4.96% Preferred Stock, Cumulative, $100.00 par value

 

$104.25

4.16% Preferred Stock, Cumulative, $100.00 par value

 

$104.21

4.44% Preferred Stock, Cumulative, $100.00 par value

 

$104.06

5.16% Preferred Stock, Cumulative, $100.00 par value

 

$104.18

5.40% Preferred Stock, Cumulative, $100.00 par value

 

$103.00

6.44% Preferred Stock, Cumulative, $100.00 par value

 

$102.92

7.84% Preferred Stock, Cumulative, $100.00 par value

 

$103.78

7.36% Preferred Stock, Cumulative, $100.00 par value

 

$103.36

8% Preferred Stock, Cumulative, $25.00 par value

 

$ 25.00

In 2004, Entergy realized a pre-tax gain of $0.9 million upon the sale to a third party of preferred shares, and less than 1% of the common shares, of Entergy Asset Management, an Entergy subsidiary. See Note 3 to the financial statements for a discussion of the tax benefit realized on the sale. Entergy Asset Management's stockholders' agreement provides that at any time during the 180-day period prior to December 31, 2007 or each subsequent December 31 thereafter, either Entergy Asset Management or the preferred shareholders may request that the preferred dividend rate be reset. If Entergy Asset Management and the preferred shareholders are unable to agree on a dividend reset rate, a preferred shareholder can request that its shares be sold to a third party. If Entergy Asset Management is unable to sell the preferred shares within 75 days, the preferred shareholder has the right to take control of the Entergy Asset Management board of directors for the purpose of liquidating the assets of Entergy Asset Management in order to repay the preferred shares and any accrued dividends.

The number of shares and units authorized and outstanding and dollar value of preferred stock and membership interests for Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans as of December 31, 2006 and 2005 are presented below. Only the two Entergy Gulf States series "with sinking fund" contain mandatory redemption requirements. All other series of the Utility operating companies' preferred stock and membership interests are redeemable at the respective company's option at the call prices presented. Dividends and distributions paid on all of Entergy's preferred stock and membership interests series are eligible for the dividends received deduction. The dividends received deduction is limited by Internal Revenue Code section 244 for the following preferred stock series: Entergy Arkansas 4.72%, Entergy Gulf States 4.40%, Entergy Mississippi 4.56%, and Entergy New Orleans 4.75%.

105

 

Shares
Authorized
and Outstanding

 


Dollars
(In Thousands)

 

Call Price Per
Share as of
December 31,

 

2006

 

2005

 

2006

 

2005

 

2006

Entergy Arkansas Preferred Stock

                 

  Without sinking fund:

                 

    Cumulative, $100 par value:

                 

      4.32% Series

70,000

 

70,000

 

$7,000

 

$7,000

 

$103.65

      4.72% Series

93,500

 

93,500

 

9,350

 

9,350

 

$107.00

      4.56% Series

75,000

 

75,000

 

7,500

 

7,500

 

$102.83

      4.56% 1965 Series

75,000

 

75,000

 

7,500

 

7,500

 

$102.50

      6.08% Series

100,000

 

100,000

 

10,000

 

10,000

 

$102.83

      7.32% Series

-

 

100,000

 

-

 

10,000

 

$-

      7.80% Series

-

 

150,000

 

-

 

15,000

 

$-

      7.40% Series

-

 

200,000

 

-

 

20,000

 

$-

      7.88% Series

-

 

150,000

 

-

 

15,000

 

$-

    Cumulative, $25 par value:

                 

      6.45% Series

3,000,000

 

-

 

75,000

 

-

 

$25.00

    Cumulative, $0.01 par value:

                 

      $1.96 Series (a)

-

 

600,000

 

-

 

15,000

 

$-

        Total without sinking fund

3,413,500

 

1,613,500

 

$116,350

 

$116,350

   

 

 

Shares
Authorized
and Outstanding

 


Dollars
(In Thousands)

 

Call Price Per
Share as of
December 31,

 

2006

 

2005

 

2006

 

2005

 

2006

Entergy Gulf States Preferred Stock

                 

Preferred Stock

                 

  Authorized 6,000,000 shares,
  $100 par value, cumulative

                 

    Without sinking fund:

                 

      4.40% Series

51,173

 

51,173

 

$5,117

 

$5,117

 

$108.00

      4.50% Series

5,830

 

5,830

 

583

 

583

 

$105.00

      4.40% 1949 Series

1,655

 

1,655

 

166

 

166

 

$103.00

      4.20% Series

9,745

 

9,745

 

975

 

975

 

$102.82

      4.44% Series

14,804

 

14,804

 

1,480

 

1,480

 

$103.75

      5.00% Series

10,993

 

10,993

 

1,099

 

1,099

 

$104.25

      5.08% Series

26,845

 

26,845

 

2,685

 

2,685

 

$104.63

      4.52% Series

10,564

 

10,564

 

1,056

 

1,056

 

$103.57

      6.08% Series

32,829

 

32,829

 

3,283

 

3,283

 

$103.34

      7.56% Series

308,830

 

308,830

 

30,883

 

30,883

 

$101.80

        Total without sinking fund

473,268

 

473,268

 

$47,327

 

$47,327

   
                   

    With sinking fund:

                 

      Adjustable Rate-A, 7.0% (b)

60,000

 

72,000

 

$6,000

 

$7,200

 

$100.00

      Adjustable Rate-B, 7.0% (b)

45,000

 

67,500

 

4,500

 

6,750

 

$100.00

        Total with sinking fund

105,000

 

139,500

 

$10,500

 

$13,950

   
                   

Fair Value of Preferred Stock with
   Sinking Fund (c)

       


$7,950

 


$15,286

   

106

 

Units
Authorized
and Outstanding

 


Dollars
(In Thousands)

 

Call Price Per
Unit as of
December 31,

 

2006

 

2005

 

2006

 

2005

 

2006

Entergy Louisiana Preferred
  Membership Interests

                 

    Without sinking fund:

                 

      Cumulative, $100 liquidation value:

                 

        6.95% Series

1,000,000

 

1,000,000

 

$100,000

 

$100,000

 

$-

           Total without sinking fund

1,000,000

 

1,000,000

 

$100,000

 

$100,000

   

 

 

Shares
Authorized
and Outstanding

 


Dollars
(In Thousands)

 

Call Price Per
Share as of
December 31,

 

2006

 

2005

 

2006

 

2005

 

2006

Entergy Mississippi Preferred Stock

                 

  Without sinking fund:

                 

    Cumulative, $100 par value:

                 

      4.36% Series

59,920

 

59,920

 

$5,992

 

$5,992

 

$103.88

      4.56% Series

43,887

 

43,887

 

4,389

 

4,389

 

$107.00

      4.92% Series

100,000

 

100,000

 

10,000

 

10,000

 

$102.88

    Cumulative, $25 par value

                 

      6.25% Series (d)

1,200,000

 

1,200,000

 

30,000

 

30,000

 

$-

        Total without sinking fund

1,403,807

 

1,403,807

 

$50,381

 

$50,381

   

 

Shares
Authorized
and Outstanding

 


Dollars
(In Thousands)

 

Call Price Per
Share as of
December 31,

 

2006

 

2005

 

2006

 

2005

 

2006

Entergy New Orleans Preferred Stock

                 

  Without sinking fund:

                 

    Cumulative, $100 par value:

                 

      4.75% Series

77,798

 

77,798

 

$7,780

 

$7,780

 

$105.00

      4.36% Series

60,000

 

60,000

 

6,000

 

6,000

 

$104.58

      5.56% Series

60,000

 

60,000

 

6,000

 

6,000

 

$102.59

        Total without sinking fund

197,798

 

197,798

 

$19,780

 

$19,780

   

(a)

The total dollar value represents the liquidation value of $25 per share.

(b)

Represents weighted-average annualized rates for 2006 and 2005.

(c)

Fair values were determined using bid prices reported by dealer markets and by nationally recognized investment banking firms. There is an additional disclosure of fair value of financial instruments in Note 16 to the financial statements.

(d)

Series is non-callable until August 2010; thereafter callable at par.

Entergy New Orleans has 77,798 shares of $100 par value, 4.75% series preferred stock ("4.75% Preferred") issued and outstanding.  The 4.75% Preferred is non-voting, limited and preferred as to dividends, has a preference in liquidation over the common stock equal to its par value ($100), has redemption rights equal to 105% of its issue price and is not convertible into any other class of stock. The 4.75% Preferred is entitled to a quarterly dividend to be paid on the first day of January, April, July, and October. If dividends with respect to the 4.75% Preferred are not paid for four quarters, the holders of these shares would have the right to elect a majority of the Entergy New Orleans board of directors.  Entergy New Orleans filed a motion in the bankruptcy court seeking authority to recommence paying dividends to the holders of the 4.75% Preferred. After a

 

107

 

 

 hearing on the motion on May 3, 2006, the court granted Entergy New Orleans the authority to pay dividends to the holders of the 4.75% Preferred, beginning with the dividend due on July 1, 2006, and thereafter, unless objections are filed by creditors forty-five days in advance of a dividend payment date. If any objections are filed, the matter would be heard by the bankruptcy court. Entergy New Orleans recommenced payments of the dividends on the 4.75% Preferred with the July 1, 2006 dividend, and intends to declare and pay the dividends on the 4.75% Preferred each quarter pending resolution of its plan of reorganization.

Because its plan of reorganization proposes to pay the accumulated, unpaid dividends on all three series of its preferred stock, Entergy New Orleans accrued for those dividends in the fourth quarter 2006, and will continue accruing preferred dividends again on a quarterly basis.

 

NOTE 7. COMMON EQUITY (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Common Stock

Treasury Stock

Treasury stock activity for Entergy for 2006, 2005, and 2004 is as follows:

   

2006

 

2005

 

2004

   

Treasury

     

Treasury

     

Treasury

   
   

Shares

 

Cost

 

Shares

 

Cost

 

Shares

 

Cost

       

(In Thousands)

     

(In Thousands)

     

(In Thousands)

                         

Beginning Balance, January 1

 

40,644,602 

 

$2,161,960 

 

31,345,028 

 

$1,432,019 

 

19,276,445 

 

$561,152 

  Repurchases

 

6,672,000 

 

584,193 

 

12,280,500 

 

878,188 

 

16,631,800 

 

1,017,996

  Issuances:

                       

  Employee Stock-Based
   Compensation Plans

 


(1,803,471)

 


(101,393)

 


(2,965,006)

 


(147,888)

 


(4,555,897)

 


(146,877)

  Directors' Plan

 

(6,820)

 

(370)

 

(15,920)

 

(359)

 

(7,320)

 

(252)

Ending Balance, December 31

 

45,506,311 

 

$2,644,390 

 

40,644,602 

 

$2,161,960 

 

31,345,028 

 

$1,432,019 

Entergy Corporation reissues treasury shares to meet the requirements of the Stock Plan for Outside Directors (Directors' Plan), the Equity Ownership Plan of Entergy Corporation and Subsidiaries (Equity Ownership Plan), the Equity Awards Plan of Entergy Corporation and Subsidiaries, and certain other stock benefit plans. The Directors' Plan awards to non-employee directors a portion of their compensation in the form of a fixed number of shares of Entergy Corporation common stock.

On January 29, 2007, the Board approved a new repurchase program under which Entergy is authorized to repurchase up to $1.5 billion of its common stock, which Entergy expects to complete over the next two years.

Retained Earnings and Dividend Restrictions

Provisions within the articles of incorporation or pertinent indentures and various other agreements relating to the long-term debt and preferred stock of certain of Entergy Corporation's subsidiaries restrict the payment of cash dividends or other distributions on their common and preferred stock. As of December 31, 2006, Entergy Arkansas and Entergy Mississippi had restricted retained earnings unavailable for distribution to Entergy Corporation of $396.4 million and $121.6 million, respectively. Entergy Corporation received dividend payments from subsidiaries totaling $950 million in 2006, $424 million in 2005, and $825 million in 2004.

108

The Federal Power Act restricts the ability of a public utility to pay dividends out of capital. As a result of its restructuring and the related accounting, Entergy Louisiana, LLC applied to the FERC for a declaratory order to pay distributions on its common and preferred membership interests from the following sources: (1) the amount of Entergy Louisiana, Inc.'s retained earnings immediately prior to its restructuring on December 31, 2005; (2) an amount in excess of the amount in (1) over a transition period not expected to last more than 3 years as long as Entergy Louisiana, LLC's proprietary capital ratio is, and will remain, above 30%; and (3) the amount of Entergy Louisiana, LLC's retained earnings after the restructuring. The FERC granted the declaratory order on January 23, 2006. Distributions paid by Entergy Louisiana, LLC on its common membership interests to Entergy Louisiana Holdings, Inc. may, in turn, be paid by Entergy Louisiana Holdings, Inc. to Entergy Corporation without the need for FERC approval. As a wholly-owned subsidiary, Entergy Louisiana Holdings, Inc. dividends its earnings to Entergy Corporation at a percentage determined monthly.

NOTE 8. COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, tax, and regulatory proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business. While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy's results of operations, cash flows, or financial condition.

Entergy New Orleans Bankruptcy

See Note 18 to the financial statements for information on the Entergy New Orleans bankruptcy proceeding.

Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project. Entergy Louisiana made payments under the contract of approximately $107.1 million in 2006, $115.1 million in 2005, and $147.7 million in 2004. If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $138.9 million in 2007, and a total of $3.2 billion for the years 2008 through 2031. Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause. In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to ten years, beginning in October 2002. The provisions of the settlement also provide that the LPSC shall not recognize or use Entergy Louisiana's use of the cash benefits from the tax treatment in setting any of Entergy Louisiana's rates. Therefore, to the extent Entergy Louisiana's use of the proceeds would ordinarily have reduced its rate base, no change in rate base shall be reflected for ratemaking purposes.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act provides insurance for the public in the event of a nuclear power plant accident. The costs of this insurance are borne by the nuclear power industry. Originally passed by Congress in 1957 and most recently amended in 2005, the Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident. This protection must consist of two levels:

  1. The primary level is private insurance underwritten by American Nuclear Insurers and provides liability insurance coverage of $300 million. If this amount is not sufficient to cover claims arising from the accident, the second level, Secondary Financial Protection, applies. An industry-wide aggregate limitation of $300 million exists for domestically-sponsored terrorist acts. There is no aggregate limitation for foreign-sponsored terrorist acts.

 

109

 

 

  1. Within the Secondary Financial Protection level, each nuclear plant must pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, up to a maximum of $100.6 million per reactor per incident. This consists of a $95.8 million maximum retrospective premium plus a five percent surcharge that may be applied, if needed, at a rate that is presently set at $15 million per year per nuclear power reactor. There are no domestically- or foreign-sponsored terrorism limitations.

Currently, 104 nuclear reactors are participating in the Secondary Financial Protection program - 103 operating reactors and one under construction. The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $10 billion in insurance coverage to compensate the public in the event of a nuclear power reactor accident.

Entergy Arkansas has two licensed reactors and Entergy Gulf States, Entergy Louisiana, and System Energy each have one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA), which would share on a pro-rata basis in any retrospective premium assessment under the Price-Anderson Act). Entergy's Non-Utility Nuclear business owns and operates five nuclear power reactors and owns the shutdown Indian Point 1 reactor.

An additional but temporary contingent liability exists for all nuclear power reactor owners because of a previous Nuclear Worker Tort (long-term bodily injury caused by exposure to nuclear radiation while employed at a nuclear power plant) insurance program that was in place from 1988 to 1998. The maximum premium assessment exposure to each reactor is $3 million and will only be applied if such claims exceed the program's accumulated reserve funds. This contingent premium assessment feature will expire with the Nuclear Worker Tort program's expiration, scheduled for 2008.

Property Insurance

Entergy's nuclear owner/licensee subsidiaries are members of certain mutual insurance companies that provide property damage coverage, including decontamination and premature decommissioning expense, to the members' nuclear generating plants. These programs are underwritten by Nuclear Electric Insurance Limited (NEIL). As of December 31, 2006, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)

Note: ANO 1 and 2 share in the Primary Layer with one policy in common for that site.

Non-Utility Nuclear Plants (Indian Point 2 and 3, FitzPatrick, Pilgrim, and Vermont Yankee)

Note: Indian Point 2 and 3 share in the Primary Layer with one policy in common for that site.

110

In addition, Waterford 3, Grand Gulf, and the Non-Utility Nuclear plants are also covered under NEIL's Accidental Outage Coverage program. This coverage provides certain fixed indemnities in the event of an unplanned outage that results from a covered NEIL property damage loss, subject to a deductible. The following summarizes this coverage as of December 31, 2006:

Waterford 3

Grand Gulf

Indian Point 2 and 3

FitzPatrick and Pilgrim (each plant has an individual policy with the noted parameters)

Vermont Yankee

Under the property damage and accidental outage insurance programs, Entergy nuclear plants could be subject to assessments should losses exceed the accumulated funds available from NEIL. As of December 31, 2006, the maximum amounts of such possible assessments per occurrence were as follows:

 

 

Assessments

 

 

 (In Millions)

Utility:

   

  Entergy Arkansas

 

$16.6

  Entergy Gulf States

 

$13.3

  Entergy Louisiana

 

$15.5

  Entergy Mississippi

 

$0.10

  Entergy New Orleans

 

$0.10

  System Energy

 

$11.6

     

Non-Utility Nuclear

 

$65.6

Entergy maintains property insurance for its nuclear units in excess of the NRC's minimum requirement of $1.06 billion per site for nuclear power plant licensees. NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations. Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

111

In the event that one or more acts of domestically-sponsored terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses. There is no aggregate limit involving one or more acts of foreign-sponsored terrorism.

Non-Nuclear Property Insurance

Entergy's non-nuclear property insurance program provides coverage up to $400 million on an Entergy system-wide basis, subject to a $20 million per occurrence self-insured retention, for all risks coverage for direct physical loss or damage, including boiler and machinery breakdown.  Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties. Excluded property generally includes above-ground transmission and distribution lines, poles, and towers. The primary property program (excess of the deductible) is placed through Oil Insurance Limited (OIL) ($250 million layer) with the excess program ($150 million layer) placed on a quota share basis through underwriters at Lloyds (50%) and Hartford Steam Boiler Inspection and Insurance Company (50%).  There is an aggregation limit of $500 million for all parties insured by OIL for any one occurrence. Coverage is in place for Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy Gulf States, and Entergy New Orleans. Most of Entergy's non-nuclear excess property insurance coverage includes a $75 million drop-down feature in the event of an OIL aggregation loss to which an Entergy loss contributes.

In addition to the OIL program, Entergy has purchased additional coverage for some of its non-regulated, non-generation assets through Zurich American.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis. The applicable deductibles are $100,000 or $250,000 as per the schedule provided to underwriters.

There was an aggregation limit of $1 billion for all parties insured by OIL for any one occurrence at the time of the Hurricane Katrina and Rita losses, and Entergy has been notified by OIL that it expects claims for both Hurricanes Katrina and Rita to materially exceed this limit. Entergy is currently evaluating the amount of the covered losses for Entergy and each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. The Utility operating companies have received $51.5 million through December 31, 2006 on their insurance claims. Entergy currently estimates that its remaining net insurance recoveries for the losses caused by the hurricanes, including the effect of the OIL aggregation limit being exceeded, will be approximately $350 million, including $84 million for Entergy Gulf States, $30 million for Entergy Louisiana, and $228 million for Entergy New Orleans.

NYPA Value Sharing Agreements

Non-Utility Nuclear's purchase of the FitzPatrick and Indian Point 3 plants from NYPA included value sharing agreements with NYPA. Under the value sharing agreements, to the extent that the average annual price of the energy sales from each of the two plants exceeds specified strike prices, the Non-Utility Nuclear business will pay 50% of the amount exceeding the strike prices to NYPA. These payments, if required, will be recorded as adjustments to the purchase price of the plants. The annual energy sales subject to the value sharing agreements are limited to the lesser of actual generation or generation assuming an 85% capacity factor based on the plants' capacities at the time of the purchase. The value sharing agreements are effective through 2014. The strike prices for FitzPatrick range from $37.51/MWh in 2005 increasing by approximately 3.5% each year to $51.30/MWh in 2014, and the strike prices for Indian Point 3 range from $42.26/MWh in 2005 increasing by approximately 3.5% each year to $57.77/MWh in 2014.

Non-Utility Nuclear calculated that nothing was owed to NYPA under the value sharing agreements for 2005. On November 1, 2006, NYPA filed a demand for arbitration claiming that $90.5 million was due to NYPA under these agreements for 2005. Non-Utility Nuclear has filed a motion in

 

112

 

 

 New York State court to determine whether NYPA's claim should be decided by a court as opposed to by an arbitrator. Regardless of whether a court or an arbitrator decides NYPA's claim, Non-Utility Nuclear disagrees with NYPA's interpretation of the value sharing agreements, believes it has meritorious defenses to NYPA's claims, and intends to litigate those claims vigorously.

CashPoint Bankruptcy

In 2003, the Utility operating companies entered an agreement with CashPoint Network Services (CashPoint) under which CashPoint was to manage a network of payment agents through which Entergy's utility customers could pay their bills. The payment agent system allows customers to pay their bills at various commercial or governmental locations, rather than sending payments by mail. Approximately one-third of Entergy's utility customers use payment agents.

On April 19, 2004, CashPoint failed to pay funds due to the Utility operating companies that had been collected through payment agents. The Utility operating companies then obtained a temporary restraining order from the Civil District Court for the Parish of Orleans, State of Louisiana, enjoining CashPoint from distributing funds belonging to Entergy, except by paying those funds to Entergy. On April 22, 2004, a petition for involuntary Chapter 7 bankruptcy was filed against CashPoint by other creditors in the United States Bankruptcy Court for the Southern District of New York. In response to these events, the Utility operating companies expanded an existing contract with another company to manage all of their payment agents. The Utility operating companies filed proofs of claim in the CashPoint bankruptcy proceeding in September 2004. Although Entergy cannot precisely determine at this time the amount that CashPoint owes to the Utility operating companies that may not be repaid, it has accrued an estimate of loss based on current information. If no cash is repaid to the Utility operating companies, an event Entergy does not believe is likely, the current estimates of maximum exposure to loss are approximately as follows:

 

 

Amount

 

 

(In Millions)

 

   

Entergy Arkansas

 

$1.8

Entergy Gulf States

 

$7.7

Entergy Louisiana

 

$8.8

Entergy Mississippi

 

$4.3

Entergy New Orleans

 

$2.4

Harrison County Plant Fire

On May 13, 2005, an explosion and fire damaged the non-nuclear wholesale assets business' Harrison County power plant.  A catastrophic failure and subsequent natural gas escape from a nearby 36-inch interstate pipeline owned and operated by a third party is believed to have caused the damage.  Repairs to the damaged portions of the plant have been completed and the plant returned to commercial operations on May 1, 2006. The total cost of clean-up and repairs were approximately $48 million. The plant's property insurer has acknowledged coverage, subject to a $200 thousand deductible and has begun paying on the claim. Entergy owns approximately 61% of this facility. Entergy does not expect the damage caused to the Harrison County plant to have a material effect on its financial position or results of operations.

Environmental Issues (Entergy Gulf States)

Entergy Gulf States has been designated as a PRP for the cleanup of certain hazardous waste disposal sites. As of December 31, 2006, Entergy Gulf States does not expect the remaining clean-up costs to exceed its recorded liability of $1.3 million for the remaining sites at which the EPA has designated Entergy Gulf States as a PRP.

113

Waterford 3 Lease Obligations (Entergy Louisiana)

On September 28, 1989, Entergy Louisiana entered into three identical transactions for the sale and leaseback of undivided interests (aggregating approximately 9.3%) in Waterford 3. In July 1997, Entergy Louisiana caused the lessors to issue $307.6 million aggregate principal amount of Waterford 3 Secured Lease Obligation Bonds, 8.09% Series due 2017, to refinance the outstanding bonds originally issued to finance the purchase of the undivided interests by the lessors. The lease payments were reduced to reflect the lower interest costs. Upon the occurrence of certain events, Entergy Louisiana may be obligated to pay amounts sufficient to permit the termination of the lease transactions and may be required to assume the outstanding bonds issued to finance, in part, the lessors' acquisition of the undivided interests in Waterford 3.

Employment Litigation

Entergy Corporation and the Registrant Subsidiaries are defendants in numerous lawsuits and other labor-related proceedings filed by former employees asserting that they were wrongfully terminated and/or discriminated against on the basis of age, race, sex, and/or other protected characteristics. Entergy Corporation and these subsidiaries are vigorously defending these suits and deny any liability to the plaintiffs. Nevertheless, no assurance can be given as to the outcome of these cases.

Asbestos and Hazardous Material Litigation (Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

Numerous lawsuits have been filed in federal and state courts in Texas, Louisiana, and Mississippi primarily by contractor employees in the 1950-1980 timeframe against Entergy Gulf States, Entergy Louisiana, and Entergy New Orleans, and Entergy Mississippi as premises owners of power plants, for damages caused by alleged exposure to asbestos or other hazardous material. Many other defendants are named in these lawsuits as well. Presently, there are approximately 600 lawsuits involving approximately 10,000 claims. Management believes that adequate provisions have been established to cover any exposure. Additionally, negotiations continue with insurers to recover more reimbursement. Management believes that loss exposure has been and will continue to be handled successfully so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position or results of operation of these companies.

System Fuels (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

The Utility operating companies that are owners of System Fuels have made loans to System Fuels to finance its fuel procurement, delivery, and storage activities. The following loans outstanding to System Fuels as of December 31, 2006 mature in 2008:


Owner

 

Ownership
Percentage

 

Loan Outstanding
at December 31, 2006

 

 

 

 

 

Entergy Arkansas

 

35%

 

$11.0 million

Entergy Louisiana

 

33%

 

$14.2 million

Entergy Mississippi

 

19%

 

$5.5 million

Entergy New Orleans

 

13%

 

$3.3 million

Grand Gulf - Related Agreements

Capital Funds Agreement (System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy's 90% interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy's operating expenses. System Energy would have to secure funds from other sources, including Entergy Corporation's obligations under the Capital Funds Agreement, to cover any shortfalls from payments

 

114

 

 

 received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its 90% share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by FERC. Charges under this agreement are paid in consideration for the purchasing companies' respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered so long as the unit remains in commercial operation. The agreement will remain in effect until terminated by the parties and the termination is approved by FERC, most likely upon Grand Gulf's retirement from service. Monthly obligations are based on actual capacity and energy costs. The average monthly payments for 2006 under the agreement are approximately $17.2 million for Entergy Arkansas, $6.9 million for Entergy Louisiana, $14.0 million for Entergy Mississippi, and $8.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy's operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years. (See Reallocation Agreement terms below.) System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations. Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement. Accordingly, no payments under the Availability Agreement have ever been required. If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas' responsibilities and obligations with respect to Grand Gulf under the Availability Agreement. FERC's decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf. Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement. However, the Reallocation Agreement does not affect Entergy Arkansas' obligation to System Energy's lenders under the assignments referred to in the preceding paragraph. Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations. No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.

115

Reimbursement Agreement (System Energy)

In December 1988, System Energy entered into two separate, but identical, arrangements for the sale and leaseback of an approximate aggregate 11.5% ownership interest in Grand Gulf. In connection with the equity funding of the sale and leaseback arrangements, letters of credit are required to be maintained to secure certain amounts payable for the benefit of the equity investors by System Energy under the leases. The current letters of credit are effective until May 29, 2009.

Under the provisions of the reimbursement agreement relating to the letters of credit, System Energy has agreed to a number of covenants regarding the maintenance of certain capitalization and fixed charge coverage ratios.  System Energy agreed, during the term of the reimbursement agreement, to maintain a ratio of debt to total liabilities and equity less than or equal to 70%. In addition, System Energy must maintain, with respect to each fiscal quarter during the term of the reimbursement agreement, a ratio of adjusted net income to interest expense of at least 1.50 times earnings.  As of December 31, 2006, System Energy's debt ratio was approximately 31.9%, and its fixed charge coverage ratio for 2006 was approximately 4.3, calculated, in each case, as prescribed in the reimbursement agreement.

NOTE 9. ASSET RETIREMENT OBLIGATIONS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

SFAS 143, "Accounting for Asset Retirement Obligations," which was implemented effective January 1, 2003, requires the recording of liabilities for all legal obligations associated with the retirement of long-lived assets that result from the normal operation of those assets. For Entergy, substantially all of its asset retirement obligations consist of its liability for decommissioning its nuclear power plants. In addition, an insignificant amount of removal costs associated with non-nuclear power plants is also included in the decommissioning line item on the balance sheets.

These liabilities are recorded at their fair values (which are the present values of the estimated future cash outflows) in the period in which they are incurred, with an accompanying addition to the recorded cost of the long-lived asset. The asset retirement obligation is accreted each year through a charge to expense, to reflect the time value of money for this present value obligation. The accretion will continue through the completion of the asset retirement activity. The amounts added to the carrying amounts of the long-lived assets will be depreciated over the useful lives of the assets. SFAS 143 is expected to be earnings neutral to the rate-regulated business of the Registrant Subsidiaries.

In accordance with ratemaking treatment and as required by SFAS 71, the depreciation provisions for the Registrant Subsidiaries include a component for removal costs that are not asset retirement obligations under SFAS 143. In accordance with regulatory accounting principles, the Registrant Subsidiaries have recorded regulatory assets (liabilities) in the following amounts to reflect their estimates of the difference between estimated incurred removal costs and estimated removal costs recovered in rates previously recorded as a component of accumulated depreciation:

 

 

December 31,

 

 

2006

 

2005

 

 

(In Millions)

 

 

 

 

 

Entergy Arkansas

 

$45.0 

 

$86.2 

Entergy Gulf States

 

$3.8 

 

$17.9 

Entergy Louisiana

 

$2.3 

 

($22.8)

Entergy Mississippi

 

$41.2 

 

$40.9 

Entergy New Orleans

 

$13.9 

 

$5.4 

System Energy

 

$20.7 

 

$17.9 

116

The cumulative decommissioning and retirement cost liabilities and expenses recorded in 2006 by Entergy were as follows:

 


Liabilities as of
December 31, 2005

 



Accretion

Change in
Cash Flow
Estimate

 



Spending

 


Liabilities as of
December 31, 2006

 

(In Millions)

Utility:

 

 

 

  Entergy Arkansas

$442.1

$30.7

$- 

$- 

$472.8

  Entergy Gulf States

$175.5

$15.5

$- 

$- 

$191.0

  Entergy Louisiana

$221.3

$17.2

$- 

$- 

$238.5

  Entergy Mississippi

$4.0

$0.3

$- 

$- 

$4.3

  System Energy

$318.9

$23.9

$- 

$- 

$342.8

Non-Utility
Nuclear


$761.2

 


$62.9


($27.0)

 


($23.8)

 


$773.3

Other

$0.9

$0.1

$-

$0.1

$1.1

Entergy periodically reviews and updates estimated decommissioning costs. The actual decommissioning costs may vary from the estimates because of regulatory requirements, changes in technology, and increased costs of labor, materials, and equipment. During 2004, 2005, and 2006 Entergy updated decommissioning cost studies for ANO 1 and 2, River Bend, Grand Gulf, Waterford 3, and certain Non-Utility Nuclear plants.

In the third quarter of 2004, Entergy Gulf States recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for River Bend that reflected an expected life extension for the plant. The revised estimate resulted in a $166.4 million reduction in decommissioning liability, along with a $31.3 million reduction in utility plant, a $49.6 million reduction in non-utility property, a $40.1 million reduction in the related regulatory asset, and a regulatory liability of $17.7 million. For the portion of River Bend not subject to cost-based ratemaking, the revised estimate resulted in the elimination of the asset retirement cost that had been recorded at the time of adoption of SFAS 143 with the remainder recorded as miscellaneous other income of $27.7 million ($17 million net-of-tax).

In the third quarter of 2004, Entergy's Non-Utility Nuclear business recorded a reduction of $20.3 million in decommissioning liability to reflect changes in assumptions regarding the timing of when decommissioning of a plant will begin. Entergy considered the assumptions as part of recent studies evaluating the economic effect of the plant in its region. The revised estimate resulted in miscellaneous income of $20.3 million ($11.9 million net-of-tax), reflecting the excess of the reduction in the liability over the amount of undepreciated asset retirement cost recorded at the time of adoption of SFAS 143.

In the first quarter of 2005, Entergy's Non-Utility Nuclear business recorded a reduction of $26.0 million in its decommissioning cost liability in conjunction with a new decommissioning cost study as a result of revised decommissioning costs and changes in assumptions regarding the timing of the decommissioning of a plant. The revised estimate resulted in miscellaneous income of $26.0 million ($15.8 million net-of-tax), reflecting the excess of the reduction in the liability over the amount of undepreciated assets.

In the second quarter of 2005, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Waterford 3 that reflected an expected life extension for the plant. The revised estimate resulted in a $153.6 million reduction in its decommissioning liability, along with a $49.2 million reduction in utility plant and a $104.4 million reduction in the related regulatory asset.

117

In the third quarter of 2005, Entergy Arkansas recorded a revision to its estimated decommissioning cost liability for ANO 2 in accordance with the receipt of approval by the NRC of Entergy Arkansas' application for a life extension for the unit. The revised estimate resulted in an $87.2 million reduction in its decommissioning liability, along with a corresponding reduction in the related regulatory asset.

In the third quarter of 2005, System Energy recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Grand Gulf.  The revised estimate resulted in a $41.4 million reduction in the decommissioning cost liability for Grand Gulf, along with a $39.7 million reduction in utility plant and a $1.7 million reduction in the related regulatory asset.

In the third quarter of 2006, Entergy's Non-Utility Nuclear business recorded a reduction of $27.0 million in decommissioning liability for a plant as a result of a revised decommissioning cost study and changes in assumptions regarding the timing of when decommissioning of the plant will begin. The revised estimate resulted in miscellaneous income of $27.0 million ($16.6 million net-of-tax), reflecting the excess of the reduction in the liability over the amount of undepreciated asset retirement cost recorded at the time of adoption of SFAS 143.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liability. NYPA and Entergy executed decommissioning agreements, which specify their decommissioning obligations. NYPA has the right to require Entergy to assume the decommissioning liability provided that it assigns the corresponding decommissioning trust, up to a specified level, to Entergy. If the decommissioning liability is retained by NYPA, Entergy will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts. Entergy believes that the amounts available to it under either scenario are sufficient to cover the future decommissioning costs without any additional contributions to the trusts.

Entergy maintains decommissioning trust funds that are committed to meeting the costs of decommissioning the nuclear power plants. The fair values of the decommissioning trust funds and asset retirement obligation-related regulatory assets of Entergy as of December 31, 2006 are as follows:

 

Decommissioning
Trust Fair Values

 

Regulatory
Asset

 

(In Millions)

 

 

 

 

Utility:

 

  ANO 1 and ANO 2

$439.4

$119.7

  River Bend

$344.9

$3.4

  Waterford 3

$208.9

$57.1

  Grand Gulf

$281.4

$98.2

Non-Utility Nuclear

$1,583.8

 

$- 

The Energy Policy Act of 1992 contains a provision that assesses domestic nuclear utilities with fees for the decontamination and decommissioning (D&D) of the DOE's past uranium enrichment operations. Annual assessments in 2006 were $4.7 million for Entergy Arkansas, $1.2 million for Entergy Gulf States, $1.8 million for Entergy Louisiana, and $2.0 million for System Energy. The Energy Policy Act calls for cessation of annual D&D assessments not later than October 24, 2007. At December 31, 2006, no assessments were remaining. These assessments are recovered through rates in the same manner as fuel costs.

118

NOTE 10. LEASES (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

General

As of December 31, 2006, Entergy Corporation and subsidiaries had capital leases and non-cancelable operating leases for equipment, buildings, vehicles, and fuel storage facilities (excluding nuclear fuel leases and the Grand Gulf and Waterford 3 sale and leaseback transactions) with minimum lease payments as follows:


Year

 

Operating
Leases

 

Capital
Leases

 

 

(In Thousands)

 

 

 

 

 

2007

 

$96,979

 

$3,439

2008

 

80,044

 

1,362

2009

 

77,759

 

237

2010

 

86,402

 

237

2011

 

38,022

 

237

Years thereafter

 

144,253

 

2,094

Minimum lease payments

 

523,459

 

7,606

Less: Amount representing interest

 

-

 

2,336

Present value of net minimum lease payments

 

$523,459

 

$5,270

Total rental expenses for all leases (excluding nuclear fuel leases and the Grand Gulf and Waterford 3 sale and leaseback transactions) amounted to $78.0 million in 2006, $71.2 million in 2005, and $81.3 million in 2004.

As of December 31, 2006 the Registrant Subsidiaries had capital leases and non-cancelable operating leases for equipment, buildings, vehicles, and fuel storage facilities (excluding nuclear fuel leases and the sale and leaseback transactions) with minimum lease payments as follows:

Capital Leases


Year

 

Entergy
Arkansas

 

Entergy
Mississippi

   

(In Thousands)

         

2007

 

$3,428

 

$11

2008

 

1,362

   

2009

 

237

 

-

2010

 

237

 

-

2011

 

237

 

-

Years thereafter

 

2,094

 

-

Minimum lease payments

 

7,595

 

11

Less: Amount representing interest

 

2,336

 

-

Present value of net minimum lease payments

 

$5,259

 

$11

119

Operating Leases


Year

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

(In Thousands)

2007

$27,534

$22,722

$9,676

$8,668

$1,453

2008

23,442

15,220

7,716

7,312

802

2009

15,895

23,625

6,762

6,525

587

2010

49,443

10,939

5,357

5,755

411

2011

5,195

9,961

4,581

3,712

231

Years thereafter

7,111

88,606

8,084

12,613

146

Minimum lease payments

$128,620

$171,073

$42,176

$44,585

$3,630

Rental Expenses


Year

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Millions)

2006

$15.6

$16.4

$8.8

$5.0

$2.0

$1.2

2005

$15.3

$23.1

$9.8

$2.8

$1.5

$1.3

2004

$17.4

$24.4

$11.9

$3.4

$1.9

$2.0

In addition to the above rental expense, railcar operating lease payments and oil tank facilities lease payments are recorded in fuel expense in accordance with regulatory treatment. Railcar operating lease payments were $12.1 million in 2006, $6.6 million in 2005, and $9.3 million in 2004 for Entergy Arkansas and $3.1 million in 2006, $1.9 million in 2005, and $2.0 million in 2004 for Entergy Gulf States. Oil tank facilities lease payments for Entergy Mississippi were $3.8 million in 2006, $3.5 million in 2005, and $3.2 million for 2004.

Nuclear Fuel Leases

As of December 31, 2006, arrangements to lease nuclear fuel existed in an aggregate amount up to $155 million for Entergy Arkansas, $100 million for Entergy Gulf States, $110 million for Entergy Louisiana, and $135 million for System Energy. As of December 31, 2006, the unrecovered cost base of nuclear fuel leases amounted to approximately $124.9 million for Entergy Arkansas, $73.4 million for Entergy Gulf States, $82.5 million for Entergy Louisiana, and $55.3 million for System Energy. The lessors finance the acquisition and ownership of nuclear fuel through loans made under revolving credit agreements, the issuance of commercial paper, and the issuance of intermediate-term notes. The credit agreements for Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy each have a termination date of August 12, 2010. The termination dates may be extended from time to time with the consent of the lenders. The intermediate-term notes issued pursuant to these fuel lease arrangements have varying maturities through September 15, 2011. It is expected that additional financing under the leases will be arranged as needed to acquire additional fuel, to pay interest, and to pay maturing debt. However, if such additional financing cannot be arranged, the lessee in each case must repurchase sufficient nuclear fuel to allow the lessor to meet its obligations in accordance with the fuel lease.

Lease payments are based on nuclear fuel use. The total nuclear fuel lease payments (principal and interest), as well as the separate interest component charged to operations, were $151.4 million (including interest of $14.6 million) in 2006, $135.8 million (including interest of $12.9 million) in 2005, and $146.6 million (including interest of $12.8 million) in 2004. The table below represents the total nuclear fuel lease payments (principal

 

120

 

 

 and interest), as well as the separate interest component charged to operations, in 2006, 2005, and 2004 for the four Registrant Subsidiaries that own nuclear power plants:

2006

2005

2004

Lease
Payments


Interest

Lease
Payments


Interest

Lease
Payments


Interest

(In Millions)

Entergy Arkansas

$55.0

$5.0

$47.5

$3.9

$53.0

$4.3

Entergy Gulf States

28.1

3.6

27.2

3.5

29.7

3.2

Entergy Louisiana

35.5

2.4

30.9

2.6

36.1

2.5

System Energy

32.8

3.6

30.2

2.9

27.8

2.8

Total

$151.4

$14.6

$135.8

$12.9

$146.6

$12.8

Sale and Leaseback Transactions

Waterford 3 Lease Obligations

In 1989, Entergy Louisiana sold and leased back 9.3% of its interest in Waterford 3 for the aggregate sum of $353.6 million. The lease has an approximate term of 28 years. The lessors financed the sale-leaseback through the issuance of Waterford 3 Secured Lease Obligation Bonds. The lease payments made by Entergy Louisiana are sufficient to service the debt.

In 1994, Entergy Louisiana did not exercise its option to repurchase the 9.3% interest in Waterford 3. As a result, Entergy Louisiana issued $208.2 million of non-interest bearing first mortgage bonds as collateral for the equity portion of certain amounts payable under the lease.

In 1997, the lessors refinanced the outstanding bonds used to finance the purchase of the 9.3% interest in Waterford 3 at lower interest rates, which reduced Entergy Louisiana's annual lease payments.

Upon the occurrence of certain events, Entergy Louisiana may be obligated to assume the outstanding bonds used to finance the purchase of the 9.3% interest in the unit and to pay an amount sufficient to withdraw from the lease transaction. Such events include lease events of default, events of loss, deemed loss events, or certain adverse "Financial Events." "Financial Events" include, among other things, failure by Entergy Louisiana, following the expiration of any applicable grace or cure period, to maintain (i) total equity capital (including preferred membership interests) at least equal to 30% of adjusted capitalization, or (ii) a fixed charge coverage ratio of at least 1.50 computed on a rolling 12 month basis.

As of December 31, 2006, Entergy Louisiana's total equity capital (including preferred stock) was 54.0% of adjusted capitalization and its fixed charge coverage ratio for 2006 was 3.5.

121

As of December 31, 2006, Entergy Louisiana had future minimum lease payments (reflecting an overall implicit rate of 7.45%) in connection with the Waterford 3 sale and leaseback transactions, which are recorded as long-term debt, as follows:

   

Amount

   

(In Thousands)

2007

 

$18,754

2008

 

22,606

2009

 

32,452

2010

 

35,138

2011

 

50,421

Years thereafter

 

203,255

Total

 

362,626

Less: Amount representing interest

 

114,901

Present value of net minimum lease payments

 

$247,725

Grand Gulf Lease Obligations

In December 1988, System Energy sold 11.5% of its undivided ownership interest in Grand Gulf for the aggregate sum of $500 million. Subsequently, System Energy leased back the 11.5% interest in the unit for a term of 26-1/2 years. System Energy has the option of terminating the lease and repurchasing the 11.5% interest in the unit at certain intervals during the lease. Furthermore, at the end of the lease term, System Energy has the option of renewing the lease or repurchasing the 11.5% interest in Grand Gulf.

In May 2004, System Energy caused the Grand Gulf lessors to refinance the outstanding bonds that they had issued to finance the purchase of their undivided interest in Grand Gulf. The refinancing is at a lower interest rate, and System Energy's lease payments have been reduced to reflect the lower interest costs.

System Energy is required to report the sale-leaseback as a financing transaction in its financial statements. For financial reporting purposes, System Energy expenses the interest portion of the lease obligation and the plant depreciation. However, operating revenues include the recovery of the lease payments because the transactions are accounted for as a sale and leaseback for ratemaking purposes. Consistent with a recommendation contained in a FERC audit report, System Energy initially recorded as a net regulatory asset the difference between the recovery of the lease payments and the amounts expensed for interest and depreciation and continues to record this difference as a regulatory asset or liability on an ongoing basis, resulting in a zero net balance for the regulatory asset at the end of the lease term. The amount of this net regulatory asset was $51.1 million and $63.1 million as of December 31, 2006 and 2005, respectively.

As of December 31, 2006 System Energy had future minimum lease payments (reflecting an implicit rate of 5.62%), which are recorded as long-term debt as follows:

   

Amount

   

(In Thousands)

2007

 

$46,552

2008

 

47,128

2009

 

47,760

2010

 

48,569

2011

 

49,437

Years thereafter

 

204,396

Total

 

443,842

Less: Amount representing interest

 

98,502

Present value of net minimum lease payments

 

$345,340

122

NOTE 11. RETIREMENT, OTHER POSTRETIREMENT BENEFITS, AND DEFINED CONTRIBUTION PLANS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Qualified Pension Plans

Entergy has seven qualified pension plans covering substantially all of its employees: "Entergy Corporation Retirement Plan for Non-Bargaining Employees," "Entergy Corporation Retirement Plan for Bargaining Employees," "Entergy Corporation Retirement Plan II for Non-Bargaining Employees," "Entergy Corporation Retirement Plan II for Bargaining Employees," "Entergy Corporation Retirement Plan III," "Entergy Corporation Retirement Plan IV for Non-Bargaining Employees," and "Entergy Corporation Retirement Plan IV for Bargaining Employees." The Registrant Subsidiaries participate in two of these plans: "Entergy Corporation Retirement Plan for Non-Bargaining Employees" and "Entergy Corporation Retirement Plan for Bargaining Employees." Except for the Entergy Corporation Retirement Plan III, the pension plans are noncontributory and provide pension benefits that are based on employees' credited service and compensation during the final years before retirement. The Entergy Corporation Retirement Plan III includes a mandatory employee contribution of 3% of earnings during the first 10 years of plan participation, and allows voluntary contributions from 1% to 10% of earnings for a limited group of employees.

Entergy Corporation and its subsidiaries fund pension costs in accordance with contribution guidelines established by the Employee Retirement Income Security Act of 1974, as amended, and the Internal Revenue Code of 1986, as amended. The assets of the plans include common and preferred stocks, fixed-income securities, interest in a money market fund, and insurance contracts. The Registrant Subsidiaries' pension costs are recovered from customers as a component of cost of service in each of their jurisdictions. Entergy uses a December 31 measurement date for its pension plans. As a result of the Entergy New Orleans bankruptcy filing, Entergy has discontinued the consolidation of Entergy New Orleans retroactive to January 1, 2005, and is reporting Entergy New Orleans' results under the equity method of accounting.

In September 2006, FASB issued SFAS 158, "Employer's Accounting for Defined Benefit Pension and Other Postretirement Plans, an amendment of FASB Statements Nos. 87, 88, 106 and 132(R)," to be effective December 31, 2006. SFAS 158 requires an employer to recognize in its balance sheet the funded status of its benefit plans. This is measured as the difference between plan assets at fair value and the benefit obligation. Employers are to record previously unrecognized gains and losses, prior service costs, and the remaining transition asset or obligation as a result of adopting SFAS 87 and SFAS 106 as accumulated other comprehensive income ("OCI") or as a regulatory asset reflective of the recovery mechanism for pension and OPEB costs in the Utility's jurisdictions. For the portion of Entergy Gulf States that is not regulated, the unrecognized prior service cost, gains and losses, and transition asset/obligation for its pension and other postretirement benefit obligations are recorded in other comprehensive income. The portion of Entergy Gulf States regulated by the LPSC and Entergy Louisiana recover other postretirement benefits costs on a pay as you go basis and will record the unrecognized prior service cost, gains and losses, and transition obligation for its other postretirement benefit obligation in other comprehensive income. SFAS 158 also requires that changes in the funded status be recorded in other comprehensive income or a regulatory asset in the period in which the changes occur.

As of December 31, 2005, Entergy recognized an additional minimum pension liability for the excess of the accumulated benefit obligation over the fair market value of plan assets. In accordance with SFAS 87, an offsetting intangible asset, up to the amount of any unrecognized prior service cost, was also recorded, with the remaining offset to the liability recorded as a regulatory asset or accumulated other comprehensive income.

123

Components of Qualified Net Pension Cost

Total 2006, 2005, and 2004 qualified pension costs of Entergy Corporation and its subsidiaries, including amounts capitalized, included the following components:

 

 

2006

2005

 

2004

 

 

(In Thousands)

 

 

 

 

 

 

 

Service cost - benefits earned
  during the period

 

$92,706 

$82,520 

 

$76,946 

Interest cost on projected
  benefit obligation

 

167,257 

155,477 

 

148,092 

Expected return on assets

 

(177,930)

(159,544)

 

(153,584)

Amortization of transition asset

 

(662)

 

(763)

Amortization of prior service cost

 

5,462 

4,863 

 

5,143 

Recognized net loss

 

43,721 

35,604 

 

21,687 

Net pension costs

 

$131,216 

$118,258 

 

$97,521 

Estimated amortization amounts
  from the regulatory asset or OCI
  to net periodic cost in the following
  year

Prior service cost

$5,531 

Net loss

$44,316 

Total 2006, 2005, and 2004 qualified pension cost of the Registrant Subsidiaries, including amounts capitalized, included the following components:


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Service cost - benefits earned
  during the period


$14,505 


$11,972 


$8,730 


$4,308 


$2,004 


$4,123 

Interest cost on projected
  benefit obligation


39,660 


31,657 


24,206 


13,008 


5,127 


6,417 

Expected return on assets

(39,335)

(40,702)

(28,454)

(14,733)

(3,534)

(7,101)

Amortization of prior service cost

1,662 

1,234 

562 

513 

225 

49 

Recognized net loss

9,749 

2,559 

6,036 

2,899 

2,035 

668 

Net pension cost

$26,241 

$6,720 

$11,080 

$5,995 

$5,857 

$4,156 

Estimated amortization
  amounts from the regulatory
  asset or OCI to net periodic
  cost in the following year

Prior service cost

$1,649 

$1,218 

$640 

$455 

$178 

$49 

Net loss

$10,492 

$2,405 

$5,519 

$2,889 

$1,417 

$579 

124


2005

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Service cost - benefits earned
  during the period


$12,893 


$10,646 


$7,712 


$3,902 


$1,799 


$3,621 

Interest cost on projected
  benefit obligation


38,132 


30,193 


23,307 


12,620 


4,876 


5,701 

Expected return on assets

(35,835)

(39,424)

(26,681)

(14,292)

(3,407)

(5,554)

Amortization of transition asset

(277)

Amortization of prior service cost

1,662 

1,234 

562 

513 

225 

50 

Recognized net loss

7,885 

1,646 

4,687 

2,249 

1,805 

877 

Net pension cost

$24,737 

$4,295 

$9,587 

$4,992 

$5,298 

$4,418 


2004

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Service cost - benefits earned
  during the period


$11,941 


$9,693 


$7,009 


$3,615 


$1,569 


$3,386 

Interest cost on projected
  benefit obligation


35,846 


28,471 


21,790 


11,915 


4,465 


5,189 

Expected return on assets

(36,913)

(39,682)

(27,510)

(14,716)

(2,568)

(4,556)

Amortization of transition asset

(319)

Amortization of prior service cost

1,662 

1,511 

650 

513 

226 

67 

Recognized net loss

3,952 

405 

1,344 

794 

898 

788 

Net pension cost

$16,488 

$398 

$3,283 

$2,121 

$4,590 

$4,555 

125

Qualified Pension Obligations, Plan Assets, Funded Status, Amounts Not Yet Recognized and Recognized in the Balance Sheet for Entergy Corporation and its subsidiaries as of December 31, 2006 and 2005:

 

 

December 31,

 

 

2006

 

2005

 

 

(In Thousands)

Change in Projected Benefit Obligation (PBO)

 

 

 

 

Balance at beginning of year

 

$2,894,008 

 

$2,555,086 

Service cost

 

92,706 

 

82,520 

Interest cost

 

167,257 

 

155,477 

Amendments

 

 

6,467 

Actuarial loss

 

4,372 

 

211,194 

Employee contributions

 

1,003 

 

1,032 

Benefits paid

 

(123,272)

 

(117,768)

Balance at end of year

 

$3,036,074 

 

$2,894,008 

 

 

 

 

 

Change in Plan Assets

 

 

 

 

Fair value of assets at beginning of year

 

$1,994,879 

 

$1,841,929 

Actual return on plan assets

 

 270,976 

 

137,885 

Employer contributions

 

318,470 

 

131,801 

Employee contributions

 

1,003 

 

1,032 

Benefits paid

 

(123,272)

 

(117,768)

Fair value of assets at end of year

 

$2,462,056 

 

$1,994,879 

 

 

 

 

 

Funded status

($574,018)

($899,129)

Amounts not yet recognized in the balance sheet (before application
  of SFAS 158)

Unrecognized prior service cost

 

$23,932 

 

$29,393 

Unrecognized net loss

 

580,880 

 

713,285 

Prepaid/(accrued) pension cost recognized in the balance sheet

$30,794 

($156,451)

Amounts recognized in the balance sheet (before application of SFAS 158)

Additional minimum pension liability

($267,003)

($406,463)

Intangible asset

5,336 

24,159 

Accumulated OCI (before taxes)

38,273 

24,243 

Regulatory asset

223,394 

358,061 

Net amount recognized

$30,794 

($156,451)

Change in amount recognized due to SFAS 158

Funded status

($574,018)

Less: Prepaid/(accrued) pension cost recognized in the balance sheet before
  application of SFAS 158


30,794 

Less: Additional minimum pension liability before application of SFAS 158

(267,003)

Change in amount recognized due to SFAS 158

($337,809)

126

 

 

December 31,

 

 

2006

 

2005

 

 

(In Thousands)

Amount recognized in the balance sheet (funded status under SFAS 158)

Non-current liabilities

($574,018)

Amount recognized in regulatory assets

Prior service cost

$14,388 

Net loss

498,502 

$512,890 

Amount recognized in OCI (before tax)

Prior service cost

$9,544 

Net loss

82,378 

$91,922 

Qualified Pension Obligations, Plan Assets, Funded Status, and Amounts Not Yet Recognized and Recognized in the Balance Sheet for the Registrant Subsidiaries as of December 31, 2006 and 2005:


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Change in Projected Benefit

Obligation (PBO)

Balance at 12/31/05

$690,125 

$550,514 

$421,453 

$227,009 

$88,749 

$109,728 

Service cost

14,505 

11,972 

8,730 

4,308 

2,004 

4,123 

Interest cost

39,660 

31,657 

24,206 

13,008 

5,127 

6,417 

Actuarial loss/(gain)

12,107 

(9,565)

(3,244)

413 

(6,046)

(2,701)

Benefits paid

(37,509)

(27,841)

(22,825)

(13,273)

(3,864)

(2,350)

Balance at 12/31/06

$718,888 

$556,737 

$428,320 

$231,465 

$85,970 

$115,217 

Change in Plan Assets

Fair value of assets at 12/31/05

$431,327 

$483,541 

$330,931 

$175,355 

$44,684 

$67,171 

Actual return on plan assets

59,714 

61,931 

44,947 

22,672 

5,478 

9,511 

Employer contributions

114,544 

22,102 

54,048 

16,357 

13,037 

Benefits paid

(37,509)

(27,841)

(22,825)

(13,272)

(3,864)

(2,350)

Fair value of assets at 12/31/06

$568,076 

$539,733 

$407,101 

$201,112 

$46,298 

$87,369 

Funded status

($150,812) 

($17,004)

($21,219)

($30,353)

($39,672)

($27,847)

Amounts not yet recognized in the
  balance sheet (before application
  of SFAS 158)

Unrecognized prior service cost

$4,853 

$3,469 

$2,638 

$1,666 

$812 

$186 

Unrecognized net loss

163,966 

51,336 

81,987 

43,734 

22,191 

21,126 

Prepaid/(accrued) pension cost
  recognized in the balance sheet


$18,007 


$37,801 


$63,406 


$15,047 


($16,669)


($6,535)

127


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Amounts recognized in the balance
  sheet (before application of
  SFAS 158)

Additional minimum pension
  liability

($60,956)

$ - 

$ - 

($10,606)

($29,045)

($6,055)

Intangible asset

1,586 

499 

812 

120 

Regulatory asset

59,370 

10,107 

28,233 

5,935 

Net amount recognized

$18,007 

$37,801 

$63,406 

$15,047 

($16,669)

($6,535)

Change in amount recognized due to
  SFAS 158

Funded Status

($150,812) 

($17,004)

($21,219)

($30,353)

($39,672)

($27,847)

Less: Prepaid/(accrued) pension cost
  recognized in the balance sheet
  before the application of SFAS 158



18,007 



37,801 



63,406 



15,047 



(16,669)



(6,535)

Less: Additional minimum pension
  liability before application of
  SFAS 158



(60,956)







(10,606)



(29,045)



(6,055)

Change in amount recognized due
  to SFAS 158


($107,863)


($54,805)


($84,625)


($34,794)


$6,042 


($15,257)

Amounts recognized in the balance
  sheet (funded status under SFAS
  158)

Non-current liabilities

($150,812)

($17,004)

($21,219)

($30,353)

($39,672)

($27,847)

Amounts recognized in
  regulatory assets

Prior service cost

$4,853 

$3,014 

$2,638 

$1,666 

$812 

$186 

Net loss

163,966 

44,600 

81,987 

43,734 

22,191 

21,126 

$168,819 

$47,614 

$84,625 

$45,400 

$23,003 

$21,312 

Amounts recognized in OCI
  (before tax)

Prior service cost

$ - 

$455 

$ - 

$ - 

$ - 

$ - 

Net loss

6,736 

$ - 

$7,191

$ - 

$ - 

$ - 

$ - 

128


2005

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Change in Projected Benefit

Obligation (PBO)

Balance at 12/31/04

$624,816 

$496,210 

$379,102 

$206,143 

$78,350 

$94,999 

Service cost

12,893 

10,646 

7,712 

3,902 

1,799 

3,621 

Interest cost

38,132 

30,193 

23,307 

12,620 

4,876 

5,701 

Actuarial loss

50,160 

41,500 

33,829 

17,441 

7,457 

7,336 

Benefits paid

(35,876)

(28,035)

(22,497)

(13,097)

(3,733)

(1,929)

Balance at 12/31/05

$690,125 

$550,514 

$421,453 

$227,009 

$88,749 

$109,728 

Change in Plan Assets

Fair value of assets at 12/31/04

$433,256 

$463,539 

$329,404 

$175,278 

$30,813 

$56,000 

Actual return on plan assets

29,944 

33,219 

24,024 

12,149 

3,200 

5,406 

Employer contributions

4,003 

14,818 

1,025 

14,404 

7,694 

Benefits paid

(35,876)

(28,035)

(22,497)

(13,097)

(3,733)

(1,929)

Fair value of assets at 12/31/05

$431,327 

$483,541 

$330,931 

$175,355 

$44,684 

$67,171 

Funded status

($258,798)

($66,973)

($90,522)

($51,654)

($44,065)

($42,557)

Amounts not yet recognized

in the balance sheet

Unrecognized prior service cost

6,515 

4,703 

3,200 

2,179 

1,038 

235 

Unrecognized net loss

181,987 

84,689 

107,760 

54,160 

32,216 

26,906 

Prepaid/(accrued) pension cost

  recognized in the balance sheet

($70,296)

$22,419 

$20,438 

$4,685 

($10,811)

($15,416)

Amounts recognized in

the balance sheet

Prepaid/(accrued) pension liability

($70,296)

$22,419 

$20,438 

$4,685 

($10,811)

($15,416)

Additional minimum pension liability

(145,634)

(16,352)

(75,271)

(42,919)

(24,335)

(12,432)

Intangible asset

7,595 

3,245 

3,200 

2,427 

1,038 

366 

Accumulated other comprehensive
  income (before taxes)



1,908 





Regulatory asset

138,039 

11,199 

72,071 

40,492 

23,297 

12,066 

Net amount recognized

($70,296) 

$22,419 

$20,438 

$4,685 

($10,811)

($15,416)

129

Other Postretirement Benefits

Entergy also currently provides health care and life insurance benefits for retired employees. Substantially all employees may become eligible for these benefits if they reach retirement age while still working for Entergy. Entergy uses a December 31 measurement date for its postretirement benefit plans.

Effective January 1, 1993, Entergy adopted SFAS 106, which required a change from a cash method to an accrual method of accounting for postretirement benefits other than pensions. At January 1, 1993, the actuarially determined accumulated postretirement benefit obligation (APBO) earned by retirees and active employees was estimated to be approximately $241.4 million for Entergy (other than Entergy Gulf States) and $128 million for Entergy Gulf States. Such obligations are being amortized over a 20-year period that began in 1993. For the most part, the Registrant Subsidiaries recover SFAS 106 costs from customers and are required to contribute postretirement benefits collected in rates to an external trust.

Entergy Arkansas, the portion of Entergy Gulf States regulated by the PUCT, Entergy Mississippi, and Entergy New Orleans have received regulatory approval to recover SFAS 106 costs through rates. Entergy Arkansas began recovery in 1998, pursuant to an APSC order. This order also allowed Entergy Arkansas to amortize a regulatory asset (representing the difference between SFAS 106 costs and cash expenditures for other postretirement benefits incurred for a five-year period that began January 1, 1993) over a 15-year period that began in January 1998.

The LPSC ordered the portion of Entergy Gulf States regulated by the LPSC and Entergy Louisiana to continue the use of the pay-as-you-go method for ratemaking purposes for postretirement benefits other than pensions. However, the LPSC retains the flexibility to examine individual companies' accounting for postretirement benefits to determine if special exceptions to this order are warranted.

Pursuant to regulatory directives, Entergy Arkansas, Entergy Mississippi, Entergy New Orleans, the portion of Entergy Gulf States regulated by the PUCT, and System Energy contribute the postretirement benefit obligations collected in rates to trusts. System Energy is funding, on behalf of Entergy Operations, postretirement benefits associated with Grand Gulf.

Components of Net Other Postretirement Benefit Cost

Total 2006, 2005, and 2004 other postretirement benefit costs of Entergy Corporation and its subsidiaries, including amounts capitalized and deferred, included the following components:

 

 

2006

2005

2004

 

 

(In Thousands)

Service cost - benefits earned during the period

 

$41,480 

 

$37,310 

 

$30,947 

Interest cost on APBO

 

57,263 

 

51,883 

 

53,801 

Expected return on assets

 

(19,024)

 

(17,402)

 

(18,825)

Amortization of transition obligation

 

2,169 

 

3,368 

 

9,429 

Amortization of prior service cost

 

(14,751)

 

(13,738)

 

(5,222)

Recognized net loss

 

22,789 

 

22,295 

 

15,546 

Net other postretirement benefit cost

 

$89,926 

 

$83,716 

 

$85,676 

Estimated amortization amounts from the
  regulatory asset or OCI to net periodic
 cost in the following year

 

     Transition obligation

$3,831 

     Prior service cost

($15,837)

     Net loss

$18,974 

130

Total 2006, 2005, and 2004 other postretirement benefit costs of the Registrant Subsidiaries, including amounts capitalized and deferred, included the following components:


2006

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

Service cost - benefits earned
  during the period

 


$5,346 

 


$5,014 

 


$3,414 

 


$1,674 

 


$928 

 


$1,656 

Interest cost on APBO

 

11,374 

 

10,989 

 

7,425 

 

3,777 

 

3,425 

 

1,626 

Expected return on assets

 

(7,186)

 

(5,955)

 

 

(2,836)

 

(2,442)

 

(1,684)

Amortization of transition obligation

 

821 

 

604 

 

382 

 

351 

 

1,662 

 

Amortization of prior service cost

 

(1,630)

 

 

(97)

 

(546)

 

38 

 

(1,204) 

Recognized net loss

 

6,684 

 

4,009 

 

3,577 

 

2,575 

 

1,371 

 

828 

Net other postretirement benefit cost

 

$15,409 

 

$14,661 

 

$14,701 

 

$4,995 

 

$4,982 

 

$1,231 

Estimated amortization amounts
  from the regulatory asset or OCI
  to net periodic cost in the
  following year

    Transition obligation

$821 

$604 

$382 

$351 

$1,662 

$9 

    Prior service cost

($788)

$872 

$467 

($246)

$361 

($1,130)

    Net loss

$6,001 

$3,170 

$3,059 

$2,449 

$1,129 

$591 


2005

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

Service cost - benefits earned during the
  period

 


$4,648 

 


$5,300 

 


$2,958 

 


$1,463 

 


$805 

 


$1,724 

Interest cost on APBO

 

10,555 

 

10,476 

 

6,872 

 

3,502 

 

3,255 

 

1,566 

Expected return on assets

 

(6,523)

 

(5,271)

 

 

(2,676)

 

(2,314)

 

(1,552)

Amortization of transition obligation

 

821 

 

1,797 

 

382 

 

351 

 

1,662 

 

15 

Amortization of prior service cost

 

(1,630)

 

 

(97)

 

(546)

 

38 

 

(672)

Recognized net loss

 

5,806 

 

2,854 

 

3,065 

 

2,287 

 

1,095 

 

626 

Net other postretirement benefit cost

 

$13,677 

 

$15,156 

 

$13,180 

 

$4,381 

 

$4,541 

 

$1,707 

 


2004

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

Service cost - benefits earned
  during the period

 


$3,860 

 


$5,328 

 


$2,371 

 


$1,213 

 


$662 

 


$1,389 

Interest cost on APBO

 

10,075 

 

11,050 

 

6,641 

 

3,222 

 

3,204 

 

1,430 

Expected return on assets

 

(6,210)

 

(4,995)

 

 

(2,554)

 

(2,263)

 

(1,362)

Amortization of transition obligation

 

1,068 

 

4,589 

 

1,202 

 

431 

 

2,121 

 

15 

Amortization of prior service cost

 

27 

 

 

98 

 

16 

 

38 

 

(361)

Recognized net loss

 

3,937 

 

1,620 

 

2,003 

 

1,503 

 

522 

 

358 

Net other postretirement benefit cost

 

$12,757 

 

$17,592 

 

$12,315 

 

$3,831 

 

$4,284 

 

$1,469 

131

Other Postretirement Benefit Obligations, Plan Assets, Funded Status, and Amounts Not Yet Recognized and Recognized in the Balance Sheet of Entergy Corporation and its subsidiaries as of December 31, 2006 and 2005:

 

 

December 31,

 

 

2006

 

2005

 

 

(In Thousands)

Change in APBO

 

 

 

 

Balance at beginning of year

 

$997,969 

 

$928,217 

Service cost

 

41,480 

 

37,310 

Interest cost

 

57,263 

 

51,883 

Plan amendments

 

(10,708)

 

(64,200)

Plan participant contributions

 

6,904 

 

6,749 

Actuarial loss/(gain)

 

(17,838)

 

98,041 

Benefits paid

 

(62,314)

 

(60,031)

Medicare Part D subsidy received

1,610 

Balance at end of year

 

$1,014,366 

 

$997,969 

 

 

 

 

 

Change in Plan Assets

 

 

 

 

Fair value of assets at beginning of year

 

$234,516 

 

$214,005 

Actual return on plan assets

 

27,912 

 

15,003 

Employer contributions

 

64,058 

 

58,790 

Plan participant contributions

 

6,904 

 

6,749 

Benefits paid

 

(60,700)

 

(60,031)

Fair value of assets at end of year

 

$272,690 

 

$234,516 

 

 

 

 

 

Funded status

($741,676)

($763,453)

Amounts not yet recognized in the balance sheet (before
  application of SFAS 158)

Unrecognized transition obligation

13,007 

15,176 

Unrecognized prior service cost

(62,062)

(66,105)

Unrecognized net loss

353,733 

403,252 

Accrued other post retirement benefit cost recognized

($436,998)

($411,130)

 

Amounts recognized in the balance sheet (SFAS 158)

Current liabilities

($27,372)

Non-current liabilities

(714,304)

Total funded status

($741,676)

Change in amount recognized due to SFAS 158

($304,678)

Amounts recognized in regulatory assets (before tax)

Transition obligation

$8,686 

Prior service cost

(9,263)

Net loss

195,567 

$194,990 

Amounts recognized in OCI (before tax)

Transition obligation

$4,321 

Prior service cost

(52,799)

Net loss

158,166 

$109,688 

132

Other Postretirement Benefit Obligations, Plan Assets, Funded Status, and Amounts Not Yet Recognized and Recognized in the Balance Sheets of the Registrant Subsidiaries as of December 31, 2006 and 2005:


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Change in APBO

Balance at 12/31/05

$199,352 

$192,289 

$130,037 

$66,054 

$60,215 

$28,242 

Service cost

5,346 

5,014 

3,414 

1,674 

928 

1,656 

Interest cost

11,374 

10,989 

7,425 

3,777 

3,425 

1,626 

Plan amendments

5,049 

5,232 

3,383 

1801 

1,936 

445 

Plan participant contributions

1,652 

1,330 

1,548 

561 

227 

99 

Actuarial gain/(loss)

2,858 

(2,975)

(2,299)

2,911 

(1,717)

(1,290)

Benefits paid

(16,962)

(14,792)

(10,279)

(4,860)

(4,986)

(1,335)

Medicare Part D subsidy received

374 

462 

298 

163 

165 

35 

Balance at 12/31/06

$209,043 

$197,549 

$133,527 

$72,081 

$60,193 

$29,478 

Change in Plan Assets

Fair value of assets at 12/31/05

$85,364 

$72,870 

$ - 

$33,869 

$37,017 

$22,834 

Actual return on plan assets

10,585 

8,512 

4,073 

3,628 

2,338 

Employer contributions

23,262 

15,972 

8,731 

5,570 

5,750 

1,329 

Plan participant contributions

1,652 

1,330 

1,548 

561 

227 

99 

Benefits paid

(16,962)

(14,792)

(10,279)

(4,860)

(4,986)

(1,335)

Fair value of assets at 12/31/06

$103,901 

$83,892 

$- 

$39,213 

$41,636 

$25,265 

Funded status

($105,142)

($113,657)

($133,527)

($32,868)

($18,557)

($4,213)

Amounts not yet recognized in
  the balance sheet (before
  application of SFAS 158)

Unrecognized transition obligation

4,925 

3,618 

2,293 

2,108 

9,968 

51 

Unrecognized prior service cost

(1,333)

5,232 

3,483 

(299)

2,278 

(4,382)

Unrecognized net loss

92,919 

57,791 

50,056 

36,594 

17,477 

9,991 

Accrued other post retirement
  benefit cost recognized in the
  balance sheet



($8,631)



($47,016)



($77,695)



$5,535 


 
$11,166 



$1,447 

Amounts recognized in the
  balance sheet (SFAS 158)

Current liabilities

$ - 

($6,053)

($8,251)

$ - 

$ - 

$ - 

Non-current liabilities

(105,142)

(107,604)

(125,276)

(32,868)

(18,557)

(4,213)

Total funded status

($105,142)

($113,657)

($133,527)

($32,868)

($18,557)

($4,213)

Change in amount recognized
  due to SFAS 158


($96,511)


($66,641)


($55,832)


($38,403)


($29,723)


($5,660)

133


2006

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Amounts recognized in
  regulatory assets (before
  tax)

Transition obligation

$4,925 

$1,590

$ - 

$2,108 

$9,968 

$51 

Prior service cost

(1,333)

2,299

(299)

2,278 

(4,382)

Net loss

92,919 

25,400

36,594 

17,477 

9,991 

$96,511 

$29,289

$ - 

$38,403 

$29,723 

$5,660 

Amounts recognized in OCI
  (before tax)

Transition obligation

$ - 

$2,028

$2,293 

$ - 

$ - 

$ - 

Prior service cost

2,933

3,483 

Net loss

32,391

50,056 

$ - 

$37,352

$55,832 

$ - 

$ - 

$ - 


2005

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

(In Thousands)

Change in APBO

Balance at 12/31/04

$179,358 

$201,264 

$115,796 

$57,578 

$54,849 

$26,902 

Service cost

4,648 

5,300 

2,958 

1,463 

805 

1,724 

Interest cost

10,555 

10,476 

6,872 

3,502 

3,255 

1,566 

Actuarial loss

24,691 

11,390 

14,273 

10,433 

6,425 

3,110 

Benefits paid

(15,882)

(13,301)

(9,888)

(5,330)

(5,193)

(1,182)

Plan amendments

(5,629)

(24,291)

(1,013)

(2,177)

(637)

(3,942)

Plan participant contributions

1,611 

1,451 

1,039 

585 

711 

64 

Balance at 12/31/05

$199,352 

$192,289 

$130,037 

$66,054 

$60,215 

$28,242 

Change in Plan Assets

Fair value of assets at 12/31/04

$76,991 

$66,825 

$ - 

$32,071 

$35,247 

$21,308 

Actual return on plan assets

4,449 

3,564 

1,756 

1,513 

973 

Employer contributions

18,195 

14,331 

8,849 

4,787 

4,739 

1,671 

Plan participant contributions

1,611 

1,451 

1,039 

585 

711 

64 

Benefits paid

(15,882)

(13,301)

(9,888)

(5,330)

(5,193)

(1,182)

Fair value of assets at 12/31/05

$85,364 

$72,870 

$ - 

$33,869 

$37,017 

$22,834 

Funded status

($113,988)

($119,419)

($130,037)

($32,185)

($23,198)

($5,408)

Amounts not yet recognized in
  the balance sheet

Unrecognized transition obligation

5,746 

4,222 

2,675 

2,459 

11,630 

60 

Unrecognized prior service cost

(8,012)

(2,646)

380 

(6,031)

Unrecognized net loss

100,144 

67,332 

55,932 

37,495 

21,751 

12,763 

Prepaid/(accrued) postretirement
  benefit cost recognized in the
  balance sheet



($16,110)



($47,865)



($71,427)



$5,123 



$10,563 



$1,384 

134

Qualified Pension and Other Postretirement Plans' Assets

Entergy's qualified pension and postretirement plans' weighted-average asset allocations by asset category at December 31, 2006 and 2005 are as follows:

 

Qualified Pension

 

Postretirement

 

2006

 

2005

 

2006

 

2005

 

 

 

 

 

 

 

 

Domestic Equity Securities

43%

 

45%

 

37%

 

37%

International Equity Securities

21%

 

21%

 

14%

 

15%

Fixed-Income Securities

34%

 

32%

 

49%

 

47%

Other

2%

 

2%

 

-%

 

1%

The Plan Administrator's trust asset investment strategy is to invest the assets in a manner whereby long-term earnings on the assets (plus cash contributions) provide adequate funding for retiree benefit payments. The mix of assets is based on an optimization study that identifies asset allocation targets in order to achieve the maximum return for an acceptable level of risk, while minimizing the expected contributions and pension and postretirement expense.

In the optimization study, the Plan Administrator formulates assumptions about characteristics, such as expected asset class investment returns, volatility (risk), and correlation coefficients among the various asset classes. The future market assumptions used in the optimization study are determined by examining historical market characteristics of the various asset classes, and making adjustments to reflect future conditions expected to prevail over the study period.

The optimization analysis utilized in the Plan Administrator's latest study produced the following approved asset class target allocations.

 

Pension

 

Postretirement

 

 

 

 

Domestic Equity Securities

45%

 

37%

International Equity Securities

20%

 

14%

Fixed-Income Securities

31%

 

49%

Other (Cash and Guaranteed Annuity Contracts)

4%

 

0%

These allocation percentages combined with each asset class' expected investment return produced an aggregate return expectation for the five years following the study of 7.6% for pension assets, 5.4% for taxable postretirement assets, and 7.2% for non-taxable postretirement assets.

The expected long term rate of return of 8.50% for the qualified Retirement Plans assets is based on the expected return of each asset class, weighted by the target allocation for each class. The expected return for each asset class was developed using risk and return assumptions that use forward projections based on historical experience. This analysis resulted in a weighted mean of 8.57% and a 50th percentile return of 8.54% which supports the long term rate of return assumption of 8.50%.

The expected long term rate of return of 8.50% for the non-taxable VEBA trust assets is based on the expected return of each asset class, weighted by the target allocation for each class. The expected return for each asset class was developed using risk and return assumptions that use forward projections based on historical experience. This analysis resulted in a weighted mean of 8.24% and a 50th percentile return of 8.22% which is consistent with the long term rate of return assumption of 8.50%. For the taxable VEBA trust, the asset allocation has a high percentage of non-

 

135

 

 

taxable bonds. After reflecting the non-taxable bond percentage and unrelated business income tax supports an expected long term rate of return of 5.50%.

Since precise allocation targets are inefficient to manage security investments, the following ranges were established to produce an acceptable economically efficient plan to manage to targets:

 

Pension

 

Postretirement

 

 

 

 

Domestic Equity Securities

45% to 55%

 

32% to 42%

International Equity Securities

15% to 25%

 

9% to 19%

Fixed-Income Securities

25% to 35%

 

44% to 54%

Other

0% to 10%

 

0% to 5%

Accumulated Pension Benefit Obligation

The accumulated benefit obligation for Entergy's qualified pension plans was $2.7 billion and $2.5 billion at December 31, 2006 and 2005, respectively.

The qualified pension accumulated benefit obligation for each of the Registrant Subsidiaries as of December 31, 2006 and 2005 was as follows:

 

 

December 31,

 

 

2006

 

2005

 

 

(In Thousands)

Entergy Arkansas

 

$657,276

 

$629,791

Entergy Gulf States

 

$507,425

 

$501,026

Entergy Louisiana

 

$391,936

 

$385,763

Entergy Mississippi

 

$213,657

 

$209,638

Entergy New Orleans

 

$78,575

 

$79,831

System Energy

 

$98,994

 

$92,883

Estimated Future Benefit Payments

Based upon the assumptions used to measure Entergy's qualified pension and postretirement benefit obligation at December 31, 2006, and including pension and postretirement benefits attributable to estimated future employee service, Entergy expects that benefits to be paid and the Medicare Part D subsidies to be received over the next ten years for Entergy Corporation and its subsidiaries will be as follows:

 

Estimated Future Benefits Payments

 


Estimated Future
Medicare Subsidy
Receipts

 


Qualified
Pension


Non-Qualified
Pension

Postretirement (before
Medicare Subsidy)

 

 

(In Thousands)

Year(s)

 

       

2007

$129,140

$14,729

$62,662

 

$4,854

2008

$132,143

$5,646

$66,316

 

$5,531

2009

$136,824

$5,518

$69,507

$6,147

2010

$142,122

$5,455

$73,310

 

$6,740

2011

$148,366

$4,018

$76,563

 

$7,396

2012 - 2016

$888,406

$19,884

$430,687

 

$48,406

136

Based upon the same assumptions, Entergy expects that benefits to be paid and the Medicare Part D subsidies to be received over the next ten years for the Registrant Subsidiaries will be as follows:

Estimated Future
Qualified Pension Benefits
Payments

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

Year(s)

                       

2007

 

$38,053

 

$28,282

 

$23,207

 

$13,470

 

$3,929

 

$2,385

2008

 

$38,921

 

$28,731

 

$23,470

 

$13,749

 

$3,974

 

$2,432

2009

 

$40,285

 

$29,463

 

$23,920

 

$14,191

 

$4,050

 

$2,507

2010

 

$41,831

 

$30,341

 

$24,496

 

$14,700

 

$4,147

 

$2,594

2011

 

$43,532

 

$31,353

 

$25,190

 

$15,266

 

$4,265

 

$2,691

2012 - 2016

 

$259,121

 

$181,042

 

$142,378

 

$90,072

 

$24,104

 

$15,809

Estimated Future
Non-Qualified Pension Benefits
Payments

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

Year(s)

                       

2007

 

$439

 

$1,781

 

$25

 

$112

 

$16

 

$ -

2008

 

$439

 

$1,772

 

$25

 

$112

 

$16

 

$ -

2009

 

$372

 

$1,772

 

$25

 

$112

 

$16

 

$ -

2010

 

$316

 

$1,765

 

$25

 

$112

 

$16

 

$ -

2011

 

$222

 

$1,710

 

$25

 

$112

 

$16

 

$ -

2012 - 2016

 

$1,029

 

$8,098

 

$125

 

$561

 

$82

 

$ -

Estimated Future
Other Postretirement
Benefits Payments

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

Year(s)

                       

2007

 

$14,458

 

$12,802

 

$8,991

 

$4,799

 

$4,963

 

$1,307

2008

 

$15,121

 

$13,504

 

$9,447

 

$5,083

 

$5,179

 

$1,407

2009

 

$15,707

 

$14,044

 

$9,782

 

$5,283

 

$5,350

 

$1,530

2010

 

$16,351

 

$14,615

 

$10,139

 

$5,570

 

$5,488

 

$1,724

2011

 

$16,733

 

$15,112

 

$10,404

 

$5,825

 

$5,525

 

$1,900

2012 - 2016

 

$87,237

 

$81,650

 

$55,047

 

$31,959

 

$27,353

 

$11,964

Estimated Future
Medicare Part D Subsidies

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

Year(s)

                       

2007

 

$1,264

 

$1,162

 

$740

 

$487

 

$561

 

$55

2008

 

$1,422

 

$1,303

 

$829

 

$543

 

$603

 

$73

2009

 

$1,552

 

$1,430

 

$910

 

$597

 

$631

 

$89

2010

 

$1,676

 

$1,550

 

$986

 

$641

 

$653

 

$101

2011

 

$1,810

 

$1,672

 

$1,065

 

$685

 

$674

 

$120

2012 - 2016

 

$11,338

 

$10,284

 

$6,524

 

$4,094

 

$3,579

 

$1,065

137

Contributions

Entergy Corporation and its subsidiaries expect to contribute $175.9 million (excluding about $1 million in employee contributions) to the qualified pension plans and $66.4 million to its other postretirement plans in 2007.

The Registrant Subsidiaries expect to contribute the following to the pension and other postretirement plans in 2007:

   

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

                         

Pension Contributions

 

$6,987

 

$25,346

 

$-

 

$784

 

$43,585

 

$5,688

                         

Other Postretirement
  Contributions

 


$17,751

 


$14,402

 


$8,991

 


$5,378

 


$5127

 


$1,128

Additional Information

The change in the qualified pension plans' minimum pension liability included in other comprehensive income and regulatory assets was as follows for Entergy Corporation and its subsidiaries for 2006 and 2005.

 

2006

2005

 

   

Increase/(decrease) in the minimum pension liability included in:

   

   Other comprehensive income (before taxes)

$14,030 

$13,462

   Regulatory assets

($134,667)

$150,729

The change in the qualified pension plans' minimum pension liability included in other comprehensive income increased by $1.9 million at Entergy Gulf States in 2005. In 2006, Entergy Gulf States was not required to record a minimum pension liability and other comprehensive income was reduced by $1.9 million. The change in the qualified pension plans' minimum pension liability included in regulatory assets at each of the Registrant Subsidiaries was as follows for 2006 and 2005:


 

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

   

(In Thousands)

                         

2006

 

($78,669)

 

($11,199)

 

($72,071)

 

($30,385)

 

$4,936 

 

($6,131)

2005

 

$67,191 

 

$11,199

 

$37,959 

 

$20,308 

 

$8,067 

 

$4,635 

138

Actuarial Assumptions

The assumed health care cost trend rate used in measuring the APBO of Entergy was 10% for 2007, gradually decreasing each successive year until it reaches 4.5% in 2012 and beyond. The assumed health care cost trend rate used in measuring the Net Other Postretirement Benefit Cost of Entergy was 12% for 2006, gradually decreasing each successive year until it reaches 4.5% in 2012 and beyond. A one percentage point change in the assumed health care cost trend rate for 2006 would have the following effects:

 

 

1 Percentage Point Increase

 

1 Percentage Point Decrease




2006

 



Impact on the
APBO

 

Impact on the
sum of service
costs and
interest cost

 



Impact on the
APBO

 

Impact on the
sum of service
costs and
interest cost

   

Increase (Decrease)
(In Thousands)

 

 

 

 

 

 

 

 

 

Entergy Corporation and its
  subsidiaries

 

$103,072

 

$13,898

 

($91,887)

 

($11,828)

A one percentage point change in the assumed health care cost trend rate for 2006 would have the following effects for the Registrant Subsidiaries:

   

1 Percentage Point Increase

 

1 Percentage Point Decrease

2006

 



Impact on the
APBO

 

Impact on the
sum of service
costs and
interest cost

 



Impact on the
APBO

 

Impact on the
sum of service
costs and
interest cost

Increase (Decrease)
(In Thousands)

 

 

 

 

 

 

 

 

 

Entergy Arkansas

 

$17,515

 

$1,853

 

($15,884)

 

($1,615)

Entergy Gulf States

 

$19,866

 

$2,099

 

($17,796)

 

($1,806)

Entergy Louisiana

 

$11,671

 

$1,258

 

($10,552)

 

($1,092)

Entergy Mississippi

 

$6,276

 

$592

 

($5,666)

 

($515)

Entergy New Orleans

 

$4,587

 

$428

 

($4,185)

 

($377)

System Energy

 

$3,375

 

$499

 

($2,983)

 

($422)

The significant actuarial assumptions used in determining the pension PBO and the SFAS 106 APBO as of December 31, 2006, and 2005 were as follows:

 

2006

 

2005

 

 

 

 

Weighted-average discount rate:

 

 

 

   Pension

6.00%

 

5.90%

   Other postretirement

6.00%

 

5.90%

Weighted-average rate of increase
  in future compensation levels


3.25%

 


3.25%

139

The significant actuarial assumptions used in determining the net periodic pension and other postretirement benefit costs for 2006, 2005, and 2004 were as follows:

 

2006

 

2005

 

2004

 

 

 

 

 

 

Weighted-average discount rate:

 

 

 

 

 

   Pension

5.90%

 

6.00%

 

6.25%

   Other postretirement

5.90%

 

6.00%

 

6.71%

Weighted-average rate of increase
  in future compensation levels


3.25%

 


3.25%

 


3.25%

Expected long-term rate of
  return on plan assets:

 

 

 

 

 

   Taxable assets

5.50%

 

5.50%

 

5.50%

   Non-taxable assets

8.50%

 

8.50%

 

8.75%

Entergy's remaining pension transition assets are being amortized over the greater of the remaining service period of active participants or 15 years which ended in 2005, and its SFAS 106 transition obligations are being amortized over 20 years ending in 2012.

Medicare Prescription Drug, Improvement and Modernization Act of 2003

In December 2003, the President signed the Medicare Prescription Drug, Improvement and Modernization Act of 2003 into law. The Act introduces a prescription drug benefit cost under Medicare (Part D), which started in 2006, as well as federal subsidy to employers who provide a retiree prescription drug benefit that is at least actuarially equivalent to Medicare Part D.

The actuarially estimated effect of future Medicare subsidies reduced the December 31, 2006 and 2005 Accumulated Postretirement Benefit Obligation by $183 million and $176 million, respectively, and reduced the 2006 and 2005 other postretirement benefit cost by $29.3 million and $24.3 million, respectively. In 2006, Entergy received $1.8 million in Medicare subsidies for prescription drug claims through June 2006. In January 2007, Entergy received an additional $0.9 million in subsidies for the third quarter of 2006 prescription drug claims.

The actuarially estimated effect of future Medicare subsidies and the actual subsidies received for the Registrant Subsidiaries was as follows:

 

 

Entergy

 

Entergy

 

Entergy

 

Entergy

 

Entergy

 

System

 

 

Arkansas

 

Gulf States

 

Louisiana

 

Mississippi

 

New Orleans

 

Energy

 

 

Increase (Decrease) In Thousands

Impact on 12/31/2006 APBO

 

($40,636)

 

($35,991)

 

($22,486)

 

($13,560)

 

($10,110)

 

($5,966)

Impact on 12/31/2005 APBO

 

($42,337)

 

($36,740)

 

($23,640)

 

($14,407)

 

($11,206)

 

($5,972)

Impact on 2006 other
  postretirement benefit cost


($6,246)

 


($5,328)

 


($3,460)

 


($2,046)

 


($1,502)

 


($1,070)

Impact on 2005 other
  postretirement benefit cost

 


($5,443)

 


($4,747)

 


($3,040)

 


($1,790)

 


($1,334)

 


($938)

Impact on 2004 other
  postretirement benefit cost

 


($4,999)

 


($4,405)

 


($2,752)

 


($1,657)

 


($1,248)

 


($815)

Medicare subsidies received in
  2006 for claims through June 2006


$374 


$462
 


$298 


$163 


$165 


$35 

Medicare subsidies received in
  January 2007 for third quarter
  2006 claims



$296 



$205 



$129 



$75 



$74 



$15 

140

Non-Qualified Pension Plans

Entergy also sponsors non-qualified, non-contributory defined benefit pension plans that provide benefits to certain executives. Entergy recognized net periodic pension cost related to these plans of $21 million in 2006, $16.4 million in 2005, and $16.4 million in 2004. The projected benefit obligation was $137 million and $142 million as of December 31, 2006 and 2005, respectively. There are $0.2 million in plan assets for a pre-merger Entergy Gulf States plan. The accumulated benefit obligation was $127 million and $133 million as of December 31, 2006 and 2005, respectively.

Before the application of SFAS 158, as of December 31, 2006, and 2005, Entergy's additional minimum pension liability for the non-qualified pension plans was $56.4 million and $63.1 million, respectively. This liability was offset by a $13.7 million and $13.6 million intangible asset as of December 31, 2006 and 2005, respectively, a $31.6 million and a $38.1 million regulatory asset as of December 31, 2006, and 2005 respectively, and a $11.1 million and $11.4 million charge to accumulated other comprehensive income before taxes as of December 31, 2006 and 2005, respectively.

After the application of SFAS 158, Entergy's non-qualified, non-current pension liability was $122.2 million and its current liability was $14.5 million. The unamortized transition asset, prior service cost and net loss are recognized in regulatory assets ($50.8 million) and accumulated other comprehensive income before taxes ($15.8 million.) The change in amount recognized in the balance sheet due to SFAS 158 is $10.2 million in 2006.

The Registrant Subsidiaries (except System Energy) participate in Entergy's non-qualified, non-contributory defined benefit pension plans that provide benefits to certain executives. The net periodic pension cost for the non-qualified plans for 2006, 2005 and 2004 was as follows:


 

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

2006

 

$499

 

$1,274

 

$25 

 

$174 

 

$222

2005

 

$508

 

$1,316

 

$27 

 

$170 

 

$204

2004

 

$510

 

$1,268

 

$27 

 

$132 

 

$190

The projected benefit obligation for the non-qualified plans as of December 31, 2006 and 2005 was as follows:


 

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

2006

 

$3,633

 

$19,010

 

$178 

 

$1,495 

 

$1,823

2005

 

$3,760

 

$19,188

 

$187 

 

$1,467 

 

$1,652

The accumulated benefit obligation for the non-qualified plans as of December 31, 2006 and 2005 was as follows:


 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

2006

 

$3,398

 

$18,941

 

$178 

 

$1,335 

 

$1,672

2005

 

$3,545

 

$19,108

 

$187 

 

$1,316 

 

$1,466

141

Before the application of SFAS 158, the additional minimum pension liability as of December 31, 2006 was as follows:

   

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

Additional minimum pension
  liability

 


($1,898)

 


($3,739)

 


($105)

 


($706)

 


($538)

Intangible asset

 

$313 

 

$113 

 

$23 

 

$38 

 

$55 

Regulatory asset

 

$1,585 

 

$3,150 

 

$82 

 

$668 

 

$483 

Accumulated other
  comprehensive income
  (before taxes)

 



$- 

 



$476 

 



$- 

 



$- 

 



$- 

The additional minimum pension liability as of December 31, 2005 was as follows:

   

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

Additional minimum pension
  liability

 


($1,656)

 


($3,839)

 


($97)

 


($662)

 


($548)

Intangible asset

 

$381 

 

$137 

 

$28 

 

$47 

 

$47 

Regulatory asset

 

$1,275 

 

$3,163 

 

$69 

 

$615 

 

$501 

Accumulated other
  comprehensive income
  (before taxes)

 



$- 

 



$539 

 



$- 

 



$- 

 



$- 

After the application of SFAS 158, the following amounts were recorded on the balance sheet as of December 31, 2006:

   

Entergy Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

   

(In Thousands)

                     

Change in amount recognized
  due to SFAS 158

 


($235)

 


($70)

 


$-

 


($160)

 


($151)

                     

Current liabilities

 

($439)

 

($1,609)

 

($25)

 

($112)

 

($17)

Non-current liabilities

 

($3,194)

 

($17,229)

 

($153)

 

($1,383)

 

($1,806)

Total Funded Status

 

($3,633)

 

($18,838)

 

($178)

 

($1,495)

 

($1,823)

                     

Regulatory Asset

 

$2,133 

 

$3,420 

 

$105 

 

$866 

 

$689 

Accumulated other
  comprehensive income
  (before taxes)

 



$- 

 



$388 

 



$- 

 



$- 

 



$- 

142

Defined Contribution Plans

Entergy sponsors the Savings Plan of Entergy Corporation and Subsidiaries (System Savings Plan). The System Savings Plan is a defined contribution plan covering eligible employees of Entergy and its subsidiaries. The employing Entergy subsidiary makes matching contributions for all non-bargaining and certain bargaining employees to the System Savings Plan in an amount equal to 70% of the participants' basic contributions, up to 6% of their eligible earnings per pay period. The 70% match is allocated to investments as directed by the employee.

Entergy also sponsors the Savings Plan of Entergy Corporation and Subsidiaries II (established in 2001) and Savings Plan of Entergy Corporation and Subsidiaries IV (established in 2002) to which matching contributions are also made. The plans are defined contribution plans that cover eligible employees, as defined by each plan, of Entergy and its subsidiaries.

Entergy's subsidiaries' contributions to defined contribution plans collectively were $31.4 million in 2006, $33.8 million in 2005, and $32.9 million in 2004. The majority of the contributions were to the System Savings Plan.

NOTE 12. STOCK-BASED COMPENSATION (Entergy Corporation)

Entergy grants stock options and long-term incentive and restricted liability awards to key employees of the Entergy subsidiaries under the Equity Ownership Plan which is a shareholder-approved stock-based compensation plan. As of December 31, 2006, there were 441,875 authorized shares remaining for stock-based awards. At the May 2006 annual meeting of shareholders, Entergy's shareholders approved the 2007 Equity Ownership and Long-Term Cash Incentive Plan (2007 Plan) effective January 1, 2007. The maximum aggregate number of common shares that can be issued from the 2007 Plan for stock-based awards is 7,000,000 with no more than 2,000,000 available for non-option grants. The 2007 Plan, which only applies to awards made on or after January 1, 2007, will expire after 10 years.

Stock Options

Stock options are granted at exercise prices that equal the closing market price of Entergy Corporation common stock on the date of grant. Generally, stock options granted will become exercisable in equal amounts on each of the first three anniversaries of the date of grant. Unless they are forfeited previously under the terms of the grant, options expire ten years after the date of the grant if they are not exercised. Stock-based compensation expense included in consolidated net income for 2006, 2005, and 2004 is $11 million, $13 million, and $8 million, respectively. The tax benefit recognized in consolidated net income for 2006, 2005, and 2004 is $4 million, $5 million, and $3 million, respectively. Compensation cost capitalized as part of fixed assets and inventory for the years 2006, 2005, and 2004 is approximately $2 million, $2 million, and $1.5 million, respectively.

Entergy determines the fair value of the stock option grants made in 2006, 2005, and 2004 by considering factors such as lack of marketability, stock retention requirements, and regulatory restrictions on exercisability. The fair value valuations comply with SFAS 123R, "Share-Based Payment," which was issued in December 2004 and became effective in the first quarter 2006. The stock option weighted-average assumptions used in determining the fair values are as follows:

 

2006

 

2005

 

2004

 

 

 

 

Stock price volatility

18.7%

 

18.8%

 

23.1%

Expected term in years

3.9   

 

3   

 

6.3   

Risk-free interest rate

4.4%

 

3.6%

 

3.2%

Dividend yield

3.2%

 

3.1%

 

3.3%

Dividend payment

$2.16

 

$2.16

 

$1.80

143

Stock price volatility is calculated based upon the weekly public stock price volatility of Entergy Corporation common stock over the last four to five years.  The expected term of the options is based upon historical option exercises and the weighted average life of options when exercised and the estimated weighted average life of all vested but unexercised options.  Options held by certain management level employees include a restriction that requires 75% of the gains upon exercise of the option to be held in Entergy Corporation common stock until the earlier of five years or termination of employment.  The reduction in fair value of the stock options is based upon an estimate of the call option value of the reinvested gain discounted to present value over the five year reinvestment period. 

A summary of stock option activity for the year ended December 31, 2006 and changes during the year are presented below:

 

Number
of Options

 

Weighted-
Average
Exercise
Price

 


Aggregate
Intrinsic
Value

 

Weighted-
Average
Contractual Life

 

 

 

 

 

 

Options outstanding at January 1, 2006

10,855,459 

 

$46.80

 

 

 

 

 

 

 

 

 

 

Options granted

1,875,293 

 

$69.01

 

 

 

Options exercised

(1,804,742)

 

$42.54

 

 

 

Options forfeited/expired

(123,087)

 

$65.05

 

 

 

 

 

 

 

 

 

 

Options outstanding at December 31, 2006

10,802,923 

 

$51.16

 

$445 million

 

6.2 years

 

 

 

 

 

 

 

Options exercisable at December 31, 2006

7,452,550 

 

$43.83

 

$361 million

 

5.2 years

 

 

 

 

 

 

 

Weighted-average grant-date fair value of
options granted during 2006

$9.21 

 

 

 

 

 

The weighted-average grant-date fair value of options granted during the year was $8.17 for 2005 and $7.76 for 2004. The total intrinsic value of stock options exercised was $65 million during 2006, $100 million during 2005, and $98 million during 2004. The intrinsic value, which has no effect on net income, of the stock options exercised is calculated by the difference in Entergy's Corporation common stock price on the date of exercise and the exercise price of the stock options granted. With the adoption of the fair value method of SFAS 123 and the application of SFAS 123R, Entergy recognizes compensation cost over the vesting period of the options based on their grant-date fair value. The total fair value of options that vested was approximately $15 million during 2006, $28 million during 2005, and $49 million during 2004.

144

The following table summarizes information about stock options outstanding as of December 31, 2006:

 

 

Options Outstanding

 

Options Exercisable

Range of
Exercise Prices

 

As of
12/31/2006

 

Weighted-Avg.
Remaining
Contractual
Life-Yrs.

 

Weighted-
Avg. Exercise
Price

 

Number
Exercisable
at 12/31/2006

 

Weighted-
Avg. Exercise
Price

 

 

 

 

 

 

 

 

 

 

 

$23 - $33.99

 

1,041,285

 

3.2

 

$25.55

 

1,041,285

 

$25.55

$34 - $44.99

 

4,634,715

 

5.1

 

$41.15

 

4,634,715

 

$41.15

$45 - $55.99

 

210,277

 

3.6

 

$49.41

 

210,277

 

$49.41

$56 - $66.99

 

1,478,283

 

7.1

 

$58.62

 

939,927

 

$58.63

$67 - $86.20

 

3,438,363

 

8.5

 

$69.31

 

626,346

 

$70.00

$23 - $86.20

 

10,802,923

 

6.2

 

$51.16

 

7,452,550

 

$43.83

 

 

 

 

 

 

 

 

 

 

 

Stock-based compensation expense related to non-vested stock options not yet recognized is approximately $13 million and is expected to be recognized on a weighted-average period of 1.8 years.

Long-Term Incentive Awards

Entergy grants long-term incentive awards earned under its stock benefit plans in the form of performance units, which are equal to the cash value of shares of Entergy Corporation common stock at the end of the performance period, which is the last trading day of the year. Performance units will pay out to the extent that the performance conditions are satisfied. In addition to the potential for equivalent share appreciation or depreciation, performance units will earn the cash equivalent of the dividends paid during the three-year performance period applicable to each plan. The costs of incentive awards are charged to income over the three-year period.

The following table includes financial information for the long-term incentive awards for each of the years presented:

 

2006

 

2005

 

2004

 

(In Millions)

           

Fair value of long-term incentive awards at December 31,

$37

 

$34

 

$49

Compensation expense included in Entergy's Net Income for the year

$22

 

$16

 

$31

Tax benefit recognized in Entergy's Net Income for the year

$8

 

$6

 

$12

Compensation cost capitalized as part of fixed assets and inventory as of
  December 31,


$3

 


$2

 


$6

Entergy paid $17.1 million in 2006 for awards earned under the Long-Term Incentive Plan. The distribution is applicable to the 2003 - 2005 performance period.

Restricted Awards

Entergy grants restricted awards earned under its stock benefit plans in the form of stock units that are subject to time-based restrictions. The restricted units are equal to the cash value of shares of Entergy Corporation common stock at the time of vesting. The costs of restricted awards are charged to income over the restricted period, which varies from grant to grant. The average vesting period for restricted awards granted is 54 months. As of December 31, 2006, there were 163,912 unvested restricted units that are expected to vest over an average period of 33 months.

145

The following table includes financial information for restricted awards for each of the years presented:

 

2006

 

2005

 

2004

 

(In Millions)

           

Fair value of restricted awards at December 31,

$3.6

 

$-

 

$-

Compensation expense included in Entergy's Net Income for the year

$3.1

 

$3.5

 

$5.3

Tax benefit recognized in Entergy's Net Income for the year

$1.2

 

$1.4

 

$2.1

Compensation cost capitalized as part of fixed assets and inventory as of
  December 31,


$0.5

 


$-

 


$-

Entergy paid $0.2 million in 2006 for awards earned under the Restricted Awards Plan.

 

NOTE 13. BUSINESS SEGMENT INFORMATION (Entergy Corporation)

Entergy's reportable segments as of December 31, 2006 are Utility and Non-Utility Nuclear. Utility generates, transmits, distributes, and sells electric power in portions of Arkansas, Louisiana, Mississippi, and Texas, and provides natural gas utility service in portions of Louisiana. Non-Utility Nuclear owns and operates five nuclear power plants and is primarily focused on selling electric power produced by those plants to wholesale customers. "All Other" includes the parent company, Entergy Corporation, and other business activity, including the Energy Commodity Services segment, the Competitive Retail Services business, and earnings on the proceeds of sales of previously-owned businesses. The Energy Commodity Services segment was presented as a reportable segment prior to 2005, but it did not meet the quantitative thresholds for a reportable segment in 2005 and 2004, and with the sale of Entergy-Koch's businesses in 2004, management does not expect the Energy Commodity Services segment to meet the quantitative thresholds in the foreseeable future. The 2004 information in the tables below has been restated to include the Energy Commodity Services segment in the All Other column. As a result of the Entergy New Orleans bankruptcy filing, Entergy has discontinued the consolidation of Entergy New Orleans retroactive to January 1, 2005, and is reporting Entergy New Orleans results under the equity method of accounting in the Utility segment.

Entergy's segment financial information is as follows:



2006



Utility

 


Non-Utility
Nuclear*

 



All Other*

 



Eliminations

 



Consolidated

 

(In Thousands)

Operating revenues

$9,150,030

$1,544,873 

$275,299 

($38,044)

$10,932,158 

Deprec., amort. & decomm.

$886,537

$134,661 

$12,478 

$- 

$1,033,676 

Interest and dividend income

$112,887

$83,155 

$95,985 

($93,192)

$198,835 

Equity in earnings of
  unconsolidated equity affiliates


$4,058


$- 


$89,686 


$- 


$93,744 

Interest and other charges

$428,662

$47,424 

$194,911 

($93,192)

$577,805 

Income taxes (benefits)

$333,105

$204,659 

($94,720)

$- 

$443,044 

Loss from discontinued operations

$-

$- 

($496)

$- 

($496)

Net income

$691,160

$309,496 

$131,894 

$52 

$1,132,602 

Total assets

$25,238,359

$5,369,730 

$2,866,377 

($2,391,735)

$31,082,731 

Investment in affiliates - at equity

$154,193

($5,233)

$214,266 

($134,137)

$229,089 

Cash paid for long-lived asset
  additions


$1,259,135


$302,865 


$23,034 


$982 


$1,586,016 

146



2005



Utility

 


Non-Utility
Nuclear*

 



All Other*

 



Eliminations

 



Consolidated

 

(In Thousands)

Operating revenues

$8,526,943 

 

$1,421,547 

 

$237,735 

 

($79,978)

 

$10,106,247 

Deprec., amort. & decomm.

$867,755 

 

$117,752 

 

$13,991 

 

$- 

 

$999,498 

Interest and dividend income

$75,748 

 

$66,836 

 

$78,185 

 

($70,290)

 

$150,479 

Equity in earnings of
  unconsolidated equity affiliates


$765 

 


$- 

 


$220 

 


$- 

 


$985 

Interest and other charges

$386,672 

 

$50,874 

 

$133,777 

 

($70,292)

 

$501,031 

Income taxes (benefits)

$405,662 

 

$163,865 

 

($10,243)

 

$- 

 

$559,284 

Loss from discontinued operations

$- 

 

$- 

 

($44,794)

 

$- 

 

($44,794)

Net income (loss)

$659,760 

 

$282,623 

 

($44,019)

 

($33)

 

$898,331 

Total assets

$25,248,820 

 

$4,887,572 

 

$3,477,169 

 

($2,755,904)

 

$30,857,657 

Investment in affiliates - at equity

$150,135 

 

$- 

 

$428,006 

 

($281,357)

 

$296,784 

Cash paid for long-lived asset
  additions


$1,285,012 

 


$160,899 

 


$11,230 

 


$945 

 


$1,458,086 



2004



Utility

 


Non-Utility
Nuclear*

 



All Other*

 



Eliminations

 



Consolidated

 

(In Thousands)

 

 

 

 

 

 

 

 

 

 

Operating revenues

$8,142,808 

 

$1,341,852 

 

$265,051 

 

($64,190)

 

$9,685,521 

Deprec., amort. & decomm.

$915,667 

 

$106,408 

 

$21,028 

 

$- 

 

$1,043,103 

Interest and dividend income

$40,831 

 

$63,569 

 

$60,430 

 

($55,195)

 

$109,635 

Equity in loss of
  unconsolidated equity affiliates


$- 

 


$- 

 


($78,727)

 


$- 

 


($78,727)

Interest and other charges

$406,315 

 

$53,657 

 

$96,526 

 

($55,197)

 

$501,301 

Income taxes (benefits)

$406,864 

 

$142,620 

 

($184,179)

 

$- 

 

$365,305 

Loss from discontinued operations

$- 

 

$- 

 

($41)

 

$- 

 

($41)

Net income

$643,408 

 

$245,029 

 

$21,087 

 

$- 

 

$909,524 

Total assets

$22,937,237 

 

$4,531,604 

 

$2,423,194 

 

($1,581,258)

 

$28,310,777 

Investment in affiliates - at equity

$207 

 

$- 

 

$512,571 

 

($280,999)

 

$231,779 

Cash paid for long-lived asset
  additions


$1,152,167 

 


$242,822 

 


$15,626 

 


($5)

 


$1,410,610 

Businesses marked with * are sometimes referred to as the "competitive businesses," with the exception of the parent company, Entergy Corporation. Eliminations are primarily intersegment activity. Almost all of Entergy's goodwill is related to the Utility segment.

In the fourth quarter of 2005, Entergy decided to divest the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas. Due to this planned divestiture, activity from this business is reported as discontinued operations in the Consolidated Statements of Income. In connection with the planned sale, an impairment reserve of $39.8 million ($25.8 million net-of-tax) was recorded for the remaining net book value of the Competitive Retail Services business' information technology systems.

147

Revenues and pre-tax income (loss) related to the Competitive Retail Services business' discontinued operations were as follows:

 

 

2006

 

2005

 

2004

 

 

(In Thousands)

             

Operating revenues

 

$134,444 

 

$654,333 

 

$438,203 

Pre-tax income (loss)

 

($429)

 

($68,854)

 

$562 

Assets and liabilities related to the Competitive Retail Services business' discontinued operations were as follows:

   

December 31,

   

2006

 

2005

   

(In Thousands)

         

Current assets

 

$10,945 

 

$89,579

Other property and investments

 

(482)

 

15,095

Property, plant and equipment - net

 

89 

 

19,587

Deferred debits and other assets

 

27,482 

 

20,903

     Total assets

 

$38,034 

 

$145,164

         

Current liabilities

 

$- 

 

$26,036

Non-current liabilities

 

 

35,884

Equity

 

38,034 

 

83,244

     Total liabilities and equity

 

$38,034 

 

$145,164

Also, in the fourth quarter of 2004, Entergy recorded a charge of approximately $55 million ($36 million net-of-tax) as a result of an impairment of the value of the Warren Power plant. Entergy concluded that the value of the plant, which is owned in the non-nuclear wholesale assets business, was impaired. Entergy reached this conclusion based on valuation studies prepared in connection with the sale of preferred stock in a subsidiary in the non-nuclear wholesale assets business.

Geographic Areas

For the years ended December 31, 2006, 2005, and 2004, Entergy derived less than 1% of its revenue from outside of the United States.

As of December 31, 2006 and 2005, Entergy had almost no long-lived assets located outside of the United States.

148

NOTE 14. EQUITY METHOD INVESTMENTS (Entergy Corporation)

As of December 31, 2006, Entergy owns investments in the following companies that it accounts for under the equity method of accounting:

Company

 

Ownership

 

Description

         

Entergy New Orleans, Inc.

 

100% ownership of common stock

 

A regulated public utility company that generates, transmits, distributes, and sells electric power and natural gas primarily to retail customers. As a result of Entergy New Orleans' bankruptcy filing in September 2005, Entergy deconsolidated Entergy New Orleans and reflects Entergy New Orleans' financial results under the equity method of accounting retroactive to January 1, 2005. See Note 18 to the financial statements for further discussion of the bankruptcy proceeding.

         

Entergy-Koch, LP

 

50% partnership interest

 

Entergy-Koch was in the energy commodity marketing and trading business and gas transportation and storage business until the fourth quarter of 2004 when these businesses were sold.

         

RS Cogen LLC

 

50% member interest

 

Co-generation project that produces power and steam on an industrial and merchant basis in the Lake Charles, Louisiana area.

         

Top Deer

 

50% member interest

 

Wind-powered electric generation joint venture.

Following is a reconciliation of Entergy's investments in equity affiliates:

   

2006

 

2005

 

2004

   

(In Thousands)

 

 

 

 

 

 

 

Beginning of year

 

$296,784 

 

$231,779 

 

$1,053,328 

Deconsolidation of Entergy New
  Orleans, effective January 1, 2005

 


 


154,462 

 


Additional investments

 

 

 

157,020 

Income (loss) from the investments

 

93,744 

 

985 

 

(78,727)

Other income

 

 

 

6,232 

Distributions received

 

(163,697)

 

(80,901)

 

(888,260)

Dispositions and other adjustments

 

2,258 

 

(9,541)

 

(17,814)

End of year

 

$229,089 

 

$296,784 

 

$231,779 

149

The following is a summary of combined financial information reported by Entergy's equity method investees:

 

 

2006

 

2005

 

2004

 

 

(In Thousands)

             

Income Statement Items

 

 

 

 

 

 

  Operating revenues

 

$632,820 

 

$721,410

 

$270,177 

  Operating income

 

$27,452 

 

$9,526

 

($111,535)

  Net income

 

$212,210 (1) 

 

$1,592

 

$739,858 (1) 

 

 

 

 

 

 

 

Balance Sheet Items

           

  Current assets

 

$262,506 

 

$415,586

 

 

  Noncurrent assets

 

$1,163,392 

 

$1,498,465

 

 

  Current liabilities

 

$389,526 

 

$544,030

 

 

  Noncurrent liabilities

 

$722,524 

 

$999,346

 

 

(1)

Includes gains recorded by Entergy-Koch on the sales of its energy trading and pipeline businesses.

Related-party transactions and guarantees

See Note 18 to the financial statements for a discussion of the Entergy New Orleans bankruptcy proceedings and activity between Entergy and Entergy New Orleans.

During 2004, Entergy procured various services from Entergy-Koch consisting primarily of pipeline transportation services for natural gas and risk management services for electricity and natural gas. The total cost of such services in 2004 was approximately $9.5 million. There were no related party transactions between Entergy-Koch and Entergy in 2006 or 2005.

Entergy Louisiana and Entergy New Orleans entered into purchase power agreements with RS Cogen that expired in April 2006, and purchased a total of $15.8 million, $61.2 million, and $43.6 million of capacity and energy from RS Cogen in 2006, 2005, and 2004, respectively. Entergy Gulf States purchased approximately $64.3 million, $12.4 million, and $17.5 million of electricity generated from Entergy's share of RS Cogen in 2006, 2005, and 2004, respectively. Entergy's operating transactions with its other equity method investees were not significant in 2006, 2005, or 2004.

In the purchase agreements for its energy trading and the pipeline business sales, Entergy-Koch agreed to indemnify the respective purchasers for certain potential losses relating to any breaches of the seller's representations, warranties, and obligations under each of the purchase agreements. Entergy Corporation has guaranteed up to 50% of Entergy-Koch's indemnification obligations to the purchasers. Entergy does not expect any material claims under these indemnification obligations.

 

150

 

 

NOTE 15. ACQUISITIONS AND DISPOSITIONS (Entergy Corporation, Entergy Louisiana, and Entergy Mississippi)

Asset Acquisitions

Attala

In January 2006, Entergy Mississippi purchased the Attala power plant, a 480 MW natural gas-fired, combined-cycle generating facility in central Mississippi, for $88 million from Central Mississippi Generating Company. Entergy Mississippi received the plant, materials and supplies, SO2 emission allowances, and related real estate. The MPSC approved the acquisition and the investment cost recovery of the plant.

Perryville

In June 2005, Entergy Louisiana purchased the 718 MW Perryville power plant located in northeast Louisiana for $162 million from a subsidiary of Cleco Corporation. Entergy Louisiana received the plant, materials and supplies, SO2 emission allowances, and related real estate. The LPSC approved the acquisition and the long-term cost-of-service purchased power agreement under which Entergy Gulf States will purchase 75 percent of the plant's output.

Asset Dispositions

Entergy-Koch Businesses

In the fourth quarter of 2004, Entergy-Koch sold its energy trading and pipeline businesses to third parties. The sales came after a review of strategic alternatives for enhancing the value of Entergy-Koch, LP. Entergy received $862 million of cash distributions in 2004 from Entergy-Koch after the business sales. Due to the November 2006 expiration of contingencies on the sale of Entergy-Koch's trading business, and the corresponding release to Entergy-Koch of sales proceeds held in escrow, Entergy recorded a gain related to its Entergy-Koch investment of approximately $55 million, net-of-tax, in the fourth quarter of 2006 and received additional cash distributions of approximately $163 million. Entergy expects future cash distributions upon liquidation of the partnership will be less than $35 million.

Other

In the second quarter of 2006, Entergy sold its remaining interest in a power development project and realized a $14.1 million ($8.6 million net-of-tax) gain on the sale.

In April 2006, Entergy sold the retail electric portion of the Competitive Retail Services business operating in the ERCOT region of Texas, realized an $11.1 million gain (net-of-tax) on the sale, and now reports this portion of the business as a discontinued operation.

In January 2004, Entergy sold its 50% interest in the Crete project, which is a 320MW power plant located in Illinois, and realized an insignificant gain on the sale.

In the fourth quarter of 2004, Entergy sold undivided interests in the Warren Power and the Harrison County plants at a price that approximated book value.

151

 

NOTE 16. RISK MANAGEMENT AND FAIR VALUES (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

Market and Commodity Risks

In the normal course of business, Entergy is exposed to a number of market and commodity risks. Market risk is the potential loss that Entergy may incur as a result of changes in the market or fair value of a particular instrument or commodity. All financial and commodity-related instruments, including derivatives, are subject to market risk. Entergy is subject to a number of commodity and market risks, including:

Type of Risk

 

Affected Businesses

 

 

 

Power price risk

 

Utility, Non-Utility Nuclear, Non-nuclear wholesale assets

Fuel price risk

 

Utility, Non-Utility Nuclear, Non-nuclear wholesale assets

Foreign currency exchange rate risk

 

Utility, Non-Utility Nuclear, Non-nuclear wholesale assets

Equity price and interest rate risk - investments

 

Utility, Non-Utility Nuclear

Entergy manages these risks through both contractual arrangements and derivatives. Contractual risk management tools include long-term power and fuel purchase agreements, capacity contracts, and tolling agreements. Entergy also uses a variety of commodity and financial derivatives, including natural gas and electricity futures, forwards, swaps, and options; foreign currency forwards; and interest rate swaps as a part of its overall risk management strategy. Except for the energy trading activities conducted through December 2004 by Entergy-Koch, Entergy enters into derivatives only to manage natural risks inherent in its physical or financial assets or liabilities.

Entergy manages fuel price risk for its Louisiana jurisdictions (Entergy Louisiana, Entergy New Orleans, and the Louisiana portion of Entergy Gulf States) and Entergy Mississippi primarily through the purchase of short-term swaps. These swaps are marked-to-market with offsetting regulatory assets or liabilities. The notional volumes of these swaps are based on a portion of projected purchases of gas for the summer (electric generation) and winter (gas distribution at Entergy Gulf States and Entergy New Orleans) peak seasons.

Entergy's exposure to market risk is determined by a number of factors, including the size, term, composition, and diversification of positions held, as well as market volatility and liquidity. For instruments such as options, the time period during which the option may be exercised and the relationship between the current market price of the underlying instrument and the option's contractual strike or exercise price also affects the level of market risk. A significant factor influencing the overall level of market risk to which Entergy is exposed is its use of hedging techniques to mitigate such risk. Entergy manages market risk by actively monitoring compliance with stated risk management policies as well as monitoring the effectiveness of its hedging policies and strategies. Entergy's risk management policies limit the amount of total net exposure and rolling net exposure during the stated periods. These policies, including related risk limits, are regularly assessed to ensure their appropriateness given Entergy's objectives.

Hedging Derivatives

Entergy classifies substantially all of the following types of derivative instruments held by its consolidated businesses as cash flow hedges:

Instrument

 

Business

 

 

 

Natural gas and electricity futures, forwards,
  and options

 

Non-Utility Nuclear, Energy Commodity Services,
  Non-nuclear wholesale assets

Foreign currency forwards

 

Utility, Non-Utility Nuclear

152

Cash flow hedges with net unrealized losses of approximately $99 million (net-of-tax) at December 31, 2006 are scheduled to mature during 2007. Net losses totaling approximately $79 million were realized during 2006 on the maturity of cash flow hedges. Unrealized gains or losses result from hedging power output at the Non-Utility Nuclear power stations and foreign currency hedges related to Euro-denominated nuclear fuel acquisitions. The related gains or losses from hedging power are included in revenues when realized. The realized gains or losses from foreign currency transactions are included in the cost of capitalized fuel. The maximum length of time over which Entergy is currently hedging the variability in future cash flows for forecasted transactions at December 31, 2006 is approximately five years. The ineffective portion of the change in the value of Entergy's cash flow hedges during 2006, 2005, and 2004 was insignificant.

 

Fair Values

Financial Instruments

The estimated fair value of Entergy's financial instruments is determined using bid prices reported by dealer markets and by nationally recognized investment banking firms. The estimated fair value of derivative financial instruments is based on market quotes. Considerable judgment is required in developing some of the estimates of fair value. Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange. In addition, gains or losses realized on financial instruments held by regulated businesses may be reflected in future rates and therefore do not necessarily accrue to the benefit or detriment of stockholders.

Entergy considers the carrying amounts of most of its financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments. Additional information regarding financial instruments and their fair values is included in Notes 5 and 6 to the financial statements.

 

NOTE 17. DECOMMISSIONING TRUST FUNDS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy)

Entergy holds debt and equity securities, classified as available-for-sale, in nuclear decommissioning trust accounts. The NRC requires Entergy to maintain trusts to fund the costs of decommissioning ANO 1, ANO 2, River Bend, Waterford 3, Grand Gulf, Pilgrim, Indian Point 1 and 2, and Vermont Yankee (NYPA currently retains the decommissioning trusts and liabilities for Indian Point 3 and FitzPatrick). The funds are invested primarily in equity securities; fixed-rate, fixed-income securities; and cash and cash equivalents. The majority of the unrealized gains and losses below relate to Entergy's Utility operating companies and System Energy. The securities held at December 31, 2006 and 2005 are summarized as follows:

 

Fair
Value

 

Total
Unrealized
Gains

 

Total
Unrealized
Losses

 

(In Millions)

2006

 

 

 

 

 

 

Equity Securities

 

$1,706

 

$418

 

$2

Debt Securities

 

1,153

 

17

 

11

  Total

 

$2,859

 

$435

 

$13

 

 

 

 

 

 

 

 

 

 

 

 

 

2005

 

 

 

 

 

 

Equity Securities

 

$1,502

 

$280

 

$12

Debt Securities

 

1,105

 

20

 

10

  Total

 

$2,607

 

$300

 

$22

153

The debt securities have an average coupon rate of approximately 5.2%, an average duration of approximately 5.5 years, and an average maturity of approximately 8.9 years. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor's 500 Index, and a relatively small percentage of the securities are held in a fund intended to replicate the return of the Wilshire 4500 Index.

The fair value and gross unrealized losses of available-for-sale equity and debt securities, summarized by investment type and length of time that the securities have been in a continuous loss position, are as follows at December 31, 2006:

 

 

Equity Securities

 

Debt Securities

 

 

Fair
Value

 

Gross
Unrealized
Losses

 

Fair
Value

 

Gross
Unrealized
Losses

 

 

(In Millions)

 

 

 

 

 

 

 

 

 

Less than 12 months

 

$6

 

$-

 

$270

 

$2

More than 12 months

 

33

 

2

 

335

 

9

   Total

 

$39

 

$2

 

$605

 

$11

Entergy evaluates these unrealized gains and losses at the end of each period to determine whether an other than temporary impairment has occurred. The assessment of whether an investment has suffered an other than temporary impairment is based on a number of factors including, first, whether Entergy has the ability and intent to hold the investment to recover its value and, then, whether it is expected that the investment will recover its value within a reasonable period of time. Entergy's trusts are managed by third parties who have independent discretion over purchases and sales of securities in the trusts and, according to interpretations of authoritative literature in December 2006, Entergy did not satisfy the ability to hold criteria. Entergy did not record any impairments in 2006 or 2005 on these assets due to the insignificance of any impairments.

Due to the regulatory treatment of decommissioning collections and trust fund earnings, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy record regulatory assets or liabilities for unrealized gains and losses on trust investments. For the unregulated portion of River Bend, Entergy Gulf States has recorded an offsetting amount of unrealized gains or losses in other deferred credits.

The fair value of debt securities, summarized by contractual maturities, at December 31, 2006 and 2005 are as follows:

   

2006

 

2005

   

(In Millions)

less than 1 year

 

$82

 

$80

1 year - 5 years

 

309

 

357

5 years - 10 years

 

472

 

382

10 years - 15 years

 

106

 

116

15 years - 20 years

 

72

 

73

20 years+

 

112

 

97

     Total

 

$1,153

 

$1,105

During the years ended December 31, 2006, 2005, and 2004, proceeds from the dispositions of securities amounted to $778 million, $944 million, and $679 million, respectively. During the years ended December 31, 2006, 2005, and 2004, gross gains of $5 million, $5 million, and $4 million, respectively, and gross losses of $10 million, $8 million, and $3 million, respectively, were reclassified out of other comprehensive income into earnings.

154

Entergy Arkansas

Entergy Arkansas holds debt and equity securities, classified as available-for-sale, in nuclear decommissioning trust accounts. The securities held at December 31, 2006 and 2005 are summarized as follows:

Fair
Value

Total
Unrealized
Gains

Total
Unrealized
Losses

(In Millions)

2006

Equity Securities

$237.6

$105.8

$-

Debt Securities

201.8

1.0

3.5

  Total

$439.4

$106.8

$3.5

2005

Equity Securities

$205.6

$78.8

$0.8

Debt Securities

196.5

1.1

2.6

  Total

$402.1

$79.9

$3.4

The fair value and gross unrealized losses of available-for-sale equity and debt securities, summarized by investment type and length of time that the securities have been in a continuous loss position, are as follows at December 31, 2006:

Equity Securities

Debt Securities

Fair
Value

Gross
Unrealized
Losses

Fair
Value

Gross
Unrealized
Losses

(In Millions)

Less than 12 months

$0.2

$-

$67.3

$0.7

More than 12 months

2.0

-

93.1

2.8

   Total

$2.2

$-

$160.4

$3.5

The fair value of debt securities, summarized by contractual maturities, at December 31, 2006 and 2005 are as follows:

2006

2005

(In Millions)

less than 1 year

$12.8

$6.3

1 year - 5 years

32.7

71.9

5 years - 10 years

144.7

112.6

10 years - 15 years

4.1

2.2

15 years - 20 years

2.3

-

20 years+

5.2

3.5

   Total

$201.8

$196.5

During the years ended December 31, 2006, 2005, and 2004, proceeds from the dispositions of securities amounted to $105.7 million, $203.8 million, and $142.5 million, respectively. During the years ended December 31, 2006, 2005, and 2004, gross gains of $0.3 million, $1.4 million, and $1 million, respectively, and gross losses of $1.3 million, $2.2 million, and $0.8 million, respectively, were recorded in earnings.

155

Entergy Gulf States

Entergy Gulf States holds debt and equity securities, classified as available-for-sale, in nuclear decommissioning trust accounts. The securities held at December 31, 2006 and 2005 are summarized as follows:

Fair
Value

Total
Unrealized
Gains

Total
Unrealized
Losses

(In Millions)

2006

Equity Securities

$181.6

$49.9

$-

Debt Securities

163.3

6.2

0.8

   Total

$344.9

$56.1

$0.8

2005

Equity Securities

$153.6

$28.7

$0.3

Debt Securities

157.2

6.9

0.5

   Total

$310.8

$35.6

$0.8

The fair value and gross unrealized losses of available-for-sale equity and debt securities, summarized by investment type and length of time that the securities have been in a continuous loss position, are as follows at December 31, 2006:

Equity Securities

Debt Securities

Fair
Value

Gross
Unrealized
Losses

Fair
Value

Gross
Unrealized
Losses

(In Millions)

Less than 12 months

$0.1

$-

$15.7

$0.1

More than 12 months

0.6

-

11.6

0.7

   Total

$0.7

$-

$27.3

$0.8

The fair value of debt securities, summarized by contractual maturities, at December 31, 2006 and 2005 are as follows:

2006

2005

(In Millions)

less than 1 year

$7.7

$7.7

1 year - 5 years

46.7

49.0

5 years - 10 years

56.5

50.1

10 years - 15 years

36.5

35.4

15 years - 20 years

12.7

12.2

20 years+

3.2

2.8

   Total

$163.3

$157.2

During the years ended December 31, 2006, 2005, and 2004, proceeds from the dispositions of securities amounted to $60.1 million, $38.1 million, and $29.2 million, respectively. During the years ended December 31, 2006, 2005, and 2004, gross gains of $0.3 million, $0.1 million, and $42,728, respectively, and gross losses of $0.2 million, $0.2 million, and $0.1 million, respectively, were recorded in earnings.

156

Entergy Louisiana

Entergy Louisiana holds debt and equity securities, classified as available-for-sale, in nuclear decommissioning trust accounts. The securities held at December 31, 2006 and 2005 are summarized as follows:

Fair
Value

Total
Unrealized
Gains

Total
Unrealized
Losses

(In Millions)

2006

Equity Securities

$125.0

$36.2

$0.2

Debt Securities

83.9

1.6

1.3

   Total

$208.9

$37.8

$1.5

2005

Equity Securities

$105.8

$23.6

$1.6

Debt Securities

81.3

2.2

0.8

   Total

$187.1

$25.8

$2.4

The fair value and gross unrealized losses of available-for-sale equity and debt securities, summarized by investment type and length of time that the securities have been in a continuous loss position, are as follows at December 31, 2006:

Equity Securities

Debt Securities

Fair
Value

Gross
Unrealized
Losses

Fair
Value

Gross
Unrealized
Losses

(In Millions)

Less than 12 months

$0.1

$-

$12.0

$-

More than 12 months

7.5

0.2

37.5

1.3

   Total

$7.6

$0.2

$49.5

$1.3

The fair value of debt securities, summarized by contractual maturities, at December 31, 2006 and 2005 are as follows:

2006

2005

(In Millions)

less than 1 year

$10.8

$15.6

1 year - 5 years

18.4

15.5

5 years - 10 years

29.3

22.1

10 years - 15 years

5.5

12.3

15 years - 20 years

11.3

12.9

20 years+

8.6

2.9

    Total

$83.9

$81.3

During the years ended December 31, 2006, 2005, and 2004, proceeds from the dispositions of securities amounted to $20.2 million, $107.3 million, and $36 million, respectively. During the years ended December 31, 2006, 2005, and 2004, gross gains of $0.8 million, $0.2 million, and $0.1 million, respectively, and gross losses of $40,560, $0.8 million, and $15,666, respectively, were recorded in earnings.

157

System Energy

System Energy holds debt and equity securities, classified as available-for-sale, in nuclear decommissioning trust accounts. The securities held at December 31, 2006 and 2005 are summarized as follows:

Fair
Value

Total
Unrealized
Gains

Total
Unrealized
Losses

(In Millions)

2006

Equity Securities

$173.9

$37.4

$0.4

Debt Securities

107.5

1.0

1.2

   Total

$281.4

$38.4

$1.6

2005

Equity Securities

$142.9

$22.3

$4.5

Debt Securities

93.1

1.2

1.1

   Total

$236.0

$23.5

$5.6

The fair value and gross unrealized losses of available-for-sale equity and debt securities, summarized by investment type and length of time that the securities have been in a continuous loss position, are as follows at December 31, 2006:

Equity Securities

Debt Securities

Fair
Value

Gross
Unrealized
Losses

Fair
Value

Gross
Unrealized
Losses

(In Millions)

Less than 12 months

$0.2

$-

$32.5

$0.3

More than 12 months

13.9

0.4

40.0

0.9

   Total

$14.1

$0.4

$72.5

$1.2

The fair value of debt securities, summarized by contractual maturities, at December 31, 2006 and 2005 are as follows:

2006

2005

(In Millions)

less than 1 year

$13.4

$9.8

1 year - 5 years

35.5

32.5

5 years - 10 years

27.8

20.7

10 years - 15 years

7.2

6.2

15 years - 20 years

2.1

3.4

20 years+

21.5

20.5

   Total

$107.5

$93.1

During the years ended December 31, 2006, 2005, and 2004, proceeds from the dispositions of securities amounted to $88.2 million, $91.1 million, and $100.7 million, respectively. During the years ended December 31, 2006, 2005, and 2004, gross gains of $0.4 million, $0.4 million, and $0.5 million, respectively, and gross losses of $0.9 million, $0.8 million, and $0.4 million, respectively, were recorded in earnings.

158

Other than temporary impairments and unrealized gains and losses

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy evaluate unrealized gains and losses at the end of each period to determine whether an other than temporary impairment has occurred. The assessment of whether an investment has suffered an other than temporary impairment is based on a number of factors including, first, whether Entergy has the ability and intent to hold the investment to recover its value and, then, whether it is expected that the investment will recover its value within a reasonable period of time. Entergy's trusts are managed by third parties who have independent discretion over purchases and sales of securities in the trusts and, according to interpretations of authoritative literature in December 2006, Entergy did not satisfy the ability to hold criteria. Entergy did not record any impairments in 2006 or 2005 on these assets due to the insignificance of any impairments.

Due to the regulatory treatment of decommissioning collections and trust fund earnings, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy record regulatory assets or liabilities for unrealized gains and losses on trust investments. For the unregulated portion of River Bend, Entergy Gulf States has recorded an offsetting amount of unrealized gains or losses in other deferred credits due to existing contractual commitments with the former owner.

 

NOTE 18. ENTERGY NEW ORLEANS BANKRUPTCY PROCEEDING (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Because of the effects of Hurricane Katrina, on September 23, 2005, Entergy New Orleans filed a voluntary petition in the United States Bankruptcy Court for the Eastern District of Louisiana seeking reorganization relief under the provisions of Chapter 11 of the United States Bankruptcy Code (Case No. 05-17697). Entergy New Orleans continues to operate its business as a debtor-in-possession under the jurisdiction of the bankruptcy court and in accordance with the applicable provisions of the Bankruptcy Code and the orders of the bankruptcy court.

On September 26, 2005, Entergy New Orleans, as borrower, and Entergy Corporation, as lender, entered into the Debtor-in-Possession (DIP) credit agreement, a debtor-in-possession credit facility to provide funding to Entergy New Orleans during its business restoration efforts. On December 9, 2005, the bankruptcy court issued its final order approving the DIP Credit Agreement. The credit facility provides for up to $200 million in loans. The facility enables Entergy New Orleans to request funding from Entergy Corporation, but the decision to lend money is at the sole discretion of Entergy Corporation. As of December 31, 2006, Entergy New Orleans had outstanding borrowings of $52 million under the DIP credit agreement.

On February 5, 2007, Entergy New Orleans filed an amended plan of reorganization and a disclosure statement with the bankruptcy court. The bankruptcy court entered an order on February 13, 2007 that approves the adequacy of Entergy New Orleans' disclosure statement. The Unsecured Creditors' Committee also filed a plan of reorganization on February 5, 2007. The Unsecured Creditors' Committee's plan is similar in some respects to Entergy New Orleans' plan, but contains several differences. The significant differences are noted below. A hearing regarding confirmation for both plans of reorganization is scheduled for May 3 and 4, 2007.

Entergy New Orleans' plan of reorganization reflects its continuing effort to work with federal, state, and local authorities to resolve the bankruptcy in a manner that allows Entergy New Orleans' customers to be served by a financially viable entity as required by law. The plan of reorganization provides full compensation to Entergy New Orleans' creditors whose claims are allowed by the bankruptcy court. Conditions precedent proposed in Entergy New Orleans' plan of reorganization before it can become effective include:

  • A final confirmation order from the bankruptcy court approving the plan of reorganization;
  • Receipt by Entergy New Orleans of insurance proceeds of at least $50 million;

 

159

 

 

  • Receipt by Entergy New Orleans of $200 million in CDBG funding; and
  • No material adverse change shall have occurred from and after the confirmation date of the plan of reorganization.

In addition, key factors that will continue to influence the timing and outcome of Entergy New Orleans' recovery efforts include the level of economic recovery of New Orleans and the number of customers that return to New Orleans, including the timing of their return. Entergy New Orleans currently estimates that approximately 95,000 electric customers and 65,000 gas customers have returned and are taking service. Prior to Hurricane Katrina, Entergy New Orleans had approximately 190,000 electric customers and 144,000 gas customers.

The Unsecured Creditors' Committee's plan does not contain the conditions precedent regarding receipt by Entergy New Orleans of insurance proceeds and CDBG funds. Instead, the Unsecured Creditors' Committee's plan proposes exit financing of up to $150 million, with a maturity of up to 5 years, and with an estimated interest rate of 10.5%, increasing by 1% per year. Obtaining this exit financing is a condition precedent to the Unsecured Creditors' Committee's plan.

The bankruptcy judge set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans, with certain exceptions, had to file their proofs of claim in the bankruptcy case. Approximately 560 claims, including amending claims, have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and is seeking withdrawal or modification of claims or objecting to claims with which it disagrees. Several of the filed claims have been withdrawn or disallowed by the bankruptcy court. Entergy New Orleans currently estimates that the prepetition claims that will be allowed in the bankruptcy case will approximate the prepetition liabilities currently recorded by Entergy New Orleans.

Entergy New Orleans' plan of reorganization proposes to pay the third-party prepetition accounts payable in full in cash and to issue three-year notes in satisfaction of the affiliate prepetition accounts payable, and proposes that its first mortgage bonds will remain outstanding with their current maturity dates and interest terms. The plan of reorganization proposes that Entergy New Orleans' preferred stock will also remain outstanding on its current dividend terms, with payment of unpaid preferred dividends in arrears. The Unsecured Creditors' Committee's plan is similar, but would pay the affiliate prepetition accounts payable in cash.

Entergy New Orleans' plan of reorganization proposes to pay interest from September 23, 2005 on the third-party and affiliate accounts payable at the Louisiana judicial rate of interest in 2005 (6%) and 2006 (8%), and at the Louisiana judicial rate of interest plus 1% thereafter. The Louisiana judicial rate of interest is 9.5% for 2007. Pursuant to an agreement with the first mortgage bondholders, Entergy New Orleans' plan of reorganization also proposes to pay the first mortgage bondholders an amount equal to the one year of interest from the bankruptcy petition date that the bondholders had waived previously in the bankruptcy proceeding. As approved by the bankruptcy court, Entergy New Orleans has begun paying interest accruing after September 23, 2006 on its first mortgage bonds. In the fourth quarter 2006, Entergy New Orleans accrued for the interest from September 23, 2005 through December 2006 and for the proposed payment to the bondholders in the amount of the one year of waived interest.

Municipalization is one potential outcome of Entergy New Orleans' recovery effort that may be pursued by a stakeholder or stakeholders, even after Entergy New Orleans exits from bankruptcy. In June 2006, the Louisiana Legislature passed a law that establishes a governance structure for a public power authority, if municipalization of Entergy New Orleans' utility business is pursued. Entergy New Orleans' October 2006 settlement approved by the City Council allowing phased-in rate increases through 2008, discussed in Note 2 to the financial statements, provides that Entergy New Orleans will work with the City Council to seek an exception to the Stafford Act that will afford Stafford Act protections to Entergy New Orleans if another catastrophic event affects Entergy New Orleans. The Stafford Act provides for restoration funding from the federal government for municipal utilities, but does not allow such funding for investor-owned utilities like Entergy New Orleans.

160

(Entergy Corporation)

Entergy owns 100 percent of the common stock of Entergy New Orleans, has continued to supply general and administrative services, and has provided debtor-in-possession financing to Entergy New Orleans. Uncertainties surrounding the nature, timing, and specifics of the bankruptcy proceedings, however, have caused Entergy to deconsolidate Entergy New Orleans and reflect Entergy New Orleans' financial results under the equity method of accounting retroactive to January 1, 2005. Because Entergy owns all of the common stock of Entergy New Orleans, this change does not affect the amount of net income Entergy records resulting from Entergy New Orleans' operations for any current or prior period, but results in Entergy New Orleans' net income for 2005 and 2006 being presented as "Equity in earnings (loss) of unconsolidated equity affiliates" rather than its results being included in each individual income statement line item, as is the case for periods prior to 2005. Entergy has reviewed the carrying value of its equity investment in Entergy New Orleans to determine if an impairment has occurred as a result of the storm, the flood, the power outages, restoration costs, and changes in customer load. Entergy determined that no impairment has occurred because management believes that cost recovery is probable. Entergy will continue to assess the carrying value of its investment in Entergy New Orleans as developments occur in Entergy New Orleans' recovery efforts.

Entergy's income statement for 2006 and 2005 includes $220 million and $207 million, respectively, in operating revenues and $46 million and $117 million, respectively, in purchased power expenses from transactions between Entergy New Orleans and Entergy's subsidiaries. Entergy's balance sheet as of December 31, 2006 and 2005 includes $95 million and $103 million, respectively, of accounts receivable that are payable to Entergy or its subsidiaries by Entergy New Orleans, including $69.5 million of prepetition accounts. As stated above, however, because Entergy owns all of the common stock of Entergy New Orleans, the deconsolidation of Entergy New Orleans does not affect the amount of net income Entergy records resulting from Entergy New Orleans' operations.

(Entergy New Orleans)

The accompanying financial statements have been prepared on the basis that Entergy New Orleans will continue as a going concern. Entergy New Orleans' filing for protection under Chapter 11 of the United States Bankruptcy Code as a result of the liquidity issues caused by Hurricane Katrina gave rise to substantial doubt regarding Entergy New Orleans' ability to continue as a going concern for a reasonable period of time, primarily because of the loss of control inherent in the bankruptcy process. The financial statements do not include any adjustments that might result from the outcome of this uncertainty including adjustments relating to the recoverability and classification of recorded asset amounts or to the amounts and classification of liabilities that may be necessary if Entergy New Orleans is unable to continue as a going concern. The financial statements also do not attempt to reflect liabilities at the priority or status of any claims that the holders of such liabilities will have.

Certain prepetition liabilities were classified as liabilities subject to compromise in Entergy New Orleans' Balance Sheet as of December 31, 2005. Because the two competing reorganization plans filed in its bankruptcy proceeding both propose to provide full value to all allowed claims, including interest, Entergy New Orleans does not believe that any of its liabilities should be classified as subject to compromise as of December 31, 2006. The following table summarizes the components of liabilities subject to compromise as of December 31, 2005:

   

Amount

   

(In Thousands)

     

Accounts payable - Associated companies

 

$46,815

Accounts payable - Other

 

25,000

Taxes accrued

 

2,027

Interest accrued

 

1,473

Accumulated provisions

 

5,770

Long-term debt

 

229,859

Total Liabilities Subject to Compromise

 

$310,944

161

Reorganization items reported as operating expenses in the income statements primarily consist of professional fees associated with the bankruptcy case and, pursuant to an agreement with the first mortgage bondholders, the accrual in the fourth quarter 2006 for Entergy New Orleans' proposed plan of reorganization provision that will pay the first mortgage bondholders an amount ($12.2 million) equal to the one year of interest from the bankruptcy petition date that the bondholders had waived previously in the bankruptcy proceeding.

 

NOTE 19. TRANSACTIONS WITH AFFILIATES (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Each Registrant Subsidiary purchases electricity from or sells electricity to the other Registrant Subsidiaries, or both, under rate schedules filed with FERC. The Registrant Subsidiaries purchase fuel from System Fuels; receive management, technical, advisory, operating, and administrative services from Entergy Services; and receive management, technical, and operating services from Entergy Operations. These transactions are on an "at cost" basis. In addition, Entergy Power sells electricity to Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans, and RS Cogen sells electricity to Entergy Louisiana and Entergy New Orleans.

As described in Note 1 to the financial statements, all of System Energy's operating revenues consist of billings to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

Additionally, as described in Note 4 to the financial statements, the Registrant Subsidiaries participate in Entergy's money pool and earn interest income from the money pool. Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans also receive interest income from System Fuels, Inc.

The tables below contain the various affiliate transactions of the Utility operating companies, System Energy, and other Entergy affiliates.

Intercompany Revenues

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Millions)

 

 

 

 

 

 

 

 

 

 

 

 

 

2006

 

$328.1

 

$82.7

 

$223.8

 

$46.4

 

$46.0

 

$555.5

2005

 

$197.7

 

$186.7

 

$342.4

 

$69.2

 

$117.6

 

$533.9

2004

 

$256.8

 

$52.5

 

$96.6

 

$47.6

 

$117.8

 

$545.4

Intercompany Operating Expenses

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Millions)

 

 

(1)

 

 

 

(2)

 

 

 

(3)

 

 

2006

 

$485.5

 

$499.5

 

$509.2

 

$387.2

 

$255.4

 

$110.6

2005

 

$670.0

 

$546.5

 

$606.4

 

$520.2

 

$260.2

 

$102.9

2004

 

$467.5

 

$558.2

 

$491.8

 

$484.4

 

$228.4

 

$109.4

(1)

Includes $0.2 million in 2006, $1.9 million in 2005, and $2.3 million in 2004 for power purchased from Entergy Power.

(2)

Includes power purchased from Entergy Power and RS Cogen LLC in 2006 of $9.8 million and $12.0 million, respectively, in 2005 of $8.4 million and $48.8 million, respectively, and in 2004 of $9.1 million and $33.0 million, respectively.

(3)

Includes power purchased from Entergy Power and RS Cogen LLC in 2006 of $10.0 million and $3.8 million, respectively, in 2005 of $8.3 million and $12.6 million, respectively, and in 2004 of $9.0 million and $10.9 million, respectively.

162

Intercompany Interest Income

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Millions)

 

 

 

 

 

 

 

 

 

 

 

 

 

2006

 

$2.5

 

$2.9

 

$1.2

 

$3.4

 

$0.3

 

$8.9

2005

 

$2.0

 

$0.1

 

$1.5

 

$1.0

 

$0.2

 

$4.2

2004

 

$0.6

 

$0.4

 

$1.1

 

$0.6

 

$0.2

 

$0.6

 

NOTE 20. QUARTERLY FINANCIAL DATA (UNAUDITED) (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Operating results for the four quarters of 2006 and 2005 for Entergy Corporation and subsidiaries were:

Operating
Revenues

 

Operating
Income

 

Net
Income

 

(In Thousands)

2006:

 

   First Quarter

$2,568,031

 

$394,763

 

$193,628

   Second Quarter

$2,628,502

 

$487,573

 

$281,802

   Third Quarter

$3,254,719

 

$644,408

 

$388,883

   Fourth Quarter

$2,480,906

 

$278,898

 

$268,289

 

 

 

 

 

2005:

 

 

 

 

 

   First Quarter

$2,110,182

 

$311,008

 

$171,996

   Second Quarter

$2,445,391

 

$515,574

 

$286,150

   Third Quarter

$2,898,258

 

$654,340

 

$349,952

   Fourth Quarter

$2,652,416

 

$311,067

 

$90,233

Earnings per Average Common Share

 

2006

 

2005

 

Basic

 

Diluted

 

Basic

 

Diluted

               

First Quarter

$0.93

 

$0.92

 

$0.80

 

$0.79

Second Quarter

$1.35

 

$1.33

 

$1.36

 

$1.33

Third Quarter

$1.87

 

$1.83

 

$1.68

 

$1.65

Fourth Quarter

$1.31

 

$1.28

 

$0.43

 

$0.42

163

The business of the Utility operating companies is subject to seasonal fluctuations with the peak periods occurring during the third quarter. Operating results for the Registrant Subsidiaries for the four quarters of 2006 and 2005 were:

Operating Revenue

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

2006:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$447,622

 

$893,205

 

$552,057

 

$373,234

 

$136,261

 

$131,654

  Second Quarter

 

$504,223

 

$881,115

 

$550,580

 

$387,849

 

$135,955

 

$129,176

  Third Quarter

 

$660,885

 

$1,055,759

 

$762,840

 

$429,460

 

$161,643

 

$146,577

  Fourth Quarter

 

$479,953

 

$849,494

 

$585,781

 

$259,465

 

$137,295

 

$148,052

2005:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$367,360

 

$679,250

 

$480,673

 

$251,246

 

$191,267

 

$124,790

  Second Quarter

 

$450,097

 

$759,519

 

$647,748

 

$288,244

 

$189,927

 

$126,364

  Third Quarter

 

$556,445

 

$971,840

 

$760,916

 

$406,765

 

$189,593

 

$140,583

  Fourth Quarter

 

$415,153

 

$956,562

 

$760,844

 

$360,288

 

$102,539

 

$142,192

Operating Income (Loss)

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

2006:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$62,717

 

$81,395

 

$36,954

 

$14,816

 

$8,761 

 

$57,911

  Second Quarter

 

$75,796

 

$111,411

 

$75,377

 

$40,952

 

$16,283 

 

$56,696

  Third Quarter

 

$115,670

 

$141,089

 

$135,461

 

$59,150

 

$13,016 

 

$58,636

  Fourth Quarter

 

$30,079

 

$59,289

 

$20,171

 

$6,446

 

($17,711)

 

$57,351

2005:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$61,847

 

$47,343

 

$16,730

 

$18,772

 

$12,521 

 

$54,606

  Second Quarter

 

$87,109

 

$91,998

 

$140,802

 

$35,793

 

$17,934 

 

$53,259

  Third Quarter

 

$157,130

 

$179,272

 

$89,913

 

$62,915

 

$13,950 

 

$57,034

  Fourth Quarter

 

$9,861

 

$72,747

 

$33,689

 

$15,209

 

($31,333)

 

$58,511

Net Income (Loss)

 

 

Entergy
Arkansas

 

Entergy
Gulf States

 

Entergy
Louisiana

 

Entergy
Mississippi

 

Entergy
New Orleans

 

System
Energy

 

 

(In Thousands)

2006:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$28,923 

 

$45,049

 

$17,396

 

$3,297 

 

$5,643 

 

$30,748

  Second Quarter

 

$55,735 

 

$51,704

 

$37,954

 

$19,747 

 

$10,774 

 

$29,608

  Third Quarter

 

$88,812 

 

$70,408

 

$71,802

 

$31,186 

 

$7,430 

 

$26,697

  Fourth Quarter

 

($316)

 

$44,827

 

$10,466

 

($1,945)

 

($18,503)

 

$53,205

2005:

 

 

 

 

 

 

 

 

 

 

 

 

  First Quarter

 

$31,931 

 

$23,349

 

$1,771

 

$7,222 

 

$5,736 

 

$26,232

  Second Quarter

 

$48,290 

 

$44,287

 

$74,163

 

$17,719 

 

$8,374 

 

$25,925

  Third Quarter

 

$92,368 

 

$105,060

 

$42,860

 

$33,327 

 

$6,417 

 

$26,920

  Fourth Quarter

 

$2,046 

 

$33,801

 

$9,288

 

$3,835 

 

($19,277)

 

$32,567

164

 

ENTERGY'S BUSINESS (continued from page 3)

Utility

The Utility is Entergy's largest business segment, with five wholly-owned retail electric utility subsidiaries: Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. These companies generate, transmit, distribute and sell electric power to retail and wholesale customers in Arkansas, Louisiana, Mississippi, and Texas. Entergy Gulf States and Entergy New Orleans also provide natural gas utility services to customers in and around Baton Rouge, Louisiana, and New Orleans, Louisiana, respectively. Also included in the Utility is System Energy, a wholly-owned subsidiary of Entergy Corporation that owns or leases 90 percent of Grand Gulf. System Energy sells its power and capacity from Grand Gulf at wholesale to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

These utility subsidiaries are each regulated by state utility commissions, or in the case of Entergy New Orleans, the City Council. System Energy is regulated by FERC as all of its transactions are at the wholesale level. The Utility continues to operate as a regulated monopoly as efforts toward deregulation have been delayed, abandoned, or not initiated in its service territories. The overall generation portfolio of the Utility, which relies heavily on natural gas and nuclear generation, is consistent with Entergy's strong support for the environment.

The Utility is focused on providing highly reliable and cost effective electricity and gas service while working in an environment that provides the highest level of safety for its employees. Since 1998, the Utility has significantly improved key customer service, reliability, and safety metrics and continues to actively pursue additional improvements.

Customers

As of December 31, 2006, the Utility operating companies provided retail electric and gas service to customers in Arkansas, Louisiana, Mississippi, and Texas, as follows (In the case of Entergy New Orleans, due to the effect of Hurricane Katrina, the number represents an estimate of customers actually using electricity or gas, because many customers who are able to accept service have not returned to their homes or businesses.):

Electric Customers

Gas Customers

Area Served

(In Thousands)

(%)

(In Thousands)

(%)

Entergy Arkansas

Portions of Arkansas

679

26%

Entergy Gulf States

Portions of Texas and

Louisiana

749

29%

92

54%

Entergy Louisiana

Portions of Louisiana

645

25%

Entergy Mississippi

Portions of Mississippi

427

16%

Entergy New Orleans

City of New Orleans*

95

4%

65

46%

Total customers

2,595

100%

157

100%

*

Excludes the Algiers area of the city, where Entergy Louisiana provides electric service.

Electric Energy Sales

The electric energy sales of the Utility operating companies are subject to seasonal fluctuations, with the peak sales period normally occurring during the third quarter of each year. On August 15, Entergy reached a 2006 peak demand of 20,887 MW, compared to the 2005 peak of 21,391 MW recorded on July 25 of that year. Selected electric energy sales data is shown in the table below:

165

Selected 2006 Electric Energy Sales Data

Entergy
Arkansas

Entergy
Gulf States

Entergy
Louisiana

Entergy
Mississippi

Entergy
New Orleans

System
Energy

Entergy
(a)(b)

(In GWh)

Sales to retail
  customers


21,331 


34,467 


27,483 


13,477 


3,759 



96,663 

Sales for resale:

   Affiliates

7,679 

3,259 

2,369 

469 

519 

9,727 

   Others

2,929 

2,896 

101 

431 

779 

10,803 

      Total

31,939 

40,622 

29,953 

14,377 

5,057 

9,727 

107,466 

Average use per
residential customer
(kWh)



13,363 



15,593 



15,269 



15,066 



9,222 





14,575 

(a)

Includes the effect of intercompany eliminations.

(b)

Because of the Entergy New Orleans bankruptcy filing, Entergy deconsolidated Entergy New Orleans; therefore, Entergy New Orleans electric sales are excluded.

The following table illustrates the Utility operating companies' 2006 combined electric sales volume as a percentage of total electric sales volume, and 2006 combined electric revenues as a percentage of total 2006 electric revenue, each by customer class.

Customer Class

 

% of Sales Volume

 

% of Revenue

         

Residential

 

30.9

 

35.2

Commercial

 

24.5

 

25.6

Industrial (a)

 

37.4

 

29.0

Governmental

 

1.5

 

1.7

Wholesale

 

5.7

 

8.5

(a)

Major industrial customers are in the chemical, petroleum refining, and paper industries.

See "Selected Financial Data" for each of the Utility operating companies for the detail of their sales by customer class for 2002-2006.

Selected 2006 Natural Gas Sales Data

Entergy New Orleans and Entergy Gulf States provide both electric power and natural gas to retail customers. Entergy New Orleans and Entergy Gulf States sold 7,696,917 and 6,583,033 Mcf, respectively, of natural gas to retail customers in 2006. In 2006, 98% of Entergy Gulf States' operating revenue was derived from the electric utility business, and only 2% from the natural gas distribution business. For Entergy New Orleans, 82% of operating revenue was derived from the electric utility business and 18% from the natural gas distribution business in 2006. Following is data concerning Entergy New Orleans' 2006 retail operating revenue sources.


Customer Class

 

Electric Operating
Revenue

 

Natural Gas
Revenue

         

Residential

 

28%

 

38%

Commercial

 

44%

 

26%

Industrial

 

12%

 

18%

Governmental/Municipal

 

16%

 

18%

166

Retail Rate Regulation

General (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

The retail regulatory philosophy has shifted in some jurisdictions from traditional, cost-of-service regulation to include performance-based rate elements. Performance-based rate plans are designed to encourage efficiencies and productivity while permitting utilities and their customers to share in the benefits. Entergy Louisiana, Entergy Gulf States in its Louisiana service territory, and Entergy Mississippi operate under performance-based formula rate plans.

Following is a summary of the status of retail open access in the retail service territories.

Jurisdiction

 

Status of Retail Open Access

  

 

 

Arkansas

 

Retail open access was repealed in February 2003.

 

 

 

Texas

 

In December 2005, Entergy Gulf States made a filing identifying three potential power region(s) to be considered for certification and the steps and schedule to achieve certification. The Texas law enacted in 2005 required Entergy Gulf States to also file a transition to competition plan by January 1, 2007 addressing how Entergy Gulf States intends to mitigate market power and achieve full customer choice in the power region identified. Entergy Gulf States made that filing in December 2006 identifying ERCOT as the appropriate power region for Entergy Gulf States to move toward customer choice. The plan contains several conditions, including cost recovery mechanisms, that must be met before Entergy Gulf States could proceed with the plan, and identifies several legislative requirements needed to accomplish the required infrastructure improvements. Assuming that these conditions can be met, retail open access could commence in 2013.

 

 

 

Louisiana

 

The LPSC has deferred pursuing retail open access, pending developments at the federal level and in other states. In response to a study submitted to the LPSC that was funded by a group of large industrial customers, the LPSC solicited comments regarding a limited retail access program. A technical conference was held in April 2005.

 

 

 

Mississippi

 

The MPSC has recommended not pursuing retail open access at this time.

 

 

 

New Orleans

 

The Council has taken no action on Entergy New Orleans' proposal filed in 1997.

Retail Rates

Each Utility operating company participates in retail rate proceedings on a consistent basis. The status of material retail rate proceedings is described in Note 2 to the financial statements. The Utility operating companies' retail rate mechanisms are discussed below.

Entergy Arkansas

Fuel Recovery

Entergy Arkansas' rate schedules include an energy cost recovery rider to recover fuel and purchased energy costs in monthly bills. The rider utilizes prior calendar year energy costs and projected energy sales for the twelve-month period commencing on April 1 of each year to develop an energy cost rate, which is redetermined annually and includes a true-up adjustment reflecting the over-recovery or under-recovery, including carrying

 

167

 

 

 charges, of the energy cost for the prior calendar year. The energy cost recovery rider tariff also allows an interim rate request depending upon the level of over- or under-recovery of fuel and purchased energy costs. See Note 2 to the financial statements for a discussion of Entergy Arkansas' energy cost recovery rider proceedings before the APSC, including discussion of an investigation initiated by the APSC of Entergy Arkansas' energy cost recovery rate, in which the APSC issued a show cause order that, among other things, ordered Entergy Arkansas to file testimony to address the general topic of elimination of the energy cost recovery rider.

Entergy Gulf States

Louisiana Service Territory - Formula Rate Plan

In March 2005, the LPSC approved a settlement that includes the establishment of a three-year formula rate plan (the first year of which was 2005) for Entergy Gulf States that, among other provisions, establishes an ROE mid-point of 10.65% for the initial three-year term of the plan and permits Entergy Gulf States to recover incremental capacity costs outside of a traditional base rate proceeding. Under the formula rate plan, over- and under-earnings outside an allowed range of 9.9% to 11.4% will be allocated 60% to customers and 40% to Entergy Gulf States. In addition, there is the potential to extend the formula rate plan beyond the initial three-year effective period by mutual agreement of the LPSC and Entergy Gulf States. Entergy Gulf States' 2005 and 2006 formula rate plan filings are discussed in Note 2 to the financial statements.

Louisiana Service Territory - Retail Gas Base Rates

Entergy Gulf States' retail gas rates include a rate stabilization plan with an ROE mid-point of 10.5%. Entergy Gulf States' January 2006 and January 2007 gas rate stabilization plans are discussed in Note 2 to the financial statements.

Louisiana Service Territory - Fuel Recovery

Entergy Gulf States' Louisiana electric rates include a fuel adjustment clause designed to recover the cost of fuel and purchased power costs. The fuel adjustment clause contains a surcharge or credit for deferred fuel expense and related carrying charges arising from the monthly reconciliation of actual fuel costs incurred with fuel cost revenues billed to customers.

To help stabilize electricity costs, Entergy Gulf States received approval from the LPSC in 2001 to hedge its exposure to natural gas price volatility through the use of financial instruments. Entergy Gulf States hedges approximately one-third of the projected natural gas volumes used to serve its native electric load for all months of the year. The hedge quantity is reviewed on an annual basis.

Entergy Gulf States' Louisiana gas rates include a purchased gas adjustment clause based on estimated gas costs for the billing month adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel costs incurred with fuel cost revenues billed to customers.

                    Louisiana Service Territory - Storm Cost Recovery

In May 2006, Entergy Gulf States completed the $6 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Effective in September 2006, interim recovery of $0.85 million per month was instituted via the formula rate plan. Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Gulf States' supplemental and amending storm cost recovery application, which was filed in July 2006. This filing seeks, among other things, to recover $200 million in storm-related costs incurred through May 31, 2006, establish an annual revenue requirement based on a ten-year levelized rate, authorize recovery through proposed Storm Cost Recovery Riders, and build an $81 million storm reserve.

On February 28, 2007, Entergy Louisiana and Entergy Gulf States filed rebuttal testimony and filed a supplemental and amending application by which they seek authority from the LPSC to securitize their storm cost recovery and storm reserve amounts. The filing updates actual storm-related costs through January 2007 and estimated future costs, declaring that Entergy Gulf States' costs are $219 million. The filing also updates the

 

168

 

 

 requested storm reserve amounts, requesting $87 million for Entergy Gulf States. Hearings are scheduled for April 2007. Securitization is authorized by a law signed by the Governor of Louisiana in May 2006. The filings are discussed in more detail in Note 2 to the financial statements.

Texas Service Territory - Retail Base Rates

Entergy Gulf States is operating in Texas under a base rate freeze that has remained in effect during the delay in the implementation of retail open access in Entergy Gulf States' Texas service territory. In June 2005, a Texas law was enacted that provides that Entergy Gulf States may not file a general base rate case in Texas before June 30, 2007, but may seek before then recovery of certain incremental purchased power capacity costs and may recover reasonable and necessary transition to competition costs. In July 2005, Entergy Gulf States filed with the PUCT a request for implementation of an incremental purchased capacity rider. An $18 million annual rider was made effective December 1, 2005 but is subject to reconciliation. As authorized by the Texas legislation, in August 2005, Entergy Gulf States filed with the PUCT an application for recovery of its transition to competition costs. As part of a unanimous settlement agreement in principle approved by the PUCT, Entergy Gulf States is recovering $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented rates based on this revenue level on March 1, 2006. Discussion of the recently passed Texas legislation is in Note 2 to the financial statements.

Texas Service Territory - Fuel Recovery

Entergy Gulf States' Texas rate schedules include a fixed fuel factor to recover fuel and purchased power costs, including carrying charges, not recovered in base rates. The fixed fuel factor formula was revised and approved by a PUCT order in August 2006. The new formula was implemented in September 2006. Under the new method, semi-annual revisions of the fixed fuel factor will continue to be made in March and September based on the expected change in the market price of natural gas over the next 12 months. The method also accounts for changes in resource mix and retail sales. Entergy Gulf States will likely continue to use this method until retail open access begins in Texas. To the extent actual costs vary from the fixed fuel factor, refunds or surcharges are required or permitted. The amounts collected under the fixed fuel factor through the start of retail open access are subject to fuel reconciliation proceedings before the PUCT. The PUCT fuel cost reviews that were resolved during the past year or are currently pending are discussed in Note 2 to the financial statements.

Texas Service Territory - Incremental Purchased Capacity Rider

Entergy Gulf States' Texas rate schedules include an incremental purchased capacity recovery rider to recover certain purchased capacity costs that are incremental to the same costs included in base rates, adjusted for load growth. The PUCT's February 2006 order approving the first incremental purchased capacity recovery rider allows for recovery of such costs incurred on and after September 1, 2005. Entergy Gulf States may petition semi-annually (March and September) to revise the rider, and all amounts collected under the rider are subject to reconciliation proceedings before the PUCT. The law authorizing the incremental purchased capacity recovery rider limits annual cost recovery under the rider to an amount equivalent to five percent of annual base rate revenues. The rider expires upon the introduction of retail open access or the implementation of new base rates.

Entergy Louisiana

Formula Rate Plan

In May 2005, the LPSC approved a rate settlement that includes the adoption of a three-year formula rate plan, the terms of which include an ROE mid-point of 10.25% for the initial three-year term of the plan and permit Entergy Louisiana to recover incremental capacity costs outside of a traditional base rate proceeding. Under the formula rate plan, over- and under-earnings outside an allowed regulatory range of 9.45% to 11.05% will be allocated 60% to customers and 40% to Entergy Louisiana. The initial formula rate plan filing was made in May 2006 based on a 2005 test year with rates effective September 2006. In addition, there is the potential to extend the formula rate plan beyond the initial three-year effective period by

 

169

 

 

 mutual agreement of the LPSC and Entergy Louisiana. Entergy Louisiana's 2006 formula rate plan filing is discussed in Note 2 to the financial statements.

Fuel Recovery

Entergy Louisiana's rate schedules include a fuel adjustment clause (FAC) designed to recover the cost of fuel and purchased power costs. The FAC contains a surcharge or credit for deferred fuel expense and related carrying charges arising from the monthly reconciliation of actual fuel costs incurred with fuel cost revenues billed to customers.

In the Delaney vs. Entergy Louisiana proceeding, the LPSC ordered Entergy Louisiana, beginning with the May 2000 FAC filing, to re-price costs flowed through its FAC related to the Evangeline gas contract so that the price included for FAC recovery shall thereafter be at the rate of the Henry Hub first of the month cash market price (as reported by the publication Inside FERC) plus $0.24 per mmBtu for the month for which FAC is calculated, irrespective of the actual cost for the Evangeline contract quantity reflected in that month's FAC.

To help stabilize electricity costs, Entergy Louisiana received approval from the LPSC in 2001 to hedge its exposure to natural gas price volatility through the use of financial instruments. Entergy Louisiana hedges approximately one-third of the projected natural gas volumes used to serve its native electric load for all months of the year. The hedge quantity is reviewed on an annual basis.

In September 2002, Entergy Louisiana settled a proceeding that concerned a contract entered into by Entergy Louisiana to purchase, through 2031, energy generated by a hydroelectric facility known as the Vidalia project. In the settlement, the LPSC approved Entergy Louisiana's proposed treatment of the regulatory effect of the benefit from a tax accounting election related to that project. In general, the settlement permits Entergy Louisiana to keep a portion of the tax benefit in exchange for bearing the risk associated with sustaining the tax treatment. The LPSC settlement divided the term of the Vidalia contract into two segments: 2002-2012 and 2013-2031. During the first eight years of the 2002-2012 segment, Entergy Louisiana agreed to credit rates by flowing through its fuel adjustment calculation $11 million each year, beginning monthly in October 2002. Entergy Louisiana must credit rates in this way and by this amount even if Entergy Louisiana is unable to sustain the tax deduction. Entergy Louisiana also must credit rates by $11 million each year for an additional two years unless either the tax accounting method elected is retroactively repealed or the IRS denies the entire deduction related to the tax accounting method. Entergy Louisiana agreed to credit ratepayers additional amounts unless the tax accounting election is not sustained, if it is challenged. During the years 2013-2031, Entergy Louisiana and its ratepayers would share the remaining benefits of this tax accounting election. Note 8 to the financial statements contains further discussion of the obligations related to the Vidalia project.

Storm Cost Recovery

In April 2006, Entergy Louisiana completed the $14 million interim recovery of storm costs through the FAC pursuant to an LPSC order. Effective in September 2006, interim recovery of $2 million per month was instituted via the formula rate plan. Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Louisiana's supplemental and amending storm cost recovery application, which was filed in July 2006. This filing seeks, among other things, to recover $467 million in storm-related costs incurred through May 31, 2006, establish an annual revenue requirement based on a ten-year levelized rate, authorize recovery through proposed Storm Cost Recovery Riders, and build a $132 million storm reserve.

On February 28, 2007, Entergy Louisiana and Entergy Gulf States filed rebuttal testimony and filed a supplemental and amending application by which they seek authority from the LPSC to securitize their storm cost recovery and storm reserve amounts. The filing updates actual storm-related costs through January 2007 and estimated future costs, declaring that Entergy Louisiana's costs are $561 million. The filing also updates the requested storm reserve amounts, requesting $141 million for Entergy Louisiana. Hearings are scheduled for April 2007. Securitization is authorized by a law signed by the Governor of Louisiana in May 2006. The filings are discussed in more detail in Note 2 to the financial statements.

170

Entergy Mississippi

Performance-Based Formula Rate Plan

Entergy Mississippi is operating under a December 2002 MPSC order whereby Entergy Mississippi files a performance-based formula rate plan annually on or before March 15. The formula rate plan compares the prior year's annual earned rate of return to, and adjusts it against, a benchmark rate of return. The benchmark rate of return is calculated under a separate formula within the formula rate plan. The formula rate plan allows for periodic small prospective adjustments in rates, up to an amount that would produce a change in Entergy Mississippi's overall revenue of almost 2%, based on a comparison of actual earned returns to benchmark returns and upon certain performance factors. Entergy Mississippi's 2006 formula rate plan filing is discussed in Note 2 to the financial statements.

Fuel Recovery

Entergy Mississippi's rate schedules include energy cost recovery riders to recover fuel and purchased energy costs. The rider utilizes projected energy costs filed quarterly by Entergy Mississippi to develop an energy cost rate. The energy cost rate is redetermined each calendar quarter and includes a true-up adjustment reflecting the over-recovery or under-recovery of the energy cost as of the second quarter preceding the redetermination.

                    Power Management Rider

The MPSC approved the purchase of the Attala power plant in November 2005. In December 2005, the MPSC issued an order approving the investment cost recovery through its power management rider and limited the recovery to a period that begins with the closing date of the purchase and ends the earlier of the date costs are incorporated into base rates or December 31, 2006. As a consequence of the events surrounding Entergy Mississippi's ongoing efforts to recover storm restoration costs associated with Hurricane Katrina, in October 2006, the MPSC approved a revision to Entergy Mississippi's power management rider. The revision has the effect of allowing Entergy Mississippi to recover the annual ownership costs of the Attala plant until such time as there has been a resolution of Entergy Mississippi's recovery of its storm restoration costs and a general rate case can be filed.

Storm Cost Recovery

In October 2006, the Mississippi Development Authority approved for payment and Entergy Mississippi received $81 million in CDBG funding for Hurricane Katrina costs. The MPSC then issued a financing order authorizing the issuance of $48 million of state bonds, with $8 million for the remainder of Entergy Mississippi's certified Hurricane Katrina restoration costs and $40 million for the increase in Entergy Mississippi's storm damage reserve.

Entergy New Orleans

Formula Rate Plans

Entergy New Orleans' 2005 formula rate plan included a target equity ratio of 45% as well as a mid-point return on equity of 10.75%. The ROE band-width was 100 basis points from the mid-point for electric operations (allowed earnings range of 9.75% to 11.75%). For gas operations, the ROE band-width was 50 basis points from the mid-point (allowed earnings range of 10.25% to 11.25%).

Entergy New Orleans made its 2006 formula rate plan filings with the City Council in June 2006. The City Council has approved a settlement agreement that allows for phased-in rate increases for electric and gas through 2008. The settlement calls for Entergy New Orleans to file a base rate case by July 31, 2008 and will include storm costs in excess of federal funding and insurance proceeds. The settlement agreement discontinues the formula rate plan and the generation performance-based plan but permits Entergy New Orleans to file an application to seek authority to implement formula rate plan mechanisms no sooner than six months following the effective date of the implementation of the base rates resulting from the July 31,

 

171

 

 

 2008 base rate case. The filings are discussed in more detail in Note 2 to the financial statements.

Storm Cost Recovery

Refer to Note 2 to the financial statements for a discussion of Entergy New Orleans' efforts to recover storm-related costs.

Fuel Recovery

Entergy New Orleans' electric rate schedules include a fuel adjustment tariff designed to reflect no more than targeted fuel and purchased power costs, adjusted by a surcharge or credit for deferred fuel expense arising from the monthly reconciliation of actual fuel and purchased power costs incurred with fuel cost revenues billed to customers, including carrying charges. In June 2006, the City Council authorized the recovery of all Grand Gulf costs through Entergy New Orleans' fuel adjustment clause (a significant portion of Grand Gulf costs was previously recovered through base rates), and continued that authorization in approving the October 2006 formula rate plan filing settlement.

Entergy New Orleans' gas rate schedules include an adjustment to reflect estimated gas costs for the billing month, adjusted by a surcharge or credit similar to that included in the electric fuel adjustment clause, including carrying charges. In October 2005, the City Council approved modification of the current gas cost collection mechanism effective November 2005 in order to address concerns regarding its fluctuations, particularly during the winter heating season. The modifications are intended to minimize fluctuations in gas rates during the winter months.

Franchises

Entergy Arkansas holds exclusive franchises to provide electric service in approximately 307 incorporated cities and towns in Arkansas. These franchises are unlimited in duration and continue unless the municipalities purchase the utility property. In Arkansas, franchises are considered to be contracts and, therefore, are terminable upon breach of the terms of the franchise.

In Louisiana, Entergy Gulf States holds non-exclusive franchises, permits, or certificates of convenience and necessity to provide electric service in approximately 55 incorporated municipalities and the unincorporated areas of approximately 19 parishes, and to provide gas service in the City of Baton Rouge and the unincorporated areas of two parishes. In Texas, Entergy Gulf States holds a certificate of convenience and necessity from the PUCT to provide electric service to areas within approximately 24 counties in eastern Texas, and holds non-exclusive franchises to provide electric service in approximately 65 incorporated municipalities. Entergy Gulf States typically is granted 50-year franchises in Texas. Most of Entergy Gulf States' Louisiana franchises have a term of 60 years. Entergy Gulf States' current electric franchises will expire during 2007 - 2045 in Texas and during 2015 - 2046 in Louisiana.

Entergy Louisiana holds non-exclusive franchises to provide electric service in approximately 116 incorporated Louisiana municipalities. Most of these franchises have 25-year terms. Entergy Louisiana also supplies electric service in approximately 353 unincorporated communities, all of which are located in the 46 Louisiana parishes in which it holds non-exclusive franchises.

Entergy Mississippi has received from the MPSC certificates of public convenience and necessity to provide electric service to areas within 45 counties, including a number of municipalities, in western Mississippi. Under Mississippi statutory law, such certificates are exclusive. Entergy Mississippi may continue to serve in such municipalities upon payment of a statutory franchise fee, regardless of whether an original municipal franchise is still in existence.

Entergy New Orleans provides electric and gas service in the City of New Orleans pursuant to city ordinances (except electric service in Algiers, which is provided by Entergy Louisiana). These ordinances contain a continuing option for the City of New Orleans to purchase Entergy New

 

172

 

 

 Orleans' electric and gas utility properties.

The business of System Energy is limited to wholesale power sales. It has no distribution franchises.

Property and Other Generation Resources

Generating Stations

The total capability of the generating stations owned and leased by the Utility operating companies and System Energy as of December 31, 2006, is indicated below:

Owned and Leased Capability MW(1)

Company

Total

Gas/Oil

Nuclear

Coal

Hydro

Entergy Arkansas

4,497

1,390

1,839

1,198

70

Entergy Gulf States

6,501

4,896

978

627

-

Entergy Louisiana

5,961

4,803

1,158

-

-

Entergy Mississippi

3,229

2,809

-

420

-

Entergy New Orleans

760

760

-

-

-

System Energy

1,139

-

1,139

-

-

Total

22,087

14,658

5,114

2,245

70

(1)

"Owned and Leased Capability" is the dependable load carrying capability as demonstrated under actual operating conditions based on the primary fuel (assuming no curtailments) that each station was designed to utilize.

The Entergy System's load and capacity projections are reviewed periodically to assess the need and timing for additional generating capacity and interconnections. These reviews consider existing and projected demand, the availability and price of power, the location of new loads, and the economy. Summer peak load in the Entergy System service territory is typically around 22,000 MW, with minimum load typically around 9,000 MW. In the 2002 time period, the Entergy System's long-term capacity resources, allowing for an adequate reserve margin, were approximately 3,000 MW less than the total capacity required for peak period demands. In this time period Entergy met its capacity shortages almost entirely through short-term power purchases in the wholesale spot market. In the fall of 2002 to 2003 timeframe the Entergy System began a program to add new resources to its existing generation portfolio. In the fall of 2002, Entergy began a process of issuing requests for proposal (RFP) to procure supply-side resources from sources other than the spot market to meet the unique regional needs of the Utility operating companies.

Entergy considers its System generation needs in three power supply role categories: (1) baseload (e.g. coal, nuclear, or other solid fuel generation); (2) load-following (e.g. combined cycle gas-fired, or CCGT); and (3) peaking. The relative supply and demand for these categories of generation vary by region of the Entergy System. For example, the northern end of the Entergy System has more baseload coal and nuclear generation than regional demand requires, but is short load-following or intermediate generation. In the southern end of the Entergy System, load would be more effectively served if gas-fired intermediate resources already in place were supplemented with additional solid fuel baseload generation.

The first RFP issued in the fall of 2002 sought resources needed to meet the estimated summer 2003 reliability requirements as well as longer-term resources through a broad range of wholesale power products, including short-term (less than one year), limited-term (1 to 3 years), and long-term contractual products and asset acquisitions. A detailed process that was overseen by an independent monitor was developed to evaluate submitted proposals. The following table illustrates the results of the RFP process for short-term, limited-term, and long-term resources acquired since the Fall 2002 RFP. The contracts that were awarded for the resources below were with non-affiliated suppliers, with the exception of the contracts with

 

173

 

 

 EWO Marketing for the sale of 185 MW to 206 MW from the RS Cogen plant and contracts with Entergy Power for the sale of approximately 100 MW from the Independence plant.



RFP

 

Short-term 3rd party

 


Limited-term affiliate

 


Limited-term 3rd party

 


Long-term affiliate

 


Long-term 3rd party

 



Total

                         

Fall 2002

 

0 MW

 

185-206 MW (a)

 

231 MW

 

101-121 MW (b)

 

718 MW

 

1,235-1,276 MW

January 2003
supplemental

 


222 MW

 


 


 


 


 


222 MW

Spring 2003

 

-

 

0 MW

 

381 MW

 

(c)

 

0 MW

 

381 MW

Fall 2003

 

-

 

0 MW

 

390 MW

 

 

 

390 MW

Fall 2004

 

-

 

n/a 

 

1,250 MW

 

 

 

1,250 MW

Total

 

222 MW

 

185-206 MW

 

2,252 MW

 

101-121 MW

 

718 MW

 

3,478 - 3,519 MW

(a)

Includes a conditional option to increase the capacity up to the upper bound of the range.

(b)

The contracted capacity will increase from 101 MW to 121 MW in 2010.

(c)

This table does not reflect (i) the River Bend 30% life-of-unit power purchase agreements totaling approximately 300 MW between Entergy Gulf States and Entergy Louisiana, and between Entergy Gulf States and Entergy New Orleans related to Entergy Gulf States' unregulated portion of the River Bend nuclear station, which portion was formerly owned by Cajun Electric Power Cooperative, Inc. or (ii) the Entergy Arkansas wholesale base load capacity life-of-unit power purchase agreements totaling approximately 220 MW between Entergy Arkansas and Entergy Louisiana and between Entergy Arkansas and Entergy New Orleans related to the sale of a portion of Entergy Arkansas' coal and nuclear base load resources (which were not included in retail rates) to Entergy Louisiana and Entergy New Orleans executed in 2003; or (iii) 12 month agreements between Entergy Arkansas and Entergy Gulf States and between Entergy Arkansas and Entergy Mississippi relating to the sale of a portion of Entergy Arkansas' coal and nuclear base load resources (which were not included in retail rates) to Entergy Gulf States and Entergy Mississippi executed in 2005. These resources were identified outside of the formal RFP process but were submitted as formal proposals in response to the Spring 2003 RFP, which confirmed the economic merits of these resources.

Entergy Louisiana purchased the 718 MW, gas-fired Perryville plant in June 2005 for approximately $162.5 million. Entergy Louisiana owns 100% of the plant and will retain 25% of the output for Entergy Louisiana customers, selling 75% of the output to Entergy Gulf States under Service Schedule MSS-4 of the Entergy System Agreement.

Entergy Mississippi purchased the 480 MW Attala plant in January 2006 for $88 million. Attala is a gas-fired power generating facility located near Kosciusko, Mississippi.

In 2005, Entergy Gulf States entered into a 485 MW contract for capacity and energy from Calpine Energy Services, L.P.'s and Carville Energy Center, LLC's Carville Energy Center. This contract, which has a one-year delivery term beginning in July 2005, was the result of bilateral negotiations conducted at the direction of the LPSC. During 2006 Entergy Gulf States extended the contract with Carville for an additional eleven months with the new contract expiring on May 31, 2007. In 2005 Entergy Louisiana also entered into a 179 MW contract for capacity and energy from Occidental Chemical Corporation's Taft Cogeneration Facility, which was also the result of bilateral negotiations conducted at the direction of the LPSC. This contract has a three-year delivery term that began in July 2005. The Utility operating companies entered into contracts with Exelon in 2006 including a one-year contract beginning in May 2007 to purchase up to 150 MW of unit-contingent capacity and energy and a two-year contract beginning in May 2008 to purchase up to 300 MW of unit-contingent capacity and energy.

In addition to the resources already identified, the Entergy System preferentially allocated to Entergy Gulf States and Entergy Louisiana 800 MW of annual block energy purchases as a part of its Summer 2005 resource plan. All of these transactions reached their contract termination date by June 2005. Block energy products help the Entergy System meet several of the objectives outlined in its planning principles. Block purchases allow the

 

174

 

 

 Utility operating companies to meet their need for baseload resources, while matching resources with demand and helping to provide price stability. In addition, block energy purchases also provide a means by which individual operating companies can move their total production costs closer to the Entergy System average. The Entergy System preferentially allocated a 100 MW annual block transaction to Entergy Gulf States for the calendar year 2006. For the calendar year 2007, the Entergy System has preferentially allocated two transactions totaling 200 MW to Entergy Gulf States, Entergy Louisiana, and Entergy Mississippi.

As part of the ongoing needs assessment and RFP process, Entergy Services issued an RFP for long-term resources in January 2006. Entergy Services sought to acquire a target of up to approximately 1,000 MW of long-term solid fuel resources and a target of up to approximately 1,000 MW of long-term CCGT resources through economically and operationally attractive proposals in the 2006 long-term RFP. It currently is anticipated that the long-term resources will include life-of-unit proposals for existing facilities and projects that may be developed or completed in the future. Entergy Services identified a self-build option to be located at Entergy Louisiana's Little Gypsy facility in this RFP, and Entergy competitive affiliates were also allowed to submit proposals. Based upon the final evaluation of the proposals submitted in response to the 2006 RFP for long-term supply side resources, on January 31, 2007, Entergy Services was authorized as agent for the respective purchasing Utility operating companies to enter into further negotiations with several selected resources as summarized below:

In October 2006, Entergy Services issued an RFP for limited-term capacity resources. This RFP is ongoing, and the selection of proposals currently is anticipated to be completed in February 2007.

On January 31, 2007 Entergy Gulf States announced that it has signed an agreement to purchase the Calcasieu Generating Facility, a 322 MW power plant, from Dynegy Inc., for approximately $57 million. The facility is a simple-cycle gas-fired generating facility located near the city of Sulphur in southwestern Louisiana. Units 1 and 2 of the facility entered commercial service in 2000 and 2001, respectively. The acquisition of a modern, quick-start peaking generation resource such as Calcasieu will help meet Entergy System and regional load following capacity requirements and is expected to provide long-term savings for customers when compared to other alternatives. Entergy Gulf States plans to invest approximately $6 million in facility upgrades at the Calcasieu generating facility with transaction costs estimated at $3 million, bringing the total capital cost of the project to approximately $66 million.

Entergy Louisiana and Entergy New Orleans currently have three long-term contracts to procure electric power from affiliates, which were filed with the FERC for approval, as follows: (a) a life-of-unit purchased power agreement with Entergy Gulf States for approximately 200 MW (Entergy Louisiana) and 100 MW (Entergy New Orleans) of capacity and associated energy from Entergy Gulf States' River Bend nuclear station (RB PPAs); (ii) a life-of-unit purchased power agreement with Entergy Arkansas for 110 MW each of capacity and associated energy from a portion of Entergy Arkansas' wholesale baseload coal and nuclear generating resources (WBL PPAs); and (iii) a life-of-unit purchased power agreement for approximately 50 MW each of capacity and associated energy from Entergy Power's share of the Independence plant (ISES PPAs). The contracts were filed with the FERC, hearings were held to review the justness and reasonableness of the agreements, and the FERC ALJ issued an initial decision generally recommending approval of the PPAs.

In September 2006, the FERC issued an order in the proceeding that: (1) affirmed the ALJ's initial decision that the RB PPAs, WBL PPAs, and ISES PPAs were just, reasonable, and not unduly discriminatory; however, the FERC did limit the term of the ISES PPAs to ten years to coincide with the ten-year analysis used to justify those contracts; (2) determined that the Utility operating companies improperly used information obtained through their 2002 RFP process to price the WBL PPAs, which FERC found to be a violation of Entergy's code of conduct, and ordered Entergy Arkansas' retained share of Grand Gulf be removed from the WBL PPAs, but approved the remaining portion of the WBL PPAs; (3) indicated that Entergy Arkansas' retained share of Grand Gulf could be separately contracted for by Entergy Louisiana and Entergy New Orleans "at the cost-

 

175

 

 

based price of $46 per MWh;" (4) agreed with the ALJ that "the design and implementation of Entergy's RFP process, while not without flaws, worked in this instance;" (5) ordered the Utility operating companies to consider transmission costs "as a price factor" and that future analysis compare the delivered cost of the resource when evaluating RFP bids; and (6) approved the Entergy System's allocation of the PPAs among the Utility operating companies. On October 26, 2006, the Utility operating companies filed with the FERC a request for rehearing/clarification on the issues of the shortening of the term of the ISES PPAs, the finding of a violation of Entergy's code of conduct, and the finding that the cost-based rate for Entergy Arkansas' retained share of the Grand Gulf capacity is $46 per MWh. In November 2006, the FERC granted rehearing for further consideration of the September 2006 order. The rehearing grant allows the FERC additional time for consideration of the matters raised in the request for rehearing.

Interconnections

The Entergy System's generating units are interconnected by a transmission system operating at various voltages up to 500 kV. These generating units consist primarily of steam-electric production facilities and are centrally dispatched and operated. Entergy's Utility operating companies are interconnected with many neighboring utilities. In addition, the Utility operating companies are members of the SERC Reliability Corporation. The primary purpose of SERC is to ensure the reliability and adequacy of the electric bulk power supply in the southeast region of the United States. SERC is a member of the North American Electric Reliability Corporation.

Gas Property

As of December 31, 2006, Entergy New Orleans distributed and transported natural gas for distribution solely within New Orleans, Louisiana, through a total of 33 miles of gas transmission pipeline, 1,498 miles of gas distribution pipeline, and 1,027 miles of gas service pipeline from the distribution mains to the customers. As of December 31, 2006, the gas properties of Entergy Gulf States, which are located in and around Baton Rouge, Louisiana, were not material to Entergy Gulf States' financial position.

Titles

The Entergy System's generating stations are generally located on properties owned in fee simple. Most of the substations and transmission and distribution lines are constructed on private property or public rights-of-way pursuant to easements, servitudes, or appropriate franchises. Some substation properties are owned in fee simple. The Utility operating companies generally have the right of eminent domain, whereby they may perfect title to, or secure easements or servitudes on, private property for their utility operations.

Substantially all of the physical properties and assets owned by Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy are subject to the liens of mortgages securing the mortgage bonds of such company. The Lewis Creek generating station is owned by GSG&T, Inc., a subsidiary of Entergy Gulf States, and is not subject to the lien of the Entergy Gulf States mortgage securing its first mortgage bonds. Lewis Creek is leased to and operated by Entergy Gulf States.

176

Fuel Supply

The sources of generation and average fuel cost per kWh for the Utility operating companies and System Energy for the years 2004-2006 were:

   


Natural Gas

 


Fuel Oil

 


Nuclear

 


Coal

 

Purchased
Power



Year

 

%
of
Gen

 

Cents
Per
kWh

 

%
of
Gen

 

Cents
Per
kWh

 

%
of
Gen

 

Cents
Per
kWh

 

%
of
Gen

 

Cents
Per
kWh

 

%
of
Gen

 

Cents
Per
kWh

                                         

2006

 

15

 

8.52

 

-

 

13.58

 

33

 

.51

 

11

 

1.77

 

41

 

5.50

2005

 

18

 

9.81

 

3

 

7.09

 

33

 

.49

 

12

 

1.57

 

34

 

6.33

2004

 

15

 

7.31

 

4

 

5.02

 

35

 

.49

 

13

 

1.39

 

33

 

4.51

Actual 2006 and projected 2007 sources of generation for the Utility operating companies and System Energy, including certain power purchases from affiliates under life of unit power purchase agreements, are:

 


Natural Gas

 


Fuel Oil

 


Nuclear

 


Coal

 

Purchased
Power

 

2006

 

2007

 

2006

 

2007

 

2006

 

2007

 

2006

 

2007

 

2006

 

2007

                                       

Entergy
Arkansas (a)


-

 


-

 


-

 


-

 


45%

 


49%

 


22%

 


23%

 


33%

 


27%

Entergy
Gulf States


21%

 


22%

 


-

 


-

 


19%

 


16%

 


11%

 


11%

 


49%

 


50%

Entergy
Louisiana


23%

 


20%

 


1%

 


1%

 


36%

 


44%

 


2%

 


2%

 


38%

 


33%

Entergy
Mississippi


24%

 


34%

 


3%

 


1%

 


2%

 


2%

 


18%

 


25%

 


53%

 


38%

Entergy
New Orleans


15%

 


42%

 


-

 


-

 


26%

 


29%

 


9%

 


12%

 


50%

 


18%

System Energy

-

 

-

 

-

 

-

 

100%(b)

 

100%(b)

 

-

 

-

 

-

 

-

                                       

Utility (a)

15%

 

17%

 

-

 

-

 

33%

 

36%

 

11%

 

12%

 

41%

 

34%

(a)

Hydroelectric power provided less than 1% of Entergy Arkansas' generation in 2006 and is expected to provide approximately 1% of its generation in 2007.

(b)

Capacity and energy from System Energy's interest in Grand Gulf was historically allocated as follows: Entergy Arkansas - 36%; Entergy Louisiana - 14%; Entergy Mississippi - 33%; and Entergy New Orleans - 17%. Pursuant to purchased power agreements, some that are the subject of a pending proceeding at the FERC, Entergy Arkansas is selling a portion of its owned capacity and energy from Grand Gulf to Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

Natural Gas

The Utility operating companies have long-term firm and short-term interruptible gas contracts. Long-term firm contracts for power plants comprise less than 20% of the Utility operating companies' total requirements but can be called upon, if necessary, to satisfy a significant percentage of the Utility operating companies' needs. Short-term contracts and spot-market purchases satisfy additional gas requirements. Entergy Gulf States owns a gas storage facility that provides reliable and flexible natural gas service to certain generating stations.

Entergy Louisiana has a long-term natural gas supply contract, which expires in 2012, in which Entergy Louisiana agreed to purchase natural gas in annual amounts equal to approximately one-third of its projected annual fuel requirements for certain generating units. Annual demand charges

 

177

 

 

 associated with this contract are estimated to be $7.2 million. Such charges aggregate $43 million for the years 2007 through 2012.

Many factors, including wellhead deliverability, storage and pipeline capacity, and demand requirements of end users, influence the availability and price of natural gas supplies for power plants. Demand is tied to weather conditions as well as to the prices of other energy sources. Natural gas supplies were significantly disrupted in 2005 due to Hurricanes Katrina and Rita (at one point up to 70% of the normal level of Gulf of Mexico production was unavailable), and disruptions continued into 2006. Nevertheless, Entergy's supplies of natural gas were adequate in 2006, and are expected to be adequate in 2007 as well. Pursuant to federal and state regulations, gas supplies to power plants may be interrupted during periods of shortage. To the extent natural gas supplies are disrupted or natural gas prices significantly increase, the Utility operating companies will use alternate fuels, such as oil, or rely to a larger extent on coal, nuclear generation, and purchased power.

Coal

Entergy Arkansas has a long-term contract for low-sulfur Powder River Basin (PRB) coal which expires in 2011, and is expected to provide for approximately 90% of Independence's expected coal requirements for 2007. Entergy Arkansas has committed to three medium-term (one- to three-year) contracts for approximately 67% of White Bluff's coal supply needs in 2007. These contracts are staggered in term so that not all contracts have to be renewed the same year. In addition to these medium term contracts, Entergy Arkansas has executed a medium-term supply agreement for about 6% of its annual needs for 2007 and 2008. Additional coal requirements for both Independence and White Bluff are satisfied by spot market or over-the-counter purchases and Entergy Arkansas continues to burn alternate fuels including both domestic and foreign coals. Entergy Arkansas has a long-term railroad transportation contract for the delivery of coal to both White Bluff and Independence that expires in 2011.

Entergy Gulf States has a medium term contract for the supply of low-sulfur PRB coal for Nelson Unit 6 which will expire in late 2007 and continues to burn alternate fuels including both domestic and foreign coals. Entergy Gulf States currently has two transportation requirements contracts with railroads to deliver coal to Nelson Unit 6 through 2007.

The operator of Big Cajun 2, Unit 3, Louisiana Generating, LLC, has advised Entergy Gulf States that it has adequate rail car and barge capacity to meet the volumes Entergy Gulf States has requested for 2007. Entergy Gulf States requests deliveries to Big Cajun 2, Unit 3 on an annual basis.

The Entergy Arkansas and Entergy Gulf States coal plants were originally designed for and have typically exclusively burned low-sulfur coal. While both Entergy Arkansas and Entergy Gulf States have adequately arranged for the supply of low-sulfur PRB coal, the railroads servicing these coal plants have not been performing at expected levels due to various issues including but not limited to apparent capacity constraints across their systems. As a result of these ongoing rail delivery issues, Entergy Arkansas and Entergy Gulf States may not receive all of the low-sulfur PRB coal required for maximum plant utilization. Thus, Entergy Arkansas and Entergy Gulf States plan to continue in their efforts to burn alternate fuels in addition to the PRB coal.

Nuclear Fuel

The nuclear fuel cycle consists of the following:

  • mining and milling of uranium ore to produce a concentrate;
  • conversion of the concentrate to uranium hexafluoride gas;
  • enrichment of the hexafluoride gas;
  • fabrication of nuclear fuel assemblies for use in fueling nuclear reactors; and
  • disposal of spent fuel.

System Fuels, a company owned by Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans, is responsible for contracts to acquire nuclear material to be used in fueling Entergy's utility nuclear units, except for River Bend. System Fuels also maintains inventories of such materials during the various stages of processing. The Utility operating companies purchase enriched uranium hexafluoride from System Fuels,

 

178

 

 

 but contract separately for the fabrication of their own nuclear fuel. The requirements for River Bend are met pursuant to contracts made by Entergy Gulf States.

Based upon currently planned fuel cycles, Entergy's nuclear units have a diversified portfolio of contracts and inventory that provides substantially adequate nuclear fuel materials and conversion and enrichment services at reasonably predictable prices over the next several years. Nevertheless, uranium market supply became extremely limited in 2006 and remains so in early 2007, and predictable pricing is not currently available at reasonable cost for new commitments. Market prices for uranium concentrates have risen since December 2000 from about $7 per pound to a December 2006 value of over $70 per pound and upward price pressure has continued into 2007.

The rising nuclear fuel market prices will affect the U.S. nuclear utility industry, including Entergy, first in its cash flow requirements for fuel acquisition, and then some time later in its nuclear fuel expense. For example, for a nuclear fleet the size of Entergy's, the current market value of annual enriched uranium requirements has increased by several hundred million dollars compared to about five years ago. As nuclear fuel installed in the core in power plants is replaced fractionally over an approximate five-year period, nuclear fuel expense will eventually, with a time lag, reflect current market realities and can be expected to increase from the current reported industry levels of about 0.5 cents per kwh to 1.0 cents per kwh or higher. Entergy's nuclear fuel contract portfolio provides substantial price hedging against the full extent of market realities for several years, but the market trends will eventually affect the costs of all nuclear plant operators.

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy each have made arrangements to lease nuclear fuel and related equipment and services. The lessors finance the acquisition and ownership of nuclear fuel through credit agreements and the issuance of notes. These arrangements are subject to periodic renewal. See Note 10 to the financial statements for a discussion of nuclear fuel leases.

Natural Gas Purchased for Resale

Entergy New Orleans has several suppliers of natural gas.  Its system is interconnected with three interstate and three intrastate pipelines.  Entergy New Orleans' primary suppliers currently are Atmos Energy, Enbridge Marketing, and Sequent Energy.  Entergy New Orleans has a "no-notice" service gas purchase contract with Atmos Energy which guarantees Entergy New Orleans gas delivery at specific delivery points and at any volume within the minimum and maximum set forth in the contract amounts.  The Atmos Energy gas supply is transported to Entergy New Orleans pursuant to a transportation service agreement with Gulf South Pipeline Co.  This service is subject to FERC-approved rates.  Entergy New Orleans also makes interruptible spot market purchases.  In recent years, natural gas deliveries to Entergy New Orleans have been subject primarily to weather-related curtailments.  However, Entergy New Orleans experienced no such curtailments in 2006.

As a result of the implementation of FERC-mandated interstate pipeline restructuring in 1993, curtailments of interstate gas supply could occur if Entergy New Orleans' suppliers failed to perform their obligations to deliver gas under their supply agreements.  Gulf South Pipeline Co. could curtail transportation capacity only in the event of pipeline system constraints.  Because of the impact of Hurricanes Katrina and Rita on natural gas supply as well as other factors, Entergy New Orleans may have additional difficulty in sourcing natural gas.

Entergy Gulf States purchases natural gas for resale under a firm contract from Enbridge Marketing (U.S.) Inc. (formerly Mid Louisiana Gas Company).  The contract termination date is September 1, 2008, but the contract will continue annually at the end of the term unless prior notice is given by Entergy Gulf States.

Federal Regulation of the Utility

State or local regulatory authorities, as described above, regulate the retail rates of the Utility operating companies. FERC regulates wholesale rates (including intrasystem sales pursuant to the System Agreement) and interstate transmission of electricity, as well as rates for System Energy's sales of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement.

179

System Agreement (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

The Utility operating companies historically have engaged in the coordinated planning, construction, and operation of generating and bulk transmission facilities under the terms of the System Agreement, which is a rate schedule that has been approved by the FERC. Under the terms of the System Agreement, generating capacity and other power resources are jointly operated by the Utility operating companies. The System Agreement provides, among other things, that parties having generating reserves greater than their load requirements (long companies) shall receive payments from those parties having deficiencies in generating reserves (short companies). Such payments are at amounts sufficient to cover certain of the long companies' costs for intermediate and peaking oil/gas-fired generation, including operating expenses, fixed charges on debt, dividend requirements on preferred equity, and a fair rate of return on common equity investment. Under the System Agreement, these charges are based on costs associated with the long companies' steam electric generating units fueled by oil or gas and having an annual average heat rate above 10,000 Btu/kWh. In addition, for all energy exchanged among the Utility operating companies under the System Agreement, the companies purchasing exchange energy are required to pay the cost of fuel consumed in generating such energy plus a charge to cover other associated costs.

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis.

FERC Investigations

See "FERC Investigations" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis.

Market-based Rate Authority

See "Market-based Rate Authority" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis.

Interconnection Orders

See "Interconnection Orders" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis.

Other Co-Owner and Customer-Initiated Proceedings at FERC

See Note 2 to the financial statements for a discussion of the proceeding commenced at the FERC by Arkansas Electric Cooperative, a co-owner of the Independence and White Bluff coal-fired power plants.

On February 17, 2005, ExxonMobil Chemical Company and ExxonMobil Refining & Supply Company (ExxonMobil) filed a complaint with FERC against Entergy Services and the Utility operating companies. The complaint alleges that the Entergy defendants have violated Entergy's open access transmission tariff, as well as its interconnection and operating agreement with ExxonMobil, by not allowing ExxonMobil to net its station power

 

180

 

 

 needs at its industrial complex in Baton Rouge, Louisiana. ExxonMobil also alleges that the Entergy defendants have been charging rates that are not on file with the FERC and that the Entergy defendants' monthly facilities charge is contrary to the FERC's current interconnection pricing policy. ExxonMobil states that such violations have resulted in monetary losses to it in excess of $5 million. Entergy believes that it has complied with the provisions of its open access transmission tariff and the provisions of the interconnection and operating agreement. On April 18, 2005, the FERC (1) rejected as unfounded ExxonMobil's allegation concerning the netting of its station power needs; and (2) set for hearing the question of whether the facility upgrades and related charges are subject to FERC jurisdiction and, if so, when they became subject to FERC jurisdiction, whether the monthly facility charge violated FERC pricing policy, and whether any refunds are appropriate. The FERC then held the hearing in abeyance in order to provide the parties an opportunity to settle their dispute before hearing procedures commence. Entergy and ExxonMobil have reached a settlement in this proceeding that will include a site-specific retail rate proposal that is subject to LPSC approval. The LPSC approved the site-specific agreement in November 2006. On January 11, 2007, Entergy filed the settlement agreement with the FERC.

System Energy and Related Agreements

System Energy recovers costs related to its interest in Grand Gulf through rates charged to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans for capacity and energy under the Unit Power Sales Agreement (described below). In December 1995, System Energy commenced a rate proceeding at the FERC. In July 2001, the rate proceeding became final, with the FERC approving a prospective 10.94% return on equity. The FERC's decision also affected other aspects of System Energy's charges to the Utility operating companies that it supplies with power. In 1998, the FERC approved requests by Entergy Arkansas and Entergy Mississippi to accelerate a portion of their Grand Gulf purchased power obligations. Entergy Arkansas' and Entergy Mississippi's acceleration of Grand Gulf purchased power obligations ceased effective July 2001 and July 2003, respectively, as approved by FERC.

Unit Power Sales Agreement

The Unit Power Sales Agreement allocates capacity, energy, and the related costs from System Energy's 90% ownership and leasehold interests in Grand Gulf to Entergy Arkansas (36%), Entergy Louisiana (14%), Entergy Mississippi (33%), and Entergy New Orleans (17%). Each of these companies is obligated to make payments to System Energy for its entitlement of capacity and energy on a full cost-of-service basis regardless of the quantity of energy delivered, so long as Grand Gulf remains in commercial operation. Payments under the Unit Power Sales Agreement are System Energy's only source of operating revenue. The financial condition of System Energy depends upon the continued commercial operation of Grand Gulf and the receipt of such payments. Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans generally recover payments made under the Unit Power Sales Agreement through rates charged to their customers.

In the case of Entergy Arkansas and Entergy Louisiana, payments are also recovered through sales of electricity from their respective retained shares of Grand Gulf. Under a settlement agreement entered into with the APSC in 1985 and amended in 1988, Entergy Arkansas retains 22% of its 36% share of Grand Gulf-related costs and recovers the remaining 78% of its share in rates. In the event that Entergy Arkansas is not able to sell its retained share to third parties, it may sell such energy to its retail customers at a price equal to its avoided cost, which is currently less than Entergy Arkansas' cost from its retained share. Entergy Arkansas has life-of-resources purchased power agreements with Entergy Louisiana and Entergy New Orleans that sell a portion of the output of Entergy Arkansas' retained share of Grand Gulf to those companies. In a series of LPSC orders, court decisions, and agreements from late 1985 to mid-1988, Entergy Louisiana was granted rate relief with respect to costs associated with Entergy Louisiana's share of capacity and energy from Grand Gulf, subject to certain terms and conditions. Entergy Louisiana retains and does not recover from retail ratepayers 18% of its 14% share of the costs of Grand Gulf capacity and energy and recovers the remaining 82% of its share in rates. Entergy Louisiana is allowed to recover through the fuel adjustment clause 4.6 cents per kWh for the energy related to its retained portion of these costs. Alternatively, Entergy Louisiana may sell such energy to non-affiliated parties at prices above the fuel adjustment clause recovery amount, subject to the LPSC's approval.

181

Availability Agreement

The Availability Agreement among System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans was entered into in 1974 in connection with the financing by System Energy of Grand Gulf. The Availability Agreement provides that System Energy make available to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans all capacity and energy available from System Energy's share of Grand Gulf.

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans also agreed severally to pay System Energy monthly for the right to receive capacity and energy from Grand Gulf in amounts that (when added to any amounts received by System Energy under the Unit Power Sales Agreement) would at least equal System Energy's total operating expenses for Grand Gulf (including depreciation at a specified rate) and interest charges. The September 1989 write-off of System Energy's investment in Grand Gulf 2, amounting to approximately $900 million, is being amortized for Availability Agreement purposes over 27 years.

The allocation percentages under the Availability Agreement are fixed as follows: Entergy Arkansas - 17.1%; Entergy Louisiana - 26.9%; Entergy Mississippi - 31.3%; and Entergy New Orleans - 24.7%. The allocation percentages under the Availability Agreement would remain in effect and would govern payments made under such agreement in the event of a shortfall of funds available to System Energy from other sources, including payments under the Unit Power Sales Agreement.

System Energy has assigned its rights to payments and advances from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under the Availability Agreement as security for its first mortgage bonds and reimbursement obligations to certain banks providing letters of credit in connection with the equity funding of the sale and leaseback transactions described in Note 9 to the financial statements under "Sale and Leaseback Transactions - Grand Gulf Lease Obligations." In these assignments, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans further agreed that, in the event they were prohibited by governmental action from making payments under the Availability Agreement (for example, if FERC reduced or disallowed such payments as constituting excessive rates), they would then make subordinated advances to System Energy in the same amounts and at the same times as the prohibited payments. System Energy would not be allowed to repay these subordinated advances so long as it remained in default under the related indebtedness or in other similar circumstances.

Each of the assignment agreements relating to the Availability Agreement provides that Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans will make payments directly to System Energy. However, if there is an event of default, those payments must be made directly to the holders of indebtedness that are the beneficiaries of such assignment agreements. The payments must be made pro rata according to the amount of the respective obligations secured.

The obligations of Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans to make payments under the Availability Agreement are subject to the receipt and continued effectiveness of all necessary regulatory approvals. Sales of capacity and energy under the Availability Agreement would require that the Availability Agreement be submitted to FERC for approval with respect to the terms of such sale. No such filing with FERC has been made because sales of capacity and energy from Grand Gulf are being made pursuant to the Unit Power Sales Agreement. If, for any reason, sales of capacity and energy are made in the future pursuant to the Availability Agreement, the jurisdictional portions of the Availability Agreement would be submitted to FERC for approval.

Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement to System Energy have exceeded the amounts payable under the Availability Agreement. Therefore, no payments under the Availability Agreement have ever been required. If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement

 

182

 

 

 payments and their required Availability Agreement payments because their Availability Agreement obligations exceed their Unit Power Sales Agreement obligations.

The Availability Agreement may be terminated, amended, or modified by mutual agreement of the parties thereto, without further consent of any assignees or other creditors.

Capital Funds Agreement

System Energy and Entergy Corporation have entered into the Capital Funds Agreement, whereby Entergy Corporation has agreed to supply System Energy with sufficient capital to (i) maintain System Energy's equity capital at an amount equal to a minimum of 35% of its total capitalization (excluding short-term debt) and (ii) permit the continued commercial operation of Grand Gulf and pay in full all indebtedness for borrowed money of System Energy when due.

Entergy Corporation has entered into various supplements to the Capital Funds Agreement. System Energy has assigned its rights under such supplements as security for its first mortgage bonds and for reimbursement obligations to certain banks providing letters of credit in connection with the equity funding of the sale and leaseback transactions described in Note 9 to the financial statements under "Sale and Leaseback Transactions - Grand Gulf Lease Obligations." Each such supplement provides that permitted indebtedness for borrowed money incurred by System Energy in connection with the financing of Grand Gulf may be secured by System Energy's rights under the Capital Funds Agreement on a pro rata basis (except for the Specific Payments, as defined below). In addition, in the supplements to the Capital Funds Agreement relating to the specific indebtedness being secured, Entergy Corporation has agreed to make cash capital contributions directly to System Energy sufficient to enable System Energy to make payments when due on such indebtedness (Specific Payments). However, if there is an event of default, Entergy Corporation must make those payments directly to the holders of indebtedness benefiting from the supplemental agreements. The payments (other than the Specific Payments) must be made pro rata according to the amount of the respective obligations benefiting from the supplemental agreements.

The Capital Funds Agreement may be terminated, amended, or modified by mutual agreement of the parties thereto, upon obtaining the consent, if required, of those holders of System Energy's indebtedness then outstanding who have received the assignments of the Capital Funds Agreement.

Service Companies

Entergy Services, a corporation wholly-owned by Entergy Corporation, provides management, administrative, accounting, legal, engineering, and other services primarily to the Utility operating companies. Entergy Operations is also wholly-owned by Entergy Corporation and provides nuclear management, operations and maintenance services under contract for ANO, River Bend, Waterford 3, and Grand Gulf, subject to the owner oversight of Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy, respectively. Entergy Services and Entergy Operations provide their services to the Utility operating companies and System Energy on an "at cost" basis, pursuant to cost allocation methodologies for these service agreements that were approved by the FERC.

Entergy Louisiana Corporate Restructuring

Effective December 31, 2005, Entergy Louisiana, LLC, a limited liability company organized under the laws of the State of Texas, as part of a restructuring involving a Texas statutory merger-by-division succeeded to all of the regulated utility operations of Entergy Louisiana, Inc. Entergy Louisiana, LLC was allocated substantially all of the property and other assets of Entergy Louisiana, Inc., including all assets used to provide retail and wholesale electric service to Entergy Louisiana, Inc.'s customers. Entergy Louisiana, LLC also assumed substantially all of the liabilities of Entergy Louisiana, Inc., including all of its debt securities and leases but excluding the outstanding preferred stock of Entergy Louisiana, Inc. 

As the operator of Entergy Louisiana, Inc.'s retail utility operations, Entergy Louisiana, LLC is subject to the jurisdiction of the LPSC over electric service, rates and charges to the same extent that the LPSC possessed jurisdiction over Entergy Louisiana, Inc.'s retail utility operations. The

 

183

 

 

 restructuring is intended to reduce corporate franchise taxes. The restructuring implemented a recommendation from the LPSC staff and is expected to result in a decrease in Entergy Louisiana, LLC's rates to its Louisiana retail customers.

On December 31, 2005, and immediately prior to the formation of Entergy Louisiana, LLC, Entergy Louisiana, Inc. changed its state of incorporation from Louisiana to Texas and its name to Entergy Louisiana Holdings, Inc. Upon the effectiveness of the statutory merger-by-division on December 31, 2005, Entergy Louisiana, LLC was organized and Entergy Louisiana Holdings held all of Entergy Louisiana, LLC's common membership interests. All of the common membership interests of Entergy Louisiana, LLC continue to be held by Entergy Louisiana Holdings and all of the common stock of Entergy Louisiana Holdings continues to be held by Entergy Corporation. As part of the merger-by-division, Entergy Louisiana Holdings succeeded to Entergy Louisiana, Inc.'s rights and obligations with respect to Entergy Louisiana, Inc.'s outstanding preferred stock, which had an aggregate par value of approximately $100 million. In June 2006, Entergy Louisiana Holdings redeemed all of its preferred stock and amended its charter to eliminate authority to issue any future series of preferred stock.

Entergy Louisiana Holdings also holds all of the common membership interests in Entergy Louisiana Properties, LLC, a Texas limited liability company that, as part of the restructuring, was organized and allocated the Entergy Louisiana, Inc. assets not allocated to Entergy Louisiana, LLC. The assets allocated to Entergy Louisiana Properties were two tracts of undeveloped real estate, known as the St. Rosalie and Wilton Plant sites, and Entergy Louisiana, Inc.'s equity ownership interest in and a long-term note receivable from System Fuels, Inc., a company also owned by Entergy Arkansas, Entergy Mississippi, and Entergy New Orleans, which implements and maintains certain programs for the purchase, delivery and storage of fuel supplies for the Utility. Entergy Louisiana Properties also assumed any obligations and liabilities relating to these assets. The book value of the assets allocated to Entergy Louisiana Properties is approximately $33 million.

As result of the merger-by-division and related accounting, the balance sheet of Entergy Louisiana, LLC carried forward the retained earnings of Entergy Louisiana, Inc. at December 31, 2005. The Federal Power Act restricts the ability of a public utility to pay dividends out of capital. As a result of its restructuring and the related accounting, Entergy Louisiana, LLC applied to the FERC for a declaratory order to pay distributions on its common and preferred membership interests from the following sources: (1) the amount of Entergy Louisiana, Inc.'s retained earnings immediately prior to its restructuring on December 31, 2005; (2) an amount in excess of the amount in (1) over a transition period not expected to last more than 3 years so long as Entergy Louisiana, LLC's proprietary capital ratio is, and will remain, above 30%; and (3) the amount of Entergy Louisiana, LLC's retained earnings after the restructuring. The FERC granted the declaratory order on January 23, 2006. Distributions paid by Entergy Louisiana, LLC on its common membership interests to Entergy Louisiana Holdings may, in turn, be paid by Entergy Louisiana Holdings to its common and preferred stockholders without the need for FERC approval. As a wholly-owned subsidiary, Entergy Louisiana Holdings dividends its earnings to Entergy Corporation, as the common stockholder, on a percentage determined monthly.

Entergy Louisiana, LLC does not join in the filing of Entergy's consolidated federal income tax return, although it will be consolidated for financial reporting purposes. Entergy Louisiana, LLC will file a separate federal income tax return, will pay federal income taxes on a stand-alone basis, and will not be a party to the Entergy System's intercompany tax allocation agreement. Entergy Louisiana, LLC may make elections for tax purposes that may differ from those made by the Entergy consolidated tax group, which may result in Entergy Louisiana, LLC having more exposure to tax liability than it would have had, had it been included in the Entergy consolidated tax return. Entergy Louisiana Holdings will continue as a party to the Entergy System's intercompany tax allocation agreement.

After the merger-by-division, Entergy Louisiana, LLC issued $100 million of its preferred membership interests, which grant the holders thereof the power to vote together, as a single class, with Entergy Corporation as the holder of the common membership interests. The preferred membership interests have approximately 23% of the total voting power. Because Entergy Corporation, indirectly through Entergy Louisiana Holdings, owns all of the common membership interests in Entergy Louisiana, LLC, Entergy Corporation will be able to elect the entire board of directors of Entergy Louisiana, LLC, except in certain circumstances when distributions on Entergy Louisiana, LLC's preferred membership interests are in arrears.

184

Earnings Ratios of Registrant Subsidiaries

The Registrant Subsidiaries' ratios of earnings to fixed charges and ratios of earnings to combined fixed charges and preferred dividends or distributions pursuant to Item 503 of SEC Regulation S-K are as follows:

   

Ratios of Earnings to Fixed Charges
Years Ended December 31,

   

2006

 

2005

 

2004

 

2003

 

2002

                     

Entergy Arkansas

 

3.37

 

3.75

 

3.37

 

3.17

 

2.79

Entergy Gulf States

 

3.01

 

3.34

 

3.04

 

1.51

 

2.49

Entergy Louisiana

 

3.23

 

3.50

 

3.60

 

3.93

 

3.14

Entergy Mississippi

 

2.54

 

3.16

 

3.41

 

3.06

 

2.48

Entergy New Orleans

 

1.52

 

1.22

 

3.60

 

1.73

 

(a)

System Energy

 

4.05

 

3.85

 

3.95

 

3.66

 

3.25

   

Ratios of Earnings to Combined Fixed
Charges and Preferred Dividends or Distributions
Years Ended December 31,

   

2006

 

2005

 

2004

 

2003

 

2002

                     

Entergy Arkansas

 

3.06

 

3.34

 

2.98

 

2.79

 

2.53

Entergy Gulf States

 

2.90

 

3.18

 

2.90

 

1.45

 

2.40

Entergy Louisiana

 

2.90

 

-

 

-

 

-

 

-

Entergy Mississippi

 

2.34

 

2.83

 

3.07

 

2.77

 

2.27

Entergy New Orleans

 

1.35

 

1.12

 

3.31

 

1.59

 

(a)

(a)

For Entergy New Orleans, earnings for the twelve months ended December 31, 2002 were not adequate to cover fixed charges and combined fixed charges and preferred dividends by $0.7 million and $3.4 million, respectively.

Non-Utility Nuclear

Entergy's Non-Utility Nuclear business owns and operates five nuclear power plants and is primarily focused on selling electric power produced by those plants to wholesale customers. This business also provides operations and management services to nuclear power plants owned by other utilities in the United States. Operations and management services, including decommissioning services, are provided through Entergy's wholly-owned subsidiary, Entergy Nuclear, Inc.

Property

Generating Stations

Entergy's Non-Utility Nuclear business owns the following nuclear power plants:



Power Plant

 



Acquired

 



Location

 

Annual Average
Capacity

 



Reactor Type

 

License
Expiration
Date

                     

Pilgrim

 

July 1999

 

Plymouth, MA

 

688 MW

 

Boiling Water Reactor

 

2012

FitzPatrick

 

Nov. 2000

 

Oswego, NY

 

838 MW

 

Boiling Water Reactor

 

2014

Indian Point 3

 

Nov. 2000

 

Buchanan, NY

 

1,041 MW

 

Pressurized Water Reactor

 

2015

Indian Point 2

 

Sept. 2001

 

Buchanan, NY

 

1,028 MW

 

Pressurized Water Reactor

 

2013

Vermont Yankee

 

July 2002

 

Vernon, VT

 

605 MW

 

Boiling Water Reactor

 

2012

185

Non-Utility Nuclear added 95 MW of capacity in 2006 through an uprate at Vermont Yankee. Entergy Non-Utility Nuclear filed with the NRC in 2006 for license extensions for Pilgrim, FitzPatrick, and Vermont Yankee, and intends to file with the NRC in 2007 for license extensions for Indian Point 2 and 3.

In July 2006, Entergy's Non-Utility Nuclear business reached an agreement to purchase Consumers Energy Company's 798 MW Palisades nuclear energy plant located near South Haven, Michigan for $380 million. The NRC recently renewed until 2031 the Palisades' operating license. Entergy's Non-Utility Nuclear business will acquire the plant, nuclear fuel, and other assets. Management expects to close the transaction in the second quarter 2007, pending the approvals of the NRC, the FERC, the Michigan Public Service Commission, and other regulatory agencies.

Interconnections

The Pilgrim and Vermont Yankee plants are dispatched as a part of Independent System Operator (ISO) New England and the FitzPatrick and Indian Point plants are dispatched by the New York Independent System Operator (NYISO). The primary purpose of ISO New England is to direct the operations of the major generation and transmission facilities in the New England region and the primary purpose of NYISO is to direct the operations of the major generation and transmission facilities in New York state.

Energy and Capacity Sales

Entergy's Non-Utility Nuclear business has entered into power purchase agreements (PPAs) and other contracts with creditworthy counterparties to sell the energy produced by its power plants at prices established in the PPAs. Entergy continues to pursue opportunities to extend the existing PPAs and to enter into new PPAs with other parties. In addition to selling the power produced by its plants, the Non-Utility Nuclear business sells installed capacity to load-serving distribution companies in order for those companies to meet requirements placed on them by the ISO in their area. See "Commodity Price Risk - Power Generation" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for additional information regarding these PPAs and other contracts.

In addition to the contracts discussed in "Significant Factors and Known Trends," Non-Utility Nuclear's purchase of the Vermont Yankee plant included a value sharing agreement providing for payments to the seller in the event that the plant's operating license is extended beyond its original expiration in 2012. Under the value sharing agreement, to the extent that the average annual price of the energy sales from the plant exceeds the specified strike price of $61/MWh, the Non-Utility Nuclear business will pay 50% of the amount exceeding the strike prices to Vermont Public Service. These payments, if required, will be recorded as adjustments to the purchase price of the plants. The value sharing would begin in 2012 and extend into 2022.

As part of the pending purchase of the Palisades plant, Entergy's Non-Utility Nuclear business executed a 15-year purchased power agreement with Consumers Energy for 100% of the plant's output, excluding any future uprates. Under the purchased power agreement, Consumers Energy will receive the value of any new environmental credits for the first ten years of the agreement. Entergy and Consumers Energy will share on a 50/50 basis the value of any new environmental credits for years 11 through 15 of the agreement. The environmental credits are defined as benefits from a change in law that causes capability of the plant as of the purchase date to become a tradable attribute (e.g., emission credit, renewable energy credit, environmental credit, "green" credit, etc.) or otherwise to have a market value.

Fuel Supply

Nuclear Fuel

The nuclear fuel requirements for Pilgrim, FitzPatrick, Indian Point 2, Indian Point 3, and Vermont Yankee are met pursuant to contracts made by Entergy's Non-Utility Nuclear business. Entergy Nuclear Fuels Company is responsible for contracts to acquire nuclear materials, except for fuel fabrication, for these non-utility nuclear plants. Upon successful closing of the acquisition of the Palisades nuclear plant, Entergy Nuclear Fuels

 

186

 

 

 Company will assume the same responsibility for Palisades.

Based upon currently planned fuel cycles, Entergy's nuclear units have a diversified portfolio of contracts and inventory that provides substantially adequate nuclear fuel materials and conversion and enrichment services at reasonably predictable prices over the next several years. Nevertheless, uranium market supply became extremely limited in 2006 and remains so in early 2007, and predictable pricing is not currently available at reasonable cost for new commitments. Market prices for uranium concentrates have risen since December 2000 from about $7 per pound to a December 2006 value of over $70 per pound and upward price pressure has continued into 2007.

The rising nuclear fuel market prices will affect the U.S. nuclear utility industry, including Entergy, first in its cash flow requirements for fuel acquisition, and then some time later in its nuclear fuel expense. For example, for a nuclear fleet the size of Entergy's, the current market value of annual enriched uranium requirements has increased by several hundred million dollars compared to about five years ago. As nuclear fuel installed in the core in power plants is replaced fractionally over an approximate five-year period, nuclear fuel expense will eventually, with a time lag, reflect current market realities and can be expected to increase from the current reported industry levels of about 0.5 cents per kwh to 1.0 cents per kwh or higher. Entergy's nuclear fuel contract portfolio provides substantial price hedging against the full extent of market realities for several years, but the market trends will eventually affect the costs of all nuclear plant operators.

Other Business Activities

Entergy Nuclear Power Marketing, LLC (ENPM) was formed in April 2006 to centralize the power marketing function for Non-Utility Nuclear. Commensurate with its formation, ENPM entered into long-term power purchase agreements with the Non-Utility Nuclear subsidiaries that own that business's power plants (generating subsidiaries). As part of a series of agreements, ENPM agreed to assume and/or otherwise service the existing power purchase agreements that were in effect between the generating subsidiaries and their customers. ENPM functions include origination of new energy and capacity transactions, generation scheduling, contract management (including billing and settlements), and market and credit risk mitigation.

Entergy Nuclear, Inc. pursues service agreements with other nuclear power plant owners who seek the advantages of Entergy's scale and expertise but do not necessarily want to sell their assets. Services provided by either Entergy Nuclear, Inc. or other Non-Utility Nuclear subsidiaries include engineering, operations and maintenance, fuel procurement, management and supervision, technical support and training, administrative support, and other managerial or technical services required to operate, maintain, and decommission nuclear electric power facilities. Entergy Nuclear, Inc. provided decommissioning services for the Maine Yankee nuclear power plant and continues to pursue opportunities for Non-Utility Nuclear with other nuclear plant owners through operating agreements or innovative arrangements such as structured leases.

In September 2003, Entergy's Non-Utility Nuclear business agreed to provide administrative support services for the 800 MW Cooper Nuclear Station located near Brownville, Nebraska. The contract is for 10 years, the remaining term of the plant's operating license. Entergy will receive $14 million in 2007 and in each of the remaining years of the contract. Entergy can also receive up to $6 million more per year beginning in 2007 if safety and regulatory goals are met. In addition, Entergy will be reimbursed for all employee-related expenses. In 2006, Entergy Nuclear, Inc. signed an agreement to provide license renewal services for the Cooper Nuclear Station.

Entergy Nuclear, Inc. also is a party to two business arrangements that assist it in providing operation and management services. Entergy Nuclear, Inc., in partnership with Areva (f/k/a Framatome ANP), offers operating license renewal and life extension services to nuclear power plants in the United States. Entergy Nuclear Inc., through its subsidiary, TLG Services, offers decommissioning, engineering, and related services to nuclear power plant owners.

187

Energy Commodity Services

Energy Commodity Services includes Entergy-Koch, LP and Entergy's non-nuclear wholesale assets business. The non-nuclear wholesale assets business sells to wholesale customers the electric power produced by power plants that it owns while it focuses on improving performance and exploring sales or restructuring opportunities for its power plants. Such opportunities are evaluated consistent with Entergy's market-based point-of-view. The non-nuclear wholesale assets business terminated new greenfield power development activity in 2002. Prior to 2005, Entergy-Koch, LP engaged in two major businesses: energy commodity marketing and trading through Entergy-Koch Trading, and gas transportation and storage through Gulf South Pipeline. Entergy-Koch sold both of these businesses in the fourth quarter of 2004, and Entergy-Koch is no longer an operating entity.

Non-Nuclear Wholesale Assets Business

Property

Generating Stations

The capacity of the generating stations owned in Entergy's non-nuclear wholesale assets business as of December 31, 2006 is indicated below:


Plant

 


Location

 


Ownership

 

Net Owned
Capacity(1)

 


Type

                 

Ritchie Unit 2, 544 MW

 

Helena, AR

 

100%

 

544 MW

 

Gas/Oil

Independence Unit 2, 842 MW

 

Newark, AR

 

14%

 

121 MW(2)

 

Coal

Warren Power, 300 MW

 

Vicksburg, MS

 

75%

 

225 MW(2)

 

Gas Turbine

Top of Iowa, 80 MW (3)

 

Worth County, IA

 

50%

 

40 MW

 

Wind

White Deer, 80 MW (3)

 

Amarillo, TX

 

50%

 

40 MW

 

Wind

RS Cogen, 425 MW (3)

 

Lake Charles, LA

 

50%

 

213 MW

 

Gas/Steam

Harrison County, 550 MW

 

Marshall, TX

 

61%

 

335 MW(2)

 

Combined Cycle Gas Turbine

(1)

"Net Owned Capacity" refers to the nameplate rating on the generating unit.

(2)

The owned MW capacity is the portion of the plant capacity owned by Entergy's non-nuclear wholesale assets business. For a complete listing of Entergy's jointly-owned generating stations, refer to "Jointly-Owned Generating Stations" in Note 1 to the financial statements.

(3)

Indirectly owned through interests in unconsolidated joint ventures.

In addition to these generating stations, Entergy's non-nuclear wholesale assets business has a contract to take 60 MW of the power from a portion of the Nelson 6 coal plant owned by a third party.

Entergy-Koch, LP

Entergy-Koch is a limited partnership owned 50% each by Entergy and Koch Industries, Inc, through subsidiaries. Entergy-Koch began operations on February 1, 2001. Entergy contributed most of the assets and trading contracts of its power marketing and trading business and $414 million cash to the venture and Koch contributed its approximately 8,000-mile Koch Gateway Pipeline (renamed Gulf South Pipeline), gas storage facilities, and Koch Energy Trading, which marketed and traded electricity, gas, weather derivatives, and other energy-related commodities and services. As specified in the partnership agreement, Entergy contributed an additional $72.7 million to the partnership in January 2004.

In the fourth quarter of 2004, Entergy-Koch sold its energy trading and pipeline businesses to third parties. The sales came after a review of strategic alternatives for enhancing the value of Entergy-Koch, LP. Entergy received $862 million of cash distributions in 2004 from Entergy-Koch after the business sales. Due to the November 2006 expiration of contingencies on the sale of Entergy-Koch's trading business, and the corresponding release

 

188

 

 

 to Entergy-Koch of sales proceeds held in escrow, Entergy received additional cash distributions of approximately $163 million during the fourth quarter of 2006 and recorded a gain of approximately $55 million (net-of-tax). Entergy expects future cash distributions upon liquidation of the partnership will be less than $35 million.

Regulation of Entergy's Business

PUHCA 2005

As part of the Energy Policy Act of 2005, PUHCA 2005 repealed PUHCA 1935. See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Federal Power Act

The Federal Power Act regulates:

The Federal Power Act gives FERC jurisdiction over the rates charged by System Energy for Grand Gulf capacity and energy provided to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans and over some of the rates charged by Entergy Arkansas and Entergy Gulf States. FERC also regulates the rates charged for intrasystem sales pursuant to the System Agreement and the provision of transmission service to wholesale market participants.

Entergy Arkansas holds a FERC license that expires in 2053 for two hydroelectric projects totaling 70 MW of capacity.

State Regulation

Entergy Arkansas is subject to regulation by the APSC, which includes the authority to:

  • oversee utility service;
  • set retail rates;
  • determine reasonable and adequate service;
  • require proper accounting;
  • control leasing;
  • control the acquisition or sale of any public utility plant or property constituting an operating unit or system;
  • set rates of depreciation;
  • issue certificates of convenience and necessity and certificates of environmental compatibility and public need; and
  • regulate the issuance and sale of certain securities.

To the extent authorized by governing legislation, Entergy Gulf States is subject to the original jurisdiction of the municipal authorities of a number of incorporated cities in Texas with appellate jurisdiction over such matters residing in the PUCT. Entergy Gulf States' Texas business is also subject to regulation by the PUCT as to:

189

Entergy Gulf States' Louisiana electric and gas business and Entergy Louisiana are subject to regulation by the LPSC as to:

Entergy Louisiana is also subject to the jurisdiction of the City Council with respect to such matters within Algiers in Orleans Parish.

Entergy Mississippi is subject to regulation by the MPSC as to the following:

Entergy Mississippi is also subject to regulation by the APSC as to the certificate of environmental compatibility and public need for the Independence Station, which is located in Arkansas.

Entergy New Orleans is subject to regulation by the City Council as to the following:

Regulation of the Nuclear Power Industry

Atomic Energy Act of 1954 and Energy Reorganization Act of 1974

Under the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, the operation of nuclear plants is heavily regulated by the NRC, which has broad power to impose licensing and safety-related requirements. The NRC has broad authority to impose fines or shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy, as owners of all or portions of ANO, River Bend, Waterford 3, and Grand Gulf, respectively, and Entergy Operations, as the licensee and operator of these units, are subject to the jurisdiction of the NRC. Entergy's Non-Utility Nuclear business is subject to the NRC's jurisdiction as the owner and operator of Pilgrim, Indian Point Energy Center, FitzPatrick, and Vermont Yankee. Substantial capital expenditures at Entergy's nuclear plants because of revised safety requirements of the NRC could be required in the future.

Nuclear Waste Policy Act of 1982

Under the Nuclear Waste Policy Act of 1982, the DOE is required, for a specified fee, to construct storage facilities for, and to dispose of, all spent nuclear fuel and other high-level radioactive waste generated by domestic nuclear power reactors. Entergy's nuclear owner/licensee subsidiaries provide for the estimated future disposal costs of spent nuclear fuel in accordance with the Nuclear Waste Policy Act of 1982. The affected Entergy

 

190

 

 

 companies entered into contracts with the DOE, whereby the DOE will furnish disposal service at a cost of one mill per net kWh generated and sold after April 7, 1983, plus a one-time fee for generation prior to that date. Entergy Arkansas is the only one of the Utility operating companies that generated electric power with nuclear fuel prior to that date and has a recorded liability as of December 31, 2006 of $168.7 million for the one-time fee. Entergy's Non-Utility Nuclear business has accepted assignment of the Pilgrim, FitzPatrick, Indian Point 3, Indian Point 2, and Vermont Yankee spent fuel disposal contracts with the DOE held by their previous owners. Upon successful closing of the acquisition of the Palisades nuclear plant, the Palisades/Big Rock Point spent fuel disposal contract will be similarly assigned. The previous owners have paid or retained liability for the fees for all generation prior to the purchase dates of those plants. The fees payable to the DOE may be adjusted in the future to assure full recovery. Entergy considers all costs incurred for the disposal of spent nuclear fuel, except accrued interest, to be proper components of nuclear fuel expense. Provisions to recover such costs have been or will be made in applications to regulatory authorities for the Utility plants. Entergy's total spent fuel fees to date, including the one-time fee liability of Entergy Arkansas, have surpassed $1 billion dollars.

The permanent spent fuel repository in the U.S. has been legislated to be Yucca Mountain, Nevada. The DOE is required by law to proceed with the licensing and, after the license is achieved (granted by the NRC), the repository construction and commencement of receipt of spent fuel. Since DOE has not accomplished these objectives, it is in non-compliance with the Nuclear Waste Policy Act of 1982 and has breached its spent fuel disposal contracts. DOE recently has had additional delays. Large uncertainty remains regarding the time frame under which the DOE will begin to accept spent fuel from Entergy's facilities for storage or disposal. As a result, continuing future expenditures will be required to increase spent fuel storage capacity at Entergy's nuclear sites.

As a result of the DOE's failure to begin disposal of spent nuclear fuel in 1998 pursuant to the Nuclear Waste Policy Act of 1982 and the spent fuel disposal contracts, Entergy's nuclear owner/licensee subsidiaries have incurred and will continue to incur damages.  These subsidiaries in November 2003 began litigation to recover the damages caused by the DOE's delay in performance.  Management cannot predict the timing or amount of any potential recovery.

Pending DOE acceptance and disposal of spent nuclear fuel, the owners of nuclear plants are providing their own spent fuel storage.  Storage capability additions using dry casks began operations at ANO in 1996, at FitzPatrick in 2002, at River Bend in 2005, and at Grand Gulf in 2006. These facilities will be expanded as needed. Construction is in progress on dry cask facilities at Indian Point and Vermont Yankee and it is planned that casks will be loaded at those sites in 2007. Current on-site spent fuel storage capacity at Pilgrim and Waterford is estimated to be sufficient until approximately 2012; dry cask storage facilities are planned to be placed into service at these units around 2011.

Nuclear Plant Decommissioning

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy recover from customers through electric rates the estimated decommissioning costs for ANO, the portion of River Bend subject to retail rate regulation, Waterford 3, and Grand Gulf, respectively. These amounts are deposited in trust funds that can only be used for future decommissioning costs. Entergy periodically reviews and updates estimated decommissioning costs to reflect inflation and changes in regulatory requirements and technology, and then makes applications to the regulatory authorities to reflect, in rates, the changes in projected decommissioning costs.

In June 2001, Entergy Arkansas received notification from the NRC of approval for a renewed operating license authorizing operations at ANO 1 through May 2034. In July 2005, Entergy Arkansas received notification from the NRC of approval for a renewed operating license authorizing operations at ANO 2 through July 2038. The APSC ordered Entergy Arkansas to use a 20-year life extension assumption for ANO 1 and 2, which resulted in the cessation of the collection of funds to decommission ANO 1 and 2 beginning in 2001. Entergy Arkansas' projections show that with the assumption of 20 years of extended operational life for both units, the current fund balance with earnings over the extended life will be sufficient to decommission both units. Every five years, Entergy Arkansas is required by the APSC to update the estimated costs to decommission ANO. In March 2003, Entergy Arkansas filed with the APSC its third five-year estimate of ANO decommissioning costs. The updated estimate indicated the

 

191

 

 

 current cost to decommission the two ANO units would be $936 million compared to $813 million in the 1997 estimate. In September 2003, the APSC approved a stipulation between the APSC Staff and Entergy Arkansas resolving issues in the decommissioning cost estimate proceeding. Entergy Arkansas and the APSC Staff agreed to exclude, at this time, certain spent fuel management costs because of uncertainty associated with the responsibility of the DOE for all or a portion of those costs as a result of Entergy Arkansas' contract with the DOE to start taking spent fuel from ANO beginning in 1998. Entergy Arkansas reserves the right to seek a decision from the APSC on this issue prior to the next required decommissioning cost filing should significant changes in relevant facts and circumstances warrant.

In December 2002, the LPSC approved a settlement between Entergy Gulf States and the LPSC staff. The settlement included, among other things, the approval to cease collection of funds to decommission River Bend based on an assumed license extension for River Bend.

As part of the Pilgrim, Indian Point 1 and 2, and Vermont Yankee purchases, Boston Edison, Consolidated Edison, and VYNPC, respectively, transferred decommissioning trust funds, along with the liability to decommission the plants, to Entergy. Entergy believes that the decommissioning trust funds will be adequate to cover future decommissioning costs for these plants without any additional deposits to the trusts.

For the Indian Point 3 and FitzPatrick plants purchased in 2000, NYPA retained the decommissioning trusts and the decommissioning liability. NYPA and Entergy executed decommissioning agreements, which specify their decommissioning obligations. NYPA has the right to require Entergy to assume the decommissioning liability provided that it assigns the corresponding decommissioning trust, up to a specified level, to Entergy. If the decommissioning liability is retained by NYPA, Entergy will perform the decommissioning of the plants at a price equal to the lesser of a pre-specified level or the amount in the decommissioning trusts. Entergy believes that the amounts available to it under either scenario are sufficient to cover the future decommissioning costs without any additional contributions to the trusts. In conjunction with the Pilgrim acquisition, Entergy received Pilgrim's decommissioning trust fund. Entergy believes that Pilgrim's decommissioning fund will be adequate to cover future decommissioning costs for the plant without any additional deposits to the trust. As part of the Indian Point 1 and 2 purchase, Consolidated Edison transferred the decommissioning trust fund and the liability to decommission Indian Point 1 and 2 to Entergy. Entergy also funded an additional $25 million to the decommissioning trust fund and believes that the trust will be adequate to cover future decommissioning costs for Indian Point 1 and 2 without any additional deposits to the trust.

Additional information with respect to decommissioning costs for ANO, River Bend, Waterford 3, Grand Gulf, Pilgrim, Indian Point 1, Indian Point 2, Indian Point 3, and FitzPatrick is found in Note 9 to the financial statements.

Energy Policy Act of 1992

The Energy Policy Act of 1992 requires all electric utilities (including Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and System Energy) that purchased uranium enrichment services from the DOE to contribute up to a total of $150 million annually over approximately 15 years (adjusted for inflation, up to a total of $2.25 billion) for decontamination and decommissioning of enrichment facilities. At December 31, 2006, all payments for these assessments are complete. In accordance with the Energy Policy Act of 1992, contributions to decontamination and decommissioning funds are recovered through rates in the same manner as other fuel costs. Entergy will oppose any attempts to extend the assessments past this date, but cannot state with certainty that an extension will not be made.

Price-Anderson Act

The Price-Anderson Act limits public liability for a single nuclear incident to approximately $100.6 million per reactor (with currently 104 nuclear industry reactors participating). Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, System Energy, and Entergy's Non-Utility Nuclear business have protection with respect to this liability through a combination of private insurance and an industry assessment program, as well as insurance for property damage, costs of replacement power, and other risks relating to nuclear generating units. Insurance applicable to the nuclear

 

192

 

 

 programs of Entergy is discussed in Note 8 to the financial statements.

Environmental Regulation

Entergy's facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that its affected companies are in substantial compliance with environmental regulations currently applicable to their facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

Clean Air Act and Subsequent Amendments

The Clean Air Act and its subsequent Amendments (the Clean Air Act) established several programs that currently or in the future may affect Entergy's fossil-fueled generation facilities. Individual states also operate similar independent state programs or delegated federal programs that may include requirements more stringent than federal regulatory requirements. These programs include:

  • New source review and preconstruction permits for new sources of criteria air pollutants and significant modifications to existing facilities;
  • Acid rain program for control of sulfur dioxide (SO2) and nitrogen oxides (NOx);
  • Non-attainment area programs for control of ozone, NOx, volatile organic compounds, and particulate matter;
  • Hazardous air pollutant emissions reduction program;
  • Interstate Air Transport;
  • Operating permits program for administration and enforcement of these and other Clean Air Act programs; and
  • Regional Haze and Best Available Retrofit Technology programs.

New Source Review (NSR)

Preconstruction permits are required for new facilities and for existing facilities that undergo a modification that is not classified as routine repair, maintenance, or replacement. Units that undergo a non-routine modification must obtain a permit modification and may be required to install additional air pollution control technologies. Entergy has an established process for identifying modifications requiring additional permitting approval and has followed the regulations and associated guidance provided by the states and the federal government with regard to the determination of routine repair, maintenance, and replacement. In recent years, however, the EPA has begun an enforcement initiative, aimed primarily at coal plants, to identify modifications that it does not consider routine and that have failed to obtain a permit modification. Entergy to date has not been included in any of these enforcement actions. Nevertheless, various courts and the EPA have been inconsistent in their judgments regarding what modifications are considered routine. Currently, the U.S. Supreme Court has agreed to hear one of the NSR enforcement cases. A ruling is expected in 2007.

Acid Rain Program

The Clean Air Act provides SO2 allowances to most of the affected Entergy generating units for emissions based upon past emission levels and operating characteristics. Each allowance is an entitlement to emit one ton of SO2 per year. Plant owners are required to possess allowances for SO2 emissions from affected generating units. Virtually all Entergy fossil-fueled generating units are subject to SO2 allowance requirements. Entergy could be required to purchase additional allowances when it generates power using fuel oil. Fuel oil usage is determined by economic dispatch and influenced by the price of natural gas, incremental emission allowance costs, and the availability and cost of purchased power.

193

Ozone Non-attainment

Entergy Gulf States and Entergy Louisiana each operate fossil-fueled generating units in geographic areas that are not in attainment of the currently-enforced national ambient air quality standards for ozone. Texas non-attainment areas that impact Entergy are the Houston-Galveston and the Beaumont-Port Arthur areas. In Louisiana, Entergy is affected by the non-attainment status of the Baton Rouge area. Areas in non-attainment are classified as "marginal", "moderate," "serious," or "severe." When an area fails to meet the ambient air standard, the EPA requires state regulatory authorities to prepare state implementation plans meant to cause progress toward bringing the area into attainment with applicable standards.

In April 2004, the EPA issued a final rule, effective June 2005, revoking the 1-hour ozone standard, including designations and classifications. In a separate action over the same period, the EPA enacted 8-hour ozone non-attainment classifications and stated that areas designated as non-attainment under a new 8-hour ozone standard shall have one year to adjust to the new requirements with submittal of a new attainment plan. For Louisiana, the Baton Rouge area is now classified as a ''marginal" (rather than "severe") non-attainment area under the new standard with an attainment date of June 15, 2007. For Texas, the Beaumont-Port Arthur area is now classified as a "marginal" (rather than "serious") non-attainment area under the new standard with an attainment date of June 15, 2007 and the Houston-Galveston area is now classified as "moderate" non-attainment under the new standard with an attainment date of June 15, 2010. In December 2006, the EPA's revocation of the 1-hour ozone standard was rejected by the courts. As a result, numerous requirements can return for areas that fail to meet 1-hour ozone levels by dates set by the law. These requirements include the potential to increase fees significantly for plants operating in these areas. In addition, it is possible that new emission controls may be required. Specific costs of compliance cannot be estimated at this time, but Entergy is monitoring development of the respective state implementation plans and will develop specific compliance strategies as the plans move through the adoption process.

Hazardous Air Pollutants

In March 2005, the EPA issued a federal rule to permanently cap and reduce mercury emissions from coal-fired power plants. The Clean Air Mercury Rule establishes "standards of performance" limiting mercury emissions from new and existing coal-fired power plants and creates a market-based cap-and-trade program that will reduce nationwide utility emissions of mercury in two distinct phases. The first phase cap is 38 tons beginning in 2010. The rule has been challenged in the U.S. Court of Appeals for the District of Columbia Circuit; however, unless the rule is stayed, compliance deadlines remain in effect. The regulatory approach chosen by the EPA to regulate mercury emissions is quite controversial, and Entergy is monitoring developments and working towards a reasonable, cost-effective, technologically sound regulation.

Entergy owns units that will be subject to the mercury regulations and is studying compliance options in order to determine the best control alternative. Entergy expects that any necessary capital expenditures will occur through 2009 and are currently estimated to be approximately $26 million, including $16 million for Entergy Arkansas, $5 million for Entergy Gulf States (not including potential costs for the co-owned Big Cajun plant), and $5 million for Entergy Mississippi. Ongoing operating costs will begin in 2010. Formal engineering and implementation will take place beginning in 2007 and cost estimates will be revised to reflect progress. Entergy does not anticipate purchasing emission credits unless further evaluation of the future market cost of credits falls below the current pollution control cost estimates for Entergy's coal fleet.

Interstate Air Transport

In March 2005, the EPA finalized the Clean Air Interstate Rule (CAIR), which will reduce SO2 and NOx emissions from electric generation plants in order to improve air quality in 29 eastern states. The rule will require a combination of investment of capital to install pollution control equipment and increased operating costs. Entergy's capital investment and annual operation and maintenance allowance purchase costs will depend on the economic assessment of NOx and SO2 allowance markets, the cost of control technologies, and unit usage. Entergy is beginning implementation in 2007, including installation of controls at several facilities and the development of a credit procurement strategy. Entergy is currently budgeting $58.4 million for implementation, including $4.3 million for Entergy Arkansas, $1.4 million for Entergy Gulf States, $23.7 million for Entergy Louisiana, $13.7 million for Entergy Mississippi, and $15.3 million for Entergy New Orleans. These project estimates are preliminary and expected to change during

 

194

 

 

 2007 as testing and engineering analysis is completed. As a result of this work, projects are likely to be moved among companies to address variables in cost of controls, projected capacity factors, and ultimately the final allocation of credits by the respective states to each effected facility. These projects will not reduce emissions to the level that Entergy has been allocated by the respective states. Therefore, in addition to the controls installed under the capital projects described above, Entergy estimates that it will also have to purchase approximately $14.7 million in emission credits each year to operate the fleet, including $0.7 million for Entergy Arkansas, $6.3 million for Entergy Louisiana, $5.5 million for Entergy Mississippi, and $2.2 million for Entergy New Orleans. The value of credits purchased will vary depending on annual swings in the market price of credits and the specific pollution control projects completed in each jurisdiction.

The capital financial effect could be offset by emission markets which allow for purchases or use of allocated credits; however, the allocation of the emission allowances and the set up of the market will determine the ultimate cost to Entergy. Entergy believes that the allocation is unfairly skewed towards states with relatively higher emissions by the use of a fuel-adjustment factor. Accordingly, Entergy filed a request for reconsideration of the allocation. The EPA granted this request but refused to alter the fuel-adjustment factor. Entergy also has filed a challenge to this aspect of the rule in the D.C. Circuit. Entergy will continue to study the final rule's impact to its generation fleet and will work to ensure that all states are treated fairly in the allocation of emission credits.

Regional Haze

In June 2005, the EPA issued the final Best Available Retrofit Control Technology (BART) regulations, which could potentially result in a requirement to install SO2 pollution control technology on certain of Entergy's coal and oil generation units. The rule leaves certain BART determinations to the states. The Arkansas Department of Environmental Quality has contacted Entergy Arkansas and indicated that White Bluff affects Class I Area visibility and will be subject to the EPA's presumptive BART requirements by 2013. This will require Entergy Arkansas to install scrubbers and low NOx burners on Units 1 and 2 at a total cost of approximately $280 million. Entergy Arkansas owns 57% of White Bluff Units 1 and 2. The installation of scrubbers at an existing facility is a major construction project, and Entergy Arkansas expects to select the primary architect-engineer by the end of 2008 and expects the scrubbers to be online by the end of 2012.

Future Legislative and Regulatory Developments

In addition to the specific instances described above, there are a number of legislative and regulatory initiatives relating to the reduction of emissions that are under consideration at the federal, state, and international level. Because of the nature of Entergy's business, the adoption of each of these could affect its operations. These initiatives include:

  • designation by the EPA and state environmental agencies of areas that are not in attainment with national ambient air quality standards;
  • introduction of several bills in Congress proposing further limits on NOx, SO2, mercury, or limits on carbon dioxide (CO2) emissions;
  • pursuit by the Bush administration of a voluntary program intended to reduce CO2 emissions and efforts in the Congress to establish a mandatory federal CO2 emission control structure;
  • passage of the Regional Greenhouse Gas Initiative by seven states in the northeast U.S.;
  • efforts by certain external groups to encourage reporting and disclosure of CO2 emissions and risk. Entergy, as one of the 500 largest electric generators, has prepared responses for the Carbon Disclosure Project's (CDP) annual questionnaire and has given permission for those responses to be posted to CDP's website; and
  • litigation filed by states and environmental advocacy groups in the United States Court of Appeals for the Second Circuit (now under review by the U.S. Supreme Court) and for the D.C. Circuit asking the courts to require the EPA to promulgate regulations under existing provisions of the Clean Air Act to control the emissions of CO2 from power plants and from mobile sources such as cars and trucks. Entergy is participating as a friend of the court in both of these cases in support of reasonable market-based regulation of CO2 as a pollutant under the Clean Air Act.

Entergy continues to monitor these actions in order to analyze their potential operational and cost implications.

195

In anticipation of the potential imposition of CO2 emission limits on the electric industry in the future, Entergy has initiated actions designed to reduce its exposure to potential new governmental requirements related to CO2 emissions. These actions included establishment of a formal program to stabilize power plant CO2 emissions at 2000 levels through 2005, and Entergy succeeded in actually reducing emissions below 2000 levels. Entergy has now established a formal program to stabilize power plant CO2 emissions at 20% below 2000 levels through 2010 and continues to support national legislation that would increase planning certainty for electric utilities while addressing emissions in a responsible and flexible manner. By virtue of its proportionally large investment in low- or non-emitting gas-fired and nuclear generation technologies, Entergy's overall CO2 emission "intensity," or rate of CO2 emitted per kilowatt-hour of electricity generated, is already among the lowest in the industry. Total CO2 emissions representing Entergy's ownership share of power plants in the United States were approximately 53.2 million tons in 2000, 49.6 million tons in 2001, 44.2 million tons in 2002, 36.8 million tons in 2003, 38.3 million tons in 2004, 36.5 million tons in 2005 and 38.9 million tons in 2006. In 2006, Entergy changed its method of calculating emissions and now includes controllable purchases as well as its ownership share of generation, which accounts for the increase in 2006.

Clean Water Act

The 1972 amendments to the Federal Water Pollution Control Act (known as the Clean Water Act or CWA) provide the statutory basis for the National Pollutant Discharge Elimination System permit program and the basic structure for regulating the discharge of pollutants from point sources to waters of the United States. The CWA requires all discharges of pollutants to waters of the United States to be permitted.

316(b) Cooling Water Intake Structures

The EPA finalized new regulations in July 2004 governing the intake of water at large existing power plants that employ cooling water intake structures. The rule seeks to reduce perceived impacts on aquatic resources by requiring covered facilities to implement technology or other measures to meet EPA-targeted reductions in water use and corresponding perceived aquatic impacts. Entergy, other industry members and industry groups, environmental groups, and a coalition of northeastern and mid-Atlantic states challenged various aspects of the rule. On January 25, 2007, the United States Court of Appeals for the Second Circuit remanded the rule to the EPA for reconsideration. The court instructed the EPA to reconsider several aspects of the rule that were beneficial to the regulated community after finding that these provisions of the rule were contrary to the language of the Clean Water Act or were not sufficiently explained in the rule. The EPA may now reissue a rule similar in structure to the rule remanded by the court but with additional content designed to meet the court's concerns, or the EPA may issue a rule with a substantially different structure and effect. Until the EPA issues guidance to the regulated community on what actions should be taken to comply with the Clean Water Act until a new rule is promulgated, and until the form and substance of the new rule itself is determined, it is impossible to gauge the effect of the court's decision on Entergy's business. Additionally, review of the decision in the United States Supreme Court may be sought by Entergy or other litigants.

Entergy's Non-Utility Nuclear business is currently in various stages of the data evaluation and discharge permitting process for its generation facilities. Indian Point is involved in an administrative permitting process with the New York environmental authority for renewal of the Indian Point 2 and 3 discharge permits. In November 2003, the New York State Department of Environmental Conservation (NYDEC) issued a draft permit indicating that closed cycle cooling would be considered the "best technology available" for minimizing perceived adverse environmental impacts attributable to the intake and discharge of cooling water at Indian Point 2 and 3. The draft permit would require Entergy to take certain steps to assess the feasibility of retrofitting the site to install cooling towers before re-licensing Indian Point 2 and 3, whose current licenses with the NRC expire in 2013 and 2015. The draft permit could also require, upon its becoming effective, the facilities to take an annual 42 unit-day outage (coordinated with the existing refueling outage schedule) and provide a payment into a NYDEC account until the start of cooling tower construction. Entergy is participating in the administrative process in order to have the draft permit modified prior to final issuance and opposes any requirement to install cooling towers or to begin annual outages at Indian Point 2 and 3. An administrative trial on the draft permit is expected to begin before the NYDEC's administrative law judges in 2007. Entergy's other Non-Utility Nuclear generation facilities are in the process of reviewing data, considering implementation options, providing information required by the remanded rule to the EPA and the affected states. Deadlines for determining compliance with the rule and for

 

196

 

 

 any required capital or operational expenditures are unknown at this time due to the remand of the rule to the EPA.

Entergy's Utility business generation facilities are likewise in the process of reviewing data, considering implementation options, and providing information required by the current rule to the EPA and the affected states. Entergy will continue to monitor the activities of the EPA and the states toward the implementation of section 316(b) of the Clean Water Act in the wake of the remand of the current rule and will respond accordingly.

Oil Pollution Prevention Regulation

The EPA published a proposed rule in December 2005 that solicited comments on proposed compliance requirements for oil-filled operating equipment.  This category of equipment includes devices such as oil-filled electrical equipment, turbine lubrication, and hydraulic-actuated control systems.  This proposal, along with the EPA's formal endorsement of reactive deployment of oil spill containment measures, eliminated the mandatory requirement to equip such devices with oil containment systems.  The EPA published its final rule in December 2006 and the final rule did not vary significantly from the proposal.  The EPA is expected to solicit comments on a "loose ends" rule that will likely reduce the spill prevention, control, and countermeasures plan requirement from that of a formal plan to an abbreviated checklist for certain facilities storing less than 10,000 gallons.  This rule change could potentially reduce further the compliance burden for Entergy's distribution operations service centers. The EPA also extended the compliance deadline for these requirements to July 1, 2009.  Economic effects associated with compliance for Entergy's transmission and transportation management sectors will largely be associated with upgrade or testing of mobile/portable storage tanks associated with substation maintenance and emergency staging areas, respectively.  Additional effects will be associated with the requirement to provide such tanks with sized secondary containment to prevent oil discharges to surface water.

Comprehensive Environmental Response, Compensation, and Liability Act of 1980

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), authorizes the EPA to mandate clean-up by or to collect reimbursement of clean-up costs from owners or operators of sites from which hazardous substances may be or have been released. Parties that transported hazardous substances to these sites or arranged for the disposal of the substances are also deemed liable by CERCLA. CERCLA has been interpreted to impose strict, joint, and several liability on responsible parties. Entergy's Utility and Non-Utility Nuclear businesses have sent waste materials to various disposal sites over the years. In addition, environmental laws now regulate certain of Entergy's operating procedures and maintenance practices that historically were not subject to regulation. Some disposal sites used by Entergy have been the subject of governmental action under CERCLA, resulting in site clean-up activities. Entergy's Utility and Non-Utility Nuclear businesses have participated to various degrees in accordance with their respective potential liabilities in such site clean-ups and have developed experience with clean-up costs. The affected Entergy companies have established reserves for such environmental clean-up and restoration activities. Details of significant CERCLA liabilities are discussed in the "Other Environmental Matters" section below.

Other Environmental Matters

Entergy Corporation

In April 2006, an environmental advocacy organization served a notice of intent to bring an environmental citizen's suit pursuant to the federal Resource Conservation and Recovery Act (RCRA) against Entergy.  Notice of suit is required by RCRA sixty days before actual filing.  The suit, if filed, will allege that Entergy violated an EPA regulation by failing formally to report a discovered release of radioactive material into the environment at Indian Point.  These allegations relate to radionuclides found in groundwater wells at the site, which Entergy continues to investigate.  It is expected that the environmental advocacy organization will ask the court to require Entergy formally to notify the EPA of the site condition, will seek to have the EPA formally involved in the ongoing site investigation and any required remediation, will seek attorney's fees under the statute, and may seek to have the judge impose statutory penalties. To date the advocacy group has not filed a complaint in the matter.

197

Entergy Gulf States

Several class action and other suits have been filed in state and federal courts seeking relief from Entergy Gulf States and others for damages caused by the disposal of hazardous waste and for asbestos-related disease allegedly resulting from exposure on Entergy Gulf States' premises (see "Litigation" below).

Entergy Gulf States is currently involved in a remedial investigation of the Lake Charles Service Center site, located in Lake Charles, Louisiana. A manufactured gas plant (MGP) is believed to have operated at this site from approximately 1916 to 1931. Coal tar, a by-product of the distillation process employed at MGPs, was apparently routed to a portion of the property for disposal. The same area has also been used as a landfill. In 1999, Entergy Gulf States signed a second Administrative Consent Order with the EPA to perform removal action at the site. In 2002, approximately 7,400 tons of contaminated soil and debris were excavated and disposed of from an area within the service center. In 2003, a cap was constructed over the remedial area to prevent the migration of contamination to the surface. In August 2005, an administrative order was issued by the EPA requiring that a 10-year groundwater study be conducted at this site. The groundwater monitoring study commenced in January 2006, and will be continued on a quarterly basis. Entergy Gulf States believes that its ultimate responsibility for this site will not materially exceed its existing clean-up provision of $1.3 million.

In 1994, Entergy Gulf States performed a site assessment in conjunction with a construction project at the Louisiana Station Generating Plant (Louisiana Station). In 1995, a further assessment confirmed subsurface soil and groundwater impact to three areas on the plant site. After validation, a notification was made to the LDEQ and a phased process was executed to remediate each area of concern. The final phase of groundwater clean-up and monitoring at Louisiana Station is expected to continue through 2009. The remediation cost incurred through December 31, 2006 for this site was $6.8 million. Future costs are not expected to exceed the existing provision of $0.7 million.

The Texas Commission on Environmental Quality (TCEQ) has notified Entergy Gulf States that the TCEQ believes that, based on a preliminary investigation, Entergy Gulf States is a PRP concerning contamination existing at the Spector Salvage Yard proposed state superfund site in Orange County, Texas. The TCEQ currently is proposing soil removal activities at the site. Entergy Gulf States communicated to the TCEQ that it will not be participating in the Spector site at this time because Entergy Gulf States has no internal knowledge of records that establish a connection with the site.

Entergy Louisiana and Entergy New Orleans

Several class action and other suits have been filed in state and federal courts seeking relief from Entergy Louisiana and Entergy New Orleans and others for damages caused by the disposal of hazardous waste and for asbestos-related disease allegedly resulting from exposure on Entergy Louisiana's and Entergy New Orleans' premises (see "Litigation" below).

The Southern Transformer Shop located in New Orleans served both Entergy Louisiana and Entergy New Orleans. This transformer shop is now closed and soil and groundwater assessment activities have continued since the demolition of the onsite buildings and structures was completed in early 2004. Entergy has entered into the Voluntary Remediation Program with the LDEQ and submitted a Site Investigation Workplan. The Site Investigation Workplan was approved by the LDEQ and the assessment activities have been concluded. A reserve of approximately $280,000 has been established for environmental assessment and remediation costs with estimated completion in mid-2007.

During 1993, the LDEQ issued new rules for solid waste regulation, including regulation of wastewater impoundments. Entergy Louisiana has determined that some of its power plant wastewater impoundments were affected by these regulations and may require remediation, repair, or closure. Completion of this work is dependent on pending LDEQ approval of submitted solid waste permit applications. As a result, a recorded liability in the amount of $2.1 million for Entergy Louisiana existed at December 31, 2006 for anticipated wastewater remediation and repairs and closures. Management believes this reserve to be adequate based on current estimates.

198

Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and Entergy New Orleans

The TCEQ notified Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and Entergy New Orleans that the TCEQ believes those entities are PRPs concerning contamination existing at the San Angelo Electric Service Company (SESCO) facility in San Angelo, Texas. The facility operated as a transformer repair and scrapping facility from the 1930s until 2003. Both soil and groundwater contamination exists at the site. Entergy Gulf States and Entergy Louisiana sent transformers to this facility during the 1980s. Entergy Gulf States, Entergy Louisiana, and Entergy Arkansas have responded to an information request from the TCEQ and will continue to cooperate in this investigation. Entergy New Orleans has provided requested information concerning its status in bankruptcy. Entergy Gulf States and Entergy Louisiana have joined a group of PRPs responding to site conditions in cooperation with the State of Texas, creating cost allocation models based on review of SESCO documents and employee interviews, and investigating contribution actions against other PRPs.  Entergy Gulf States and Entergy Louisiana have agreed to contribute to the remediation of contaminated soil and groundwater at the site in a measure proportionate to those companies' involvement at the site, while Entergy Arkansas likely will pay a de minimis amounts.  Current estimates, although preliminary and variable depending on the level of third-party cost contributions, indicate that Entergy's total share of remediation costs likely will be less than $1 million. The TCEQ approved an Agreed Administrative Order on September 20, 2006 that will allow the implementation of a Remedial Investigation/Feasibility Study at the SESCO site; with the ultimate disposition being a remedial action to remove contaminants of concern.

Entergy New Orleans

In March 2004, agents of the United States Fish and Wildlife Service conducted an inspection of Entergy New Orleans' Michoud power plant and found a number of dead brown pelicans near the facility's water intake structure and fish-return trough. Brown pelicans are an endangered species in Louisiana. The United States Attorney's Office for the Eastern District of Louisiana (Attorney's Office) issued a grand jury subpoena to an Entergy New Orleans employee in May 2004 to give evidence regarding the cause of death of the pelicans. The Attorney's Office then agreed to meet with Entergy New Orleans rather than requiring the employee to testify. As a result of that meeting, Entergy New Orleans conducted an internal investigation of the matter and submitted a report to the Attorney's Office in August 2004. Entergy New Orleans also constructed an engineered walkway and cover over the intake structure and fish-return trough to eliminate pelican access to the area. Entergy New Orleans continues negotiations with the Attorney's Office toward a resolution of this matter, and Entergy New Orleans' plan of reorganization includes terms under which it will make donations of $150,000 to the Louisiana Wildlife and Fisheries Foundation and $100,000 to the United States Fish and Wildlife Service to resolve the matter. The donations would be used to protect the eastern brown pelican species and other species of migratory birds.

Entergy Louisiana

Transmission and distribution storm teams entered wetland areas of Lafourche Parish to restore Entergy Louisiana's Barataria-Golden Meadow line shortly after Hurricane Katrina.  A portion of this line crosses property owned by Lafourche Realty.  The realty company has requested that Entergy Louisiana conduct an extensive wetland mitigation program over a ten-acre area and has filed suit against Entergy Louisiana and certain other Entergy subsidiaries concerning the extent of the mitigation.  Entergy Louisiana believes that the marsh area affected by its activities is less than 2 acres and that restoration can be conducted to the satisfaction of the United States Corps of Engineers and the State of Louisiana for less than $1 million.  Entergy Louisiana will meet with the Corps and the State of Louisiana to determine the extent of mitigation required by the Clean Water Act and parallel state law.

Entergy Louisiana and Entergy Gulf States

Restoration of electrical transmission and distribution infrastructures in several areas affected by Hurricanes Katrina and Rita required emergency access and utilization of construction equipment in saltwater marsh environments. Stakeholder regulatory agencies have allowed a postponement of assessment of damage that could potentially require mitigation until conclusion of one growing season for the marsh vegetation. An aerial survey of these areas was conducted in late 2006, and will continue as necessary in 2007. A meeting between stakeholder regulatory agencies and Entergy is

 

199

 

 

 planned for the first quarter 2007. Depending upon the permanent marsh impacts deemed to have resulted from Entergy's activities, expenditures could be required for marsh restoration. Estimation of the potential financial effect will be based upon evaluation of the results of the aerial surveys.

Litigation

Entergy uses legal and appropriate means to contest litigation threatened or filed against it, but certain states in which Entergy operates have proven to be unusually litigious environments. Judges and juries in Louisiana, Mississippi, and Texas have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. The litigation environment in these states poses a significant business risk to Entergy.

Ratepayer Lawsuits (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, and Entergy New Orleans)

Entergy New Orleans Fuel Adjustment Clause Litigation

In April 1999, a group of ratepayers filed a complaint against Entergy New Orleans, Entergy Corporation, Entergy Services, and Entergy Power in state court in Orleans Parish purportedly on behalf of all Entergy New Orleans ratepayers. The plaintiffs seek treble damages for alleged injuries arising from the defendants' alleged violations of Louisiana's antitrust laws in connection with certain costs passed on to ratepayers in Entergy New Orleans' fuel adjustment filings with the City Council. In particular, plaintiffs allege that Entergy New Orleans improperly included certain costs in the calculation of fuel charges and that Entergy New Orleans imprudently purchased high-cost fuel or energy from other Entergy affiliates. Plaintiffs allege that Entergy New Orleans and the other defendant Entergy companies conspired to make these purchases to the detriment of Entergy New Orleans' ratepayers and to the benefit of Entergy's shareholders, in violation of Louisiana's antitrust laws. Plaintiffs also seek to recover interest and attorneys' fees. Entergy filed exceptions to the plaintiffs' allegations, asserting, among other things, that jurisdiction over these issues rests with the City Council and the FERC. In March 2004, the plaintiffs supplemented and amended their petition. If necessary, at the appropriate time, Entergy will also raise its defenses to the antitrust claims. The suit in state court has been stayed by stipulation of the parties pending review of the decision by the City Council in the proceeding discussed in the next paragraph.

Plaintiffs also filed a corresponding complaint with the City Council in order to initiate a review by the City Council of the plaintiffs' allegations and to force restitution to ratepayers of all costs they allege were improperly and imprudently included in the fuel adjustment filings. Testimony was filed on behalf of the plaintiffs in this proceeding asserting, among other things, that Entergy New Orleans and other defendants have engaged in fuel procurement and power purchasing practices and included costs in Entergy New Orleans' fuel adjustment that could have resulted in Entergy New Orleans customers being overcharged by more than $100 million over a period of years. Hearings were held in February and March 2002. In February 2004, the City Council approved a resolution that resulted in a refund to customers of $11.3 million, including interest, during the months of June through September 2004. The resolution concludes, among other things, that the record does not support an allegation that Entergy New Orleans' actions or inactions, either alone or in concert with Entergy Corporation or any of its affiliates, constituted a misrepresentation or a suppression of the truth made in order to obtain an unjust advantage of Entergy New Orleans, or to cause loss, inconvenience or harm to its ratepayers. Management believes that it has adequately provided for the liability associated with this proceeding. The plaintiffs appealed the City Council resolution to the state courts. On May 26, 2005, the Civil District Court for the Parish of Orleans affirmed the City Council resolution that resulted in a refund to customers of $11.3 million, including interest, during the months of June through September 2004, finding no support for the plaintiffs' claim that the refund amount should be higher.

In June 2005, the plaintiffs appealed the Civil District Court decision to the Louisiana Fourth Circuit Court of Appeal. Subsequent to Entergy New Orleans' filing of a bankruptcy petition in the Eastern District of Louisiana, Entergy New Orleans filed a Notice of Stay with the Court of Appeal. The Bankruptcy Court lifted the stay with respect to the plaintiffs' appeal of the Civil District Court decision, but the class action lawsuit remains stayed. In

 

200

 

 

 February 2006, Entergy New Orleans filed a notice removing the class action lawsuit from the Civil District Court to the U.S. District Court for the Eastern District of Louisiana.  Additionally, in the Entergy New Orleans bankruptcy proceeding, the named plaintiffs in the Entergy New Orleans fuel clause lawsuit, together with the named plaintiffs in the Entergy New Orleans rate of return lawsuit, filed a Complaint for Declaratory Judgment asking the court to declare that Entergy New Orleans, Entergy Corporation, and Entergy Services are a single business enterprise, and, as such, are liable in solido with Entergy New Orleans for any claims asserted in the Entergy New Orleans fuel adjustment clause lawsuit and the Entergy New Orleans rate of return lawsuit, and, alternatively, that the automatic stay be lifted to permit the movants to pursue the same relief in state court.  The bankruptcy court dismissed the action on April 26, 2006. The matter was appealed to the U.S. District Court for the Eastern District of Louisiana, and the district court affirmed the dismissal in October 2006, but on different grounds, concluding that the lawsuit was premature. In addition, in April 2006, proofs of claim were filed by the plaintiffs in the Entergy New Orleans rate of return lawsuit and by the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation relating to both the City Council and class action proceedings. The plaintiffs in the Entergy New Orleans rate of return lawsuit and the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation also filed for class certification. In July 2006, the bankruptcy court denied the request for class certification. The individual claims of the approximately 14 individual named plaintiffs remain pending in the bankruptcy proceeding, and it is uncertain whether the bankruptcy judge will re-open the bar date for other ratepayers to file individual proofs of claim based on the allegations in the two lawsuits.

Entergy New Orleans Rate of Return Lawsuit

In April 1998, a group of residential and business ratepayers filed a complaint against Entergy New Orleans in state court in Orleans Parish purportedly on behalf of all ratepayers in New Orleans. The plaintiffs allege that Entergy New Orleans overcharged ratepayers by at least $300 million since 1975 in violation of limits on Entergy New Orleans' rate of return that the plaintiffs allege were established by ordinances passed by the Council in 1922. The plaintiffs seek, among other things, (i) a declaratory judgment that such franchise ordinances have been violated; and (ii) a remand to the Council for the establishment of the amount of overcharges plus interest. Entergy New Orleans believes the lawsuit is without merit. Entergy New Orleans has charged only those rates authorized by the Council in accordance with applicable law. In May 2000, a court of appeal granted Entergy New Orleans' exception to jurisdiction in the case and dismissed the proceeding. The Louisiana Supreme Court denied the plaintiffs' request for a writ of certiorari. The plaintiffs then commenced a similar proceeding before the Council. The plaintiffs and the advisors for the Council each filed their first round of testimony in January 2002. In their testimony, the plaintiffs allege that Entergy New Orleans earned in excess of the legally authorized rate of return during the period 1979 to 2000 and that Entergy New Orleans should be required to refund between $240 million and $825 million to its ratepayers. In the testimony submitted by the Council advisors, the advisors allege that Entergy New Orleans has not earned in excess of its authorized rate of return for the period at issue and that no refund is therefore warranted.

In December 2003, the Council Advisors filed a motion in the City Council proceedings to bifurcate the hearing in this matter, such that the effect of the provision of the 1922 Ordinance in setting lawful rates would be considered first. Only if it is determined that this provision establishes a limitation would the remaining issues be reached. The motion to bifurcate was granted by the City Council in April 2004, and a hearing on the first part of the bifurcated proceeding was completed in June 2005. After the submission of briefs and oral argument in April 2006, the City Council dismissed with prejudice the plaintiffs' claims on multiple grounds. In May 2006, the plaintiffs appealed the City Council's decision, and the plaintiffs' appeal is currently pending in Civil District Court for the Parish of Orleans. Entergy New Orleans also appealed certain evidentiary rulings included in the City Council's decision. The district court has not yet issued a procedural schedule for the appeal.

Additionally, in the Entergy New Orleans bankruptcy proceeding, the named plaintiffs in the Entergy New Orleans rate of return lawsuit, together with the named plaintiffs in the Entergy New Orleans fuel adjustment clause lawsuit, filed a Complaint for Declaratory Judgment asking the court to declare that Entergy New Orleans, Entergy Corporation, and Entergy Services are a single business enterprise, and, as such, are liable in solido with Entergy New Orleans for any claims asserted in the Entergy New Orleans rate of return lawsuit and the Entergy New Orleans fuel clause lawsuit, and, alternatively, that the automatic stay be lifted to permit the movants to pursue the same relief in state court.  The bankruptcy court dismissed the

 

201

 

 

 action on April 26, 2006. The matter was appealed to the U.S. District Court for the Eastern District of Louisiana, and the district court affirmed the dismissal in October 2006, but on different grounds, concluding that the lawsuit was premature. In addition, in April 2006, proofs of claim were filed by the plaintiffs in the Entergy New Orleans rate of return lawsuit and by the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation relating to both the City Council and class action proceedings. The plaintiffs in the Entergy New Orleans rate of return lawsuit and the plaintiffs in the Entergy New Orleans fuel adjustment clause litigation also filed for class certification. In July 2006, the bankruptcy court denied the request for class certification. The individual claims of the approximately 14 individual named plaintiffs remain pending in the bankruptcy proceeding, and it is uncertain whether the bankruptcy judge will re-open the bar date for other ratepayers to file individual proofs of claim based on the allegations in the two lawsuits.

Texas Power Price Lawsuit

In August 2003, a lawsuit was filed in the district court of Chambers County, Texas by Texas residents on behalf of a purported class apparently of the Texas retail customers of Entergy Gulf States who were billed and paid for electric power from January 1, 1994 to the present. The named defendants include Entergy Corporation, Entergy Services, Entergy Power, Entergy Power Marketing Corp., and Entergy Arkansas. Entergy Gulf States is not a named defendant, but is alleged to be a co-conspirator. The court granted the request of Entergy Gulf States to intervene in the lawsuit to protect its interests.

Plaintiffs allege that the defendants implemented a "price gouging accounting scheme" to sell to plaintiffs and similarly situated utility customers higher priced power generated by the defendants while rejecting and/or reselling to off-system utilities less expensive power offered and/or purchased from off-system suppliers and/or generated by the Entergy system. In particular, plaintiffs allege that the defendants manipulated and continue to manipulate the dispatch of generation so that power is purchased from affiliated expensive resources instead of buying cheaper off-system power.

Plaintiffs estimate that customers in Texas were charged at least $57 million above prevailing market prices for power. Plaintiffs seek actual, consequential and exemplary damages, costs and attorneys' fees, and disgorgement of profits. In September 2003, the Entergy defendants removed the lawsuit to the federal court in Galveston, and in October 2003, filed a pleading seeking dismissal of the plaintiffs' claims. In October 2003, the plaintiffs filed a motion to remand the case to state court. In January 2004, the federal court determined that it did not have jurisdiction over the subject matter of the lawsuit, and remanded the case to the state district court in Chambers County. In November 2004, the state district court dismissed the case based on a lack of jurisdiction. The plaintiffs initiated appellate proceedings in the court of appeals.

On March 2, 2006 the Corpus Christi Court of Appeals handed down its opinion and judgment. The court of appeals determined that neither the FERC nor the PUCT had exclusive jurisdiction over the plaintiffs' claims and, on this basis, reversed the district court's dismissal order and remanded the case for further proceedings. The court of appeals affirmed the district court's decision allowing Entergy Gulf States to intervene in the case. Entergy filed a petition for review, which is discretionary, with the Texas Supreme Court. The Texas Supreme Court denied the petition for review in February 2007, and Entergy filed a petition asking the Texas Supreme Court to reconsider that decision.

Fiber Optic Cable Litigation (Entergy Corporation, Entergy Gulf States, and Entergy Louisiana and Entergy Mississippi)

In 1998, a group of property owners filed a class action suit against Entergy Corporation, Entergy Gulf States, Entergy Services, and Entergy Technology Holding Company in state court in Jefferson County, Texas purportedly on behalf of all property owners in each of the states throughout the Entergy service area who have conveyed easements to the defendants. The lawsuit alleged that Entergy installed fiber optic cable across their property without obtaining appropriate easements. The plaintiffs sought actual damages for the use of the land and a share of the profits made through use of the fiber optic cables and punitive damages. The state court petition was voluntarily dismissed, and the plaintiffs commenced a class action suit with the same claims in the United States District Court in Beaumont, Texas. Both sides have filed motions for summary judgment, which were heard

 

202

 

 

 by the court in late 2001. In 2003, the district judge ruled that, as a matter of law, all of the Texas easements permit Entergy to utilize the fiber for their own communications. Further, the court ruled that approximately two-thirds of the Texas easements allow Entergy to use the fiber for external or third party communications. Entergy believes that any damages suffered by the remaining one-third plaintiff landowners are negligible and that there is no basis for the claim seeking a share of profits. In April 2004, the trial court entered an order denying the plaintiffs' request that this case be certified as a class. The plaintiffs appealed this ruling to the United States Court of Appeals for the Fifth Circuit, which upheld the trial court's order denying the class certification. In the fourth quarter 2006, the parties agreed to settle the lawsuit for an immaterial amount.

Several property owners have filed a class action suit against Entergy Louisiana, Entergy Services, ETHC, and Entergy Technology Company in state court in St. James Parish, Louisiana purportedly on behalf of all property owners in Louisiana who have conveyed easements to the defendants. The lawsuit alleges that Entergy installed fiber optic cable across their property without obtaining appropriate easements. The plaintiffs seek actual damages for the use of the land, a share of the profits made through use of the fiber optic cables and punitive damages. Entergy removed the case to federal court in New Orleans; however, the District Court remanded the case back to state court.  While Entergy appealed this ruling, the United States Court of Appeals for the Fifth Circuit denied this appeal.  In December 2003, the trial court held a hearing to determine if a class should be certified. On February 18, 2004, the trial court entered an order certifying this matter as a class. Entergy appealed this ruling to the Louisiana Fifth Circuit Court of Appeal, which has denied Entergy's appeal of the trial court's order certifying a class. Entergy sought an appellate review of the certification order before the Louisiana Supreme Court, which was denied in December 2005. At this time, management cannot determine the specific amount of damages being sought.

Asbestos and Hazardous Waste Suits (Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

Numerous lawsuits have been filed in federal and state courts in Texas, Louisiana, and Mississippi primarily by contractor employees in the 1950-1980 timeframe against Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans as premises owners of power plants, for damages caused by alleged exposure to asbestos or other hazardous material. Many other defendants are named in these lawsuits as well. Currently, there are approximately 600 lawsuits involving approximately 10,000 claims. Reserves have been established that should be adequate to cover any exposure. Additionally, negotiations continue with insurers to recover more reimbursement. Management believes that loss exposure has been and will continue to be handled successfully so that the ultimate resolution of these matters will not be material, in the aggregate, to the companies' financial position or results of operation.

Employment Litigation (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy and the Utility operating companies are defendants in various lawsuits and other labor-related proceedings that have been filed by former employees alleging that they were wrongfully terminated and/or discriminated against on the basis of age, race, sex, and/or other protected characteristics. Generally, the amount of damages being sought are not specified in these proceedings. Entergy Corporation and the Utility operating companies are vigorously defending these suits and deny any liability to the plaintiffs. However, no assurance can be given as to the outcome of these cases, and at this time management cannot estimate the total amount of damages sought.

Research Spending

Entergy is a member of the Electric Power Research Institute (EPRI). EPRI conducts a broad range of research in major technical fields related to the electric utility industry. Entergy participates in various EPRI projects based on Entergy's needs and available resources. The Utility operating companies contributed $1.7 million in 2006 and $1.6 million in both 2005 and 2004 to EPRI. The Non-Utility Nuclear business contributed $2.1 million in both 2006 and 2005, and $3.2 million in 2004.

 

203

 

Employees

Employees are an integral part of Entergy's commitment to serving its customers. As of December 31, 2006, Entergy employed 13,814 people.

Utility:

 

 

Entergy Arkansas

 

1,473

Entergy Gulf States

 

1,595

Entergy Louisiana

 

933

Entergy Mississippi

 

802

Entergy New Orleans

 

343

System Energy

 

-

Entergy Operations

 

2,579

Entergy Services

 

2,725

Entergy Nuclear Operations

 

3,132

Other subsidiaries

 

97

Total Full-time

 

13,679

Part-time

 

135

Total Entergy

 

13,814

Approximately 4,800 employees are represented by the International Brotherhood of Electrical Workers Union, the Utility Workers Union of America, and the International Brotherhood of Teamsters Union.

204

RISK FACTORS

Entergy and its subsidiaries operate in a market environment that involves significant risks, many of which are beyond their control. The following risk factors, as well as the risks discussed in "FORWARD-LOOKING INFORMATION" and in each of the registrant's Part II. Item 7. - Management's Financial Discussion and Analysis, may adversely affect Entergy's and the Registrant Subsidiaries' results of operations and cash flows, as well as the market prices of their publicly traded securities. While Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans and System Energy each believes it has identified and discussed below the key risk factors affecting its business, there may be additional risks and uncertainties that are not presently known or that are not currently believed to be significant that may adversely affect its performance or financial condition.

Utility

Entergy's Utility business segment faces the risks described under this heading as well as the risks described under "General Business" below.

Regulatory Risks

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans and System Energy)

The terms and conditions of service, including electric and gas rates, of the Utility operating companies and System Energy are determined through regulatory approval proceedings that are lengthy and subject to appeal that could result in delays in effecting rate changes as well as uncertainty as to ultimate results.

The rates that the Utility operating companies and System Energy charge to provide service reflect their capital expenditures, operations and maintenance charges, allowed rates of return, financing costs, and related costs of service. The rates they charge significantly influence the financial condition, results of operations, and liquidity of both Entergy and that individual company. These rates are determined in regulatory proceedings and are subject to periodic regulatory review and adjustment. From time to time, regulators have initiated and, in the future, may initiate, proceedings to investigate the prudence of costs included in the Utility operating companies' base rates.  These proceedings may examine, among other things, the prudence of the companies' operation and maintenance practices, level of expenditures, allowed rates of return, and previously incurred capital expenditures.  The regulatory bodies have the authority to disallow costs found not to have been prudently incurred, creating some risk to the ultimate recovery of those costs.  These regulatory proceedings typically involve multiple parties, including governmental bodies and officials, consumer advocacy groups, and various consumers of energy, who have differing concerns but who have the common objective of limiting rate increases or reducing rates. The proceedings generally have long timelines, which may or may not be limited by statute. Decisions are typically subject to appeal, potentially leading to additional uncertainty associated with these approval proceedings. For information regarding rate case proceedings, reference is made to Note 2 to the financial statements and the "Utility - Retail Rate Regulation" section of Part 1 Item 1.

The Utility operating companies recover fuel and purchased power costs through rate mechanisms that are subject to risks of delay or disallowance in regulatory proceedings.

The Utility operating companies recover their fuel and purchased power costs from their customers through rate mechanisms subject to periodic regulatory review and adjustment. Because the regulatory bodies have authority to disallow incurred costs found not to have been prudently incurred, there exists some risk to the ultimate recovery of those costs. From time to time, regulators have initiated and, in the future, may initiate proceedings to investigate the adequacy and operation of the fuel recovery clauses of the Utility operating companies as well as their fuel and purchased power procurement practices. These proceedings may examine procurement practices as well as the operation of the Utility operating companies' generation facilities. The Utility operating companies' cash flows can be impacted by the time delays between when gas or power is purchased and the ultimate recovery from customers in rates. On occasion, when the level of incurred costs for fuel and purchased power rises very dramatically, some of the

 

205

 

 

 Utility operating companies may agree to defer recovery of a portion of that month's fuel and purchased power costs for recovery at a later date, which could increase the near-term working capital and borrowing requirements of those companies. For further information regarding the regulatory proceedings for fuel and purchased power recovery, reference is made to the "Significant Factors and Known Trends - State and Local Rate Regulation and Fuel-Cost Recovery" section of Management's Financial Discussion and Analysis for Entergy and each of its Registrant Subsidiaries and Note 2 to the financial statements.

As a result of a challenge by two retail regulatory bodies, the manner in which the Utility operating companies have traditionally shared the costs associated with coordinated planning, construction and operation of generating resources and bulk transmission facilities has been changed by the FERC, which will require adjustment of retail rates in the jurisdictions where the Utility operating companies provide service and will introduce some uncertainty in the ratemaking process pending those adjustments.

The Utility operating companies have historically engaged in the coordinated planning, construction, and operation of generating resources and bulk transmission facilities and shared the associated costs under the terms of a FERC rate schedule called the System Agreement. A December 2005 FERC decision requires changes to the cost allocation methodology used in that rate schedule, with the first potential reallocation payments, expected to be required of Entergy Arkansas, to be made in 2007 based on calendar year 2006 production costs. The payments made and the receipts by other Utility operating companies will need to be reflected in retail rates through regulatory proceedings. Accordingly, the affected Utility operating companies will submit the changes resulting from the FERC's decision to their retail regulators as part of their retail ratemaking processes. Entergy's management believes that any changes in the allocation of production costs resulting from the FERC's decision and related retail proceedings should result in similar rate changes for retail customers. The timing of recovery of these costs in rates could be the subject of additional proceedings before Entergy's retail regulators, and the retail regulators could initiate other proceedings as a result of the FERC decision on the System Agreement.

For instance, the LPSC, APSC, MPSC and AEEC have appealed the FERC decision to the Court of Appeals for the D.C. Circuit. In June 2006, the APSC also filed a complaint with the FERC requesting an investigation into the prudence of Entergy's practices affecting the wholesale rates that flow through the System Agreement, and the LPSC initiated a proceeding at the FERC to investigate the effect of, and on what terms, Entergy Arkansas may withdraw from the System Agreement. In addition, in December 2005, Entergy Arkansas provided notice of its intent to terminate its participation in the System Agreement in ninety-six (96) months or such earlier time as authorized by the FERC.

Although the outcome and timing of the FERC and other proceedings cannot be predicted at this time, Entergy does not believe that the ultimate resolution of these proceedings will have a material effect on its financial condition or results of operations. For information relating to the System Agreement proceedings, reference is made to the "Significant Factors and Known Trends - Federal Regulation - System Agreement Proceedings" section of Management's Financial Discussion and Analysis for Entergy Corporation and each of its Registrant Subsidiaries.

Changing Market Structure Risks

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans)

Entergy and its Utility operating companies face uncertainty with respect to the implementation of the various provisions of the Utility operating companies' independent coordinator of transmission proposal approved by the FERC and the outcome of related FERC, state, and local regulatory proceedings relating to transmission.

The Utility operating companies face uncertainties with respect to the implementation of various provisions of the Utility operating companies' independent coordinator of transmission proposal, including the establishment of the weekly procurement process and the implementation of the approved pricing policy. Additionally, the Utility operating companies face uncertainty as to the outcome of the Available Flowgate Capacity (AFC) proceedings at the FERC. To the extent the AFC hearing is not terminated in accordance with previous FERC orders, an adverse outcome in these

 

206

 

 

 matters could negatively affect the financial condition, results of operations and liquidity of Entergy Corporation and the Utility operating companies. Reference is made to the "Significant Factors and Known Trends - Federal Regulation - Independent Coordinator of Transmission and Available Flowgate Capacity Proceeding" sections of Management's Financial Discussion and Analysis for Entergy and each of its Registrant Subsidiaries for information regarding the ICT and the FERC's AFC proceedings.

(Entergy Corporation and Entergy Gulf States)

Delays and uncertainty relating to the start of retail open access in Texas for Entergy Gulf States could have a material adverse effect on Entergy Gulf States' and Entergy Corporation's financial condition, results of operations and liquidity.

The PUCT has delayed implementation of retail open access in Entergy Gulf States' Texas service territory. In addition, the PUCT has not approved a base rate increase for Entergy Gulf States since 1991, although, pursuant to a statute enacted in June 2005, the PUCT approved rate riders allowing Entergy Gulf States to collect reasonable and necessary costs of incremental resources to meet load requirements and to recover reasonable and necessary transition to competition costs previously incurred by Entergy Gulf States. The statute also provides (i) for Entergy Gulf States to file a transition to competition plan, which Entergy Gulf States filed on December 29, 2006, and (ii) for Entergy Gulf States' Texas retail rates to be subject to cost-of-service regulation until retail customer choice is implemented in its service territory. The statute also extended the existing base rate freeze until mid-2008.

Under the transition to competition plan filed by Entergy Gulf States with the PUCT, Entergy Gulf States proposed joining the Electric Reliability Council of Texas, or ERCOT, since ERCOT already has all of the prerequisites for retail choice. Entergy Gulf States' filing includes an estimate that construction costs for facilities to interconnect Entergy Gulf States' Texas operations with ERCOT and implement retail open access could be approximately $1 billion. The plan contains several conditions, including cost recovery mechanisms, that must be met before Entergy Gulf States could proceed with the plan, and proposes several legislative requirements needed to accomplish the required infrastructure improvements. Assuming PUCT approval of the plan and the satisfaction of these conditions, retail open access could commence, at the earliest, in 2013.

Further extended delays and uncertainty with respect to the start of retail open access in Texas, particularly with respect to the PUCT's ultimate decision on the transition to competition plan filed on December 29, 2006, and the recovery of capital costs that may be incurred in connection with the implementation of the transition to competition plan, as well as the possibility of adverse decisions in proceedings currently pending, or which will be commenced in the future, at the PUCT (in each case whether related to the statute or otherwise), could have a material adverse effect on Entergy Gulf States' and Entergy Corporation's financial condition, results of operations, and liquidity. For additional information regarding Entergy Gulf States' transition to competition plan, reference is made to the "Retail Rate Proceedings - Filings with the PUCT and Texas Cities (Entergy Gulf States)" section of Note 2 to the consolidated financial statements.

The proposed jurisdictional separation of Entergy Gulf States into two separate vertically integrated utilities could be delayed or not consummated at all.

In June 2005, the Texas legislature enacted legislation authorizing Entergy Gulf States to proceed with a jurisdictional separation into two vertically integrated utilities, a Louisiana utility subject solely to the retail jurisdiction of the LPSC and a Texas utility subject solely to the retail jurisdiction of the PUCT. In January 2007, the LPSC approved Entergy Gulf States' plan for jurisdictional separation that specifies how the assets, obligations and liabilities of Entergy Gulf States will be divided between the resulting Louisiana utility and the resulting Texas utility. Pending the receipt of further regulatory approvals by the FERC and the NRC and the satisfaction of the other conditions set forth in the LPSC order, Entergy Gulf States has identified December 31, 2007 as the target date for completing the jurisdictional separation.

The LPSC order specifically provides, as a condition to completing the proposed jurisdictional separation, that Entergy Gulf States must obtain reasonable assurances from the credit rating agencies that the jurisdictional separation will not cause the credit ratings of the resulting Louisiana utility

 

207

 

 

 and Texas utility to be lower than Entergy Gulf States' credit ratings prior to separation. The LPSC order also provides that if Entergy Gulf States' credit ratings are downgraded at any time before the implementation of the jurisdictional separation, Entergy Gulf States will not proceed with the jurisdictional separation until its credit ratings improve to an acceptable level. In addition, the LPSC order expires, unless extended with the consent of the LPSC, on January 1, 2009 if the separation is not actually implemented on or before December 31, 2008. Factors that the credit rating agencies will consider in assessing the ratings to be issued for the separate Louisiana and Texas utilities will be the potential range of reasonable outcomes for Entergy Gulf States-Texas' planned base rate case to be filed in the third quarter of 2007 and other rate and regulatory proceedings before the PUCT and the LPSC. The PUCT has 185 days to act on a rate case filing after it is filed by the applicant.

Pending receipt of the necessary regulatory approvals, assurances from the credit rating agencies as required under the LPSC order and the satisfaction of other conditions in the LPSC order, there is risk that the proposed jurisdictional separation could be delayed or not consummated at all, which could further delay or complicate the transition to competition plan in Texas filed by Entergy Gulf States with the PUCT. Reference is made to the "Significant Factors and Known Trends - Transition to Retail Competition - Jurisdictional Separation Plan," section of Management's Financial Discussion and Analysis for Entergy Gulf States for information relating to the proposed jurisdictional separation of Entergy Gulf States.

Operating Risks

(Entergy Corporation, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans)

A delay or failure in recovering amounts for storm restoration costs incurred, or revenue lost, as a result of Hurricane Katrina and Hurricane Rita could have material, adverse effects on Entergy and those Utility operating companies affected by these storms.

As a result of Hurricanes Katrina and Rita, Entergy New Orleans, Entergy Louisiana, Entergy Mississippi and Entergy Gulf States have incurred a total of approximately $1.48 billion through December 31, 2006 in storm restoration costs for the repair or replacement of their electric and gas facilities damaged by the hurricanes as well as for business continuity costs. These costs do not include other incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates due to reduced sales volumes resulting from the storms. Entergy and the Utility operating companies are pursuing a broad range of initiatives to recover storm restoration costs, including:

  • obtaining reimbursement of certain costs covered by insurance,
  • obtaining assistance through federal legislation for Hurricane Katrina as well as Hurricane Rita, and
  • pursuing recovery through existing or new rate mechanisms regulated by FERC, state and local regulatory bodies, in combination with the issuance of bonds securitized by the storm recovery rates.

The non-capital portion of the incurred and future restoration costs are being accumulated as regulatory assets and not charged against current income based upon expectation of cost recovery. Because some of the Utility operating companies have not completed the regulatory process for recovery of these storm costs, however, there is an element of risk regarding recovery. For further information regarding the effects of Hurricane Katrina and Hurricane Rita, including the effect on revenues for those Utility operating companies where customers are unable to accept electric and gas service, reference is made to the "Hurricane Katrina and Hurricane Rita" section of Management's Financial Discussion and Analysis for Entergy and each of the Utility Operating Companies (except Entergy Arkansas). For further information with respect to storm cost recovery regulatory filings, reference is made to Note 2 to the financial statements.

208

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans)

The effects of weather and the related impact on electricity and gas usage may adversely affect the Utility operating companies' results of operations.

Temperatures above normal levels in the summer tend to increase summer cooling electricity demand and revenues, and temperatures below moderate levels in the winter tend to increase winter heating electricity and gas demand and revenues. As a corollary, moderate temperatures tend to decrease usage of energy and resulting revenues. Seasonal pricing differentials, coupled with higher consumption levels, typically cause the Utility operating companies to report higher revenues in the third quarter of the fiscal year than in the other quarters. Extreme weather conditions or storms, however, may stress the Utility operating companies' generation facilities and transmission and distribution systems, resulting in increased maintenance and capital costs, limits on their ability to meet peak customer demand, increased regulatory oversight, and lower customer satisfaction. These extreme conditions may have material adverse effects on the Utility operating companies' results of operations.

(Entergy Gulf States and Entergy New Orleans)

The effect of higher purchased gas cost charges to customers may adversely affect Entergy Gulf States' and Entergy New Orleans' results of operations and cash flows.

Gas rates charged to customers are comprised primarily of purchased gas cost charges, which provide no return or profit to Entergy Gulf States or Entergy New Orleans, and distribution charges, which provide a return or profit to the utility. Distribution charges are affected by the amount of gas sold to customers. Purchased gas cost charges, which comprise most of a customer's bill and may be adjusted quarterly, represent gas commodity costs that Entergy Gulf States or Entergy New Orleans recovers from its customers. Entergy Gulf States' or Entergy New Orleans' cash flows can be affected by differences between the time period when gas is purchased and the time when ultimate recovery from customers is received. When purchased gas cost charges increase substantially reflecting higher gas procurement costs incurred by Entergy Gulf States or Entergy New Orleans customer usage may decrease, resulting in lower distribution charges for Entergy Gulf States or Entergy New Orleans.

(System Energy)

System Energy owns and operates a single nuclear generating facility, and it is dependent on affiliated companies for all of its revenues.

System Energy's operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf. Charges under the Unit Power Sales Agreement are paid by the Utility operating companies as consideration for their respective entitlements to receive capacity and energy and are payable on a full cost-of-service basis only so long as Grand Gulf remains in commercial operation. The useful economic life of Grand Gulf is finite and is limited by the terms of its operating license, which is currently due to expire on November 1, 2024. Payments under the Unit Power Sales Agreement are System Energy's only source of operating revenues. System Energy's financial condition depends both on the receipt of payments from the Utility operating companies under the Unit Power Sales Agreement and on the continued commercial operation of Grand Gulf.

Nuclear Operating Risk

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana and System Energy)

Ownership and operation of nuclear facilities creates business, financial and waste disposal risks.

Certain of the Utility operating companies, System Energy, and Entergy's Non-Utility Nuclear subsidiaries own and operate ten nuclear power generating units and the shutdown Indian Point 1 nuclear reactor. These companies, therefore, are subject to the risks arising from owning and operating nuclear generating facilities. The factors and risks affecting these nuclear operations include:

209

210

 

  • Nuclear accident risk. Although the safety record of nuclear reactors, including those reactors owned and operated by Entergy's subsidiaries, generally has been very good, accidents and other unforeseen problems have occurred both in the U.S. and elsewhere. The consequences of an accident can be severe and include loss of life and property damage. As an owner of nuclear power plants, Entergy participates in mandatory industry self-insurance programs and could be liable to fund claims should a plant owned by a different company experience a major event. Any resulting liability from a nuclear accident may exceed any of the Utility operating companies' or the Non-Utility Nuclear subsidiaries' primary insurance coverage, and require contribution of additional funds through the industry-wide program that could significantly affect the results of operations or financial position of Entergy, a Utility operating company or System Energy.
  • Nuclear insurance. The Price-Anderson Act limits the liability of nuclear reactor owners for claims that could arise from a single incident. The limit as of December 31, 2006 is $10.76 billion and is subject to change to account for the effects of inflation, a change in the primary limit of insurance coverage, and changes in the number of licensed reactors. As required by the Price-Anderson Act, the Utility operating companies and Non-Utility Nuclear subsidiaries carry the maximum available amount of nuclear liability insurance (currently $300 million for each operating site). Claims for any incident exceeding that amount are covered through mandatory participation in a financial protection pool comprised of other nuclear reactors. In the event of a nuclear plant disaster that causes damages in excess of the $300 million in primary insurance coverage, each owner of a nuclear plant reactor, including Entergy's Utility operating companies, System Energy, and Non-Utility Nuclear plant owners, will be required to pay a retrospective premium, equal to its proportionate share of the loss in excess of the $300 million primary level, up to a maximum of $100.6 million per reactor per incident. The retrospective premium payment is currently set at $15 million per year per reactor.
  • Decommissioning. Owners of nuclear generating plants have an obligation to decommission those plants. The Utility operating companies, System Energy and the Non-Utility Nuclear subsidiaries maintain decommissioning trust funds for this purpose. The Utility operating companies collect funds from their customers, which are deposited into the trusts covering the units operated for or on behalf of those companies. Those rate collections are based upon operating license lives as well as estimated trust fund earnings and decommissioning costs. In connection with the acquisition of the nuclear plants, the Entergy Non-Utility Nuclear subsidiaries also acquired decommissioning trust funds that are funded in accordance with NRC regulations. An early plant shutdown, poor investment results or higher than anticipated decommissioning costs could cause trust fund assets to be insufficient to meet the decommissioning obligations, with the result that the Non-Utility Nuclear companies may be required to provide additional funds or credit support to satisfy regulatory requirements for decommissioning. For further information regarding nuclear decommissioning costs, reference is made to the "Critical Accounting Estimates - Nuclear Decommissioning Costs" section of Management's Financial Discussion and Analysis for Entergy and each of its Registrant Subsidiaries (except Entergy Mississippi and Entergy New Orleans).

Non-Utility Nuclear

Entergy's Non-Utility Nuclear business segment faces the risks described under this heading, the risks associated with operating nuclear generating units discussed above under "Utility - Nuclear Operating Risk" and the risks described under "General Business" below. The following risk factors apply only to Entergy Corporation, which operates this business segment through subsidiaries that are separate from the Utility operating companies and System Energy.

(Entergy Corporation)

The nuclear power generation plants owned by Entergy's Non-Utility Nuclear business will be exposed to price risk to the extent they must compete for the sale of energy and capacity.

Entergy and its subsidiaries are not guaranteed any rate of return on its capital investments in their unregulated businesses. In particular, the sale of capacity and energy from the power generation plants owned by its Non-Utility Nuclear business, unless otherwise contracted, is subject to the fluctuation of market power prices. Market prices may fluctuate substantially sometimes over relatively short periods of time and at other times

 

211

 

 

 experience sustained increases or decreases. Demand for electricity and its fuel stock can fluctuate dramatically, creating periods of substantial under- or over-supply. During periods of over-supply, prices might be depressed. Also, at times there may be political pressure, or pressure from regulatory authorities with jurisdiction over wholesale and retail energy commodity and transportation rates, to impose price limitations, bidding rules and other mechanisms to address volatility and other issues in these markets.

Among the factors that could affect market prices for electricity and fuel, all of which are beyond Entergy's control to a significant degree, are:

  • prevailing market prices for natural gas, uranium (and its conversion), coal, oil, and other fuels used in electric generation plants, including associated transportation costs, and supplies of such commodities;
  • seasonality;
  • availability of competitively priced alternative energy sources;
  • changes in production and storage levels of natural gas, lignite, coal and crude oil and refined products;
  • liquidity in the general wholesale electricity market;
  • the actions of external parties, such as the FERC and local independent system operators, that may impose price limitations and other mechanisms to address some of the volatility in the energy markets;
  • transmission or transportation constraints, inoperability or inefficiencies;
  • weather conditions impacting demand for electricity or availability of hydroelectric power or fuel supplies;
  • the rate of growth in demand for electricity as a result of population changes, regional economic conditions and the implementation of conservation programs;
  • union and labor relations;
  • changes in federal and state energy and environmental laws and regulations including but not limited to the price impacts of proposed emission controls such as the Regional Greenhouse Gas Initiative (RGGI); and
  • natural disasters, wars, embargoes and other catastrophic events.

Concerns have been expressed regarding the safety of nuclear generating units and nuclear fuel, which could lead to restrictions upon the operation of the Non-Utility Nuclear generating units.

Concerns are being expressed in public forums about the safety of nuclear generating units and nuclear fuel, in particular in the northeastern United States, which is where the current fleet of Non-Utility Nuclear generating units is located. These concerns have led to, and are expected to continue to lead to, various proposals to federal regulators as well as governing bodies in some localities where Entergy's subsidiaries own nuclear generating units for legislative and regulatory changes that could lead to the shut-down of nuclear units, denial of license extension applications, municipalization of nuclear units, restrictions on nuclear units as a result of unavailability of sites for spent nuclear fuel storage and disposal, or other adverse effects on owning and operating nuclear generating units. Entergy vigorously responds to these concerns and proposals. However, if any of the proposals relating to legislative and regulatory changes becomes effective, it could have a material adverse effect on Entergy's results of operations, financial condition and liquidity.

General Business

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

Entergy and the Utility operating companies face potential liquidity constraints to handle future contingencies such as future natural disasters or substantial increases in gas and fuel prices.

Under normal circumstances, Entergy's business is capital intensive and dependent upon its ability to access capital at reasonable rates and other terms. The effects of Hurricanes Katrina and Rita on Entergy's business created greater liquidity needs emphasizing the importance of Entergy's and its subsidiaries' access to the capital markets. At times there are also spikes in the price for natural gas and other commodities that increase the liquidity requirements of the Utility operating companies. Specifically, after Hurricanes Katrina and Rita in the third and fourth quarters of 2005, there

 

212

 

 

 was a rapid increase in natural gas and other commodity prices. As a result, the Utility operating companies had increased working capital and borrowing requirements to cover the higher than expected gas and fuel prices and to finance the storm restoration costs. The Utility operating companies then had to carry the higher incurred costs pending recovery through existing regulatory fuel and purchased power recovery mechanisms, as well as several different mechanisms for storm restoration cost recovery.

The occurrence of one or more contingencies, including lower than expected insurance recovery with respect to storm restoration costs, or a delay in such recovery, a delay in regulatory recovery of storm restoration costs not covered by insurance, a greater than expected increase in natural gas prices and other commodity prices, an acceleration of payments or decreased credit lines in respect of fuel or power supply to the Utility operating companies, less cash flow from operations than expected, or other unknown events, such as future storms, could cause the financing needs of Entergy and its subsidiaries to increase.

In addition, accessing the capital markets more frequently in these situations may result in an increase in leverage. Material leverage increases could negatively affect the credit ratings of Entergy and the Utility operating companies, which in turn can negatively affect access to the capital markets.

(Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans and System Energy)

A downgrade in Entergy Corporation's or its subsidiaries' credit ratings could negatively affect Entergy Corporation's and its subsidiaries' ability to access capital and/or could require Entergy Corporation or its subsidiaries to post collateral, accelerate certain payments or repay certain indebtedness.

There are a number of factors that the rating agencies are currently evaluating in order to arrive at the credit ratings for Entergy Corporation and the Registrant Subsidiaries, including certainty as to recovery of storm costs through insurance, retail rates, securitization financings, and/or CDBG funds, the ability to cover liquidity requirements, the availability of committed external credit support, and Entergy Corporation's share repurchase program, dividend policy and other commitments for capital. If Standard & Poor's Ratings Services, Moody's Investors Service, Inc. or Fitch Ratings were to downgrade Entergy Corporation's, any of the Utility operating companies' and/or System Entergy's ratings, particularly below investment grade, borrowing costs would increase, the potential pool of investors and funding sources would likely decrease, and cash collateral demands may be triggered by the terms of a number of commodity contracts, leases and other agreements. Most of Entergy Corporation's and its subsidiaries' large customers, suppliers and counterparties require sufficient creditworthiness to enter into transactions. If Entergy Corporation's or its subsidiaries' ratings were to decline, particularly below investment grade, or if certain counterparties determine Entergy Corporation or the Utility operating companies are losing creditworthiness and demand adequate assurance under fuel, gas and purchased power contracts, the counterparties may then require the posting of collateral in the form of cash or letters of credit, the prepayment before delivery of any fuel, gas or purchase power or the accelerated payment after such delivery, or the counterparties may decline to do business with Entergy Corporation or its subsidiaries. In addition, in the event of a decrease in Entergy Corporation's credit rating to below investment grade, Entergy Corporation may be required to replace in a short period of time the Entergy Corporation guarantees relating to some of the Non-Utility Nuclear business' agreements to sell power with approximately $1 billion in cash or letters of credit.

The consequences of Hurricanes Katrina and Rita on the financial condition of Entergy Corporation and the Utility operating companies, and the related uncertainty associated with storm restoration cost recovery, together with other factors, such as the bankruptcy filing of Entergy New Orleans, negatively affected Entergy Corporation's credit profile and the credit profile of the Utility operating companies. Following Hurricane Katrina, Standard & Poor's Ratings Services placed Entergy Corporation and the Utility operating companies on credit watch with negative implications. Fitch Ratings also changed the credit ratings of the Utility operating companies to outlook negative and Moody's Investors Service, Inc. placed the debt ratings of Entergy Gulf States on review for possible downgrade. After the Entergy New Orleans bankruptcy filing, Moody's, Standard & Poor's and Fitch downgraded the senior secured debt ratings of Entergy New Orleans to Caa1, D and CCC, respectively, and since December 2005, Moody's Investors Service, Inc. has withdrawn any rating of Entergy New Orleans. Currently, Standard & Poor's has issued a negative outlook for Entergy Corporation and the Utility operating companies (other than Entergy New Orleans), Moody's Investors Service, Inc. has issued a stable outlook for

 

213

 

 

 Entergy Corporation and the Utility operating companies, thereby removing the review for possible downgrade for Entergy Gulf States, and Fitch has placed the Utility operating companies on outlook stable.

The timing and outcome of Entergy New Orleans' emergence from bankruptcy is subject to certain risks. Until a plan of reorganization is confirmed and implemented, Entergy New Orleans' bankruptcy poses financial risks to Entergy Corporation and the other Utility operating companies.

Entergy New Orleans cannot emerge from bankruptcy until a plan of reorganization has been confirmed by the Bankruptcy Court and the confirmed plan of reorganization becomes effective and is implemented. Entergy New Orleans filed a plan of reorganization that requires receipt, in cash, of $200 million in CDBG funds and $50 million in insurance proceeds as a condition to Entergy New Orleans' exit from bankruptcy. The Unsecured Creditors' Committee also filed a competing plan of reorganization that requires a $150 million credit facility for Entergy New Orleans to exit from bankruptcy. The Bankruptcy Court will conduct hearings on May 3 and 4, 2007 to determine whether to confirm the Entergy New Orleans' plan of reorganization, the Unsecured Creditors' Committee plan of reorganization, or neither plan of reorganization. If Entergy New Orleans' plan of reorganization is confirmed, there is a risk of delay in implementing the plan and emerging from bankruptcy pending Entergy New Orleans' receipt of $200 million in CDBG funds and $50 million in insurance proceeds. Entergy New Orleans' plan of reorganization sets an effective date of June 30, 2007 by which all conditions must be satisfied; however, in its plan, Entergy New Orleans reserves the right to seek Bankruptcy Court approval to postpone the effective date subject to certain conditions. If on or before June 30, 2007, or such later date as approved by the Bankruptcy Court, the conditions set forth in Entergy New Orleans' plan of reorganization have not occurred, then the confirmation order can be vacated by the Bankruptcy Court, in which event Entergy New Orleans' plan of reorganization cannot become effective.

Pending confirmation of a plan of reorganization and implementation of such plan, Entergy Corporation and the Utility operating companies are at risk for recovering investments in or funds advanced to Entergy New Orleans, including:

  • the recovery of Entergy Corporation's investment in Entergy New Orleans;
  • the recovery of amounts advanced by Entergy Corporation as general and administrative services and through debtor-in-possession financing; and
  • the payment of approximately $69 million of pre-petition payables owed by Entergy New Orleans to the other Utility operating companies.

For further information regarding Entergy New Orleans' bankruptcy, Entergy New Orleans' plan of reorganization, the Unsecured Creditors' Committee plan of reorganization and the DIP credit agreement, reference is made to the "Hurricane Katrina and Hurricane Rita - Entergy New Orleans Bankruptcy" and "Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital - Debtor-in-Possession Credit Agreement" sections of Management's Financial Discussion and Analysis for Entergy.

The Utility operating companies, System Energy and Entergy's Non-Utility Nuclear business may incur substantial costs to fulfill their obligations related to environmental and other matters.

The businesses in which the Utility operating companies, System Energy and the Non-Utility Nuclear business operate are subject to extensive environmental regulation by local, state and Federal authorities. These laws and regulations affect the manner in which the Utility operating companies, System Energy and the Non-Utility Nuclear business conduct their operations and make capital expenditures. These regulations also affect how the Utility operating companies, System Energy and the Non-Utility Nuclear business manage air emissions, discharges to water, solid and hazardous waste storage and disposal, cooling and service water intake, the protection of threatened and endangered species, hazardous materials transportation, and similar matters. Federal, state, and local authorities continually revise these statutes and regulations, and the statutes and regulations are subject to judicial interpretation and to the permitting and enforcement discretion vested in the implementing agencies. Developing and implementing plans for facility compliance with these requirements can lead to capital, personnel, and operation and maintenance expenditures. Violations of these requirements can subject the Utility operating companies, System Energy and the Non-Utility Nuclear business to enforcement

 

214

 

 

 actions, capital expenditures to bring existing facilities into compliance, additional operating costs or operating restrictions to achieve compliance, remediation and clean-up costs, civil penalties, and exposure to third parties' claims for alleged health or property damages. In addition, the Utility operating companies, System Energy and the Non-Utility Nuclear business are subject to liability under these laws for the costs of remediation of environmental contamination of property now or formerly owned by the Utility operating companies, System Energy and the Non-Utility Nuclear business and of property contaminated by hazardous substances they generate. The Utility operating companies are currently involved in a number of proceedings relating to sites where hazardous substances have been released and may be subject to additional proceedings in the future. The Utility operating companies, System Energy and the Non-Utility Nuclear business have incurred and expect to incur significant costs related to environmental compliance.

Entergy and its subsidiaries may not be able to obtain or maintain all required environmental regulatory approvals. If there is a delay in obtaining any required environmental regulatory approvals, or if Entergy and its subsidiaries fail to obtain, maintain or comply with any such approval, the operation of its facilities could be stopped or become subject to additional costs. For further information regarding environmental regulation and environmental matters, reference is made to the "Regulation of Entergy's Business - Environmental Regulation" section of Part I Item 1.

Entergy and its subsidiaries face exposure to changes in commodity prices, which can affect the value of assets and operating costs and which may not be adequately hedged against adverse changes.

To manage their near-term financial exposure related to commodity price fluctuations, Entergy and its subsidiaries enter into contracts to hedge portions of their purchase and sale commitments, weather positions, fuel requirements and inventories of natural gas, uranium (and its conversion), lignite, coal, refined products, and other commodities, within established risk management guidelines. As part of this strategy, Entergy and its subsidiaries utilize fixed-price forward physical purchase and sales contracts, futures, financial swaps, and option contracts traded in the over-the-counter markets or on exchanges. However, Entergy and its subsidiaries can normally cover only a small portion of the exposure of their assets and positions to market price volatility, and the coverage will vary over time. In addition, Entergy also elects to leave certain volumes during certain years unhedged. To the extent Entergy and its subsidiaries have unhedged positions, fluctuating commodity prices can materially affect Entergy's and its subsidiaries' results of operations and financial position, either favorably or unfavorably.

Although Entergy and its subsidiaries devote a considerable amount of management time and effort to these risk management strategies, they cannot eliminate all the risks associated with these activities. As a result of these and other factors, Entergy and its subsidiaries cannot predict with precision the impact that risk management decisions may have on their business, results of operations or financial position.

Entergy has guaranteed or indemnified the performance of a portion of the obligations relating to hedging and risk management activities. Reductions in Entergy's credit quality or changes in the market prices of energy commodities could increase the cash collateral required to be posted in connection with hedging and risk management activities, which could materially affect Entergy's liquidity and financial position. For instance, after Hurricanes Katrina and Rita in the third and fourth quarters of 2005, there was a rapid increase in natural gas and other commodity prices that resulted in increased collateral requirements for Entergy's Non-Utility Nuclear business.

The Utility operating companies and Entergy's Non-Utility Nuclear business are exposed to the risk that counterparties may not meet their obligations.

Entergy's Utility operating companies' and its Non-Utility Nuclear subsidiaries' hedging and risk management activities are exposed to the risk that counterparties that owe Entergy and its subsidiaries money, energy, or other commodities will not perform their obligations. Certain counterparties may fail to perform their obligations due to financial difficulties, brought on by various factors. Should the counterparties to these arrangements fail to perform, Entergy or its subsidiaries might be forced to acquire alternative hedging arrangements or honor the underlying commitment at then-current market prices. In such event, Entergy and its subsidiaries might incur losses in addition to amounts, if any, already paid to the counterparties.

215

Market performance and other changes may decrease the value of benefit plan assets, which then could require significant additional funding.

The performance of the capital markets affects the values of the assets that are held in trust under Entergy's pension and postretirement benefit plans. Entergy's Utility operating companies and Non-Utility Nuclear subsidiaries have significant obligations in these areas and hold significant assets in these trusts. These assets are subject to market fluctuations and will yield uncertain returns, which may fall below the Utility operating companies' and Non-Utility Nuclear subsidiaries' projected return rates. A decline in the market value of the assets, as was experienced from 2000 to 2002, may increase the funding requirements of these obligations. Additionally, changes in interest rates affect the liabilities under Entergy's pension and postretirement benefit plans; as interest rates decrease, the liabilities increase, potentially requiring additional funding. Further, changes in demographics, including increased numbers of retirements or changes in life expectancy assumptions, or changes in federal regulations may also increase the funding requirements of the obligations related to the pension benefit plans. For further information regarding Entergy's pension and other postretirement benefit plans, reference is made to the "Critical Accounting Estimates - Qualified Pension and Other Benefits" section of Management's Financial Discussion and Analysis for Entergy and each of its Registrant Subsidiaries and Note 11 to the financial statements.

The litigation environment in the states in which certain Entergy subsidiaries operate poses a significant risk to those businesses.

Entergy and its subsidiaries are involved in the ordinary course of business in a number of lawsuits involving employment, commercial, asbestos, hazardous material, ratepayer, and injuries and damages issues, among other matters. States in which the Utility operating companies operate, in particular Louisiana, Mississippi and Texas, have proven to be unusually litigious environments. Judges and juries in these states have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. Entergy and its subsidiaries use legal and appropriate means to contest litigation threatened or filed against them, but the litigation environment in these states poses a significant business risk.

Changes in taxation as well as the inherent difficulty in quantifying potential tax effects of business decisions could negatively impact Entergy's, the Utility operating companies' and System Energy's results of operations, financial condition and liquidity.

Entergy and its subsidiaries are required to make judgments regarding the potential tax effects of various financial transactions and results of operations in order to estimate their obligations to taxing authorities. These tax obligations include income, franchise, real estate, sales and use and employment-related taxes. These judgments include reserves for potential adverse outcomes regarding tax positions that have been taken. Entergy and its subsidiaries also estimate their ability to utilize tax benefits, including those in the form of carryforwards for which the benefits have already been reflected in the financial statements. Changes in federal, state and/or local tax laws, adverse tax audit results or adverse tax rulings on positions taken by Entergy and its subsidiaries could negatively impact Entergy's, the Utility operating companies' and System Energy's results of operations, financial condition and liquidity. For further information regarding Entergy's accounting for tax obligations, reference is made to Note 3 to the financial statements.

(Entergy Louisiana)

Entergy Louisiana will not join in filing the Entergy consolidated federal income tax return. Because it will file as a separate taxpayer, Entergy Louisiana's financial condition could be adversely affected.

Entergy Louisiana will not join in the filing of Entergy's consolidated federal income tax return, although it is consolidated for financial reporting purposes. Entergy Louisiana will file a separate federal income tax return, will pay federal income taxes on a stand-alone basis, and will not be a party to Entergy's intercompany tax allocation agreement. Entergy Louisiana may make elections for tax purposes that may differ from those made by the Entergy consolidated tax group, which may result in Entergy Louisiana having more exposure to tax liability than it would have had, if included in the Entergy consolidated tax return, thereby adversely affecting Entergy Louisiana's financial condition.

216

(Entergy Corporation)

Entergy Corporation's holding company structure could limit its ability to pay dividends.

Entergy Corporation is a holding company with no material assets other than the stock of its subsidiaries. Accordingly, all of its operations are conducted by its subsidiaries. Entergy Corporation's ability to pay dividends on its common stock depends on the payment to it of dividends by its subsidiaries. The payments of dividends to Entergy Corporation by its subsidiaries in turn depend on their results of operations and cash flows and other items affecting retained earnings. Provisions in the articles of incorporation, indentures for debt issuances and other agreements of certain of Entergy Corporation's subsidiaries restrict the payment of cash dividends to Entergy Corporation. For further information regarding dividend restrictions to Entergy Corporation, reference is made to the "COMMON EQUITY - Retained Earnings and Dividend Restrictions" section of Note 7 to the financial statements.

UNRESOLVED STAFF COMMENTS

Neither Entergy Corporation nor any of its subsidiaries that are subject to the reporting requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934 received any written comments regarding any of their periodic or current reports from the staff of the Securities and Exchange Commission that were issued 180 days or more preceding the end of their 2006 fiscal year and that remain unresolved.

217

ENTERGY ARKANSAS, INC.

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

2006 Compared to 2005

Net income decreased slightly, by $1.5 million, in 2006.

2005 Compared to 2004

Net income increased $32.4 million due to higher net revenue and other income, partially offset by higher other operation and maintenance expenses.

Net Revenue

2006 Compared to 2005

Net revenue, which is Entergy Arkansas' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2006 to 2005.

   

Amount

   

(In Millions)

     

2005 net revenue

 

$1,010.7 

Pass-through rider revenue

 

35.5 

Volume/weather

 

13.1 

Net wholesale revenue

 

10.6 

Other

 

4.6 

2006 net revenue

 

$1,074.5 

The pass-through rider revenue variance is primarily due to a change in 2006 in the accounting for city franchise tax revenues as directed by the APSC. The change results in an increase in rider revenue with a corresponding increase in taxes other than income taxes, resulting in no effect on net income.

The volume/weather variance is primarily due to an increase in electricity usage, including the effect of more favorable weather compared to 2005. Billed retail electricity usage increased by a total of 326 GWh.

The net wholesale revenue variance is primarily due to improved results related to co-owner contracts and higher wholesale prices.

Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

Gross operating revenues increased primarily due to:

 

218

 

 

The increase was partially offset by a decrease of $19 million in Grand Gulf revenues due to a decrease in the Grand Gulf rider effective January 2006.

Fuel and purchased power expenses increased primarily due to an increase in the recovery from customers of deferred fuel costs due to higher fuel rates.

Other regulatory charges decreased primarily due to a decrease of $22.3 million resulting from the under-recovery of Grand Gulf costs due to a decrease in the Grand Gulf rider effective January 2006. The rider has no material effect on net income due to the refund and/or recovery through annual adjustments to the rider.

2005 Compared to 2004

Net revenue, which is Entergy Arkansas' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2005 to 2004.

   

Amount

   

(In Millions)

     

2004 net revenue

 

$978.4 

Volume/weather

 

43.6 

Deferred fuel cost revisions

 

15.5 

Capacity costs

 

(11.3)

Net wholesale revenue

 

(14.4)

Other

 

(1.1)

2005 net revenue

 

$1,010.7 

The volume/weather variance is primarily due to an increase in electricity usage, including the effect of more favorable weather compared to 2004. Billed electricity usage increased by a total of 1,270 GWh.

The deferred fuel cost revisions variance is primarily due to a revised estimate of fuel costs filed for recovery at Entergy Arkansas in the March 2004 energy cost recovery rider, which reduced net revenue in the first quarter of 2004 by $11.5 million. The remainder of the variance is due to the 2004 energy cost recovery true-up, made in the first quarter of 2005, which increased net revenue by $4.0 million.

The capacity costs variance is primarily due to higher capacity-related costs including the revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

The net wholesale revenue variance is primarily due to lower margins on wholesale contracts and provisions for refunds related to wholesale formula rate and contract disputes.

Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

Gross operating revenues increased primarily due to an increase of $99 million in fuel cost recovery revenues due to increases in the energy cost recovery rider effective April 2005 and October 2005 (fuel cost recovery revenues are discussed in Note 2 to the financial statements). The increase in volume/weather, discussed above, also contributed to the increase.

Fuel and purchased power expenses increased primarily due to an increase in the market price of purchased power, partially offset by decreased deferred fuel expense resulting primarily from higher fuel and purchased power costs. Entergy Arkansas' fuel cost recovery filings are discussed in Note 2 to the financial statements.

219

Other regulatory charges increased primarily due to:

Other Income Statement Variances

2006 Compared to 2005

Other operation and maintenance expenses increased primarily due to:

Taxes other than income taxes increased primarily due to an increase in city franchise tax expense due to a change in 2006 in the accounting for city franchise tax revenues as directed by the APSC. The change results in an increase in taxes other than income taxes with a corresponding increase in rider revenue, resulting in no effect on net income.

Depreciation and amortization expenses increased primarily due to an increase in plant in service and a revision in 2005 of estimated depreciable lives involving certain intangible assets.

2005 Compared to 2004

Other operation and maintenance expenses increased primarily due to an increase of $15.8 million in payroll and benefits costs, partially offset by a decrease of $2.7 million in information technology costs and a decrease of $2.4 million related to proceeds received from the radwaste settlement discussed below in "Significant Factors and Known Trends - Central States Compact Claim."

Other income increased primarily due to:

220

Income Taxes

The effective income tax rates for 2006, 2005, and 2004 were 24.7%, 35.7%, and 38.5%, respectively. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

Liquidity and Capital Resources

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$9,393 

$89,744 

$8,834 

Cash flow provided by (used in):

Operating activities

501,503 

507,711 

539,012 

Investing activities

(280,420)

(488,718)

(292,946)

Financing activities

(195,661)

(99,344)

(165,156)

Net increase (decrease) in cash and cash equivalents

25,422 

(80,351)

80,910 

Cash and cash equivalents at end of period

$34,815 

$9,393 

$89,744 

Operating Activities

Cash flow from operations decreased $6.2 million in 2006 compared to 2005 primarily due to an increase of $110.5 million in pension contributions, substantially offset by increased recovery of deferred fuel costs along with income tax refunds of $27.1 million in 2006 compared to income tax payments of $33.8 million in 2005.

In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $12 million of the refund to Entergy Arkansas.

Cash flow from operations decreased $31.3 million in 2005 compared to 2004 primarily due to income tax payments made in 2005 compared to income tax refunds received in 2004, partially offset by the timing of the collection of receivables from customers and the timing of payments to vendors.

Investing Activities

Net cash flow used in investing activities decreased $208.3 million in 2006 compared to 2005 primarily due to:

The decreases were partially offset by money pool activity.

221

Net cash flow used in investing activities increased $195.8 million in 2005 compared to 2004 primarily due to:

The increases were partially offset by money pool activity.

Financing Activities

Net cash flow used in financing activities increased $96.3 million in 2006 compared to 2005 primarily due to an increase of $93.9 million in common stock dividends paid and money pool activity. The increase was partially offset by the net retirement of $54.8 million of long-term debt in 2005.

Net cash flow used in financing activities decreased $65.8 million in 2005 compared to 2004 primarily due to money pool activity and a decrease of $21.7 million in common stock dividends in 2005, partially offset by the net retirement of $54.8 million of long-term debt in 2005.

See Note 5 to the financial statements for details on long-term debt. See "Sources of Capital" below for the details of Entergy Arkansas' preferred stock activity in 2006.

Capital Structure

Entergy Arkansas' capitalization is balanced between equity and debt, as shown in the following table.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Net debt to net capital

 

47.5%

 

47.4%

Effect of subtracting cash from debt

 

0.6%

 

0.1%

Debt to capital

 

48.1%

 

47.5%

Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas' financial condition.

Uses of Capital

Entergy Arkansas requires capital resources for:

222

Following are the amounts of Entergy Arkansas' planned construction and other capital investments, existing debt and lease obligations (includes estimated interest payments), and other purchase obligations:

 

 

2007

 

2008-2009

 

2010-2011

 

after 2011

 

Total

 

 

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

 

  capital investment (1)

 

$287

 

$781

 

N/A

 

N/A

 

$1,068

Long-term debt

 

$64

 

$128

 

$222

 

$2,013

 

$2,427

Capital lease payments

 

$3

 

$2

 

$-

 

$2

 

$7

Operating leases

 

$28

 

$39

 

$55

 

$7

 

$129

Purchase obligations (2)

 

$534

 

$1,007

 

$849

 

$2,194

 

$4,584

Nuclear fuel lease obligations (3)

 

$53

 

$71

 

N/A

 

N/A

 

$124

(1)

Includes approximately $201 to $206 million annually for maintenance capital, which is planned spending on routine capital projects that are necessary to support reliability of service, equipment or systems and to support normal customer growth.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For Entergy Arkansas, almost all of the total consists of unconditional fuel and purchased power obligations, including its obligations under the Unit Power Sales Agreement, which is discussed in Note 8 to the financial statements.

(3)

It is expected that additional financing under the leases will be arranged as needed to acquire additional fuel, to pay interest, and to pay maturing debt. If such additional financing cannot be arranged, however, Entergy Arkansas must repurchase sufficient nuclear fuel to allow the lessor to meet its obligations.

In addition to these contractual obligations, Entergy Arkansas expects to contribute $7 million to its pension plans and $17.8 million to other postretirement plans in 2007.

The planned capital investment estimate for Entergy Arkansas also reflects capital required to support existing business and customer growth, including the acquisition of generation resources identified in Entergy's supply plan initiative. As part of an ongoing needs assessment and requests for proposal (RFP) process, Entergy issued an RFP for long-term resources in January 2006. Based upon the final evaluation of the proposals submitted in response to the RFP for long-term resources, on January 31, 2007, Entergy Services was authorized as agent for the respective purchasing Utility operating companies to enter into further negotiations with several selected resources, including load-following, combined cycle gas-fired generation in Arkansas.

The estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, market volatility, economic trends, environmental compliance, and the ability to access capital. Management provides more information on long-term debt and preferred stock maturities in Notes 5 and 6 to the financial statements.

As a wholly-owned subsidiary, Entergy Arkansas pays dividends to Entergy Corporation from its earnings at a percentage determined monthly. Entergy Arkansas' long-term debt indentures restrict the amount of retained earnings available for the payment of cash dividends or other distributions on its common and preferred stock. As of December 31, 2006, Entergy Arkansas had restricted retained earnings unavailable for distribution to Entergy Corporation of $396.4 million.

Sources of Capital

Entergy Arkansas' sources to meet its capital requirements include:

223

In March 2006, Entergy Arkansas issued 3,000,000 shares of $25 par value 6.45% Series Preferred Stock. The dividends are cumulative and payable quarterly beginning July 1, 2006. The preferred stock is redeemable on or after April 1, 2011, at Entergy Arkansas' option, at the call price of $25 per share. In April 2006, Entergy Arkansas used the proceeds from this issuance to redeem all outstanding shares of the following series of preferred stock:

Series of Entergy Arkansas Preferred Stock

 

Redemption Price Per Share

     

7.32% Preferred Stock, Cumulative, $100.00 par value

 

$103.17

7.80% Preferred Stock, Cumulative, $100.00 par value

 

$103.25

7.40% Preferred Stock, Cumulative, $100.00 par value

 

$102.80

7.88% Preferred Stock, Cumulative, $100.00 par value

 

$103.00

$1.96 Preferred Stock, Cumulative, $0.01 par value

 

$ 25.00

In June 2006, Entergy Arkansas issued $54.7 million of 4.60% Series Jefferson County bonds due October 2017. The proceeds were used to redeem, prior to maturity, $45.5 million 5.6% Series of Jefferson County bonds and $9.2 million 6.3% Series of Jefferson County bonds in July 2006. The issuance and redemptions are not shown on the cash flow statement because the proceeds from the issuance were placed in a trust and never held as cash by Entergy Arkansas.

Entergy Arkansas may refinance or redeem debt and preferred stock prior to maturity, to the extent market conditions and interest and dividend rates are favorable.

All debt and common and preferred stock issuances by Entergy Arkansas require prior regulatory approval. Preferred stock and debt issuances are also subject to issuance tests set forth in Entergy Arkansas' corporate charters, bond indentures, and other agreements. Entergy Arkansas has sufficient capacity under these tests to meet its foreseeable capital needs.

In April 2006, Entergy Arkansas renewed its $85 million credit facility through April 30, 2007. The facility is no longer subject to a combined borrowing limit with Entergy Louisiana's credit facility. The $85 million credit facility requires that Entergy Arkansas maintain total shareholders' equity of at least 25% of its total assets. There were no outstanding borrowings under the Entergy Arkansas credit facility as of December 31, 2006.

Entergy Arkansas' receivables from or (payables to) the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

             

$16,109

 

($27,346)

 

$23,561

 

($69,153)

See Note 4 to the financial statements for a description of the money pool.

Short-term borrowings by Entergy Arkansas, including borrowings under the money pool, are limited to an amount authorized by the FERC, which is $250 million. The FERC has jurisdiction over these short-term borrowings effective with the repeal of PUHCA 1935 on February 8, 2006 and has issued an order effective through March 31, 2008. See Note 4 to the financial statements for further discussion of Entergy Arkansas' short-term borrowing limits.

Significant Factors and Known Trends

State and Local Rate Regulation

The rates that Entergy Arkansas charges for its services significantly influence its financial position, results of operations, and liquidity. Entergy Arkansas is closely regulated and the rates charged to its customers are determined in regulatory proceedings. The APSC, a governmental agency, is primarily responsible for approval of the rates charged to customers.

224

In August 2006, Entergy Arkansas filed with the APSC a request for a change in base rates. Entergy Arkansas requested a general base rate increase of $150 million (using an ROE of 11.25%), as well as recovery of FERC-allocated costs pursuant to the FERC decision on the System Agreement. Entergy Arkansas also requested a capacity management rider to recover incremental capacity costs. In February 2007, the APSC Staff and intervenors filed testimony in the case indicating that the parties generally favor recovery of the FERC-allocated System Agreement costs through a new rider.  Moreover, the parties commenting on the energy cost recovery rider supported retention of the energy cost recovery rider to recover fuel and purchased energy expense. Regarding the level of base rates, the APSC staff found a revenue requirement excess of $13.5 million.  The parties generally opposed recovering incremental capacity purchase charges through the proposed capacity management rider, although the APSC staff indicated such a rider might be appropriate for a proposed power plant acquisition once more facts were known. Entergy Arkansas rebuttal testimony is scheduled to be filed in March 2007. The procedural schedule calls for hearings to begin in April 2007.

In November 2006, Entergy Arkansas filed with the APSC a request to approve Entergy Arkansas' need for load-following generation resources. In January 2007, the APSC staff recommended that the APSC issue an order declaring that Entergy Arkansas has demonstrated a need to acquire capacity for load-following generation. Upon completion of negotiations with the final selected bidder, which is expected in third quarter 2007, Entergy Arkansas will file with the APSC a request to approve the specific capacity acquisition. Cost recovery for the new resource is being addressed in the general rate case.

Energy Cost Rate Investigation

In September 2005, Entergy Arkansas filed with the APSC an interim energy cost rate per the energy cost recovery rider that provides for an interim adjustment should the cumulative over- or under-recovery for the energy period exceed 10 percent of the energy costs for that period. As of the end of July 2005, the cumulative under-recovery of fuel and purchased power expenses had exceeded the 10 percent threshold due to increases in purchased power expenditures resulting from higher natural gas prices. The interim cost rate of $0.01900 per kWh became effective the first billing cycle in October 2005.

In early October 2005, the APSC initiated an investigation into Entergy Arkansas' interim rate. The investigation is focused on Entergy Arkansas' 1) gas contracting, portfolio, and hedging practices; 2) wholesale purchases during the period; 3) management of the coal inventory at its coal generation plants; and 4) response to the contractual failure of the railroads to provide coal deliveries. In March 2006, the APSC extended its investigation to cover the costs included in Entergy Arkansas' March 2006 filing requesting an energy cost rate of $0.02827 per kWh, which is discussed below. On April 7, 2006, the APSC issued a show cause order in the investigation proceeding that ordered Entergy Arkansas to file a cost of service study by June 8, 2006. The order also directed Entergy Arkansas to file testimony to support the cost of service study, to support the $0.02827 per kWh cost rate, and to address the general topic of elimination of the energy cost recovery rider.

On June 7, 2006, Entergy Arkansas filed a cost of service study and testimony supporting the redetermined energy cost rate and testimony addressing the prospective elimination of the energy cost recovery rider as ordered by the APSC. A hearing was held in the APSC energy cost recovery investigation on October 12, 2006 and post-hearing briefs were filed by Entergy Arkansas, the APSC General Staff, the Arkansas Attorney General, and the Arkansas Electric Energy Consumers. No party recommended termination of the energy cost recovery rider. In the January 16, 2007 order referenced below, the APSC stated the issue of whether Entergy Arkansas' energy cost recovery rider should be terminated, modified, or continued will be deferred and addressed in Entergy Arkansas' pending rate case.

As discussed above, in March 2006, Entergy Arkansas filed with the APSC its annual redetermination of the energy cost rate for application to the period April 2006 through March 2007. The filed energy cost rate of $0.02827 per kWh was proposed to replace the interim rate of $0.01900 per kWh that had been in place since October 2005, as discussed above. The increase in the energy cost rate was due to increases in the cost of purchased power primarily due to the natural gas cost increase and the effect that Hurricanes Katrina and Rita had on market conditions, increased demand for purchased power during the ANO 1 refueling and steam generator replacement outage in the fall of 2005, and coal plant generation curtailments during off-peak periods due to railroad delivery problems. On March 31, 2006, the APSC suspended implementation of the $0.02827

 

225

 

 

 per kWh energy cost rate, and ordered that the $0.01900 per kWh interim rate remain in effect pending the APSC proceedings on the energy cost recovery filings discussed above. In June 2006, Entergy Arkansas filed a motion with the APSC seeking again to implement the redetermined energy cost rate of $0.02827 per kWh. After a hearing, the APSC approved Entergy Arkansas' request and the redetermined rate was implemented in July 2006, subject to refund pending the outcome of the APSC energy cost recovery investigation.

On January 16, 2007, the APSC issued an order in its review of Entergy Arkansas' interim rate, mentioned above. The APSC found that Entergy Arkansas failed to maintain an adequate coal inventory level going into the summer of 2005 and that Entergy Arkansas should be responsible for any incremental energy costs resulting from two outages caused by employee and contractor error. As stated above, the coal plant generation curtailments were caused by railroad delivery problems. The APSC staff was directed to perform an analysis with Entergy Arkansas' assistance to determine the additional fuel and purchased energy costs associated with these findings and file the analysis within 60 days of the order. After a final determination of the costs is made by the APSC, Entergy Arkansas would be directed to refund that amount with interest to its customers as a credit on energy cost recovery rider that collects fuel and purchased energy costs. The order also stated that the APSC would address any additional issues regarding the energy cost recovery rider in the pending Entergy Arkansas rate case. Entergy Arkansas has requested rehearing of the order.

Federal Regulation

System Agreement Proceedings

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and of other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Interconnection Orders

See "Interconnection Orders" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Utility Restructuring

In April 1999, the Arkansas legislature enacted Act 1556, the Arkansas Electric Consumer Choice Act, providing for competition in the electric utility industry through retail open access. In December 2001, the APSC recommended to the Arkansas General Assembly that legislation be enacted during the 2003 legislative session to either repeal Act 1556 or further delay retail open access until at least 2010. In February 2003, the Arkansas legislature voted to repeal Act 1556 and the repeal was signed into law by the governor.

226

Central States Compact Claim

The Low-Level Radioactive Waste Policy Act of 1980 holds each state responsible for disposal of low-level radioactive waste originating in that state, but allows states to participate in regional compacts to fulfill their responsibilities jointly.  Arkansas and Louisiana participate in the Central Interstate Low-Level Radioactive Waste Compact (Central States Compact or Compact).  Commencing in early 1988, Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana made a series of contributions to the Central States Compact to fund the Central States Compact's development of a low-level radioactive waste disposal facility to be located in Boyd County, Nebraska.  In December 1998, Nebraska, the host state for the proposed Central States Compact disposal facility, denied the compact's license application for the proposed disposal facility.  Several parties, including the commission that governs the compact (the Compact Commission), filed a lawsuit against Nebraska seeking damages resulting from Nebraska's denial of the proposed facility's license.  After a trial, the U.S. District Court concluded that Nebraska violated its good faith obligations regarding the proposed waste disposal facility and rendered a judgment against Nebraska in the amount of $151 million.  In August 2004, Nebraska agreed to pay the Compact $141 million in settlement of the judgment. In July 2005, the Compact Commission decided to distribute a substantial portion of the proceeds from the settlement to the nuclear power generators that had contributed funding for the Boyd County facility, including Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana. On August 1, 2005, Nebraska paid $145 million, including interest, to the Compact, and the Compact distributed from the settlement proceeds $23.6 million to Entergy Arkansas, $19.9 million to Entergy Gulf States, and $19.4 million to Entergy Louisiana.  The proceeds were first applied to the existing regulatory asset, with the remainder causing an increase in pre-tax earnings of $7.4 million at Entergy Arkansas in 2005.

Nuclear Matters

Entergy Arkansas owns and operates, through an affiliate, the ANO 1 and ANO 2 nuclear power plants. Entergy Arkansas is, therefore, subject to the risks related to owning and operating nuclear plants. These include risks from the use, storage, handling and disposal of high-level and low-level radioactive materials, regulatory requirement changes, including changes resulting from events at other plants, limitations on the amounts and types of insurance commercially available for losses in connection with nuclear operations, and technological and financial uncertainties related to decommissioning nuclear plants at the end of their licensed lives, including the sufficiency of funds in decommissioning trusts. In the event of an unanticipated early shutdown of either ANO 1 or ANO 2, Entergy Arkansas may be required to file with the APSC a rate mechanism to provide additional funds or credit support to satisfy regulatory requirements for decommissioning.

The nuclear industry continues to address susceptibility to stress corrosion cracking of certain materials associated with components within the reactor coolant system. The issue is applicable to ANO and is managed in accordance with industry standard practices and guidelines. Several major modifications to the ANO units have been implemented, with the most recent project being the replacement of the ANO 2 pressurizer during the fall 2006 refueling outage. A replacement reactor vessel head is being fabricated for ANO 2 at this time. Routine inspections of the existing ANO 2 reactor vessel head have identified no significant material degradation issues for that component. These inspections will continue at planned refueling outages.

Environmental Risks

Entergy Arkansas' facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that Entergy Arkansas is in substantial compliance with environmental regulations currently applicable to its facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

227

Critical Accounting Estimates

The preparation of Entergy Arkansas' financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and the potential for future changes in the assumptions and measurements that could produce estimates that would have a material effect on the presentation of Entergy Arkansas' financial position or results of operations.

Nuclear Decommissioning Costs

See "Nuclear Decommissioning Costs" in the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the estimates inherent in accounting for nuclear decommissioning costs.

In the third quarter of 2005, Entergy Arkansas recorded a revision to its estimated decommissioning cost liability for ANO 2 in accordance with the receipt of approval by the NRC of Entergy Arkansas' application for a life extension for the unit. The revised estimate resulted in an $87.2 million reduction in its decommissioning liability, offset by a corresponding reduction in the related regulatory asset.

Unbilled Revenue

As discussed in Note 1 to the financial statements, Entergy Arkansas records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period, in addition to changes in certain components of the calculation.

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified, defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

228

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Qualified
Projected
Benefit Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$2,161

 

$23,016

Rate of return on plan assets

 

(0.25%)

 

$1,158

 

-

Rate of increase in compensation

 

0.25%

 

$1,007

 

$5,425

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$740

 

$4,220

Discount rate

 

(0.25%)

 

$438

 

$5,388

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for Entergy Arkansas in 2006 was $26.2 million. Entergy Arkansas anticipates 2007 qualified pension cost to decrease to $25 million. Entergy Arkansas contributed $114.5 million to its qualified pension plans in 2006, including the 2005 contribution of $10 million that was delayed until 2006 as a result of the Katrina Emergency Tax Relief Act. Entergy Arkansas' contributions to the pension trust are projected to be $7 million in 2007.

Entergy Arkansas' qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, Entergy Arkansas was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005, Entergy Arkansas' qualified pension additional minimum liability was $146 million. Entergy Arkansas' intangible asset for the unrecognized prior service cost was $7.6 million and the regulatory asset was $138 million at December 31, 2005. Net income for 2005 and 2004 was not affected. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Total postretirement health care and life insurance benefit costs for Entergy Arkansas in 2006 were $15.4 million, including $6.2 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy Arkansas expects 2007 postretirement health care and life insurance benefit costs to approximate $15.4 million, including $5.5 million in savings due to the estimated effect of future Medicare Part D subsidies.

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

 

229

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Arkansas, Inc.:

We have audited the accompanying balance sheets of Entergy Arkansas, Inc. (the "Company") as of December 31, 2006 and 2005, and the related statements of income, retained earnings, and cash flows (pages 231 through 236 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such financial statements present fairly, in all material respects, the financial position of Entergy Arkansas, Inc. as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

230

 

 

 

ENTERGY ARKANSAS, INC.
INCOME STATEMENTS
         
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $2,092,683    $1,789,055    $1,653,145 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   429,718    22,151    210,394 
  Purchased power   614,246    755,277    484,849 
  Nuclear refueling outage expenses   29,478    27,892    24,568 
  Other operation and maintenance   437,574    392,777    384,424 
Decommissioning   30,695    31,205    32,902 
Taxes other than income taxes   75,585    39,011    35,848 
Depreciation and amortization   216,919    203,836    206,926 
Other regulatory charges (credits) - net   (25,794)   959    (20,501)
TOTAL   1,808,421    1,473,108    1,359,410 
             
OPERATING INCOME   284,262    315,947    293,735 
             
OTHER INCOME            
Allowance for equity funds used during construction   7,630    11,614    11,737 
Interest and dividend income   24,720    22,941    10,298 
Miscellaneous - net   (4,115)   (2,408)   (6,354)
TOTAL   28,235    32,147    15,681 
             
INTEREST AND OTHER CHARGES  
Interest on long-term debt   76,932    78,527    79,521 
Other interest - net   8,877    6,465    4,909 
Allowance for borrowed funds used during construction   (3,290)   (8,482)   (6,288)
TOTAL   82,519    76,510    78,142 
             
INCOME BEFORE INCOME TAXES   229,978    271,584    231,274 
             
Income taxes   56,824    96,949    89,064 
             
NET INCOME   173,154    174,635    142,210 
             
Preferred dividend requirements and other   7,560    7,776    7,776 
             
EARNINGS APPLICABLE TO            
COMMON STOCK   $165,594    $166,859    $134,434 
             
See Notes to Financial Statements.            

231

 

 

 

 

 

 

 

 

 

 

(Page left blank intentionally)

232

 

ENTERGY ARKANSAS, INC.
STATEMENTS OF CASH FLOWS
     
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING ACTIVITIES            
Net income   $173,154    $174,635    $142,210 
Adjustments to reconcile net income to net cash flow provided by operating activities:            
  Reserve for regulatory adjustments   22,310    (3,231)   3,099 
  Other regulatory charges (credits) - net   (25,794)   959    (20,501)
  Depreciation, amortization, and decommissioning   247,614    235,041    239,828 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   46,454    106,605    149,301 
  Changes in working capital:            
    Receivables   (49,943)   6,495    (63,003)
    Fuel inventory   (10,631)   (8,044)   2,424 
    Accounts payable   (42,296)   64,558    28,282 
    Taxes accrued   37,161    (35,874)   35,874 
    Interest accrued   372    (2,169)   (48)
    Deferred fuel costs   202,025    773    6,880 
    Other working capital accounts   (4,947)   (14,690)   23,192 
  Provision for estimated losses and reserves   1,576    (1,387)   (1,281)
  Changes in other regulatory assets   (39,128)   71,932    37,668 
  Other   (56,424)   (87,892)   (44,913)
Net cash flow provided by operating activities   501,503    507,711    539,012 
             
INVESTING ACTIVITIES            
Construction expenditures   (259,409)   (317,112)   (270,427)
Allowance for equity funds used during construction   7,630    11,614    11,737 
Nuclear fuel purchases   (51,118)   (72,290)   (8,101)
Proceeds from sale/leaseback of nuclear fuel   49,027    72,290    8,101 
Proceeds from nuclear decommissioning trust fund sales   105,658    203,772    142,508 
Investment in nuclear decommissioning trust funds   (116,099)   (212,966)   (151,368)
Change in money pool receivable - net   (16,109)   23,561    (23,561)
Changes in other investments - net   -    -    1,856 
Other regulatory investments     (197,587)   (3,691)
Net cash flow used in investing activities   (280,420)   (488,718)   (292,946)
             
FINANCING ACTIVITIES            
Proceeds from the issuance of:            
  Long-term debt   -   272,702    59,429 
  Preferred stock   73,355     
Retirement of long-term debt     (327,516)   (61,856)
Redemption of preferred stock   (75,885)    
Change in money pool payable - net   (27,346)   27,346    (69,153)
Dividends paid:            
  Common stock   (158,000)   (64,100)   (85,800)
  Preferred stock   (7,785)   (7,776)   (7,776)
Net cash flow used in financing activities   (195,661)   (99,344)   (165,156)
             
Net increase (decrease) in cash and cash equivalents   25,422    (80,351)   80,910 
             
Cash and cash equivalents at beginning of period   9,393    89,744    8,834 
             
Cash and cash equivalents at end of period   $34,815    $9,393    $89,744 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
Cash paid/(received) during the period for:            
  Interest - net of amount capitalized   $73,250    $77,821    $78,144 
  Income taxes   ($27,080)   $33,792    ($103,476)
             
See Notes to Financial Statements.            

 

233

 

 

ENTERGY ARKANSAS, INC.
BALANCE SHEETS
ASSETS
         
  December 31,
  2006   2005
  (In Thousands)
         
CURRENT ASSETS        
Cash and cash equivalents:        
  Cash   $2,849    $9,393 
  Temporary cash investments - at cost,        
   which approximates market   31,966   
     Total cash and cash equivalents   34,815    9,393 
Accounts receivable:        
  Customer   105,347    115,321 
  Allowance for doubtful accounts   (15,257)   (15,777)
  Associated companies   57,554    30,902 
  Other   114,108    63,702 
  Accrued unbilled revenues   66,876    68,428 
     Total accounts receivable   328,628    262,576 
Deferred fuel costs   2,157    153,136 
Accumulated deferred income taxes   19,232   
Fuel inventory - at average cost   22,973    12,342 
Materials and supplies - at average cost   100,061    87,875 
Deferred nuclear refueling outage costs   23,678    30,967 
Prepayments and other   6,368    9,628 
TOTAL   537,912    565,917 
         
OTHER PROPERTY AND INVESTMENTS        
Investment in affiliates - at equity   11,206    11,206 
Decommissioning trust funds   439,408    402,124 
Non-utility property - at cost (less accumulated depreciation)   1,446    1,449 
Other   2,976    2,976 
TOTAL   455,036    417,755 
          
UTILITY PLANT        
Electric   6,599,348    6,344,435 
Property under capital lease   5,260    9,900 
Construction work in progress   113,069    139,208 
Nuclear fuel under capital lease   124,850    92,181 
Nuclear fuel   21,044    22,616 
TOTAL UTILITY PLANT   6,863,571    6,608,340 
Less - accumulated depreciation and amortization   2,986,576    2,843,904 
UTILITY PLANT - NET   3,876,995    3,764,436 
         
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:        
  SFAS 109 regulatory asset - net   93,682    61,236 
  Other regulatory assets   542,052    461,015 
  Deferred fuel costs   -    51,046 
Other   35,359    46,605 
TOTAL   671,093    619,902 
         
TOTAL ASSETS   $5,541,036    $5,368,010 
         
See Notes to Financial Statements.        
 
 

234

 

 
ENTERGY ARKANSAS, INC.
BALANCE SHEETS
LIABILITIES AND SHAREHOLDERS' EQUITY
 
  December 31,
  2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
Accounts payable:        
  Associated companies   $64,546   $135,357
  Other   117,655   120,090
Customer deposits   49,978   45,432
Taxes accrued   37,161   -
Accumulated deferred income taxes   -   56,186
Interest accrued   19,579   19,207
Obligations under capital leases   56,265   46,857
Other   15,372   21,836
TOTAL   360,556   444,965
         
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued   1,243,855   1,105,712
Accumulated deferred investment tax credits   59,834   64,001
Obligations under capital leases   73,845   55,224
Other regulatory liabilities   103,350   76,507
Decommissioning   472,810   442,115
Accumulated provisions   14,539   12,963
Pension and other postretirement liabilities   259,147   235,584
Long-term debt   1,306,201   1,298,238
Other   96,623   86,560
TOTAL   3,630,204   3,376,904
         
Commitments and Contingencies        
         
SHAREHOLDERS' EQUITY        
Preferred stock without sinking fund   116,350   116,350
Common stock, $0.01 par value, authorized 325,000,000        
 shares; issued and outstanding 46,980,196 shares in 2006        
 and 2005   470   470
Paid-in capital   588,528   591,102
Retained earnings   844,928   838,219
TOTAL   1,550,276   1,546,141
         
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY   $5,541,036   $5,368,010
         
See Notes to Financial Statements.        

235

 

 

ENTERGY ARKANSAS, INC.
STATEMENTS OF RETAINED EARNINGS
 
  For the Years Ended December 31,
  2006   2005   2004
  (In Thousands)
           
Retained Earnings, January 1 $838,219   $735,460   $686,826
           
  Add:          
    Net income 173,154   174,635   142,210
           
  Deduct:          
    Dividends declared on common stock 158,000   64,100   85,800
    Preferred dividend requirements and other 8,445   7,776   7,776
      Total 166,445   71,876   93,576
           
Retained Earnings, December 31 $844,928   $838,219   $735,460
           
           
See Notes to Financial Statements.          

236

 

 

ENTERGY ARKANSAS, INC.
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands)
                     
Operating revenues   $2,092,683   $1,789,055   $1,653,145   $1,589,670   $1,561,110
Net Income   $173,154   $174,635   $142,210   $126,009   $135,643
Total assets   $5,541,036   $5,368,010   $5,193,392   $5,058,078   $4,569,511
Long-term obligations (1)   $1,380,046   $1,353,462   $1,253,301   $1,406,026   $1,246,567
                     
(1) Includes long-term debt (excluding currently maturing debt) and noncurrent capital lease obligations.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Electric Operating Revenues:                    
  Residential   $706   $620   $539   $526   $556
  Commercial   418   348   305   291   304
  Industrial   436   362   318   305   330
  Governmental   19   18   16   15   15
    Total retail   1,579   1,348   1,178   1,137   1,205
  Sales for resale:                    
    Associated companies   328   192   250   234   165
    Non-associated companies   145   211   186   188   164
  Other   41   38   39   31   27
      Total   $2,093   $1,789   $1,653   $1,590   $1,561
Billed Electric Energy Sales (GWh):                    
  Residential   7,655   7,653   7,028   7,057   7,050
  Commercial   5,816   5,730   5,428   5,328   5,221
  Industrial   7,587   7,334   7,004   6,999   7,074
  Governmental   273   288   275   266   255
    Total retail   21,331   21,005   19,735   19,650   19,600
  Sales for resale:                    
    Associated companies   7,679   4,555   7,437   7,036   6,811
    Non-associated companies   2,929   4,103   4,911   5,399   5,069
      Total   31,939   29,663   32,083   32,085   31,480
                     

 

237

 

 

 

ENTERGY GULF STATES, INC.

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

 

Hurricane Rita and Hurricane Katrina

In August and September 2005, Hurricanes Katrina and Rita hit Entergy Gulf States' service territory in Louisiana and Texas. The storms resulted in power outages; significant damage to electric distribution, transmission, and generation infrastructure; and the temporary loss of sales and customers due to mandatory evacuations. Total restoration costs through December 31, 2006 for the repair or replacement of Entergy Gulf States' electric facilities damaged by Hurricanes Katrina and Rita and for business continuity are $634 million ($205 million in Louisiana and $429 million in Texas, and including $10 million in AFUDC), the majority of which is due to Hurricane Rita. The costs include $302 million in construction expenditures and $332 million recorded originally as regulatory assets. Entergy Gulf States recorded regulatory assets in accordance with its accounting policies because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable, based on historic treatment of such costs in its service territories and communications with local regulators. These costs do not include other potential incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates, which base rate revenue was not received due to a loss of anticipated sales. Entergy Gulf States expects its additional storm restoration spending will be approximately $5 million.

Entergy is pursuing a broad range of initiatives to recover storm restoration and business continuity costs and incremental losses. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for Hurricanes Katrina and Rita, and pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, in combination with securitization.

See Note 8 to the financial statements for a discussion of Entergy's non-nuclear property insurance program. Entergy is currently evaluating the amount of the covered losses for Entergy and each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. Entergy has been notified by its primary insurer, OIL, that it expects claims for both Hurricanes Katrina and Rita to materially exceed the aggregation limit of $1 billion for all parties insured by OIL for any one occurrence. Entergy Gulf States has received $27 million through December 31, 2006 on its hurricane loss insurance claims. Entergy Gulf States currently estimates that its remaining net insurance recoveries for the losses caused by the hurricanes, including the effect of the OIL aggregation limit being exceeded, will be approximately $84 million.

In December 2005, the U.S. Congress passed the Katrina Relief Bill, a hurricane aid package that includes $11.5 billion in Community Development Block Grants (CDBG) (for the states affected by Hurricanes Katrina, Rita, and Wilma) that allows state and local leaders to fund individual recovery priorities. The bill includes language that permits funding to be provided for infrastructure restoration. In September 2006, Entergy Gulf States presented a revised CDBG request to the Louisiana Recovery Authority's Infrastructure Committee. The updated request of $183 million includes estimated spending necessary for restoration in Louisiana net of estimated insurance proceeds. The Louisiana Recovery Authority has not acted on Entergy Gulf States' request.

Storm Costs Recovery Filings with Retail Regulators

In July 2006, Entergy Gulf States filed an application with the PUCT with respect to the $393.2 million of Hurricane Rita reconstruction costs incurred in its Texas service territory through March 31, 2006. The filing asked the PUCT to determine that $393.2 million is the amount of reasonable and necessary hurricane reconstruction costs eligible for securitization and recovery, approve the recovery of carrying costs, and approve the manner in which Entergy Gulf States allocates those costs among its Texas retail customer classes.  This was the first of two filings authorized by a law passed earlier in 2006 in a special session of the Texas Legislature. In December 2006, the PUCT approved $381 million ($353 million net of expected insurance proceeds) as the reasonable and necessary hurricane reconstruction costs incurred through March 31, 2006, plus carrying costs, as eligible for recovery. In February 2007, the PUCT voted to approve securitization of the $353 million in storm cost recovery expenses, but it also offset the securitization amount by $31.6 million, which the PUCT Commissioners determined was the net present value of the accumulated deferred income tax benefits related to the storm costs. The PUCT further voted to impose certain caps on the amount of qualified transaction costs that can

 

238

 

 

 be included in the total securitization amount. The PUCT is expected to issue a financing order authorizing the issuance of securitization bonds by early-March 2007, and Entergy Gulf States intends to implement rates to recover revenues to pay the securitization bonds by mid-2007. Entergy Gulf States will file a semi-annual report with the PUCT to reflect any additional insurance proceeds or other government grant money received, which would be applied against the storm cost recovery balance.

In May 2006, Entergy Gulf States completed the $6 million interim recovery of storm costs in its Louisiana service territory through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, Entergy Gulf States' interim storm cost recovery of approximately $0.85 million per month was instituted via the formula rate plan.  Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Gulf States' supplemental and amending storm cost recovery application, which is discussed below.

On July 31, 2006, Entergy Louisiana and Entergy Gulf States (for its Louisiana service territory) filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC: (1) review Entergy Louisiana's and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in Louisiana and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, including carrying costs, based on a ten-year levelized rate, are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Securitized Storm Cost Recovery Riders (SSCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SSCRRs be adjusted annually (or semi-annually if needed) to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SSCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States.

On February 28, 2007, Entergy Louisiana and Entergy Gulf States filed rebuttal testimony and filed a second supplemental and amending application by which they seek authority from the LPSC to securitize their storm cost recovery and storm reserve amounts, together with certain debt retirement costs and upfront and ongoing costs of the securitized debt issued. The filing updates actual storm-related costs through January 2007 and estimated future costs, declaring that Entergy Louisiana's costs are $561 million and Entergy Gulf States' costs are $219 million. The filing also updates the requested storm reserve amounts, requesting $141 million for Entergy Louisiana and $87 million for Entergy Gulf States. Securitization is authorized by a law signed by the Governor of Louisiana in May 2006. Hearings are scheduled for April 2007.

Results of Operations

Net Income

2006 Compared to 2005

Net income increased $5.5 million primarily due to higher net revenue and higher other income, substantially offset by higher other operation and maintenance expenses, higher taxes other than income taxes, and higher interest and other charges.

239

2005 Compared to 2004

Net income increased $14.2 million primarily due to higher net revenue and lower interest expense, partially offset by lower other income and higher taxes other than income taxes.

Net Revenue

2006 Compared to 2005

Net revenue, which is Entergy Gulf States' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2006 to 2005.

 

 

Amount

 

 

(In Millions)

 

 

 

2005 net revenue

 

$1,191.7 

Base revenues

 

62.0 

Net wholesale revenue

 

29.3 

Volume/weather

 

20.6 

Fuel recovery

 

17.0 

Reserve equalization

 

12.3 

Price applied to unbilled electric sales

 

(51.4)

Purchased power capacity

 

(24.7)

Other

 

18.2 

2006 net revenue

 

$1,275.0 

Base revenues increased due to increases in both the Louisiana and Texas service territories. The increases in the Louisiana service territory were effective in October 2005 for the 2004 formula rate plan filing and the annual revenue requirement related to the purchase of power from the Perryville generating station and in September 2006 for the 2005 formula rate plan filing that includes the recovery of incremental deferred and ongoing capacity requirement. The increases in the Texas service territory are related to an incremental purchased capacity recovery rider that began in December 2005 and a transition to competition rider that began in March 2006. Refer to Note 2 to the financial statements and "Significant Factors and Known Trends - State and Local Rate Regulation" herein for further discussion of the rate increases.

The net wholesale revenue variance is primarily due to increased volume and higher margins on sales to municipal and co-op customers.

The volume/weather variance is due to increased weather-adjusted electricity usage on billed sales in addition to an increase in usage during the unbilled sales period. Weather-adjusted retail electricity usage increased a total of 727 GWh. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The fuel recovery variance resulted primarily from adjustments of fuel clause recoveries in Entergy Gulf States' Louisiana service territory. The variance is also due to increased fuel cost recovery in 2006 as a result of special rate contracts.

The reserve equalization variance is due to lower payments in 2006 as a result of resource plan capacity purchases effective February 2006 and power purchases from the Perryville generating station effective July 2005, both of which reduced the amount of system-wide capacity allocated to Entergy Gulf States.

The price applied to unbilled electric sales variance is primarily due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. The variance is also due to lower base rates included in the unbilled revenue calculations. See "Critical

 

240

 

 

 Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The purchased power capacity variance is primarily due to an increase in capacity charges primarily associated with power purchases, which began in mid-2005, from the Perryville generating station in addition to new purchased power contracts in 2006. A portion of the increase in purchased power capacity costs is offset in base revenues due to base rate increases implemented to recover incremental deferred and ongoing purchased power capacity charges, as discussed above.

Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

Gross operating revenues increased primarily due to an increase of $299 million in fuel cost recovery revenues due to higher fuel rates and higher volume. Also contributing to the increase was the base revenue increase of $62 million and the volume/weather variance of $20.6 million. The increases were partially offset by the decrease of $51.4 million in the price applied to unbilled electric sales and a decrease in gross wholesale revenue of $30 million.

Fuel and purchased power expenses increased primarily due to an increase in deferred fuel expense due to higher fuel rates partially offset by decreases in the average market prices of natural gas and purchased power.

Other regulatory charges increased primarily due to:

Partially offsetting the increase was a regulatory credit of $4.5 million recorded during the second quarter of 2006 as a result of Entergy Gulf States reinstating the application of regulatory accounting principles to its wholesale business. Refer to "Application of SFAS 71" in Note 1 to the financial statements for further discussion.

2005 Compared to 2004

Net revenue, which is Entergy Gulf States' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing 2005 to 2004.

 

 

Amount

 

 

(In Millions)

 

 

 

2004 net revenue

 

$1,149.8 

Price applied to unbilled electric sales

 

44.2 

Rate refund provisions

 

22.1 

Base rates

 

8.4 

Net wholesale revenue

 

(14.7)

Volume/weather

 

(13.4)

Other

 

(4.7)

2005 net revenue

 

$1,191.7 

241

The price applied to unbilled electric sales variance is due to an increase in the fuel cost component of the price applied to unbilled sales in 2005. The fuel cost component is higher because of an increase in natural gas costs. The increase was also due to an increase in the base price applied to unbilled sales in both the Louisiana and Texas service territories. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The rate refund provisions variance is due to provisions recorded in 2004 for potential rate actions and refunds.

The increase in electric base rates is due to the implementation of the LPSC formula rate plan rate increase effective with the first billing cycle of October 2005.

The net wholesale revenue variance is primarily due to lower margins on sales to municipal and co-op customers.

The volume/weather variance is primarily due to decreased usage primarily during the unbilled sales period and decreased weather-adjusted usage on billed sales primarily due to the effects of Hurricanes Katrina and Rita. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues. The decrease was partially offset by more favorable weather on billed sales compared to 2004.

Gross operating revenues and fuel and purchased power expenses

Gross operating revenues increased primarily due to:

Fuel and purchased power expenses increased primarily due to an increase in the market prices of natural gas and purchased power.

Other Income Statement Variances

2006 Compared to 2005

Other operation and maintenance expenses increased primarily due to:

242

The increase was partially offset by a decrease of $5.8 million due to a planned decrease in vegetation maintenance.

Taxes other than income taxes increased primarily due to higher Louisiana local franchise taxes primarily due to higher gross revenues in 2006 and lower franchise taxes in 2005 due to the refund to customers in 2005.

Other income increased primarily due to the accrual of $24 million of carrying charges through December 31, 2006 on hurricane reconstruction costs approved by the PUCT. The PUCT approval and the securitization filing for the recovery of reconstruction costs are discussed above under "Storm Costs Recovery Filings with Retail Regulators".

Interest and other charges increased primarily due to the increase in long-term debt outstanding as a result of the funding of the storm restoration costs resulting from Hurricanes Katrina and Rita.

2005 Compared to 2004

Taxes other than income taxes increased primarily due to higher ad valorem, franchise, and employment taxes. Ad valorem taxes increased primarily due to the increase in fuel-based revenues.

Depreciation and amortization expenses increased primarily due to an increase in plant in service as well as a change in 2004 in the estimated salvage values of certain depreciable assets.

Other income decreased primarily due to miscellaneous income - net, which decreased $35.3 million as a result of the following:

The decrease in other income was partially offset by an increase in interest and dividend income primarily due to proceeds received from a radwaste settlement and an increase in AFUDC as a result of an increase in construction work in progress.

Interest on long-term debt decreased primarily due to the net retirement of $357 million of long-term debt in 2004, partially offset by the net issuance of $363.6 million of long-term debt issued in 2005. See "Liquidity and Capital Resources - Sources of Capital" below for tables of Entergy Gulf States' long-term debt issuances and retirements.

Income Taxes

The effective income tax rates were 33.6% for 2006, 34.8% for 2005, and 36.0% for 2004. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

243

Liquidity and Capital Resources

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$25,373 

$6,974 

$206,030 

Cash flow provided by (used in):

Operating activities

782,103 

61,993 

520,384 

Investing activities

(406,469)

(577,859)

(319,990)

Financing activities

(220,626)

534,265 

(399,450)

Net increase (decrease) in cash and cash equivalents

155,008 

18,399 

(199,056)

Cash and cash equivalents at end of period

$180,381 

$25,373 

$6,974 

Operating Activities

Cash flow from operations increased $720.1 million in 2006 compared to 2005 primarily due to:

In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $23 million of the refund to Entergy Gulf States.

Cash flow from operations decreased by $458.4 million in 2005 compared to 2004 primarily due to:

Investing Activities

Net cash used in investing activities decreased $171.4 million in 2006 compared to 2005 primarily due to a decrease in under-recovered fuel and purchased power expenses of $138.9 million in the Texas service territory that have been deferred and are expected to be collected over a period greater than twelve months and money pool activity. See Note 1 to the financial statements for further discussion of the accounting for fuel costs.

Net cash used in investing activities increased $257.9 million in 2005 compared to 2004 primarily due to money pool activity, an increase in under-recovered fuel and purchased power expenses of $102.6 million in Texas that have been deferred and are expected to be collected over a period greater than twelve months, and the maturity in 2004 of $23.6 million of other investments that provided cash in 2004. See Note 1 to the financial statements for further discussion of the accounting for fuel costs.

244

Capital expenditures made as a result of Hurricane Rita and Hurricane Katrina were approximately $170 million during 2006 and approximately $122 million during 2005.

Financing Activities

Financing activities used cash of $220.6 million in 2006 compared to providing cash of $534.3 million in 2005 primarily due to the following:

  • the net issuance of $363.6 million of long-term debt in 2005;
  • a capital contribution of $300 million in 2005 from Entergy Corporation; and
  • an increase of $151.3 million in common stock dividends paid.

The use of cash was partially offset by money pool activity.

Financing activities provided cash of $534.3 million in 2005 compared to using cash of $399.5 million in 2004 primarily due to the capital contribution of $300 million received from Entergy Corporation and the net issuance of $363.6 million of long-term debt in 2005 compared to the net retirement of $357 million of long-term debt in 2004. See "Sources of Capital" below for tables of Entergy Gulf States' long-term debt issuances and retirements.

See Note 5 to the financial statements for details on long-term debt.

Capital Structure

Entergy Gulf States' capitalization is balanced between equity and debt, as shown in the following table.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Net debt to net capital

 

50.1%

 

51.4%

Effect of subtracting cash from debt

 

1.9%

 

0.3%

Debt to capital

 

52.0%

 

51.7%

Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, preferred stock with sinking fund, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Gulf States uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Gulf States' financial condition.

Uses of Capital

Entergy Gulf States requires capital resources for:

245

Following are the amounts of Entergy Gulf States' planned construction and other capital investments, existing debt and lease obligations (includes estimated interest payments), and other purchase obligations:

 

2007

 

2008-2009

 

2010-2011

 

after 2011

 

Total

 

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

  capital investment (1)

$307

 

$596

 

N/A

 

N/A

 

$903

Long-term debt

$130

 

$1,121

 

$479

 

$1,750

 

$3,480

Operating leases

$23

 

$39

 

$21

 

$89

 

$172

Purchase obligations (2)

$172

 

$77

 

$62

 

$116

 

$427

Other long-term liabilities

$3

 

$5

 

$2

 

$-

 

$10

Nuclear fuel lease obligations (3)

$25

 

$49

 

N/A

 

N/A

 

$74

(1)

Includes approximately $218 to $251 million annually for maintenance capital, which is planned spending on routine capital projects that are necessary to support reliability of service, equipment or systems and to support normal customer growth.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For Entergy Gulf States, it primarily includes unconditional fuel and purchased power obligations.

(3)

It is expected that additional financing under the leases will be arranged as needed to acquire additional fuel, to pay interest, and to pay maturing debt. If such additional financing cannot be arranged, however, Entergy Gulf States must repurchase sufficient nuclear fuel to allow the lessor to meet its obligations.

Entergy Gulf States expects to contribute $25.3 million to its pension plans and $14.4 million to other postretirement plans in 2007.

The planned capital investment estimate for Entergy Gulf States reflects capital required to support existing business and customer growth. On January 31, 2007, Entergy Gulf States announced that it has signed an agreement to purchase the Calcasieu Generating Facility, a 322 MW power plant, from Dynegy Inc., for approximately $57 million. The facility is a simple-cycle gas-fired generating facility located near the city of Sulphur in southwestern Louisiana. Units 1 and 2 of the facility entered commercial service in 2000 and 2001, respectively. Entergy Gulf States plans to invest approximately $6 million in facility upgrades at the Calcasieu generating facility with transaction costs estimated at $3 million, bringing the total capital cost of the project to approximately $66 million.

The estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental compliance, market volatility, economic trends, business restructuring, and the ability to access capital. Management provides more information on long-term debt and preferred stock maturities in Notes 5 and 6 to the financial statements.

The planned construction and capital investments given above do not include the costs associated with the potential interconnection between Entergy Gulf States and ERCOT that is discussed in Note 2 to the financial statements. These potential costs are currently estimated to be approximately $1 billion.

As a wholly-owned subsidiary, Entergy Gulf States pays dividends to Entergy Corporation from its earnings at a percentage determined monthly. Entergy Gulf States' long-term debt indentures contain restrictions on the payment of cash dividends or other distributions on its common and preferred stock. Currently, all of Entergy Gulf States' retained earnings are available for distribution.

246

Sources of Capital

Entergy Gulf States' sources to meet its capital requirements include:

Entergy Gulf States may refinance or redeem debt and preferred stock prior to maturity, to the extent market conditions and interest and dividend rates are favorable.

All debt and common and preferred stock issuances by Entergy Gulf States require prior regulatory approval. Preferred stock and debt issuances are also subject to issuance tests set forth in its corporate charter, bond indentures, and other agreements. Entergy Gulf States has sufficient capacity under these tests to meet its foreseeable capital needs.

Entergy Gulf States' receivables from or (payables to) the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

 

 

 

 

 

 

 

$75,048

 

$64,011

 

($59,720)

 

$69,354

See Note 4 to the financial statements for a description of the money pool.

Prior to February 8, 2006, borrowings and securities issuances by Entergy Gulf States were limited to amounts authorized by the SEC. Effective with repeal of PUHCA 1935 on that date, the FERC, under the Federal Power Act, has jurisdiction over all of the securities issuances by Entergy Gulf States. After the effective date of PUHCA 1935 repeal, the FERC has issued two orders authorizing long- and short-term securities issuances by Entergy Gulf States. The short-term authority extends through March 31, 2008 in an aggregate amount, at any one time outstanding, of up to $350 million. The long-term authority also extends through March 31, 2008.

Significant Factors and Known Trends

Transition to Retail Competition

Texas

In June 2005, a Texas law was enacted which provides that:

 

247

 

 

Entergy Gulf States made the January 2006 filing regarding the identification of power region(s) required by the 2005 legislation, and based on the statutory requirements for the certification of a qualified power region (QPR), previous PUCT rulings, and Entergy Gulf States' geographical location, Entergy Gulf States identified three potential power regions:

  1. Electric Reliability Council of Texas (ERCOT) as the power region and Independent Organization (IO);
  2. Southwest Power Pool (SPP) as the power region and IO; and
  3. the Entergy market as the power region and the Independent Coordinator of Transmission (ICT) as the IO.

Based on previous rulings of the PUCT, and absent reconsideration of those rulings, Entergy Gulf States believes that the third alternative, an ICT operating in Entergy's market area, is not likely to be a viable QPR alternative at this time. Accordingly, while noting this alternative, Entergy Gulf States' January 2006 filing focused on the first two alternatives, which were expected to meet the statutory requirements for certification so long as certain key implementation issues could be resolved. Entergy Gulf States' filing enumerated and discussed the corresponding steps and included a high-level schedule associated with certifying either of these two power regions.

Entergy Gulf States' filing did not make a recommendation between ERCOT and the SPP as a power region. Rather, the filing discussed the major issues that must be resolved for either of those alternatives to be implemented. In the case of ERCOT, the major issue is the cost and time related to the construction of facilities to interconnect Entergy Gulf States' Texas operations with ERCOT, while addressing the interest of Entergy Gulf States' retail customers and certain wholesale customers in access to generation outside of Texas. With respect to the SPP, the major issue is the development of protocols that would ultimately be necessary to implement retail open access. Entergy Gulf States recommended that the PUCT open a project for the purpose of involving stakeholders in the selection of the single power region that Entergy Gulf States should request for certification. In August 2006, the PUCT staff recommended that Entergy Gulf States be required to provide additional information on both the ERCOT option and the SPP option. The PUCT accepted the PUCT staff's recommendation and stated the need for a "robust record" to make a decision on the applicable power region.

As required by the June 2005 legislation, Entergy Gulf States filed its proposed transition to competition plan in December 2006 and maintained that to achieve full customer choice, Entergy Gulf States should join ERCOT since it already has all of the prerequisites for retail choice. The plan contains several conditions, including cost recovery mechanisms, that must be met before Entergy Gulf States could proceed with the plan, and identifies several legislative requirements needed to accomplish the required infrastructure improvements. Assuming that these conditions can be met, retail open access could commence in 2013. Entergy Gulf States' filing includes an estimate that construction costs for facilities to interconnect Entergy Gulf States' Texas operations with ERCOT could be approximately $1 billion. The PUCT has 180 days to accept, reject, or modify the plan. The Texas Legislature began its session on January 9, 2007.

In December 2006, the PUCT asked for parties to brief the effects of the 2005 legislation on the competition dockets of Entergy Gulf States, most notably, the settlement that the parties entered with respect to the unbundling of Entergy Gulf States for retail open access. Finding that the 2005 legislation now provides the mechanism by which Entergy Gulf States will transition to competition, the PUCT, on February 1, 2007, dismissed Entergy Gulf States' unbundled cost of service proceeding.

248

Jurisdictional Separation Plan

Pursuit of Entergy Gulf States' business separation plan mandated by Texas law in connection with retail open access in the Texas service territory has been complicated by the existence of retail operations in Louisiana subject to the jurisdiction of the LPSC. During the course of Entergy Gulf States' retail open access proceedings before the PUCT, the LPSC held independent proceedings concerning the proposed separation of Entergy Gulf States' business. Unlike the plan filed with the PUCT in 2000 (and amended through 2001) to separate Entergy Gulf States' Texas generation, transmission, distribution, and retail electric functions into separate companies, the focus of the investigation at the LPSC began to shift to a jurisdictional split of Entergy Gulf States into a Louisiana company and a Texas company. In a status conference held in September 2004 before an ALJ, the LPSC staff asserted that uncertainty with respect to retail open access in Texas should not control whether or when the LPSC should require the jurisdictional separation of Entergy Gulf States and recommended that an investigation concerning the proposed jurisdictional separation proceed.

In January 2006, the LPSC directed that Entergy Gulf States file a complete jurisdictional separation plan as soon as possible. Therefore, on April 26, 2006, Entergy Gulf States filed its plan for jurisdictional separation with the LPSC.  The plan provides for Entergy Gulf States to be separated into two vertically integrated utilities, one subject solely to the retail jurisdiction of the LPSC and the other subject solely to the retail jurisdiction of the PUCT. The plan also provides that the Texas utility should own all the distribution and transmission assets located in Texas, the gas-fired generating plants located in Texas, and undivided ownership shares of Entergy Gulf States' 70% interest in Nelson 6 and 42% interest in Big Cajun 2, Unit 3, which are coal-fired generating plants located in Louisiana. The Louisiana utility would own all of the remaining assets currently owned by Entergy Gulf States.  The Texas utility would purchase from the Louisiana utility pursuant to a life-of-the unit purchased power agreement (PPA) a share of capacity and energy of River Bend. As part of the plan, the Texas utility will assume a share of River Bend's nuclear and environmental liabilities that is identical to the share of the plant's output purchased by the Texas utility under that PPA. Each separated utility also would purchase pursuant to a PPA a share of capacity and energy of the gas-fired generating plants owned by the other utility. The PPAs associated with the gas-fired generating plants would terminate when retail open access commences in the Texas utility's service territory or when the unit(s) is no longer dispatched by the Entergy System. Until that time, each utility will participate in the System Agreement and the Entergy System generation will continue to be dispatched in the same manner as before the jurisdictional separation. Under the provisions of the System Agreement, if the Texas utility implements retail open access in accordance with the plan that it filed at the PUCT in December 2006, the Texas utility will terminate its participation in the System Agreement, and the aspects of the System Agreement related to transmission equalization will require amendment. The plan also provides that the operation of the generating plants will not change as a result of the jurisdictional separation. The LPSC approved the plan in January 2007. Approvals of the FERC and the NRC will also be required for certain matters before the jurisdictional separation of Entergy Gulf States may be implemented. Although formal approval of the PUCT is not required for implementation of the jurisdictional separation, Entergy Gulf States will continue to seek input from the PUCT and continue to keep it informed of the status of the proceedings.

Louisiana

In November 2001, the LPSC decided not to move forward with retail open access for any customers at this time. The LPSC instead directed its staff to hold collaborative group meetings concerning open access from time to time, and to have the LPSC staff monitor developments in neighboring states and to report to the LPSC regarding the progress of retail access developments in those states. In September 2004, in response to a study performed by the Louisiana State University Center for Energy Studies that evaluated a limited industrial-only retail choice program, the LPSC asked the LPSC staff to solicit comments and obtain information from utilities, customers, and other interested parties concerning the potential costs and benefits of a limited choice program, the impact of such a program on other customers, as well as issues such as stranded costs and transmission service.  Comments from interested parties were filed with the LPSC in January 2005. A technical conference was held in April 2005 and in May 2005 interested parties filed reply comments to arguments made at the technical conference. Entergy stated that it believes that there is no new information or credible evidence that would justify altering the LPSC's previous conclusion that retail access is not in the public interest.

249

State and Local Rate Regulation

The rates that Entergy Gulf States charges for its services significantly influence its financial position, results of operations, and liquidity. Entergy Gulf States is closely regulated and the rates charged to its customers are determined in regulatory proceedings. Governmental agencies, the LPSC and the PUCT, are primarily responsible for approval of the rates charged to customers.

Filings with the LPSC

In June 2005, Entergy Gulf States made its formula rate plan filing with the LPSC for the test year ending December 31, 2004. The filing shows a net revenue deficiency of $2.58 million indicating that no refund liability exists. The filing also indicates that a prospective rate increase of $23.8 million is required in order for Entergy Gulf States to earn the authorized ROE mid-point of 10.65%. A revision to the filing was made in September 2005 resulting in a $37.2 million base rate increase effective with the first billing cycle of October 2005, subject to refund. The base rate increase consists of two components. The first is a base rate increase of approximately $21.1 million due to the formula rate plan 2004 test year revenue requirement. The second component of the increase is the recovery of the annual revenue requirement of $16.1 million associated with the purchase of power from the Perryville generating station, which purchase was approved by the LPSC. In March 2006, the LPSC approved an uncontested stipulated settlement that includes a revenue requirement increase of $36.8 million and calls for Entergy Gulf States to apply a refund liability of $744 thousand to capacity deferrals. The refund liability pertained to the periods 2004-2005 as well as the interim period in which a $37.2 million revenue increase was in place.

In May 2006, Entergy Gulf States made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Gulf States implemented, subject to refund, a $17.2 million for 1) recovery of $6.7 million of LPSC-approved incremental deferred and ongoing capacity costs and 2) $10.5 million of interim storm cost recovery pursuant to an LPSC order. The filing reflects an 11.1% return on equity which is within the authorized bandwidth.

In January 2006, Entergy Gulf States filed with the LPSC its gas rate stabilization plan. The filing showed a revenue deficiency of $4.1 million based on an ROE mid-point of 10.5%. In May 2006, Entergy Gulf States implemented a $3.5 million rate increase pursuant to an uncontested agreement with the LPSC Staff.

In January 2007, Entergy Gulf States filed with the LPSC its gas rate stabilization plan for the test year ending September 30, 2006.  The filing showed a revenue deficiency of $3.5 million based on an ROE mid-point of 10.5%. A decision by the LPSC and implementation is not expected until the second quarter of 2007.

Filings with the PUCT

Entergy Gulf States filed with the PUCT in July 2005 a request for implementation of an incremental purchased capacity recovery rider, consistent with the June 2005 Texas legislation that was enacted discussed above under "Transition to Retail Competition." Through this rider, Entergy Gulf States sought to recover $23.1 million annually in incremental revenues on a Texas retail basis which represents the incremental purchased capacity costs, including Entergy Gulf States' obligation to purchase power from Entergy Louisiana's recently acquired Perryville plant, over what is already in Entergy Gulf States' base rates. Entergy Gulf States reached an initial agreement with parties that the date upon which cost recovery and cost reconciliation would begin is September 1, 2005.  A further non-unanimous settlement was reached with most of the parties that allowed for the implementation of the $18 million annual rider effective December 1, 2005. The hearing with respect to the non-unanimous settlement, which was opposed by the Office of Public Utility Counsel, was conducted on October 19, 2005 before the ALJ, who issued a Proposal for Decision supporting the settlement. In December 2005, the PUCT approved the settlement. The amounts collected by the purchased capacity recovery rider are subject to reconciliation.

The June 2005 Texas legislation that was enacted also allowed Entergy Gulf States to file for recovery of reasonable and necessary transition to competition costs. Entergy Gulf States filed with the PUCT in August 2005 an application for recovery of such costs. Entergy Gulf States requested recovery of $189 million in transition to competition costs through implementation of a 15-year rider to be effective no later than March 1, 2006. The $189 million represents transition to competition costs Entergy Gulf States incurred from June 1, 1999 through June 17, 2005 in preparing for

 

250

 

 

 competition in its service area, including attendant AFUDC, and all carrying costs projected to be incurred on the transition to competition costs through February 28, 2006. The $189 million is before any gross-up for taxes or carrying costs over the 15-year recovery period. Entergy Gulf States reached a unanimous settlement agreement, which the PUCT approved in June 2006, on all issues with the active parties in the transition to competition cost recovery case. The agreement allows Entergy Gulf States to recover $14.5 million per year in transition to competition costs over a 15-year period. Entergy Gulf States implemented interim rates based on this revenue level on March 1, 2006. The formal settlement agreement was approved by the PUCT in June 2006.

Federal Regulation

System Agreement Proceedings

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and of other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Interconnection Orders

See "Interconnection Orders" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Central States Compact Claim

The Low-Level Radioactive Waste Policy Act of 1980 holds each state responsible for disposal of low-level radioactive waste originating in that state, but allows states to participate in regional compacts to fulfill their responsibilities jointly.  Arkansas and Louisiana participate in the Central Interstate Low-Level Radioactive Waste Compact (Central States Compact or Compact).  Commencing in early 1988, Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana made a series of contributions to the Central States Compact to fund the Central States Compact's development of a low-level radioactive waste disposal facility to be located in Boyd County, Nebraska.  In December 1998, Nebraska, the host state for the proposed Central States Compact disposal facility, denied the compact's license application for the proposed disposal facility.  Several parties, including the commission that governs the compact (the Compact Commission), filed a lawsuit against Nebraska seeking damages resulting from Nebraska's denial of the proposed facility's license.  After a trial, the U.S. District Court concluded that Nebraska violated its good faith obligations regarding the proposed waste disposal facility and rendered a judgment against Nebraska in the amount of $151 million.  In August 2004, Nebraska agreed to pay the Compact $141 million in settlement of the judgment. In July 2005, the Compact Commission decided to distribute a substantial portion of the proceeds from the settlement to the nuclear power generators that had contributed funding for the Boyd County facility, including Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana. On August 1, 2005, Nebraska paid $145 million, including interest, to the Compact, and the Compact distributed from the settlement proceeds $23.6 million to Entergy Arkansas, $19.9 million to Entergy Gulf States, and $19.4 million

 

251

 

 

 to Entergy Louisiana.  The proceeds were first applied to the existing regulatory asset, with the remainder causing an increase in pre-tax earnings in 2005 of $16.7 million at Entergy Gulf States.

Industrial, Commercial, and Wholesale Customers

Entergy Gulf States' large industrial and commercial customers continually explore ways to reduce their energy costs. In particular, cogeneration is an option available to a portion of Entergy Gulf States' industrial customer base. Entergy Gulf States responds by working with industrial and commercial customers and negotiating electric service contracts to provide competitive rates that match specific customer needs and load profiles. Entergy Gulf States actively participates in economic development, customer retention, and reclamation activities to increase industrial and commercial demand, from both new and existing customers. Entergy Gulf States does not currently expect additional significant losses to cogeneration because of the current economics of the electricity markets and Entergy Gulf States' marketing efforts in retaining industrial customers.

Nuclear Matters

Entergy Gulf States owns and operates, through an affiliate, the River Bend nuclear power plant. Entergy Gulf States is, therefore, subject to the risks related to owning and operating a nuclear plant. These include risks from the use, storage, handling and disposal of high-level and low-level radioactive materials, regulatory requirement changes, including changes resulting from events at other plants, limitations on the amounts and types of insurance commercially available for losses in connection with nuclear operations, and technological and financial uncertainties related to decommissioning nuclear plants at the end of their licensed lives, including the sufficiency of funds in decommissioning trusts. In the event of an unanticipated early shutdown of River Bend, Entergy Gulf States may be required to provide additional funds or credit support to satisfy regulatory requirements for decommissioning.

Environmental Risks

Entergy Gulf States' facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that Entergy Gulf States is in substantial compliance with environmental regulations currently applicable to its facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

Litigation Risks

The states of Louisiana and Texas in which Entergy Gulf States operates have proven to be unusually litigious environments. Judges and juries in these states have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. Entergy Gulf States uses legal and appropriate means to contest litigation threatened or filed against it, but the litigation environment in these states poses a business risk.

Critical Accounting Estimates

The preparation of Entergy Gulf States' financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and the potential for future changes in the assumptions and measurements that could produce estimates that would have a material effect on the presentation of Entergy Gulf States' financial position or results of operations.

252

Nuclear Decommissioning Costs

See "Nuclear Decommissioning Costs" in the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the estimates inherent in accounting for nuclear decommissioning costs.

In the third quarter of 2004, Entergy Gulf States recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for River Bend that reflected an expected life extension for the plant. The revised estimate resulted in a $166.4 million reduction in decommissioning liability, along with a $31.3 million reduction in utility plant, a $49.6 million reduction in non-utility property, a $40.1 million reduction in the related regulatory asset, and a regulatory liability of $17.7 million. For the portion of River Bend not subject to cost-based ratemaking, the revised estimate resulted in the elimination of the asset retirement cost that had been recorded at the time of adoption of SFAS 143 with the remainder recorded as miscellaneous income of $27.7 million ($17 million net-of-tax).

Application of SFAS 71

The application of SFAS 71, "Accounting for the Effects of Certain Types of Regulation," has a significant and pervasive impact on accounting and reporting for Entergy Gulf States.

Entergy Gulf States' financial statements primarily reflect assets and costs based on existing cost-based ratemaking regulation in accordance with SFAS 71, "Accounting for the Effects of Certain Types of Regulation." Under traditional ratemaking practice, Entergy Gulf States is granted a geographic franchise to sell electricity. In return, Entergy Gulf States must make investments and incur obligations to serve customers. Prudently incurred costs are recovered from customers along with a return on investment. Regulators may require Entergy Gulf States to defer collecting from customers some operating costs until a future date. These deferred costs are recorded as regulatory assets in the financial statements. In order to continue applying SFAS 71 to its financial statements, Entergy Gulf States' rates must be set on a cost-of-service basis by an authorized body and the rates must be charged to and collected from customers.

If the generation portion of a utility company moves toward competition, it is possible that generation rates will no longer be set on a cost-of-service basis. If that occurs, the generation portion of the business could be required to discontinue application of SFAS 71. The result of discontinuing application of SFAS 71 would be the removal of regulatory assets and liabilities from the balance sheet, and could include the recording of asset impairments. This result is because some of the costs or commitments incurred under a regulated pricing system might be impaired or not recovered in a competitive market. These costs are referred to as stranded costs.

Unbilled Revenue

As discussed in Note 1 to the financial statements, Entergy Gulf States records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month, including fuel price in Entergy Gulf States' Louisiana jurisdiction. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period and fuel price fluctuations, in addition to changes in certain components of the calculation. Effective January 1, 2006, the Louisiana portion of Entergy Gulf States reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in the unbilled calculation, which is in accordance with regulatory treatment.

253

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Qualified
Projected
Benefit Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$1,728

 

$18,114

Rate of return on plan assets

 

(0.25%)

 

$1,197

 

-

Rate of increase in compensation

 

0.25%

 

$816

 

$4,496

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$843

 

$4,763

Discount rate

 

(0.25%)

 

$489

 

$5,572

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for Entergy Gulf States in 2006 was $6.7 million. Entergy Gulf States anticipates 2007 qualified pension cost to decrease to $5.3 million. Entergy Gulf States contributed $22.1 million to its qualified pension plans in 2006, including the 2005 contribution of $8.2 million that was delayed until 2006 as a result of the Katrina Emergency Tax Relief Act. Entergy Gulf States' contributions to the pension trusts are projected to be $25.3 million in 2007.

Entergy Gulf States' qualified pension accumulated benefit obligation at December 31, 2005, exceeded plan assets. As a result, Entergy Gulf States' was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005, Entergy Gulf States' recorded an additional minimum liability for its qualified pension plans of $16.4 million, a regulatory asset of $11.2 million, an intangible asset for the unrecognized prior service cost of $3.2 million, and accumulated other comprehensive income of $1.7 million net-of-tax. Net income for 2005 and 2004 was not affected. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

254

Total postretirement health care and life insurance benefit costs for Entergy Gulf States in 2006 were $14.7 million, including $5.3 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy Gulf States expects 2007 postretirement health care and life insurance benefit costs to approximate $15.6 million, including $4.9 million in savings due to the estimated effect of future Medicare Part D subsidies.

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for a discussion of new accounting pronouncements.

 

255

 

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Gulf States, Inc.:

We have audited the accompanying balance sheets of Entergy Gulf States, Inc. (the "Company") as of December 31, 2006 and 2005, and the related statements of income; of retained earnings, comprehensive income, and paid-in capital; and of cash flows (pages 257 through 262 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such financial statements present fairly, in all material respects, the financial position of Entergy Gulf States, Inc. as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

256

 

 

 

ENTERGY GULF STATES, INC.
INCOME STATEMENTS
 
  For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $3,595,343    $3,289,511    $2,821,296 
Natural gas   84,230    77,660    61,088 
TOTAL   3,679,573    3,367,171    2,882,384 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   1,110,987    829,151    772,914 
  Purchased power   1,288,137    1,353,108    969,779 
  Nuclear refueling outage expenses   16,653    18,151    15,969 
  Other operation and maintenance   510,876    445,326    445,413 
Decommissioning   10,815    9,483    13,645 
Taxes other than income taxes   136,734    125,263    118,081 
Depreciation and amortization   206,736    202,128    197,234 
Other regulatory charges (credits) - net   5,451    (6,799)   (10,070)
TOTAL   3,286,389    2,975,811    2,522,965 
             
OPERATING INCOME   393,184    391,360    359,419 
             
OTHER INCOME            
Allowance for equity funds used during construction   11,808    18,757    13,027 
Interest and dividend income   53,922    21,375    15,753 
Miscellaneous - net   2,933    910    36,180 
TOTAL   68,663    41,042    64,960 
             
INTEREST AND OTHER CHARGES  
Interest on long-term debt   137,938    116,633    125,356 
Other interest - net   11,842    10,155    8,242 
Allowance for borrowed funds used during construction   (6,988)   (11,153)   (9,771)
TOTAL   142,792    115,635    123,827 
             
INCOME BEFORE INCOME TAXES   319,055    316,767    300,552 
             
Income taxes   107,067    110,270    108,288 
             
NET INCOME   211,988    206,497    192,264 
             
Preferred dividend requirements and other   3,966    4,201    4,472 
             
EARNINGS APPLICABLE TO            
COMMON STOCK   $208,022    $202,296    $187,792 
             
See Notes to Financial Statements.            

 

257

 

 

 

 

 

 

 

 

 

 

(Page left blank intentionally)

258

ENTERGY GULF STATES, INC.
STATEMENTS OF CASH FLOWS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING ACTIVITIES            
Net income   $211,988    $206,497    $192,264 
Adjustments to reconcile net income to net cash flow provided by operating activities:            
  Reserve for regulatory adjustments   (9,157)   (64,802)   24,112 
  Other regulatory charges (credits) - net   5,451    (6,799)   (10,070)
  Depreciation, amortization, and decommissioning   217,551    211,611    210,879 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   123,354    155,849    111,201 
  Changes in working capital:            
    Receivables   154,778    (147,085)   (54,580)
    Fuel inventory   (9,015)   (10,538)   1,205 
    Accounts payable   (69,624)   99,581    126 
    Taxes accrued   27,781    (22,882)   22,882 
    Interest accrued   145    1,596    (3,834)
    Deferred fuel costs   264,153    (87,594)   78,200 
    Other working capital accounts   14,178    7,660    31,206 
  Provision for estimated losses and reserves   (3,488)   (3,979)   (13,844)
  Changes in other regulatory assets   (138,461)   (219,172)   (10,060)
  Other   (7,531)   (57,950)   (59,303)
Net cash flow provided by operating activities   782,103    61,993    520,384 
             
INVESTING ACTIVITIES            
Construction expenditures   (375,664)   (370,521)   (357,720)
Allowance for equity funds used during construction   11,808    18,757    13,027 
Nuclear fuel purchases   (40,738)   (1,297)   (45,085)
Proceeds from sale/leaseback of nuclear fuel   37,647    491    38,800 
Proceeds from nuclear decommissioning trust fund sales   60,053    38,070    29,185 
Investment in nuclear decommissioning trust funds   (73,450)   (51,178)   (41,255)
Change in money pool receivable - net   (11,037)   (64,011)   69,354 
Changes in other investments - net   (1,466)   4,343    23,579 
Other regulatory investments   (13,622)   (152,513)   (49,875)
Net cash flow used in investing activities   (406,469)   (577,859)   (319,990)
             
FINANCING ACTIVITIES            
Proceeds from the issuance of long-term debt     929,782    472,039 
Retirement of long-term debt     (566,229)   (829,000)
Proceeds from a capital contribution     300,000   
Change in money pool payable - net     (59,720)   59,720 
Redemption of preferred stock   (3,450)   (3,450)   (3,450)
Dividends paid:            
  Common stock   (213,200)   (61,900)   (94,300)
  Preferred stock   (3,976)   (4,218)   (4,459)
Net cash flow provided by (used in) financing activities   (220,626)   534,265    (399,450)
             
Net increase (decrease) in cash and cash equivalents   155,008    18,399    (199,056)
             
Cash and cash equivalents at beginning of period   25,373    6,974    206,030 
             
Cash and cash equivalents at end of period   $180,381    $25,373    $6,974 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
Cash paid/(received) during the period for:            
  Interest - net of amount capitalized   $140,204    $117,075    $130,491 
  Income taxes   ($61,870)   $14,450    ($28,169)
             
See Notes to Financial Statements.            

 

259

 

 

ENTERGY GULF STATES, INC.
BALANCE SHEETS
ASSETS
       
      December 31,
  2006   2005
  (In Thousands)
       
CURRENT ASSETS          
Cash and cash equivalents:          
  Cash     $2,923    $7,341 
  Temporary cash investments - at cost,          
   which approximates market     177,458    18,032 
     Total cash and cash equivalents     180,381    25,373 
Accounts receivable:          
  Customer     146,144    203,205 
  Allowance for doubtful accounts     (1,618)   (4,794)
  Associated companies     106,990    90,223 
  Other     50,811    50,445 
  Accrued unbilled revenues     79,538    186,527 
     Total accounts receivable     381,865    525,606 
Deferred fuel costs       254,950 
Accumulated deferred income taxes     20,352   
Fuel inventory - at average cost     69,211    60,196 
Materials and supplies - at average cost     120,245    112,544 
Deferred nuclear refueling outage costs     12,971    6,388 
Prepayments and other     16,725    36,996 
TOTAL     801,750    1,022,053 
            
OTHER PROPERTY AND INVESTMENTS        
Decommissioning trust funds     344,911    310,779 
Non-utility property - at cost (less accumulated depreciation)     94,776    91,589 
Other     25,218    22,498 
TOTAL     464,905    424,866 
           
UTILITY PLANT         
Electric     8,857,166    8,569,073 
Natural gas     92,368    86,375 
Construction work in progress     149,392    526,017 
Nuclear fuel under capital lease     73,422    55,155 
Nuclear fuel     10,821    11,338 
TOTAL UTILITY PLANT     9,183,169    9,247,958 
Less - accumulated depreciation and amortization     4,263,307    4,075,724 
UTILITY PLANT - NET     4,919,862    5,172,234 
           
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:          
  SFAS 109 regulatory asset - net     465,259    459,136 
  Other regulatory assets     1,001,016    604,419 
  Deferred fuel costs     100,124    69,443 
Long-term receivables     9,833    16,151 
Other     23,928    41,195 
TOTAL     1,600,160    1,190,344 
            
TOTAL ASSETS     $7,786,677    $7,809,497 
           
See Notes to Financial Statements.          
 
 

260

 

 
ENTERGY GULF STATES, INC.
BALANCE SHEETS
LIABILITIES AND SHAREHOLDERS' EQUITY
 
  December 31,
  2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
Accounts payable:          
  Associated companies     $79,584    $100,313 
  Other     200,746    479,232 
Customer deposits     68,844    57,756 
Accumulated deferred income taxes       71,196 
Taxes accrued     27,781   
Interest accrued     34,483    34,338 
Deferred fuel costs     26,262   
Obligations under capital leases     24,769    33,516 
Pension and other postretirement liabilities     7,662   
Other     31,933    14,945 
TOTAL     502,064    791,296 
           
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued     1,803,461    1,623,421 
Accumulated deferred investment tax credits     127,202    132,909 
Obligations under capital leases     48,653    20,724 
Other regulatory liabilities     53,648    37,482 
Decommissioning and asset retirement cost liabilities     191,036    175,480 
Transition to competition     79,098    79,098 
Regulatory reserves     219    16,153 
Accumulated provisions     21,245    19,882 
Pension and other postretirement liabilities     141,834    60,549 
Long-term debt     2,358,327    2,358,130 
Preferred stock with sinking fund     10,500    13,950 
Other     196,512    203,862 
TOTAL     5,031,735    4,741,640 
           
Commitments and Contingencies          
           
SHAREHOLDERS' EQUITY        
Preferred stock without sinking fund     47,327    47,327 
Common stock, no par value, authorized 200,000,000          
 shares; issued and outstanding 100 shares in 2006 and 2005     114,055    114,055 
Paid-in capital     1,457,486    1,457,486 
Retained earnings     653,924    659,102 
Accumulated other comprehensive loss     (19,914)   (1,409)
TOTAL     2,252,878    2,276,561 
            
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY     $7,786,677    $7,809,497 
           
See Notes to Financial Statements.          

 

261

 

 

ENTERGY GULF STATES, INC.
STATEMENTS OF RETAINED EARNINGS, COMPREHENSIVE INCOME, AND PAID-IN CAPITAL
                         
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
RETAINED EARNINGS                        
Retained Earnings - Beginning of period   $659,102        $518,706        $419,690     
  Add:                        
    Net Income   211,988    $211,988    206,497    $206,497    192,264    192,264 
    Adjustment for change in accounting method               5,524     
      Total   211,988        206,497        197,788     
                         
  Deduct:                        
    Dividends declared on common stock   213,200        61,900        94,300     
    Preferred dividend requirements and other   3,966    3,966    4,201    4,201    4,472    4,472 
      Total   217,166        66,101        98,772     
                         
Retained Earnings - End of period   $653,924        $659,102        $518,706     
                         
                         
ACCUMULATED OTHER COMPREHENSIVE                        
INCOME (LOSS) (Net of Taxes):                        
Balance at beginning of period:                        
  Accumulated derivative instrument fair value changes   $ -        $ -        $3,912     
  Other accumulated comprehensive income items   (1,409)       714           
     Total   ($1,409)       $714        $3,912     
                         
Net derivative instrument fair value changes                        
 arising during the period           (3,912)   (3,912)
                         
Minimum pension liability (net of tax expense (benefit) of $31 and ($214))   1,941    1,941    (2,233)   (2,233)    
                         
Pension and other postretirement liabilities (net of tax benefit of $24,944)   (19,622)                
                         
Net unrealized investment gains (losses)   (824)   (824)   110    110    714    714 
                         
Balance at end of period:                        
  Pension and other postretirement liabilities   (19,914)                
  Other accumulated comprehensive income items   -       (1,409)       714     
     Total   ($19,914)       ($1,409)       $714     
Comprehensive Income       $209,139        $200,173        $184,594 
                         
                         
PAID-IN CAPITAL                        
Paid-in Capital - Beginning of period   $1,457,486        $1,157,486        $1,157,486     
                         
  Add:                        
    Capital contribution         300,000           
                         
Paid-in Capital - End of period   $1,457,486        $1,457,486        $1,157,486     
                         
                         
                         
See Notes to Financial Statements.                        
                         

 

262

 

 

ENTERGY GULF STATES, INC.
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands)
                     
Operating revenues   $3,679,573   $3,367,171   $2,882,384   $2,639,737   $2,183,879
Net Income   $211,988   $206,497   $192,264   $45,262   $174,078
Total assets   $7,786,677   $7,809,497   $6,655,402   $6,854,862   $6,599,533
Long-term obligations (1)   $2,417,480   $2,392,804   $1,946,589   $2,051,083   $2,096,329
                     
(1) Includes long-term debt (excluding currently maturing debt), preferred stock with sinking fund, and noncurrent capital lease obligations.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Electric Operating Revenues:                    
  Residential   $1,122   $960   $881   $829   $700
  Commercial   883   734   672   614   502
  Industrial   1,150   1,014   976   853   695
  Governmental   49   41   37   39   34
     Total retail   $3,204   $2,749   2,566   2,335   1,931
  Sales for resale:                    
    Associated companies   145   186   52   42   28
    Non-associated companies   199   188   160   150   139
  Other   47   167   43   53   44
     Total   $3,595   $3,290   $2,821   $2,580   $2,142
Billed Electric Energy Sales (GWh):                    
  Residential   10,110   10,024   9,803   9,739   9,502
  Commercial   8,838   8,486   8,444   8,174   7,894
  Industrial   15,065   14,967   16,596   15,417   15,887
  Governmental   454   441   432   475   477
     Total retail   34,467   33,918   35,275   33,805   33,760
  Sales for resale:                    
    Associated companies   3,259   3,213   1,528   1,185   708
    Non-associated companies   2,896   2,804   3,172   3,358   4,391
     Total   40,622   39,935   39,975   38,348   38,859
                     

 

263

 

ENTERGY LOUISIANA, LLC

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

 

Hurricane Rita and Hurricane Katrina

In August and September 2005, Hurricane Katrina and Hurricane Rita, along with extensive flooding that resulted from levee breaks in and around Entergy Louisiana's service territory, caused catastrophic damage. The storms and flooding resulted in widespread power outages; significant damage to distribution, transmission, and generation infrastructure; and the temporary loss of sales and customers due to mandatory evacuations and destruction of homes and businesses due to wind, rain, and extended periods of flooding. Total restoration costs through December 31, 2006 for the repair and/or replacement of Entergy Louisiana's electric facilities damaged by Hurricanes Katrina and Rita and for business continuity costs are $534 million, including $19 million of AFUDC. The costs include $381 million in construction expenditures and $153 million recorded originally as regulatory assets. Entergy Louisiana recorded accruals in accordance with its accounting policies because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable, based on historic treatment of such costs in its service territories and communications with local regulators. These costs do not include other potential incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates, which base rate revenue was not recovered due to a loss of anticipated sales. Entergy Louisiana expects its additional storm restoration spending will be approximately $50 million.

Entergy is pursuing a broad range of initiatives to recover storm restoration and business continuity costs and incremental losses. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for damage caused by Hurricanes Katrina and Rita, and pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, in combination with securitization.

See Note 8 to the financial statements for a discussion of Entergy's non-nuclear property insurance program. Entergy is currently evaluating the amount of the covered losses for Entergy and each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. Entergy has been notified by its primary insurer, OIL, that it expects claims for both Hurricanes Katrina and Rita to materially exceed the aggregation limit of $1 billion for all parties insured by OIL for any one occurrence. Entergy Louisiana has received $12.7 million through December 31, 2006 on its insurance claims. Entergy Louisiana currently estimates that its remaining net insurance recoveries for the losses caused by the hurricanes, including the effect of the OIL aggregation limit being exceeded, will be approximately $30 million.

In December 2005, the U.S. Congress passed the Katrina Relief Bill, a hurricane aid package that includes $11.5 billion in Community Development Block Grants (for the states affected by Hurricanes Katrina, Rita, and Wilma) that allows state and local leaders to fund individual recovery priorities. The bill includes language that permits funding to be provided for infrastructure restoration. In September 2006, Entergy Louisiana presented a revised CDBG request to the Louisiana Recovery Authority's Infrastructure Committee. The request of $539 million includes estimated spending necessary to complete restoration net of estimated insurance proceeds. The Louisiana Recovery Authority has not acted on Entergy Louisiana's request.

Storm Costs Recovery Filing with Retail Regulator

In April 2006, Entergy Louisiana completed the $14 million interim recovery of storm costs through the fuel adjustment clause pursuant to an LPSC order. Beginning in September 2006, Entergy Louisiana's interim storm cost recovery of approximately $2 million per month was instituted via the formula rate plan.  Interim recovery will continue until a final decision is reached by the LPSC with respect to Entergy Louisiana's supplemental and amending storm cost recovery application, which is discussed below.

On July 31, 2006, Entergy Louisiana and Entergy Gulf States (for its Louisiana service territory) filed a supplemental and amending storm cost recovery application with the LPSC, in which Entergy Louisiana and Entergy Gulf States requested that the LPSC: (1) review Entergy Louisiana's

 

264

 

 

 and Entergy Gulf States' testimony and exhibits relating to the costs associated with Hurricanes Katrina and Rita, and declare that those verified, actual storm-related costs through May 31, 2006 are $466.8 million for Entergy Louisiana and $200.3 million for Entergy Gulf States in Louisiana and that those costs were prudently incurred; (2) declare that the annual revenue requirements associated with the recovery of those costs, including carrying costs, based on a ten-year levelized rate, are $54.4 million for Entergy Louisiana and $26.2 million for Entergy Gulf States; (3) authorize Entergy Louisiana and Entergy Gulf States to recover the costs through Securitized Storm Cost Recovery Riders (SSCRRs) proposed by Entergy Louisiana and Entergy Gulf States; (4) declare that the storm costs incurred subsequent to May 31, 2006 are to be filed by Entergy Louisiana and Entergy Gulf States with the LPSC on an annual basis in connection with their annual formula rate plan (FRP) filings, and that the SSCRRs be adjusted annually (or semi-annually if needed) to reflect such costs and any insurance proceeds or CDBG funds actually received, with the adjusted amounts to be collected through the SSCRRs to take effect contemporaneous with the effective date of rate changes under the FRP; (5) declare that the storm-related costs incurred by Entergy Louisiana and Entergy Gulf States meet the conditions set forth in the FRP for exclusion from the sharing provisions in those FRPs and authorize the permanent recovery of storm costs outside of the FRPs adopted by the LPSC for Entergy Louisiana and Entergy Gulf States; and (6) authorize the funding of a storm reserve through securitization sufficient to fund a storm cost reserve of $132 million for Entergy Louisiana and $81 million for Entergy Gulf States.

On February 28, 2007, Entergy Louisiana and Entergy Gulf States filed rebuttal testimony and filed a second supplemental and amending application by which they seek authority from the LPSC to securitize their storm cost recovery and storm reserve amounts, together with certain debt retirement costs and upfront and ongoing costs of the securitized debt issued. The filing updates actual storm-related costs through January 2007 and estimated future costs, declaring that Entergy Louisiana's costs are $561 million and Entergy Gulf States' costs are $219 million. The filing also updates the requested storm reserve amounts, requesting $141 million for Entergy Louisiana and $87 million for Entergy Gulf States. Securitization is authorized by a law signed by the Governor of Louisiana in May 2006. Hearings are scheduled for April 2007.

Results of Operations

Net Income

2006 Compared to 2005

Net income increased $9.5 million primarily due to higher net revenue, lower taxes other than income taxes, and higher other income, partially offset by higher other operation and maintenance expenses.

2005 Compared to 2004

Net income increased slightly primarily due to lower other operation and maintenance expenses, lower depreciation and amortization expenses, and higher other income, substantially offset by higher interest and other charges and a higher effective income tax rate.

265

Net Revenue

2006 Compared to 2005

Net revenue, which is Entergy Louisiana's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing 2006 to 2005.

   

Amount

   

(In Millions)

     

2005 net revenue

 

$931.5 

Base revenues

 

40.3 

Net wholesale revenue

 

12.6 

Storm cost recovery

 

8.3 

Price applied to unbilled electric sales

 

6.7 

Rate refund provisions

 

5.0 

Purchased power capacity

 

(31.6)

Volume/weather

 

(23.3)

Reserve equalization

 

(13.0)

Other

 

5.6 

2006 net revenue

 

$942.1 

The base revenues variance is primarily due to increases effective September 2006 for the 2005 formula rate plan filing to recover LPSC-approved incremental deferred and ongoing capacity costs and for the interim recovery of storm costs. See "Significant Factors and Known Trends - State and Local Rate Regulation" below and Note 2 to the financial statements for a discussion of the formula rate plan filing.

The net wholesale revenue variance is primarily due to the sale of 75% of the generation pursuant to a long-term power purchase agreement from the Perryville plant to Entergy Gulf States for a full year in 2006 compared to a partial year in 2005.

The storm cost recovery variance is due to the return earned on the interim recovery of storm-related costs in 2006 as allowed by the LPSC. The storm cost recovery filings are discussed in Note 2 to the financial statements.

The price applied to unbilled electric sales variance is due to the exclusion in 2006 of the fuel cost component in the calculation of the price applied to unbilled sales. Effective January 1, 2006, the fuel cost component is no longer included in the unbilled revenue calculation, which is in accordance with regulatory treatment. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The rate refund provisions variance is primarily due to provisions recorded in 2005 as a result of the March 2005 Global Settlement with the LPSC.

The purchased power capacity variance is primarily due to higher purchased power capacity charges and the amortization of capacity charges effective September 2006 as a result of the formula rate plan filing in May 2006. A portion of the purchased power capacity costs is offset in base revenues due to a base rate increase implemented to recover incremental deferred and ongoing purchased power capacity charges, as mentioned above. See "Significant Factors and Known Trends - State and Local Rate Regulation" below and Note 2 to the financial statements for a discussion of the formula rate plan filing.

The volume/weather variance is primarily due to decreased usage during the unbilled sales period and less favorable weather compared to 2005 on billed sales primarily in the residential sector. The decrease was partially offset by an increase in weather-adjusted electricity usage, which increased by a total of 735 GWh.

266

The reserve equalization variance is primarily due to a revision made in 2005 of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

Gross operating revenues, fuel, purchased power expenses, and other regulatory credits

Gross operating revenues decreased primarily due to:

The decrease was partially offset by:

Fuel and purchased power expenses decreased primarily due to decreases in the market prices of natural gas and purchased power.

Other regulatory credits decreased primarily due to:

See Note 2 to the financial statements for a discussion of the formula rate plan and storm cost recovery filings with the LPSC.

2005 Compared to 2004

Net revenue, which is Entergy Louisiana's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory credits. Following is an analysis of the change in net revenue comparing 2005 to 2004.

   

Amount

   

(In Millions)

     

2004 net revenue

 

$931.3 

Reserve equalization

 

21.1 

Rate refund provisions

 

12.0 

Net wholesale revenue

 

10.8 

Volume/weather

 

(32.5)

2004 deferrals

 

(15.2)

Other

 

4.0 

2005 net revenue

 

$931.5 

The reserve equalization variance is primarily due to a revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations and an increase in capacity due to the purchase of Perryville.

The rate refund provisions variance is primarily due to higher accruals for potential rate actions and refunds in 2004.

267

The net wholesale revenue variance is primarily due to the sale of 75% of the generation from the Perryville plant to Entergy Gulf States pursuant to a long-term power purchase agreement.

The volume/weather variance is due to a decrease of a total of 1,742 GWh in weather-adjusted usage primarily due to Hurricane Katrina and Hurricane Rita, partially offset by the effect of more favorable weather compared to 2004 on billed sales in the residential and commercial sectors.

The 2004 deferrals variance is due to the deferral related to Entergy's voluntary severance program, in accordance with a stipulation with the LPSC staff. The deferrals are being amortized over four years effective January 2004.

Gross operating revenues, fuel and purchased power expenses, and other regulatory credits

Gross operating revenues increased primarily due to:

The increase was partially offset by the volume/weather variance discussed above.

Fuel and purchased power expenses increased primarily due to a shift from lower priced nuclear generation to higher priced gas generation and purchased power due to nuclear plant outages in 2005 in addition to increases in the market prices of natural gas and purchased power.

Other regulatory credits increased primarily due to the following:

The increase was partially offset by the deferral in 2004 of $15.2 million related to Entergy's voluntary severance program, as discussed above.

Other Income Statement Variances

2006 Compared to 2005

Other operation and maintenance expenses increased primarily due to:

The increase was partially offset by a decrease of $3.5 million in vegetation maintenance expenses.

Taxes other than income taxes decreased primarily due to decreased franchise taxes as a result of the merger-by-division that created Entergy Louisiana, LLC.

 

268

 

Other income increased primarily due to:

The increase was partially offset by the $2.5 million of deferred capacity interest adjustments related to the formula rate plan filed with the LPSC in May 2006.

2005 Compared to 2004

Other operation and maintenance expenses decreased primarily due to:

The decrease was partially offset by an increase of $5.3 million in storm reserves in connection with the March 2005 rate case settlement.

Depreciation and amortization expenses decreased primarily due to a change in the depreciation rate for Waterford 3 as approved by the LPSC effective April 2005.

Other income increased primarily due to:

The increase was partially offset by the write-off of $7.1 million in June 2005 of a portion of the customer care system investment and the related allowance for equity funds used during construction pursuant to an LPSC-approved settlement.

Interest and other charges increased primarily due to interest accrued on past transmission construction collections from a cogenerator in accordance with a December 2004 FERC order.

Income Taxes

The effective income tax rates for 2006, 2005, and 2004 were 36.3%, 43.0%, and 38.4%, respectively. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

269

Liquidity and Capital Resources

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$105,285 

$146,049 

$8,787 

Cash flow provided by (used in):

Operating activities

413,017 

171,076 

499,870 

Investing activities

(479,276)

(549,453)

(283,780)

Financing activities

(36,283)

337,613 

(78,828)

Net increase (decrease) in cash and cash equivalents

(102,542)

(40,764)

137,262 

Cash and cash equivalents at end of period

$2,743 

$105,285 

$146,049 

Operating Activities

Cash flow from operations increased $241.9 million in 2006 primarily due to the effect that Hurricane Katrina had on collections from customers in 2005, partially offset by a decrease in fuel cost recoveries, an increase of $54 million in pension contributions, and an increase of $33.7 million in income tax payments.

Cash flow from operations decreased $328.8 million in 2005 primarily due to storm restoration spending, the receipt of an income tax refund of $70.7 million in 2004 through Entergy's intercompany tax allocation process compared to income tax payments in 2005 of $11.1 million, and decreased recovery of deferred fuel costs.

Investing Activities

The decrease of $70.2 million in net cash used by investing activities in 2006 was primarily due to the purchase of the Perryville plant in June 2005 for $162 million and a decrease of $15.9 million in capacity costs that have been deferred and are expected to be recovered over a period greater than twelve months. The decrease was offset by an increase of $64.5 million in distribution construction expenditures due to Hurricanes Katrina and Rita and money pool activity.

The increase of $265.7 million in net cash used by investing activities in 2005 was primarily due to:

The increases were offset by money pool activity.

Capital expenditures made as a result of Hurricanes Katrina and Rita were approximately $210 million during 2006 and approximately $152 million during 2005.

270

Financing Activities

Entergy Louisiana's financing activities used $36.3 million in 2006 compared to providing $337.6 million in 2005 primarily due to:

Partially offsetting the above was the payment of $51.6 million in common stock dividends in 2005 and proceeds of $50 million from an equity contribution from its parent, Entergy Louisiana Holdings, Inc., in 2006.

Entergy Louisiana's financing activities provided $337.6 million in 2005 compared to using $78.8 million in 2004 primarily due to:

See Note 5 to the financial statements for details of long-term debt.

Capital Structure

Entergy Louisiana's capitalization is balanced between equity and debt, as shown in the following table. The decrease in the debt to capital for Entergy Louisiana as of December 31, 2006 is primarily due to an increase in members' equity due to: 1) retained earnings in 2006; 2) additional equity from its parent because of a revision in the estimate of the tax liabilities allocated to Entergy Louisiana Holdings in the merger-by-division that created Entergy Louisiana, LLC; and 3) the cash equity contribution that Entergy Louisiana Holdings made to Entergy Louisiana in 2006.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Net debt to net capital

 

46.4%

 

49.2%

Effect of subtracting cash from debt

 

0.0%

 

2.1%

Debt to capital

 

46.4%

 

51.3%

Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable, capital lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and members' equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana's financial condition.

 

271

 

 

Uses of Capital

Entergy Louisiana requires capital resources for:

Following are the amounts of Entergy Louisiana's planned construction and other capital investments, existing debt and lease obligations (includes estimated interest payments), and other purchase obligations:

 

2007

 

2008-2009

 

2010-2011

 

After 2011

 

Total

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

  capital investment (1)

$300

 

$1,194

 

N/A

 

N/A

 

$1,494

Long-term debt

$71

 

$160

 

$382

 

$1,487

 

$2,100

Operating leases

$10

 

$14

 

$10

 

$8

 

$42

Purchase obligations (2)

$668

 

$1,168

 

$974

 

$3,768

 

$6,578

Nuclear fuel lease obligations (3)

$39

 

$43

 

N/A

 

N/A

 

$82

(1)

Includes approximately $157 to $173 million annually for maintenance capital, which is planned spending on routine capital projects that are necessary to support reliability of service, equipment or systems and to support normal customer growth.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For Entergy Louisiana, almost all of the total consists of unconditional fuel and purchased power obligations, including its obligations under the Vidalia purchased power agreement and the Unit Power Sales Agreement, both of which are discussed in Note 8 to the financial statements.

(3)

It is expected that additional financing under the lease will be arranged as needed to acquire additional fuel, to pay interest, and to pay maturing debt. If such additional financing cannot be arranged, however, Entergy Louisiana must repurchase sufficient nuclear fuel to allow the lessor to meet its obligations.

In addition to the planned spending in the table above, Entergy Louisiana expects to contribute $9 million to other postretirement plans in 2007. Entergy Louisiana does not anticipate contributing to its pension plan in 2007.

The planned capital investment estimate for Entergy Louisiana reflects capital required to support existing business and customer growth, including the acquisition or construction of generation resources identified in Entergy's supply plan initiative. As part of an ongoing needs assessment and requests for proposal (RFP) process, Entergy issued an RFP for long-term resources in January 2006. Based upon the final evaluation of the proposals submitted in response to the RFP for long-term resources, on January 31, 2007, Entergy Services was authorized as agent for the respective purchasing Utility operating companies to enter into further negotiations for several selected resources, including the self-build solid fuel repowering of Entergy Louisiana's Little Gypsy plant.

The estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental compliance, market volatility, economic trends, business restructuring, and the ability to access capital. Management provides more information on long-term debt and preferred stock maturities in Notes 5 and 6 to the financial statements.

The estimated capital expenditures given above do not include potential spending associated with the potential replacement of the steam generators at Waterford 3, as discussed below in "Nuclear Matters".

The Federal Power Act restricts the ability of a public utility to pay distributions out of capital. As a result of its restructuring and the related accounting, Entergy Louisiana, LLC applied to the FERC for a declaratory order to pay distributions on its common and preferred membership interests from the following sources: (1) the amount of Entergy Louisiana, Inc.'s retained earnings immediately prior to its restructuring on

 

272

 

 

 December 31, 2005; (2) an amount in excess of the amount in (1) over a transition period not expected to last more than 3 years as long as Entergy Louisiana, LLC's proprietary capital ratio is, and will remain, above 30%; and (3) the amount of Entergy Louisiana, LLC's retained earnings after the restructuring. The FERC granted the declaratory order on January 23, 2006. Distributions paid by Entergy Louisiana, LLC on its common membership interests to Entergy Louisiana Holdings may, in turn, be paid by Entergy Louisiana Holdings to Entergy Corporation without the need for FERC approval. As a wholly-owned subsidiary, Entergy Louisiana Holdings dividends its earnings to Entergy Corporation at a percentage determined monthly.

Sources of Capital

Entergy Louisiana's sources to meet its capital requirements include:

In April 2006, Entergy Louisiana's $85 million credit facility expired and was not renewed. Also, Entergy Louisiana's $15 million credit facility expired in May 2006 and was not renewed.

Entergy Louisiana may refinance or redeem debt and preferred membership interests prior to maturity, to the extent market conditions and interest and distribution rates are favorable.

All debt and common and preferred membership interest issuances by Entergy Louisiana require prior regulatory approval. Preferred membership interest and debt issuances are also subject to issuance tests set forth in corporate charters, bond indentures, and other agreements. Entergy Louisiana has sufficient capacity under these tests to meet its foreseeable capital needs.

Entergy Louisiana's receivables from or (payables to) the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

 

 

 

 

 

 

 

($54,041)

 

($68,677)

 

$40,549

 

($41,317)

See Note 4 to the financial statements for a description of the money pool.

Prior to February 8, 2006, borrowings and securities issuances by Entergy Louisiana, LLC (as well as, prior to December 31, 2005, Entergy Louisiana, Inc., the predecessor to Entergy Louisiana, LLC's SEC financing authority) were limited to amounts authorized by the SEC. Effective with repeal of PUHCA 1935 on that date, the FERC, under the Federal Power Act, has jurisdiction over all of the securities issuances by Entergy Louisiana, LLC. After the effective date of PUHCA 1935 repeal, the FERC has issued two orders authorizing long- and short-term securities issuances by Entergy Louisiana, LLC. The short-term authority extends through March 31, 2008 in an aggregate amount, at any one time outstanding, of up to $250 million. The long-term authority also extends through March 31, 2008.

Significant Factors and Known Trends

State and Local Rate Regulation

The rates that Entergy Louisiana charges for its services significantly influence its financial position, results of operations, and liquidity. Entergy Louisiana is closely regulated and the rates charged to its customers are determined in regulatory proceedings. A governmental agency, the LPSC, is primarily responsible for approval of the rates charged to customers.

273

In May 2006, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2005 test year. Entergy Louisiana implemented a $143.4 million increase, subject to refund, effective September 2006 for 1) ongoing and deferred incremental capacity costs of $119.2 million and 2) $24.2 million of interim storm cost recovery pursuant to an LPSC order. In response to an LPSC Staff report, Entergy Louisiana subsequently reduced rates by $0.5 million annually, effective October 2006, to reflect issues and errors identified by the staff with which Entergy Louisiana agrees. The modified filing reflects a 9.56% return on common equity, which is within the authorized bandwidth and a reduction in the collection of ongoing and deferred incremental capacity costs to $118.8 million. Entergy Louisiana and the LPSC Staff are working to resolve outstanding issues.

In addition to rate proceedings, Entergy Louisiana's fuel costs recovered from customers are subject to regulatory scrutiny. This regulatory risk represents Entergy Louisiana's largest potential exposure to price changes in the commodity markets.

Entergy Louisiana's retail rate matters and proceedings, including fuel cost recovery-related issues, are discussed in Note 2 to the financial statements.

Federal Regulation

System Agreement Proceedings

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and of other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion.

Interconnection Orders

See "Interconnection Orders" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion.

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Utility Restructuring

In November 2001, the LPSC decided not to move forward with retail open access for any customers at this time. The LPSC instead directed its staff to hold collaborative group meetings concerning open access from time to time, and to have the LPSC staff monitor developments in neighboring states and to report to the LPSC regarding the progress of retail access developments in those states. In September 2004, in response to a study performed by the Louisiana State University Center for Energy Studies that evaluated a limited industrial-only retail choice program, the LPSC asked the LPSC staff to solicit comments and obtain information from utilities, customers, and other interested parties concerning the potential costs and benefits of a limited choice program, the impact of such a program on other customers, as well as issues such as stranded costs and transmission service.  Comments from interested parties were filed with the LPSC in January 2005. A technical conference was held in April 2005 and in May

 

274

 

 

 2005 interested parties filed reply comments to arguments made at the technical conference. Entergy stated that it believes that there is no new information or credible evidence that would justify altering the LPSC's previous conclusion that retail access is not in the public interest.

Central States Compact Claim

The Low-Level Radioactive Waste Policy Act of 1980 holds each state responsible for disposal of low-level radioactive waste originating in that state, but allows states to participate in regional compacts to fulfill their responsibilities jointly.  Arkansas and Louisiana participate in the Central Interstate Low-Level Radioactive Waste Compact (Central States Compact or Compact).  Commencing in early 1988, Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana made a series of contributions to the Central States Compact to fund the Central States Compact's development of a low-level radioactive waste disposal facility to be located in Boyd County, Nebraska.  In December 1998, Nebraska, the host state for the proposed Central States Compact disposal facility, denied the compact's license application for the proposed disposal facility.  Several parties, including the commission that governs the compact (the Compact Commission), filed a lawsuit against Nebraska seeking damages resulting from Nebraska's denial of the proposed facility's license.  After a trial, the U.S. District Court concluded that Nebraska violated its good faith obligations regarding the proposed waste disposal facility and rendered a judgment against Nebraska in the amount of $151 million.  In August 2004, Nebraska agreed to pay the Compact $141 million in settlement of the judgment. In July 2005, the Compact Commission decided to distribute a substantial portion of the proceeds from the settlement to the nuclear power generators that had contributed funding for the Boyd County facility, including Entergy Arkansas, Entergy Gulf States, and Entergy Louisiana. On August 1, 2005, Nebraska paid $145 million, including interest, to the Compact, and the Compact distributed from the settlement proceeds $23.6 million to Entergy Arkansas, $19.9 million to Entergy Gulf States, and $19.4 million to Entergy Louisiana.  A liability was recorded in 2005 for the portion of the proceeds previously recovered from ratepayers, with the remainder of the proceeds causing an increase in pre-tax earnings in 2005 of $4.6 million at Entergy Louisiana.

Nuclear Matters

Entergy Louisiana owns and operates, through an affiliate, the Waterford 3 nuclear power plant. Entergy Louisiana is, therefore, subject to the risks related to owning and operating a nuclear plant. These include risks from the use, storage, handling and disposal of high-level and low-level radioactive materials, regulatory requirement changes, including changes resulting from events at other plants, limitations on the amounts and types of insurance commercially available for losses in connection with nuclear operations, and technological and financial uncertainties related to decommissioning nuclear plants at the end of their licensed lives, including the sufficiency of funds in decommissioning trusts. In the event of an unanticipated early shutdown of Waterford 3, Entergy Louisiana may be required to provide additional funds or credit support to satisfy regulatory requirements for decommissioning.

The nuclear industry continues to address susceptibility to stress corrosion cracking of certain materials associated with components within the reactor coolant system.  The issue is applicable to Waterford 3 and is managed in accordance with standard industry practices and guidelines.  A replacement reactor vessel head is being fabricated for Waterford 3 at this time.  Routine inspections of the Waterford 3 reactor vessel head have identified no significant material degradation issues for that component associated with the stress corrosion cracking of those materials.  Routine inspections of the Waterford 3 steam generators during the Fall 2006 refueling outage identified, however, degradation of certain tube spacer supports in the steam generators that required repair beyond that anticipated prior to the refueling outage inspections.  Corrective measures were successfully implemented to permit continued operation of the steam generators. Future inspections of the steam generators will be scheduled to address this degradation mechanism and could result in additional planned outages, pending discussions with the NRC regarding this issue.  Entergy Louisiana will continue to manage steam generator component life in accordance with industry standard practices.  Plans are being developed for the potential replacement of the steam generators which could be scheduled as early as 2011.

275

Environmental Risks

Entergy Louisiana's facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that Entergy Louisiana is in substantial compliance with environmental regulations currently applicable to its facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

Litigation Risks

The state of Louisiana has proven to be an unusually litigious environment. Judges and juries in Louisiana have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. Entergy Louisiana uses legal and appropriate means to contest litigation threatened or filed against it, but the litigation environment poses a business risk.

Critical Accounting Estimates

The preparation of Entergy Louisiana's financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and the potential for future changes in the assumptions and measurements that could produce estimates that would have a material effect on the presentation of Entergy Louisiana's financial position or results of operations.

Nuclear Decommissioning Costs

See "Nuclear Decommissioning Costs" in the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the estimates inherent in accounting for nuclear decommissioning costs.

In the second quarter of 2005, Entergy Louisiana recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Waterford 3 that assumes a life extension for the plant. The revised estimate resulted in a $153.6 million reduction in its decommissioning liability, along with a $49.2 million reduction in utility plant and a $104.4 million reduction in the related regulatory asset.

Unbilled Revenue

As discussed in Note 1 to the financial statements, Entergy Louisiana records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month, including fuel price. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period and fuel price fluctuations, in addition to changes in certain components of the calculation. Effective January 1, 2006, Entergy Louisiana reclassified the fuel component of unbilled accounts receivable to deferred fuel and will no longer include the fuel component in the unbilled calculation, which is in accordance with regulatory treatment.

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the

 

276

 

 

 provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Projected
Qualified Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$1,294

 

$13,966

Rate of return on plan assets

 

(0.25%)

 

$836

 

-

Rate of increase in compensation

 

0.25%

 

$619

 

$3,388

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$502

 

$2,808

Discount rate

 

(0.25%)

 

$292

 

$3,498

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for Entergy Louisiana in 2006 was $11.1 million. Entergy Louisiana anticipates 2007 qualified pension cost to decrease to $9.1 million due to an increase in the discount rate (from 5.9% to 6.00%) used to calculate benefit obligations. Entergy Louisiana contributed $54 million to its qualified pension plans in 2006. Entergy Louisiana does not anticipate contributing to the pension trust in 2007.

Entergy Louisiana's qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, Entergy Louisiana was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005, Entergy Louisiana's additional minimum liability for its qualified pension plans was $75 million. At December 31, 2005, Entergy Louisiana's intangible asset for the unrecognized prior service cost was $3.2 million and its regulatory asset was $72.1 million. Net income for 2005 and 2004 was not impacted by the additional minimum pension liability. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Total postretirement health care and life insurance benefit costs for Entergy Louisiana in 2006 were $14.7 million, including $3.5 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy Louisiana expects 2007 postretirement health care and life insurance benefit costs to approximate $15.6 million, including $3 million in savings due to the estimated effect of future Medicare Part D subsidies.

277

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for a discussion of new accounting pronouncements.

278

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Members
Entergy Louisiana, LLC:

We have audited the accompanying balance sheets of Entergy Louisiana, LLC (the "Company") as of December 31, 2006 and 2005 and the related statements of income; of members' equity and comprehensive income; and of cash flows (pages 280 through 284 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such financial statements present fairly, in all material respects, the financial position of Entergy Louisiana, LLC, as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

279

 

 

 

 

ENTERGY LOUISIANA, LLC
INCOME STATEMENTS
         
  For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $2,451,258    $2,650,181    $2,226,986 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   710,746    916,779    671,549 
  Purchased power   824,645    872,026    667,893 
  Nuclear refueling outage expenses   15,337    15,351    13,633 
  Other operation and maintenance   394,390    356,084    367,824 
Decommissioning   17,245    18,785    21,958 
Taxes other than income taxes   61,168    73,860    68,999 
Depreciation and amortization   186,021    186,281    197,380 
Other regulatory credits - net   (26,257)   (70,119)   (43,765)
TOTAL   2,183,295    2,369,047    1,965,471 
             
OPERATING INCOME   267,963    281,134    261,515 
             
OTHER INCOME            
Allowance for equity funds used during construction   14,229    10,251    7,494 
Interest and dividend income   12,997    19,882    8,209 
Miscellaneous - net   2,725    (7,539)   (929)
TOTAL   29,951    22,594    14,774 
             
INTEREST AND OTHER CHARGES          
Interest on long-term debt   81,563    73,691    70,210 
Other interest - net   10,653    11,727    3,931 
Allowance for borrowed funds used during construction   (10,258)   (6,591)   (4,822)
TOTAL   81,958    78,827    69,319 
             
INCOME BEFORE INCOME TAXES   215,956    224,901    206,970 
             
Income taxes   78,338    96,819    79,475 
             
NET INCOME   137,618    128,082    127,495 
             
Preferred distribution requirements and other   6,950     
             
EARNINGS APPLICABLE TO            
COMMON EQUITY   $130,668    $128,082    $127,495 
             
             
See Notes to Financial Statements.            

 

 

280

 

ENTERGY LOUISIANA, LLC
STATEMENTS OF CASH FLOWS
             
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING ACTIVITIES            
Net income   $137,618    $128,082    $127,495 
Adjustments to reconcile net income to net cash flow provided by operating activities:            
  Reserve for regulatory adjustments   7,635    (13,674)   14,076 
  Other regulatory credits - net   (26,257)   (70,119)   (43,765)
  Depreciation, amortization, and decommissioning   203,266    205,066    219,338 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   38,290    185,140    95,448 
  Changes in working capital:            
    Receivables   140,690    (112,828)   4,364 
    Accounts payable   50,499    40,382    4,455 
    Taxes accrued   (23,997)   81,280    7,268 
    Interest accrued   2,047    10,004    (1,791)
    Deferred fuel costs   (92,423)   (13,231)   21,955 
    Other working capital accounts   4,739    (26,873)   82,134 
  Provision for estimated losses and reserves   2,060    512    6,119 
  Changes in other regulatory assets   16,555    (111,641)   (14,456)
  Other   (47,705)   (131,024)   (22,770)
Net cash flow provided by operating activities   413,017    171,076    499,870 
             
INVESTING ACTIVITIES            
Construction expenditures   (449,015)   (389,220)   (240,283)
Allowance for equity funds used during construction   14,229    10,251    7,494 
Nuclear fuel purchases   (55,994)   (54,498)   - 
Proceeds from the sale/leaseback of nuclear fuel   44,819    54,158    - 
Payment for purchase of plant   -    (162,075)   - 
Proceeds from nuclear decommissioning trust fund sales   20,179    107,291    35,987 
Investment in nuclear decommissioning trust funds   (29,079)   (115,552)   (48,602)
Change in money pool receivable - net   -    40,549    (40,549)
Change in other investments - net   -    -    2,173 
Other regulatory investments   (24,415)   (40,357)   - 
Net cash flow used in investing activities   (479,276)   (549,453)   (283,780)
             
FINANCING ACTIVITIES            
Proceeds from the issuance of:            
  Long-term debt   -    401,928    282,745 
  Preferred membership interests   -    97,982    - 
Additional equity from parent   50,013    -    - 
Retirement of long-term debt   (25,000)   (219,374)   (203,756)
Change in money pool payable - net   (14,636)   68,677    (41,317)
Changes in short-term borrowings   (40,000)   40,000    - 
Dividends/distributions paid:            
  Common equity   -    (51,600)   (116,500)
  Preferred membership interests   (6,660)   -    - 
Net cash flow provided by (used in) financing activities   (36,283)   337,613    (78,828)
             
Net increase (decrease) in cash and cash equivalents   (102,542)   (40,764)   137,262 
             
Cash and cash equivalents at beginning of period   105,285    146,049    8,787 
             
Cash and cash equivalents at end of period   $2,743    $105,285    $146,049 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
Cash paid/(received) during the period for:            
  Interest - net of amount capitalized   $86,229    $71,831    $73,170 
  Income taxes   $44,830    $11,116    ($70,650)
             
See Notes to Financial Statements.            

 

281

 

 

ENTERGY LOUISIANA, LLC
BALANCE SHEETS
ASSETS
         
  December 31,
  2006   2005
  (In Thousands)
         
CURRENT ASSETS        
Cash and cash equivalents   $2,743    $105,285 
Accounts receivable:        
  Customer   97,207    176,169 
  Allowance for doubtful accounts   (1,856)   (6,141)
  Associated companies   28,621    24,453 
  Other   22,652    12,553 
  Accrued unbilled revenues   69,628    149,908 
     Total accounts receivable   216,252    356,942 
Deferred fuel costs   46,310    21,885 
Accumulated deferred income taxes     3,884 
Materials and supplies - at average cost   98,284    92,275 
Deferred nuclear refueling outage costs   23,639    15,337 
Prepayments and other   5,769    173,055 
TOTAL   392,997    768,663 
         
OTHER PROPERTY AND INVESTMENTS        
Decommissioning trust funds   208,926    187,101 
Non-utility property - at cost (less accumulated depreciation)   1,670    1,852 
Other    
TOTAL   210,600    188,957 
         
UTILITY PLANT        
Electric   6,693,633    6,233,711 
Property under capital lease   252,972    250,610 
Construction work in progress   190,454    415,475 
Nuclear fuel under capital lease   82,464    58,492 
TOTAL UTILITY PLANT   7,219,523    6,958,288 
Less - accumulated depreciation and amortization   2,959,422    2,805,944 
UTILITY PLANT - NET   4,260,101    4,152,344 
         
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:        
  SFAS 109 regulatory asset - net   157,789    205,802 
  Other regulatory assets   539,309    498,542 
  Deferred fuel costs   67,998   
Long-term receivables   5,986    8,222 
Other   20,062    32,523 
TOTAL   791,144    745,089 
         
TOTAL ASSETS   $5,654,842    $5,855,053 
         
See Notes to Financial Statements.        
 
 

282

 

 
ENTERGY LOUISIANA, LLC
BALANCE SHEETS
LIABILITIES AND MEMBERS' EQUITY
   
  December 31,
  2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
Notes payable   $-    $40,000 
Accounts payable:        
  Associated companies   160,555    121,382 
  Other   203,076    398,507 
Customer deposits   72,579    66,705 
Taxes accrued   6,237    88,548 
Accumulated deferred income taxes   32,026   
Interest accrued   30,489    28,442 
Obligations under capital leases   39,067    22,753 
Pension and other postretirement liabilities   8,276   
Other   30,425    8,721 
TOTAL   582,730    775,058 
         
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued   1,827,900    2,055,083 
Accumulated deferred investment tax credits   89,242    92,439 
Obligations under capital leases   43,397    35,740 
Other regulatory liabilities   50,210    58,129 
Decommissioning   238,536    221,291 
Accumulated provisions   23,798    21,738 
Pension and other postretirement liabilities   146,646    126,447 
Long-term debt   1,147,647    1,172,400 
Other   86,428    91,556 
TOTAL   3,653,804    3,874,823 
         
Commitments and Contingencies        
         
MEMBERS' EQUITY        
Preferred membership interests without sinking fund   100,000    100,000 
Members' equity   1,344,003    1,105,172 
Accumulated other comprehensive loss   (25,695)  
TOTAL   1,418,308    1,205,172 
         
TOTAL LIABILITIES AND MEMBERS' EQUITY   $5,654,842    $5,855,053 
         
See Notes to Financial Statements.        

 

283

 

 

ENTERGY LOUISIANA, LLC
STATEMENTS OF MEMBERS' EQUITY AND COMPREHENSIVE INCOME
                 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
                         
RETAINED EARNINGS                        
Members' Equity, January 1   $1,105,172        $1,032,703       $1,021,716    
                         
  Add:                        
    Net income   137,618    $137,618   128,082   $128,082   127,495   $127,495
    Additional equity from parent   108,327        -       -    
      Total   245,945        128,082       127,495    
                         
  Deduct:                        
    Dividends/distribution declared:                        
    Common equity         51,600       116,500    
    Preferred membership interests   6,950    6,950   -   -   -   -
  Other   164        4,013       8    
     Total   7,114        55,613       116,508    
                         
Members' Equity, December 31   $1,344,003        $1,105,172       $1,032,703    
                         
                         
ACCUMULATED OTHER COMPREHENSIVE                        
INCOME (Net of Taxes):                        
Balance at beginning of period:                        
  Accumulated other comprehensive income   $ -        $ -       $ -    
                         
Pension and other postretirement liabilities (net of tax benefit of $30,137)   (25,695)       -       -    
                         
Balance at end of period:                        
  Pension and other postretirement liabilities   ($25,695)       $ -       $ -    
Comprehensive Income       $130,668       $128,082       $127,495
                         
                         
See Notes to Financial Statements.                        
                         

 

284

 

 

ENTERGY LOUISIANA, LLC
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands)
                     
Operating revenues   $2,451,258   $2,650,181   $2,226,986   $2,165,570   $1,815,352
Net Income   $137,618   $128,082   $127,495   $146,154   $144,709
Total assets   $5,654,842   $5,855,053   $4,845,597   $4,641,142   $4,720,307
Long-term obligations (1)   $1,191,044   $1,208,140   $939,598   $917,247   $919,319
                     
(1) Includes long-term debt (excluding currently maturing debt) and noncurrent capital lease obligations.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Electric Operating Revenues:                    
  Residential   $797   $828   $770   $739   $638
  Commercial   533   539   501   473   403
  Industrial   809   834   779   723   637
  Governmental   40   41   38   41   36
     Total retail   2,179   2,242   2,088   1,976   1,714
  Sales for resale:                    
    Associated companies   215   339   96   102   8
    Non-associated companies   12   14   13   12   11
  Other   45   55   30   76   82
     Total   $2,451   $2,650   $2,227   $2,166   $1,815
Billed Electric Energy Sales (GWh):                    
  Residential   8,558   8,559   8,842   8,795   8,780
  Commercial   5,714   5,554   5,762   5,622   5,538
  Industrial   12,770   12,348   13,140   12,870   14,738
  Governmental   441   428   439   491   510
     Total retail (2)   27,483   26,889   28,183   27,778   29,566
  Sales for resale:                    
    Associated companies   2,369   2,451   1,129   1,344   146
    Non-associated companies   101   109   122   132   139
     Total   29,953   29,449   29,434   29,254   29,851
                     
(2) 2006 billed electric energy sales includes 96 GWh of billings related to 2005 deliveries that were billed in 2006 because of billing delays following Hurricane Katrina, which results in an increase of 402 GWh in 2006, or 1.5%.
                     

 

285

 

 

ENTERGY MISSISSIPPI, INC.

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

Hurricane Katrina and Storm Costs Recovery Filing

In August 2005, Hurricane Katrina hit Entergy Mississippi's service territory causing power outages and significant infrastructure damage to Entergy Mississippi's distribution and transmission systems. Total restoration costs through December 31, 2006 for the repair and/or replacement of Entergy Mississippi's electric facilities damaged by Hurricane Katrina, and business continuity costs, and a small amount of damage caused by Hurricane Rita, are $106 million, including $44 million in construction expenditures and $62 million recorded originally as regulatory assets. Entergy Mississippi recorded regulatory assets in accordance with its accounting policies because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable based on historic treatment of such costs in its service territories and communications with local regulators. These costs do not include other potential incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates, which base rate revenue was not recovered due to a loss of anticipated sales. Entergy Mississippi expects its additional storm restoration spending will be approximately $2 million.

Entergy is pursuing a broad range of initiatives to recover storm restoration and business continuity costs and incremental losses. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for damage caused by Hurricanes Katrina and Rita, and, as noted above, pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies, in combination with securitization.

See Note 8 to the financial statements for a discussion of Entergy's non-nuclear property insurance program. Entergy is currently evaluating the amount of the covered losses for Entergy and each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. There is an aggregation limit of $1 billion for all parties insured by OIL, Entergy's primary insurer, for any one occurrence, and Entergy has been notified by OIL that it expects claims for both Hurricanes Katrina and Rita to materially exceed this limit. Entergy Mississippi currently estimates that its remaining net insurance recoveries for the losses caused by the hurricanes, including the effect of the OIL aggregation limit being exceeded, will be approximately $4 million.

In December 2005, the U.S. Congress passed the Katrina Relief Bill, a hurricane aid package that includes $11.5 billion in Community Development Block Grants (for the states affected by Hurricanes Katrina, Rita, and Wilma) that allows state and local leaders to fund individual recovery priorities. The bill includes language that permits funding to be provided for infrastructure restoration.

In June 2006, the MPSC issued an order certifying Entergy Mississippi's Hurricane Katrina restoration costs incurred through March 31, 2006 of $89 million, net of estimated insurance proceeds. Two days later, Entergy Mississippi filed a request with the Mississippi Development Authority for $89 million of CDBG funding for reimbursement of its Hurricane Katrina infrastructure restoration costs. Entergy Mississippi also filed a Petition for Financing Order with the MPSC for authorization of state bond financing of $169 million for Hurricane Katrina restoration costs and future storm costs. The $169 million amount included the $89 million of Hurricane Katrina restoration costs plus $80 million to build Entergy Mississippi's storm damage reserve for the future. Entergy Mississippi's filing stated that the amount actually financed through the state bonds would be net of any CDBG funds that Entergy Mississippi received.

In October 2006, the Mississippi Development Authority approved for payment and Entergy Mississippi received $81 million in CDBG funding for Hurricane Katrina costs. The MPSC then issued a financing order authorizing the issuance of $48 million of state bonds, with $8 million for the remainder of Entergy Mississippi's certified Hurricane Katrina restoration costs and $40 million for the increase in Entergy Mississippi's storm damage reserve. $30 million of the storm reserve will be set aside in a restricted account. Entergy Mississippi forwarded the financing order to the state bond commission, as per the March 2006 law, and expects to receive the proceeds from the state bond issuance in the second quarter of 2007.

286

Results of Operations

Net Income

2006 Compared to 2005

Net income decreased $9.8 million primarily due to higher other operation and maintenance expenses, higher interest and other charges, and higher taxes other than income taxes, partially offset by higher net revenue.

2005 Compared to 2004

Net income decreased $11.4 million primarily due to lower net revenue, higher taxes other than income taxes, and higher depreciation and amortization expenses.

Net Revenue

2006 Compared to 2005

Net revenue, which is Entergy Mississippi's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related, expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2006 to 2005.

   

Amount

   

(In Millions)

     

2005 net revenue

 

$439.5 

Attala costs

 

25.6 

Fuel Recovery

 

3.6 

Reserve Equalization

 

(6.4)

Other

 

3.8 

2006 net revenue

 

$466.1 

The Attala costs variance is primarily due to the recovery of Attala power plant costs through the power management rider. The net income effect of this cost deferral is partially offset by Attala costs in other operation and maintenance expenses, depreciation expense, and taxes other than income taxes. The recovery of Attala costs is discussed further in "Liquidity and Capital Resources - Uses of Capital" below.

The fuel recovery variance is primarily due to increased fuel recovery from retail customers resulting from quarterly changes to the energy cost recovery rider.

The reserve equalization variance is primarily due to changes in the Entergy System generation mix compared to the same period in 2005 and a revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations.

Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

Gross operating revenue increased primarily due to an increase of $160.5 million in fuel cost recovery revenues due to higher fuel rates and increased usage.

Fuel and purchased power expenses increased primarily due to increased recovery of fuel and purchased power costs due to an increase in fuel rates. In addition, gas costs increased as a result of the purchase of Attala. The increase was partially offset by decreases in the average market prices of natural gas and purchased power.

287

Other regulatory credits increased primarily due to over-recoveries in 2005 as a result of gains recorded on gas hedging contracts and the refunding of those over-recoveries through the power management recovery rider in 2006. The increase is also due to the under-recovery of Attala costs, discussed above. There is no material effect on net income due to quarterly adjustments to the power management recovery rider.

2005 Compared to 2004

Net revenue, which is Entergy Mississippi's measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related, expenses, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2005 to 2004.

   

Amount

   

(In Millions)

     

2004 net revenue

 

$443.5 

Reserve Equalization

 

(3.0)

Price applied to unbilled sales

 

(2.1)

Volume/weather

 

6.0 

Other

 

(4.9)

2005 net revenue

 

$439.5 

The reserve equalization variance is primarily due to a revision of reserve equalization payments among Entergy companies due to a FERC ruling regarding the inclusion of interruptible loads in reserve equalization calculations, and Entergy Louisiana's purchase of the Perryville plant, which also affected the reserve calculation.

The price applied to unbilled sales variance is due to lower cost per kWh that occurs when sales increase and a decrease in Grand Gulf rates applied to unbilled sales in 2005. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

The volume/weather variance is primarily due to the effect of more favorable weather on billed sales in 2005 compared to 2004. Billed usage increased a total of 363 GWh in the service territory.

The other variance includes several individually insignificant items.

Gross operating revenues, fuel and purchased power expenses, and other regulatory charges (credits)

Gross operating revenues increased primarily due to an increase of $48.6 million in fuel cost recovery revenues due to higher fuel rates and an increase of $30.5 million in gross wholesale revenue as a result of increased volume due to higher net generation and purchases in excess of net area retail demand resulting in more energy available for resale sales coupled with an increase in the average price of energy available for resale.

Fuel and purchased power expenses increased primarily due to increases in the market prices of natural gas and purchased power. The increase was partially offset by the under-recovery of fuel and purchased power costs as a result of higher fuel costs. Refer to Note 2 to the financial statements for discussion of the energy cost recovery rider.

Other regulatory charges increased primarily due to the over-recovery of costs through the power management recovery rider as a result of gains recorded on gas hedging contracts in addition to the over-recovery through the Grand Gulf rider of Grand Gulf capacity charges. There is no material effect on net income due to quarterly adjustments to the power management recovery rider.

288

Other Income Statement Variances

2006 Compared to 2005

Other operation and maintenance expense increased primarily due to:

Taxes other than income taxes increased primarily due to higher assessed values for ad valorem tax purposes as a result of the Attala plant purchase and higher franchise taxes in 2006 due to higher revenue.

Other income increased primarily as a result of higher interest earned on money pool investments.

Interest charges increased primarily due to additional long-term debt issued to finance the Attala power plant purchase.

2005 Compared to 2004

Taxes other than income taxes increased primarily due to higher assessed values for ad valorem tax purposes and higher franchise taxes in 2005.

Depreciation and amortization expenses increased primarily due to an increase in plant in service.

Income Taxes

The effective income tax rates for 2006, 2005, and 2004 were 35.3%, 35.3%, and 33.5%, respectively. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

Liquidity and Capital Resources

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$4,523 

$80,396 

$63,838 

Cash flow provided by (used in):

Operating activities

410,721 

4,935 

257,687 

Investing activities

(349,100)

(138,510)

(151,013)

Financing activities

7,273 

57,702 

(90,116)

Net increase (decrease) in cash and cash equivalents

68,894 

(75,873)

16,558 

Cash and cash equivalents at end of period

$73,417 

$4,523 

$80,396 

289

Operating Activities

Cash flow from operations increased by $405.8 million in 2006 primarily due to:

In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005. In accordance with Entergy's intercompany tax allocation agreement, in April 2006 Entergy Corporation distributed $66 million of the refund to Entergy Mississippi.

Cash flow from operations decreased by $252.8 million in 2005 primarily due to a decrease in recovery of deferred fuel and purchased power costs and also due to storm restoration spending caused by Hurricane Katrina.

Investing Activities

Net cash used in investing activities increased $210.6 million in 2006 primarily due to funds held in trust for the redemption, prior to maturity, of Entergy Mississippi's $100 million 4.35% Series First Mortgage Bonds in January 2007. The increase is also due to the purchase of the 480 MW Attala power plant for $88 million in January 2006 and money pool activity.

Net cash used in investing activities decreased $12.5 million in 2005 primarily due to money pool activity, partially offset by the maturity in 2004 of $7.5 million of other temporary investments that had been made in 2003, which provided cash in 2004.

Financing Activities

Net cash provided by financing activities decreased $50.4 million in 2006 primarily due to money pool activity, partially offset by the issuance of $100 million of First Mortgage Bonds during 2006 and a decrease of $16.9 million in common stock dividends paid.

Financing activities provided $57.7 million of cash in 2005 compared to using $90.1 million in 2004 primarily due to money pool activity, the net retirement of $39.9 million in long-term debt in 2004, and a decrease of $24.9 million in common stock dividends paid.

See Note 5 to the financial statements for details on long-term debt.

Capital Structure

Entergy Mississippi's capitalization is balanced between equity and debt, as shown in the following table. The increase in the debt to capital percentage as of December 31, 2006 is primarily due to the issuance of $100 million of First Mortgage Bonds in January 2006.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Net debt to net capital

 

51.9%

 

52.6%

Effect of subtracting cash from debt

 

2.4%

 

0.1%

Debt to capital

 

54.3%

 

52.7%

Net debt consists of debt less cash and cash equivalents. Debt consists of capital lease obligations and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity. Net capital consists of capital less cash and cash equivalents. Entergy Mississippi uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi's financial condition.

290

Uses of Capital

Entergy Mississippi requires capital resources for:

Following are the amounts of Entergy Mississippi's planned construction and other capital investments, and existing debt obligations and lease obligations (includes estimated interest payments):

 

2007

 

2008-2009

 

2010-2011

 

After 2011

 

Total

 

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

  capital investment (1)

$171

 

$314

 

N/A

 

N/A

 

$485

Long-term debt

$44

 

$183

 

$159

 

$1,082

 

$1,468

Operating leases

$9

 

$13

 

$10

 

$13

 

$45

Purchase obligations (2)

$186

 

$349

 

$344

 

$1,764

 

$2,643

(1)

Includes approximately $132 to $134 million annually for maintenance capital, which is planned spending on routine capital projects that are necessary to support reliability of service, equipment or systems, and to support normal customer growth.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For Entergy Mississippi, almost all of the total consists of unconditional fuel and purchased power obligations, including its obligations under the Unit Power Sales Agreement, which is discussed in Note 8 to the financial statements.

In addition to the planned spending in the table above, Entergy Mississippi expects to contribute $0.8 million to its pension plans and $5.4 million to other postretirement plans in 2007.

The planned capital investment estimate for Entergy Mississippi reflects capital required to support existing business, customer growth, and the anticipated acquisition of additional generation supply resources. The estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental compliance, market volatility, economic trends, and the ability to access capital. Management provides more information on long-term debt and preferred stock maturities in Notes 5 and 6 to the financial statements.

In January 2006, Entergy Mississippi purchased for $88 million the Attala power plant, a 480 MW natural gas-fired, combined-cycle generating facility owned by Central Mississippi Generating Company. In November 2005, the MPSC issued an order approving the acquisition of the Attala plant. In December 2005, the MPSC issued an order approving the investment cost recovery through the power management rider and limited the recovery to a period that begins with the closing date of the purchase and ends the earlier of the date costs are incorporated into base rates or December 31, 2006. As a consequence of the events surrounding Entergy Mississippi's ongoing efforts to recover storm restoration costs associated with Hurricane Katrina, in October 2006, the MPSC approved a revision to Entergy Mississippi's power management rider. The revision has the effect of allowing Entergy Mississippi to recover the annual ownership costs of the Attala plant until such time as there has been a resolution of Entergy Mississippi's recovery of its storm restoration costs and a general rate case can be filed.

As a wholly-owned subsidiary, Entergy Mississippi dividends its earnings to Entergy Corporation at a percentage determined monthly. Entergy Mississippi's long-term debt indentures restrict the amount of retained earnings available for the payment of cash dividends or other distributions on its common and preferred stock. As of December 31, 2006, Entergy Mississippi had restricted retained earnings unavailable for distribution to Entergy Corporation of $121.6 million.

291

Sources of Capital

Entergy Mississippi's sources to meet its capital requirements include:

Entergy Mississippi may refinance or redeem debt and preferred stock prior to maturity, to the extent market conditions and interest and dividend rates are favorable.

All debt and common and preferred stock issuances by Entergy Mississippi require prior regulatory approval. Preferred stock and debt issuances are also subject to issuance tests set forth in its corporate charter, bond indenture, and other agreements. Entergy Mississippi has sufficient capacity under these tests to meet its foreseeable capital needs.

In January 2006, Entergy Mississippi issued $100 million of 5.92% Series First Mortgage Bonds due February 2016.  Entergy Mississippi used the proceeds to purchase the Attala power plant, discussed above, and to repay short-term indebtedness.

In January 2007, Entergy Mississippi redeemed, prior to maturity, $100 million of 4.35% Series First Mortgage Bonds.

Prior to February 8, 2006, borrowings and securities issuances by Entergy Mississippi were limited to amounts authorized by the SEC. Effective with repeal of PUHCA 1935 on that date, the FERC, under the Federal Power Act, has jurisdiction over its securities issuances. Entergy Mississippi has obtained a short-term borrowing authorization from the FERC under which it may borrow through March 31, 2008, up to the aggregate amount, at any one time outstanding, of $175 million.

Under a savings provision in PUHCA 2005 which repealed PUHCA 1935, Entergy Mississippi can rely, after the repeal, on the long-term securities issuance authority in its SEC PUHCA 1935 order unless superseded by FERC authorization. Under its SEC order, Entergy Mississippi cannot incur additional indebtedness or issue other securities unless (a) it and Entergy Corporation maintain a common equity ratio of at least 30% and (b) with the exception of money pool borrowings, the security to be issued (if rated) and all outstanding securities of Entergy Mississippi, as well as all outstanding securities of Entergy Corporation, that are rated, are rated investment grade. See Note 4 to the financial statements for further discussion of Entergy Mississippi's short-term borrowing limits.

Entergy Mississippi's receivables from or (payables to) the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

 

 

 

 

 

 

 

$39,573

 

($84,066)

 

$21,584

 

$22,076

See Note 4 to the financial statements for a description of the money pool.

292

Significant Factors and Known Trends

State and Local Rate Regulation

The rates that Entergy Mississippi charges for electricity significantly influence its financial position, results of operations, and liquidity. Entergy Mississippi is closely regulated and the rates charged to its customers are determined in regulatory proceedings. A governmental agency, the MPSC, is primarily responsible for approval of the rates charged to customers.

In March 2006, Entergy Mississippi made its annual scheduled formula rate plan filing with the MPSC.  The filing was amended by an April 2006 filing.  The amended filing showed that an increase of $3.1 million in electric revenues was warranted.  The MPSC has approved a settlement providing for a $1.8 million rate increase, which was implemented in August 2006.

Entergy Mississippi's fuel costs recovered from customers are subject to regulatory scrutiny. Entergy Mississippi's retail rate matters and proceedings, including fuel cost recovery-related issues are discussed more thoroughly in Note 2 to the financial statements.

Federal Regulation

System Agreement Proceedings

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and of other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Interconnection Orders

See "Interconnection Orders" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Utility Restructuring

The MPSC has recommended not pursuing open access at this time.

293

Critical Accounting Estimates

The preparation of Entergy Mississippi's financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and there is the potential for future changes in the assumptions and measurements that could produce estimates that would have a material impact on the presentation of Entergy Mississippi's financial position or results of operations.

Unbilled Revenue

As discussed in Note 1 to the financial statements, Entergy Mississippi records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period, in addition to changes in certain components of the calculation.

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Projected
Qualified Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$636

 

$6,856

Rate of return on plan assets

 

(0.25%)

 

$433

 

-

Rate of increase in compensation

 

0.25%

 

$300

 

$1,549

294

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$242

 

$1,509

Discount rate

 

(0.25%)

 

$145

 

$1,902

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for Entergy Mississippi in 2006 was $6 million. Entergy anticipates 2007 qualified pension cost to be $5.9 million. Entergy Mississippi contributed $16.4 million to its qualified pension plans in 2006, including the 2005 contribution of $2.2 million that was delayed until 2006 as a result of the Katrina Emergency Tax Relief Act. Entergy Mississippi's contributions to the pension trusts are projected to be $0.8 million in 2007.

Entergy Mississippi's qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, Entergy Mississippi was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005, Entergy Mississippi's additional minimum liability for its qualified pension plans was $42.9 million. Entergy Mississippi's intangible asset for the unrecognized prior service cost was $2.4 million and its regulatory asset was $40.5 million at December 31, 2005. Net income for 2005 and 2004 was not affected. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Total postretirement health care and life insurance benefit costs for Entergy Mississippi in 2006 were $5 million, including $2 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy Mississippi expects 2007 postretirement health care and life insurance benefit costs to approximate $5.4 million, including $1.8 million in savings due to the estimated effect of future Medicare Part D subsidies.

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for a discussion of new accounting pronouncements.

295

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Mississippi, Inc.:

We have audited the accompanying balance sheets of Entergy Mississippi, Inc. (the "Company") as of December 31, 2006 and 2005, and the related statements of income, retained earnings, and cash flows (pages 297 through 302 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such financial statements present fairly, in all material respects, the financial position of Entergy Mississippi, Inc. as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

296

 

 

 

ENTERGY MISSISSIPPI, INC.
INCOME STATEMENTS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $1,450,008    $1,306,543    $1,213,629 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   586,625    136,870    335,271 
  Purchased power   463,015    688,800    436,013 
  Other operation and maintenance   206,031    176,202    178,007 
Taxes other than income taxes   63,126    58,540    53,443 
Depreciation and amortization   75,561    72,028    65,452 
Other regulatory charges (credits) - net   (65,714)   41,414    (1,171)
TOTAL   1,328,644    1,173,854    1,067,015 
             
OPERATING INCOME   121,364    132,689    146,614 
             
OTHER INCOME            
Allowance for equity funds used during construction   3,942    3,490    4,402 
Interest and dividend income   6,435    2,560    2,550 
Miscellaneous - net   (2,348)   (1,613)   (1,508)
TOTAL   8,029    4,437    5,444 
             
INTEREST AND OTHER CHARGES      
Interest on long-term debt   45,555    39,406    41,681 
Other interest - net   5,661    4,301    2,956 
Allowance for borrowed funds used during construction   (2,675)   (2,636)   (3,116)
TOTAL   48,541    41,071    41,521 
             
INCOME BEFORE INCOME TAXES   80,852    96,055    110,537 
             
Income taxes   28,567    33,952    37,040 
             
NET INCOME   52,285    62,103    73,497 
             
Preferred dividend requirements and other   2,828    3,316    3,369 
              
EARNINGS APPLICABLE TO            
COMMON STOCK   $49,457    $58,787    $70,128 
             
See Notes to Financial Statements.            

 

297

 

 

 

 

 

 

(Page left blank intentionally)

298

ENTERGY MISSISSIPPI, INC.
STATEMENTS OF CASH FLOWS
     
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING ACTIVITIES            
Net income   $52,285    $62,103    $73,497 
Adjustments to reconcile net income to net cash flow provided by operating activities:            
  Other regulatory charges (credits) - net   (65,714)   41,414    (1,171)
  Depreciation and amortization   75,561    72,028    65,452 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   63,964    95,612    33,005 
  Changes in working capital:            
    Receivables   41,108    (33,549)   (15,386)
    Fuel inventory   (4,558)   1,050    940 
    Accounts payable   (32,643)   37,204    432 
    Taxes accrued   12,566    (6,985)   1,065 
    Interest accrued   (588)   1,164    (1,285)
    Deferred fuel costs   209,192    (136,749)   111,871 
    Other working capital accounts   18,241    4,487    2,684 
  Provision for estimated losses and reserves   600    (3,283)   2,789 
  Changes in other regulatory assets   7,581    (63,618)   9,401 
  Other   33,126    (65,943)   (25,607)
Net cash flow provided by operating activities   410,721    4,935    257,687 
             
INVESTING ACTIVITIES            
Construction expenditures   (152,193)   (163,584)   (163,413)
Payment for purchase of plant   (88,199)    
Receipt of CDBG funds - capital portion   28,424     
Allowance for equity funds used during construction   3,942    3,490    4,402 
Change in money pool receivable - net   (39,573)   21,584    492 
Changes in other temporary investments - net   (101,501)     7,506 
Net cash flow used in investing activities   (349,100)   (138,510)   (151,013)
             
FINANCING ACTIVITIES            
Proceeds from the issuance of:            
  Long-term debt   99,167      178,510 
  Preferred stock     29,151   
Retirement of long-term debt       (218,457)
Redemption of preferred stock     (30,269)  
Change in money pool payable - net   (84,066)   84,066   
Dividends paid:            
  Common stock   (5,000)   (21,900)   (46,800)
  Preferred stock   (2,828)   (3,346)   (3,369)
Net cash flow provided by (used in) financing activities   7,273    57,702    (90,116)
             
Net increase (decrease) in cash and cash equivalents   68,894    (75,873)   16,558 
             
Cash and cash equivalents at beginning of period   4,523    80,396    63,838 
             
Cash and cash equivalents at end of period   $73,417    $4,523    $80,396 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
  Cash paid/(received) during the period for:            
    Interest - net of amount capitalized   $49,693    $40,445    $43,824 
    Income taxes   ($49,158)   $4,446    $11,995 
             
See Notes to Financial Statements.            

 

299

 

 

ENTERGY MISSISSIPPI, INC.
BALANCE SHEETS
ASSETS
 
    December 31,
  2006   2005
  (In Thousands)
         
CURRENT ASSETS        
Cash and cash equivalents:        
  Cash   $2,128    $4,523 
  Temporary cash investment - at cost,        
   which approximates market   71,289   
     Total cash and cash equivalents   73,417    4,523 
Accounts receivable:        
  Customer   61,216    102,202 
  Allowance for doubtful accounts   (616)   (1,826)
  Associated companies   45,040    5,415 
  Other   9,032    9,254 
  Accrued unbilled revenues   32,550    33,712 
     Total accounts receivable   147,222    148,757 
Deferred fuel costs     113,956 
Fuel inventory - at average cost   7,645    3,087 
Materials and supplies - at average cost   28,607    21,521 
Other special deposits   100,000   
Prepayments and other   7,398    62,759 
TOTAL   364,289    354,603 
         
OTHER PROPERTY AND INVESTMENTS        
Investment in affiliates - at equity   5,531    5,531 
Non-utility property - at cost (less accumulated depreciation)   6,061    6,199 
TOTAL   11,592    11,730 
         
UTILITY PLANT        
Electric   2,692,971    2,473,035 
Property under capital lease   17    50 
Construction work in progress   79,950    119,354 
TOTAL UTILITY PLANT   2,772,938    2,592,439 
Less - accumulated depreciation and amortization   945,548    886,687 
UTILITY PLANT - NET   1,827,390    1,705,752 
         
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:        
  SFAS 109 regulatory asset - net   26,378    17,073 
  Other regulatory assets   186,986    186,197 
Long-term receivable   2,288    3,270 
Other   21,968    32,418 
TOTAL   237,620    238,958 
          
TOTAL ASSETS   $2,440,891    $2,311,043 
         
See Notes to Financial Statements.        
 
 

300

 

 
ENTERGY MISSISSIPPI, INC.
BALANCE SHEETS
LIABILITIES AND SHAREHOLDERS' EQUITY
 
    December 31,
  2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
Accounts payable:        
  Associated companies   $59,696    $158,579 
  Other   38,097    83,306 
Customer deposits   51,568    44,025 
Taxes accrued   45,687    33,121 
Accumulated deferred income taxes   3,963    13,233 
Interest accrued   13,063    13,651 
Deferred fuel costs   95,236   
Obligations under capital leases     40 
Other   17,622    2,739 
TOTAL   324,934    348,694 
         
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued   516,558    491,857 
Accumulated deferred investment tax credits   11,047    12,358 
Obligations under capital leases     11 
Other regulatory liabilities     34,368 
Asset retirement cost liabilities   4,254    4,016 
Accumulated provisions   10,036    9,436 
Pension and other postretirement liabilities   64,604    39,550 
Long-term debt   795,187    695,146 
Other   46,253    52,038 
TOTAL   1,447,939    1,338,780 
         
Commitments and Contingencies        
         
SHAREHOLDERS' EQUITY        
Preferred stock without sinking fund   50,381    50,381 
Common stock, no par value, authorized 15,000,000        
 shares; issued and outstanding 8,666,357 shares in 2006 and 2005   199,326    199,326 
Capital stock expense and other   (690)   (682)
Retained earnings   419,001    374,544 
TOTAL   668,018    623,569 
         
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY   $2,440,891    $2,311,043 
         
See Notes to Financial Statements.        

 

301

 

 

ENTERGY MISSISSIPPI, INC.
STATEMENTS OF RETAINED EARNINGS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
Retained Earnings, January 1   $374,544   $338,164   $314,836
             
  Add:            
    Net income   52,285   62,103   73,497
             
  Deduct:            
    Preferred dividend requirements and other   2,828   3,316   3,369
    Dividends declared on common stock   5,000   21,900   46,800
    Capital stock and other expenses   -   507   -
       Total   7,828   25,723   50,169
             
Retained Earnings, December 31   $419,001   $374,544   $338,164
             
             
See Notes to Financial Statements.            

 

302

 

 

ENTERGY MISSISSIPPI, INC.
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands)
                     
Operating revenues   $1,450,008   $1,306,543   $1,213,629   $1,035,360   $991,095
Net Income   $52,285   $62,103   $73,497   $67,058   $52,408
Total assets   $2,440,891   $2,311,043   $2,036,186   $1,952,352   $1,832,372
Long-term obligations (1)   $795,187   $695,157   $695,125   $655,051   $510,240
                     
(1) Includes long-term debt (excluding currently maturing debt) and noncurrent capital lease obligations.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Electric Operating Revenues:                    
  Residential   $568   $503   $467   $410   $375
  Commercial   484   421   397   342   310
  Industrial   236   209   204   174   165
  Governmental   45   41   38   32   29
     Total retail   1,333   1,174   1,106   958   879
  Sales for resale:                    
    Associated companies   43   62   39   21   63
    Non-associated companies   37   37   30   21   15
  Other   37   34   39   35   34
     Total   $1,450   $1,307   $1,214   $1,035   $991
Billed Electric Energy Sales (GWh):                    
  Residential   5,387   5,333   5,085   5,092   5,092
  Commercial   4,746   4,630   4,518   4,476   4,445
  Industrial   2,927   2,967   2,977   2,939   2,910
  Governmental   417   411   398   384   382
     Total retail   13,477   13,341   12,978   12,891   12,829
  Sales for resale:                    
    Associated companies   469   516   305   112   1,123
    Non-associated companies   431   420   393   331   197
     Total   14,377   14,277   13,676   13,334   14,149
                     
                     
                     

303

ENTERGY NEW ORLEANS, INC. (Debtor-in-possession)

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

 

Hurricane Katrina

9; In August 2005, Hurricane Katrina caused catastrophic damage to Entergy New Orleans' service territory, including the effect of extensive flooding that resulted from levee breaks in and around the New Orleans area. The storms and flooding resulted in power outages; significant damage to electric distribution, transmission, and generation and gas infrastructure; and the loss of sales and customers due to mandatory evacuations and the destruction of homes and businesses. Total restoration costs through December 31, 2006 for the repair and/or replacement of Entergy New Orleans' electric and gas facilities damaged by Hurricane Katrina and business continuity costs are $188 million, including $8 million in AFUDC. These costs include $94 million in construction expenditures and $94 million recorded originally as regulatory assets. Entergy New Orleans recorded regulatory assets in accordance with its accounting policies because management believes that recovery of these prudently incurred costs through some form of regulatory mechanism is probable, based on historic treatment of such costs in its service territories and communications with local regulators. Entergy New Orleans has also incurred $22 million in uncollectible receivables as a result of the storm. These costs do not include other potential incremental losses, such as the inability to recover fixed costs scheduled for recovery through base rates, which base rate revenue was not recovered due to a loss of anticipated sales. Entergy New Orleans estimates that lost net revenue due to Hurricane Katrina will total approximately $194 million through 2007. In the first quarter 2006, Entergy New Orleans reduced its accrued accounts payable for storm restoration costs by $97.4 million, with corresponding reductions of $88.7 million in construction work in progress and $8.7 million in regulatory assets, based on a reassessment of the nature and timing of expected restoration and rebuilding costs and the obligations associated with restoring service. Although Entergy New Orleans reduced its accrual for restoration spending by these amounts, it continues to expect to incur the related costs over time and Entergy New Orleans still expects its storm restoration and business continuity costs to total approximately $275 million, including $80 million related to the gas rebuild project discussed below.

The estimated storm restoration costs do not include the longer-term accelerated rebuilding of the gas system in New Orleans that Entergy New Orleans expects will be necessary due to the massive salt water intrusion into the system caused by the flooding in New Orleans. The salt water intrusion is expected to shorten the life of the gas system, making it necessary to rebuild that system over time, earlier than otherwise would be expected. Entergy New Orleans currently expects the long-term cost to rebuild the gas system to be $385 million, with the project extending many years into the future.

Entergy is pursuing a broad range of initiatives to recover storm restoration and business continuity costs. Initiatives include obtaining reimbursement of certain costs covered by insurance, obtaining assistance through federal legislation for damage caused by Hurricanes Katrina and Rita, and, as noted above, pursuing recovery through existing or new rate mechanisms regulated by the FERC and local regulatory bodies.

See Note 8 to the financial statements for a discussion of Entergy's non-nuclear property insurance program. Entergy is currently evaluating the amount of the covered losses for each of the affected Utility operating companies, working with insurance adjusters, and preparing proofs of loss for Hurricanes Katrina and Rita. There is an aggregation limit of $1 billion for all parties insured by OIL, Entergy's primary insurer, for any one occurrence, and Entergy has been notified by OIL that it expects claims for both Hurricanes Katrina and Rita to materially exceed this limit. Entergy New Orleans has received $10.2 million through December 31, 2006 on its insurance claims. Entergy New Orleans currently estimates that its remaining net insurance recoveries for the losses caused by Hurricane Katrina, including the effect of the OIL aggregation limit being exceeded, will be approximately $228 million. Entergy New Orleans currently expects to receive payment for the majority of its estimated insurance recovery related to Hurricane Katrina through 2009.

304

In December 2005, the U.S. Congress passed the Katrina Relief Bill, a hurricane aid package that includes $11.5 billion in Community Development Block Grants (for the states affected by Hurricanes Katrina, Rita, and Wilma) that allows state and local leaders to fund individual recovery priorities. The bill includes language that permits funding to be provided for infrastructure restoration. In March 2006, Entergy New Orleans provided a justification statement to state and local officials in connection with its pursuit of CDBG funds to mitigate costs that otherwise would be borne by ratepayers. The statement included all the estimated costs of Hurricane Katrina damage, as well as a lost customer base component intended to help offset the need for storm-related rate increases. The statement included justification for a request for $718 million in CDBG funding. In September 2006, Entergy New Orleans presented a revised CDBG request to the Louisiana Recovery Authority's Infrastructure Committee. The updated request of $592 million takes into account the sale of output of Entergy New Orleans' share of Grand Gulf nuclear power into the wholesale market for a period of time longer than originally anticipated, lower operation and maintenance expenses, and the cessation of interest payments on long-term debt for an agreed-upon period of one year. In October 2006, the Louisiana Recovery Authority (LRA) Board endorsed a resolution proposing to allocate $200 million in CDBG funds to Entergy New Orleans to defray gas and electric utility system repair costs in an effort to provide rate relief for Entergy New Orleans customers. The proposal was developed as an action plan amendment and published for public comment. State lawmakers approved the action plan in December 2006, and the U. S. Department of Housing and Urban Development approved it in February 2007. In addition, the City Council must review and certify the amount of Entergy New Orleans' eligible storm costs before an application can be filed with the LRA and CDBG funding can be released to Entergy New Orleans. Entergy New Orleans filed applications seeking City Council certification of $210 million in storm-related costs incurred through December 2006. Entergy New Orleans has supplemented this request to include the estimated future cost of the gas system rebuild. In January 2007, the City Council passed a resolution in which it stated its intent to render a decision in the certification proceeding by March 2007.

Bankruptcy Proceedings

As a result of Hurricane Katrina Entergy New Orleans' cash receipts were significantly below normal levels due to the number of customers displaced by the storm and the extended interruption in customers' ability to take power. Entergy New Orleans' need to make cash payments continued, however, due to costs associated with fuel used before the hurricane outages along with recurring payments associated with fuel and purchased power contracts, in addition to storm restoration costs and other obligations. On September 23, 2005, Entergy New Orleans filed a voluntary petition in the United States Bankruptcy Court for the Eastern District of Louisiana seeking reorganization relief under the provisions of Chapter 11 of the United States Bankruptcy Code. Entergy New Orleans continues to operate its business as a debtor-in-possession (DIP) under the jurisdiction of the bankruptcy court and in accordance with the applicable provisions of the Bankruptcy Code and the orders of the bankruptcy court.

On September 26, 2005, Entergy New Orleans, as borrower, and Entergy Corporation, as lender, entered into the Debtor-in-Possession (DIP) credit agreement, a debtor-in-possession credit facility to provide funding to Entergy New Orleans during its business restoration efforts. On December 9, 2005, the bankruptcy court issued its final order approving the DIP Credit Agreement. The credit facility provides for up to $200 million in loans. The facility enables Entergy New Orleans to request funding from Entergy Corporation, but the decision to lend money is at the sole discretion of Entergy Corporation. The DIP credit agreement is discussed in further detail in the "Liquidity and Capital Resources" section below.

On February 5, 2007, Entergy New Orleans filed an amended plan of reorganization and a disclosure statement with the bankruptcy court. The bankruptcy court entered an order on February 13, 2007 that approves the adequacy of Entergy New Orleans' disclosure statement. The Unsecured Creditors' Committee also filed a plan of reorganization on February 5, 2007. The Unsecured Creditors' Committee's plan is similar in some respects to Entergy New Orleans' plan, but contains several differences. The significant differences are noted below. A hearing regarding confirmation for both plans of reorganization is scheduled for May 3 and 4, 2007.

Entergy New Orleans' plan of reorganization reflects its continuing effort to work with federal, state, and local authorities to resolve the bankruptcy in a manner that allows Entergy New Orleans' customers to be served by a financially viable entity as required by law. The plan of reorganization provides full compensation to Entergy New Orleans' creditors whose claims are allowed by the bankruptcy court. Conditions precedent proposed in Entergy New Orleans' plan of reorganization before it can become effective include:

305

In addition, key factors that will continue to influence the timing and outcome of Entergy New Orleans' recovery efforts include the level of economic recovery of New Orleans and the number of customers that return to New Orleans, including the timing of their return. Entergy New Orleans currently estimates that approximately 95,000 electric customers and 65,000 gas customers have returned and are taking service. Prior to Hurricane Katrina, Entergy New Orleans had approximately 190,000 electric customers and 144,000 gas customers.

The Unsecured Creditors' Committee's plan does not contain the conditions precedent regarding receipt by Entergy New Orleans of insurance proceeds and CDBG funds. Instead, the Unsecured Creditors' Committee's plan proposes exit financing of up to $150 million, with a maturity of up to 5 years, and with an estimated interest rate of 10.5%, increasing by 1% per year. Obtaining this exit financing is a condition precedent to the Unsecured Creditors' Committee's plan.

The bankruptcy judge set a date of April 19, 2006 by which creditors with prepetition claims against Entergy New Orleans, with certain exceptions, had to file their proofs of claim in the bankruptcy case. Approximately 560 claims, including amending claims, have been filed thus far in Entergy New Orleans' bankruptcy proceeding. Entergy New Orleans is currently analyzing the accuracy and validity of the claims filed, and is seeking withdrawal or modification of claims or objecting to claims with which it disagrees. Several of the filed claims have been withdrawn or disallowed by the bankruptcy court. Entergy New Orleans currently estimates that the prepetition claims that will be allowed in the bankruptcy case will approximate the prepetition liabilities currently recorded by Entergy New Orleans.

Entergy New Orleans' plan of reorganization proposes to pay the third-party prepetition accounts payable in full in cash and to issue three-year notes in satisfaction of the affiliate prepetition accounts payable, and proposes that its first mortgage bonds will remain outstanding with their current maturity dates and interest terms. The plan of reorganization proposes that Entergy New Orleans' preferred stock will also remain outstanding on its current dividend terms, with payment of unpaid preferred dividends in arrears. The Unsecured Creditors' Committee's plan is similar, but would pay the affiliate prepetition accounts payable in cash.

Entergy New Orleans' plan of reorganization proposes to pay interest from September 23, 2005 on the third-party and affiliate accounts payable at the Louisiana judicial rate of interest in 2005 (6%) and 2006 (8%), and at the Louisiana judicial rate of interest plus 1% thereafter. The Louisiana judicial rate of interest is 9.5% for 2007. Pursuant to an agreement with the first mortgage bondholders, Entergy New Orleans' plan of reorganization also proposes to pay the first mortgage bondholders an amount equal to the one year of interest from the bankruptcy petition date that the bondholders had waived previously in the bankruptcy proceeding. As approved by the bankruptcy court, Entergy New Orleans has begun paying interest accruing after September 23, 2006 on its first mortgage bonds. In the fourth quarter 2006 Entergy New Orleans accrued for the interest from September 23, 2005 through December 2006 and for the proposed payment to the bondholders in the amount of the one year of waived interest.

Municipalization is one potential outcome of Entergy New Orleans' recovery effort that may be pursued by a stakeholder or stakeholders, even after Entergy New Orleans exits from bankruptcy. In June 2006, the Louisiana Legislature passed a law that establishes a governance structure for a public power authority, if municipalization of Entergy New Orleans' utility business is pursued. Entergy New Orleans' October 2006 settlement approved by the City Council allowing phased-in rate increases through 2008, discussed in "Significant Factors and Known Trends", provides that Entergy New Orleans will work with the City Council to seek an exception to the Stafford Act that will afford Stafford Act protections to Entergy New Orleans if another catastrophic event affects Entergy New Orleans. The Stafford Act provides for restoration funding from the federal government for municipal and cooperative utilities, but does not allow such funding for investor-owned utilities like Entergy New Orleans.

306

Results of Operations

Net Income

2006 Compared to 2005

Net income increased $4.1 million primarily due to higher net revenue, lower other operation and maintenance expenses, lower taxes other than income taxes, and higher other income, partially offset by higher reorganization items and higher interest and other charges.

2005 Compared to 2004

Net income decreased $26.8 million primarily due to lower net revenue and higher depreciation and amortization expenses, partially offset by lower other operation and maintenance expenses and lower interest charges.

Net Revenue

2006 Compared to 2005

Net revenue, which is Entergy New Orleans' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges. Following is an analysis of the change in net revenue comparing 2006 to 2005.

   

Amount

   

(In Millions)

     

2005 net revenue

 

$179.2 

Fuel revenue

 

48.1 

Net wholesale revenue

 

22.4 

Volume/weather

 

(44.3)

Price applied to unbilled electric sales

 

(11.3)

Other

 

(1.9)

2006 net revenue

 

$192.2 

The fuel revenue variance is due to the inclusion of Grand Gulf costs in fuel recoveries effective July 1, 2006. In June 2006, the City Council approved the recovery of all Grand Gulf costs through Entergy New Orleans' fuel adjustment clause, without a corresponding change in base rates (a significant portion of Grand Gulf costs was previously recovered through base rates).

The net wholesale revenue variance is due to an increase in energy available for sales for resale due to the decrease in retail usage caused by customer losses following Hurricane Katrina. The increased revenue includes the sales into the wholesale market of Entergy New Orleans' share of the output of Grand Gulf, pursuant to City Council approval of measures proposed by Entergy New Orleans to address the reduction in Entergy New Orleans' retail customer demand caused by Hurricane Katrina and provide revenue support for the costs of Entergy New Orleans' share of Grand Gulf. In June 2006, the City Council approved the return of Grand Gulf output to serve Entergy New Orleans' retail load effective July 1, 2006.

The volume/weather variance is due to a decrease in electricity usage in the service territory caused by customer losses following Hurricane Katrina, partially offset increased usage during the unbilled sales period. Billed retail electricity usage decreased a total of 953 GWh, a decline of 20%. Entergy New Orleans currently estimates that approximately 95,000 electric customers and 65,000 gas customers have returned and are taking service. Prior to Hurricane Katrina, Entergy New Orleans had approximately 190,000 electric customers and 144,000 gas customers.

307

The price applied to unbilled electric sales variance is primarily due to a decrease in the fuel cost component of the price applied to unbilled sales. The decrease in the fuel cost component is due to a decrease in the average cost of generation due to a change in the generation mix from natural gas to solid fuel resources. See "Critical Accounting Estimates" below and Note 1 to the financial statements for further discussion of the accounting for unbilled revenues.

2005 Compared to 2004

Net revenue, which is Entergy New Orleans' measure of gross margin, consists of operating revenues net of: 1) fuel, fuel-related, and gas purchased for resale, 2) purchased power expenses, and 3) other regulatory charges (credits). Following is an analysis of the change in net revenue comparing 2005 to 2004.

   

Amount

   

(In Millions)

     

2004 net revenue

 

$239.0 

Volume/weather

 

(59.7)

Net gas revenue

 

(16.2)

Net wholesale revenue

 

18.1 

Other

 

(2.0)

2005 net revenue

 

$179.2 

The volume/weather variance is due to a decrease in electricity usage in the service territory caused by Hurricane Katrina. Billed electricity usage decreased a total of 1,343 GWh compared to 2004.

The net gas revenue variance is due to a decrease in gas usage in the service territory caused by Hurricane Katrina.

The net wholesale variance is due to an increase in volume as a result of increased generation resulting in more energy available for resale sales in early 2005.

Other Income Statement Variances

2006 Compared to 2005

Taxes other than income taxes decreased primarily due to lower franchise taxes in 2006 due to lower revenues and a reduction in ad valorem tax assessments in 2006.

Other operation and maintenance expenses decreased due to limited operations since Hurricane Katrina and storm restoration efforts in 2006.

Reorganization items primarily consist of professional fees associated with the bankruptcy case and, pursuant to an agreement with the first mortgage bondholders, the accrual in the fourth quarter 2006 for the proposed plan of reorganization provision that will pay the first mortgage bondholders an amount ($12.2 million) equal to the one year of interest from the bankruptcy petition date that the bondholders had waived previously in the bankruptcy proceeding.

Other income increased primarily due to:

Interest and other charges increased primarily due to interest accrued on prepetition accounts payable pursuant to the terms of Entergy New Orleans' proposed reorganization plan (described above) and on the DIP credit facility. On September 23, 2006, when the interest moratorium agreed to by

 

308

 

 

 the bondholders expired, Entergy New Orleans also resumed interest accrual on its outstanding first mortgage bonds.

2005 Compared to 2004

Other operation and maintenance expenses decreased primarily due to the following:

Depreciation and amortization expenses increased due to an adjustment in 2005 in the estimated salvage values included in the depreciation calculation of certain depreciable assets.

Other income decreased primarily due to a decrease in the investment in the customer service system in accordance with a formula rate plan settlement partially offset by an increase in the allowance for equity funds used during construction as a result of an increase in construction work in progress due to Hurricane Katrina.

Interest on long-term debt decreased primarily due to the cessation of interest accruals as a result of the bankruptcy filing in addition to lower interest recorded prior to the bankruptcy filing as a result of the refinancing of long-term debt in 2004.

Income Taxes

The effective income tax rates for 2006, 2005, and 2004 were 48.6%, 58.9%, and 37.5%, respectively. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

Preferred Dividends

No preferred dividends were declared during the third and fourth quarters of 2005 and the first quarter of 2006. Due to its bankruptcy, Entergy New Orleans did not pay the preferred stock dividends due October 1, 2005; January 1, 2006; or April 1, 2006. 

Entergy New Orleans has 77,798 shares of $100 par value, 4.75% series preferred stock ("4.75% Preferred") issued and outstanding.  The 4.75% Preferred is non-voting, limited and preferred as to dividends, has a preference in liquidation over the common stock equal to its par value ($100), has redemption rights equal to 105% of its issue price and is not convertible into any other class of stock. The 4.75% Preferred is entitled to a quarterly dividend to be paid on the first day of January, April, July, and October. If dividends with respect to the 4.75% Preferred are not paid for four quarters, the holders of these shares would have the right to elect a majority of the Entergy New Orleans board of directors.  Entergy New Orleans filed a motion in the bankruptcy court seeking authority to recommence paying dividends to the holders of the 4.75% Preferred. After a hearing on the motion on May 3, 2006, the court granted Entergy New Orleans the authority to pay dividends to the holders of the 4.75% Preferred, beginning with the dividend due on July 1, 2006, and thereafter, unless objections are filed by creditors forty-five days in advance of a dividend payment date. If any objections are filed, the matter would be heard by the bankruptcy court. Entergy New Orleans recommenced payments of the dividends on the 4.75% Preferred with the July 1, 2006 dividend, and intends to declare and pay the dividends on the 4.75% Preferred each quarter pending resolution of its plan of reorganization.

Because its plan of reorganization proposes to pay the accumulated, unpaid dividends on all three series of its preferred stock, Entergy New Orleans accrued for those dividends in the fourth quarter 2006, and will continue accruing preferred dividends again on a quarterly basis.

309

Liquidity and Capital Resources

Debtor-in-Possession Credit Agreement

9; On September 26, 2005, Entergy New Orleans, as borrower, and Entergy Corporation, as lender, entered into the Debtor-in-Possession (DIP) credit agreement, a debtor-in-possession credit facility to provide funding to Entergy New Orleans during its business restoration efforts. On December 9, 2005, the bankruptcy court issued its final order approving the DIP Credit Agreement. The credit facility provides for up to $200 million in loans. The facility enables Entergy New Orleans to request funding from Entergy Corporation, but the decision to lend money is at the sole discretion of Entergy Corporation. As of December 31, 2006, Entergy New Orleans had $52 million of outstanding borrowings under the DIP credit agreement.

Borrowings under the DIP credit agreement are due in full, and the agreement will terminate, at the earliest of (i) August 23, 2007, (ii) the acceleration of the loans and the termination of the DIP credit agreement in accordance with its terms, (iii) the date of the closing of a sale of all or substantially all of Entergy New Orleans' assets pursuant to section 363 of the United States Bankruptcy Code or a confirmed plan of reorganization, or (iv) the effective date of a plan of reorganization in Entergy New Orleans' bankruptcy case.

As security for Entergy Corporation as the lender, the terms of the December 9, 2005 bankruptcy court order provide that all borrowings by Entergy New Orleans under the DIP Credit Agreement are: (i) entitled to superpriority administrative claim status pursuant to section 364(c)(1) of the Bankruptcy Code; (ii) secured by a perfected first priority lien on all property of Entergy New Orleans pursuant to sections 364(c)(2) and 364(d) of the Bankruptcy Code, except on any property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition; and (iii) secured by a perfected junior lien pursuant to section 364(c)(3) of the Bankruptcy Code on all property of Entergy New Orleans subject to valid, perfected, and non-avoidable liens in favor of the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition.

The interest rate on borrowings under the DIP credit agreement will be the average interest rate of borrowings outstanding under Entergy Corporation's $2 billion revolving credit facility, which was approximately 5.7% per annum at December 31, 2006.

The lien granted by the bankruptcy court under sections 364(c)(2) and 364(d) primes the liens that secure Entergy New Orleans' obligations under its mortgage bond indenture that existed as of the date Entergy New Orleans filed its bankruptcy petition. To secure Entergy New Orleans' obligations under its mortgage bond indenture, the bankruptcy court's December 9, 2005 order grants in favor of the bond trustee, for the benefit of itself and the bondholders, a lien on all Entergy New Orleans property that secures its obligations under the DIP Credit Agreement. The lien in favor of the bond trustee is senior to all other liens except for the liens in favor of Entergy Corporation and the lender on Entergy New Orleans' $15 million credit facility that existed as of the date Entergy New Orleans filed its bankruptcy petition.

Events of default under the DIP credit agreement include: failure to make payment of any installment of principal or interest when due and payable; the occurrence of a change of control of Entergy New Orleans; failure by either Entergy New Orleans or Entergy Corporation to receive other necessary governmental approvals and consents; the occurrence of an event having a materially adverse effect on Entergy New Orleans or its prospects; and customary bankruptcy-related defaults, including, without limitation, appointment of a trustee, "responsible person," or examiner with expanded powers, conversion of Entergy New Orleans' chapter 11 case to a case under chapter 7 of the Bankruptcy Code, and the interim or final orders approving the DIP Credit Agreement being stayed or modified or ceasing to be in full force and effect.

310

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$48,056 

$7,954 

$4,669 

Cash flow provided by (used in):

Operating activities

95,430 

(41,152)

63,207 

Investing activities

(73,050)

(52,998)

(48,910)

Financing activities

(53,343)

134,252 

(11,012)

Net increase (decrease) in cash and cash equivalents

(30,963)

40,102 

3,285 

Cash and cash equivalents at end of period

$17,093 

$48,056 

$7,954 

Operating Activities

Entergy New Orleans' operating activities provided $95.4 million of cash in 2006 compared to using $41.2 million of cash for 2005 primarily due to:

These increases were partially offset by increased payments to vendors.

In the first quarter of 2006, Entergy Corporation received an income tax refund as a result of net operating loss carryback provisions contained in the Gulf Opportunity Zone Act of 2005. In accordance with Entergy's intercompany tax allocation agreement, in April 2006, Entergy Corporation distributed $71 million of the refund to Entergy New Orleans. Entergy New Orleans used the income tax refund to repay a portion of the borrowings outstanding under the DIP credit facility.

Entergy New Orleans operating activities used $41.2 million in 2005 compared to providing $63.2 million in 2004 primarily due to the effects of Hurricane Katrina including lower net income, storm restoration spending, decreased recovery of deferred fuel costs, and decreased collection of receivables in addition to a pension fund contributions of $14 million made in 2005, partially offset by an increase of $12.3 million in income tax refunds in 2005.

Investing Activities

Net cash used in investing activities increased $20.1 million in 2006 primarily due to capital expenditure activity related to Hurricane Katrina. Capital expenditures made during 2006 as a result of Hurricane Katrina were approximately $59 million.

Net cash used in investing activities increased $4.1 million in 2005 primarily due to increased capital expenditures related to distribution projects as a result of Hurricane Katrina. Capital expenditures made during 2005 as a result of Hurricane Katrina were approximately $27 million.

311

Financing Activities

Entergy New Orleans used $53.3 million in financing activities in 2006 compared to providing $134.3 million in 2005 primarily due to:

Financing activities provided $134.3 million of cash in 2005 compared to using $11.0 million of cash in 2004 due to the borrowing of $90 million under the DIP credit agreement in addition to money pool activity and a $15 million borrowing under a 364-day credit facility.

See Note 5 to the financial statements for details on long-term debt.

Capital Structure

Entergy New Orleans' capitalization is shown in the following table. The decrease in the debt to capital percentage as of December 31, 2006 is primarily the result of repayments on the DIP credit facility and 364-day credit facility in 2006.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Debt to capital

 

61.9%

 

66.4%

Debt consists of notes payable, the DIP credit facility, and long-term debt, including the currently maturing portion. Capital consists of debt and shareholders' equity.

Uses of Capital

Entergy New Orleans requires capital resources for:

Following are the amounts of Entergy New Orleans' planned construction and other capital investments and existing debt and lease obligations (includes estimated interest payments):

 

2007

 

2008-2009

 

2010-2011

 

After 2011

 

Total

 

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

  capital investment (1)

$27

 

$83

 

N/A

 

N/A

 

$110

Long-term debt

$12

 

$53

 

$50

 

$247

 

$362

Operating leases

$2

 

$1

 

$1

 

$-

 

$4

Purchase obligations (2)

$185

 

$303

 

$250

 

$1,140

 

$1,878

(1)

Consists almost entirely of maintenance capital, which is planned spending on routine capital projects that are necessary to support reliability of service, equipment or systems and to support normal customer growth.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For Entergy New Orleans, almost all of the total consists of unconditional fuel and purchased power obligations, including its obligations under the Unit Power Sales Agreement, which is discussed in Note 8 to the financial statements.

312

In addition to the planned spending in the table above, Entergy New Orleans expects to make payments of $109 million related to Hurricane Katrina restoration work for the years 2007-2009, of which $55 million is expected to be incurred in 2007. Also, Entergy New Orleans expects to contribute $44 million to its pension plans and $5.1 million to other postretirement plans in 2007.

The planned capital investment estimate for Entergy New Orleans reflects capital required to support existing business. The estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental compliance, market volatility, economic trends, and the ability to access capital. Management provides more information on long-term debt and preferred stock maturities in Notes 5 and 6 and to the financial statements.

Sources of Capital

Entergy New Orleans' sources to meet its capital requirements include:

Entergy New Orleans' receivables from or (payables to) the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

 

 

 

 

 

 

 

($37,166)

 

($37,166)

 

$1,413

 

$1,783

See Note 4 to the financial statements for a description of the money pool. Entergy New Orleans remains a participant in the money pool, but Entergy New Orleans has not made, and does not expect to make, any additional borrowings from the pool while it is in bankruptcy proceedings.

In addition, Entergy New Orleans had a 364-day credit facility in the amount of $15 million which expired in May 2006. As authorized by the bankruptcy judge, in July 2006, Entergy New Orleans set off $15 million of its cash held by the lender against the outstanding debt on the credit facility.

Significant Factors and Known Trends

State and Local Rate Regulation

The rates that Entergy New Orleans charges for electricity and natural gas significantly influence its financial position, results of operations, and liquidity. Entergy New Orleans is closely regulated and the rates charged to its customers are determined in regulatory proceedings. A governmental agency, the City Council, is primarily responsible for approval of the rates charged to customers.

In June 2006, Entergy New Orleans made its annual formula rate plan filings with the City Council.  The filings presented various alternatives to reflect the effect of Entergy New Orleans' lost customers and decreased revenue following Hurricane Katrina. The alternative that Entergy New Orleans recommended adjusts for lost customers and assumes that the City Council's June 2006 decision to allow recovery of all Grand Gulf costs through the fuel adjustment clause stays in place during the rate-effective period (a significant portion of Grand Gulf costs was previously recovered through base rates).

At the same time as it made its formula rate plan filings, Entergy New Orleans also filed with the City Council a request to implement two storm-related riders. With the first rider, Entergy New Orleans sought to recover the electric and gas restoration costs that it had actually spent through March 31, 2006. Entergy New Orleans also proposed semiannual filings to update the rider for additional restoration spending and also to consider

 

313

 

 

 the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans sought to establish a storm reserve to provide for the risk of another storm.

In October 2006, the City Council approved a settlement agreement that resolves Entergy New Orleans' rate and storm-related rider filings by providing for phased-in rate increases, while taking into account with respect to storm restoration costs the anticipated receipt of CDBG funding as recommended by the Louisiana Recovery Authority. The settlement provides for a 0% increase in electric base rates through December 2007, with a $3.9 million increase implemented in January 2008. Recovery of all Grand Gulf costs through the fuel adjustment clause will continue. Gas base rates increased by $4.75 million in November 2006 and will increase by an additional $1.5 million in March 2007 and an additional $4.75 million in November 2007. The settlement calls for Entergy New Orleans to file a base rate case by July 31, 2008. The settlement agreement discontinues the formula rate plan and the generation performance-based plan but permits Entergy New Orleans to file an application to seek authority to implement formula rate plan mechanisms no sooner than six months following the effective date of the implementation of the base rates resulting from the July 31, 2008 base rate case. Any storm costs in excess of CDBG funding and insurance proceeds will be addressed in that base rate case. The settlement also authorizes a $75 million storm reserve for damage from future storms, which will be created over a ten-year period through a storm reserve rider beginning in March 2007. These storm reserve funds will be held in a restricted escrow account.

In addition to rate proceedings, Entergy New Orleans' fuel costs recovered from customers are subject to regulatory scrutiny.

Entergy New Orleans' retail and wholesale rate matters and proceedings, including fuel cost recovery- related issues, are discussed more thoroughly in Note 2 to the financial statements.

Federal Regulation

System Agreement Proceedings

See "System Agreement Proceedings" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the proceeding at the FERC involving the System Agreement and of other related proceedings.

Transmission

See "Independent Coordinator of Transmission" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Available Flowgate Capacity Proceeding

See "Available Flowgate Capacity Proceeding" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion.

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Environmental Risks

Entergy New Orleans' facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous solid wastes, and other environmental matters. Management believes that Entergy New Orleans is in substantial compliance with environmental regulations currently applicable to its facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

314

Litigation Risks

The territory in which Entergy New Orleans operates has proven to be an unusually litigious environment. Judges and juries in New Orleans have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. Entergy New Orleans uses legal and appropriate means to contest litigation threatened or filed against it, but the litigation environment poses a significant business risk.

Critical Accounting Estimates

The preparation of Entergy New Orleans' financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and there is the potential for future changes in the assumptions and measurements that could produce estimates that would have a material impact on the presentation of Entergy New Orleans' financial position or results of operations.

Unbilled Revenue

As discussed in Note 1 to the financial statements, Entergy New Orleans records an estimate of the revenues earned for energy delivered since the latest customer billing. Each month the estimated unbilled revenue amounts are recorded as revenue and a receivable, and the prior month's estimate is reversed. The difference between the estimate of the unbilled receivable at the beginning of the period and the end of the period is the amount of unbilled revenue recognized during the period. The estimate recorded is primarily based upon an estimate of customer usage during the unbilled period and the billed price to customers in that month. Therefore, revenue recognized may be affected by the estimated price and usage at the beginning and end of each period, in addition to changes in certain components of the calculation.

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Projected
Qualified Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$267

 

$2,935

Rate of return on plan assets

 

(0.25%)

 

$104

 

-

Rate of increase in compensation

 

0.25%

 

$126

 

$722

315

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$184

 

$1,108

Discount rate

 

(0.25%)

 

$82

 

$1,403

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for Entergy New Orleans in 2006 was $5.9 million. Entergy New Orleans anticipates 2007 qualified pension cost to decrease to $2.8 million. This decrease is primarily the result of the expected earnings on the $29 million pension contribution projected to be made in April 2007. Entergy New Orleans did not contribute to its qualified pension plan in 2006. Entergy New Orleans plans to contribute $44 million to its qualified pension plan in 2007.

Entergy New Orleans' qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, Entergy New Orleans was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005 Entergy New Orleans additional minimum liability for its qualified pension plans was $24.3 million. Entergy New Orleans' intangible asset for the unrecognized prior service cost was $1 million and the regulatory asset was $23.3 million at December 31, 2005. Net income for 2005 and 2004 was not affected. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Total postretirement health care and life insurance benefit costs for Entergy New Orleans in 2006 were $5 million, including $1.5 million in savings due to the estimated effect of future Medicare Part D subsidies. Entergy New Orleans expects 2007 postretirement health care and life insurance benefit costs to approximate $4.9 million, including $1.2 million in savings due to the estimated effect of future Medicare Part D subsidies.

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of new accounting pronouncements.

316

 

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy New Orleans, Inc.:

We have audited the accompanying balance sheets of Entergy New Orleans, Inc. (Debtor-in-Possession) (the "Company") as of December 31, 2006 and 2005, and the related statements of income, retained earnings, and cash flows (pages 318 through 322 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

In our opinion, such financial statements present fairly, in all material respects, the financial position of Entergy New Orleans, Inc. (Debtor-in-Possession) as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 18 to the respective financial statements, the Company has filed for reorganization under Chapter 11 of the Federal Bankruptcy Code. The accompanying financial statements do not purport to reflect or provide for the consequences of the bankruptcy proceedings. In particular, such financial statements do not purport to show (a) as to assets, their realizable value on a liquidation basis or their availability to satisfy liabilities; (b) as to prepetition liabilities, the amounts that may be allowed for claims or contingencies, or the status and priority thereof; (c) as to shareholder accounts, the effect of any changes that may be made in the capitalization of the Company; or (d) as to operations the effect of any changes that may be made in its business.

The accompanying financial statements have been prepared assuming that the Company will continue as a going concern. As further discussed in Note 18 to the respective financial statements, the Company's filing for reorganization under Chapter 11 raises substantial doubt about its ability to continue as a going concern. Management's plans concerning these matters are also discussed in Note 18. The financial statements do not include adjustments that might result from the outcome of this uncertainty.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

DELOITTE & TOUCHE LLP

New Orleans, Louisiana
February 26, 2007

317

 

ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
INCOME STATEMENTS
             
  For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $471,066    $536,016    $588,457 
Natural gas   100,088    137,310    147,411 
TOTAL   571,154    673,326    735,868 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   157,535    217,365    245,301 
  Purchased power   217,212    273,576    256,190 
  Other operation and maintenance   78,856    89,130    107,874 
Taxes other than income taxes   34,953    41,538    43,577 
Depreciation and amortization   31,634    33,975    29,657 
Reorganization items   26,455    1,489   
Other regulatory charges (credits) - net   4,160    3,181    (4,670)
TOTAL   550,805    660,254    677,929 
             
OPERATING INCOME   20,349    13,072    57,939 
             
OTHER INCOME            
Allowance for equity funds used during construction   3,078    3,229    1,378 
Interest and dividend income   4,363    1,795    720 
Miscellaneous - net   (543)   (4,110)   270 
TOTAL   6,898    914    2,368 
             
INTEREST AND OTHER CHARGES      
Interest on long-term debt   4,069    10,153    15,357 
Other interest - net   15,260    3,402    1,253 
Allowance for borrowed funds used during construction   (2,477)   (2,609)   (1,243)
TOTAL   16,852    10,946    15,367 
             
INCOME BEFORE INCOME TAXES   10,395    3,040    44,940 
             
Income taxes   5,051    1,790    16,868 
             
NET INCOME   5,344    1,250    28,072 
             
Preferred dividend requirements and other   1,286    482    965 
             
EARNINGS APPLICABLE TO            
COMMON STOCK   $4,058    $768    $27,107 
             
See Notes to Financial Statements.            
             

 

318

 

 

ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
STATEMENTS OF CASH FLOWS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
OPERATING ACTIVITIES            
Net income   $5,344    $1,250    $28,072 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:            
  Other regulatory charges (credits) - net   4,160    3,181    (4,670)
  Depreciation and amortization   31,634    33,975    29,657 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   54,395    87,051    18,909 
  Changes in working capital:            
    Receivables   6,334    (17,902)   8,792 
    Fuel inventory   3,007    (3,867)   1,399 
    Accounts payable   4,313    36,897    (3,014)
    Taxes accrued   2,086    (2,592)   2,592 
    Interest accrued   15,336    (2,089)   (1,455)
    Deferred fuel costs   11,597    (28,034)   (5,279)
    Other working capital accounts   (1,069)   (6,946)   7,346 
  Provision for estimated losses and reserves   496    (1,632)   (1,305)
  Changes in other regulatory assets   (55,607)   (59,707)   (5,380)
  Other   13,404    (80,737)   (12,457)
Net cash flow provided by (used in) operating activities   95,430    (41,152)   63,207 
             
INVESTING ACTIVITIES            
Construction expenditures   (76,128)   (57,640)   (51,264)
Allowance for equity funds used during construction   3,078    3,229    1,378 
Change in money pool receivable - net   -    1,413    370 
Changes in other temporary investments - net   -    -    606 
Net cash flow used in investing activities   (73,050)   (52,998)   (48,910)
             
FINANCING ACTIVITIES            
Borrowings on DIP credit facility   -    90,000    - 
Repayment on DIP credit facility   (38,066)   -    - 
Proceeds from the issuance of long-term debt   -    29,783    72,640 
Retirement of long-term debt   -    (30,065)   (77,487)
Change in money pool payable - net   -    35,558    - 
Changes in short-term borrowings   (15,000)   15,000    - 
Dividends paid:            
  Common stock   -    (5,300)   (5,200)
  Preferred stock   (277)   (724)   (965)
Net cash flow provided by (used in) financing activities   (53,343)   134,252    (11,012)
             
Net increase (decrease) in cash and cash equivalents   (30,963)   40,102    3,285 
             
Cash and cash equivalents at beginning of period   48,056    7,954    4,669 
             
Cash and cash equivalents at end of period   $17,093    $48,056    $7,954 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
Cash paid/(received) during the period for:            
  Interest - net of amount capitalized   $3,255    $20,066    $16,172 
  Income taxes   ($57,193)   ($18,000)   ($5,736)
             
See Notes to Financial Statements.            

 

319

 

 

ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
BALANCE SHEETS
ASSETS
 
  December 31,
  2006   2005
  (In Thousands)
         
CURRENT ASSETS        
Cash and cash equivalents        
  Cash   $3,886    $48,056 
  Temporary cash investments - at cost        
   which approximates market   13,207   
     Total cash and cash equivalents   17,093    48,056 
Accounts receivable:        
  Customer   58,999    82,052 
  Allowance for doubtful accounts   (10,563)   (25,422)
  Associated companies   17,797    17,895 
  Other   8,428    6,530 
  Accrued unbilled revenues   23,758    23,698 
     Total accounts receivable   98,419    104,753 
Deferred fuel costs   18,996    30,593 
Fuel inventory - at average cost   5,041    8,048 
Materials and supplies - at average cost   7,825    8,961 
Prepayments and other   5,641    61,581 
TOTAL   153,015    261,992 
         
OTHER PROPERTY AND INVESTMENTS        
Investment in affiliates - at equity   3,259    3,259 
Non-utility property at cost (less accumulated depreciation)   1,107    1,107 
TOTAL   4,366    4,366 
         
UTILITY PLANT        
Electric   698,081    691,045 
Natural gas   186,932    189,207 
Construction work in progress   21,824    202,353 
TOTAL UTILITY PLANT   906,837    1,082,605 
Less - accumulated depreciation and amortization   446,673    428,053 
UTILITY PLANT - NET   460,164    654,552 
         
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:        
  Other regulatory assets   295,440    166,133 
Long term receivables   936    1,812 
Other   7,230    31,266 
TOTAL   303,606    199,211 
         
TOTAL ASSETS   $921,151    $1,120,121 
         
See Notes to Financial Statements.        
 
 

320

 

 
ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
BALANCE SHEETS
LIABILITIES AND SHAREHOLDERS' EQUITY
 
  December 31,
  2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
DIP credit facility   $51,934   $90,000
Notes payable   -   15,000
Accounts payable:        
  Associated companies   94,686   55,923
  Other   76,831   228,496
Customer deposits   14,808   16,930
Taxes accrued   2,086   -
Accumulated deferred income taxes   2,924   1,898
Interest accrued   18,004   1,195
Other   6,154   2,018
TOTAL CURRENT LIABILITIES NOT SUBJECT TO COMPROMISE   267,427   411,460
         
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued   98,884   125,653
Accumulated deferred investment tax credits   3,157   3,570
SFAS 109 regulatory liability - net   71,870   52,229
Other regulatory liabilities   -   591
Retirement cost liability   2,591   2,421
Accumulated provisions   8,385   2,119
Pension and other postretirement liabilities   60,033   36,612
Long-term debt   229,875   -
Other   5,161   4,812
TOTAL NON-CURRENT LIABILITIES NOT SUBJECT TO COMPROMISE   479,956   228,007
         
LIABILITIES SUBJECT TO COMPROMISE   -   310,944
         
TOTAL LIABILITIES   747,383   950,411
         
Commitments and Contingencies        
         
SHAREHOLDERS' EQUITY        
Preferred stock without sinking fund   19,780   19,780
Common stock, $4 par value, authorized 10,000,000        
 shares; issued and outstanding 8,435,900 shares in 2006        
 and 2005   33,744   33,744
Paid-in capital   36,294   36,294
Retained earnings   83,950   79,892
TOTAL   173,768   169,710
         
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY   $921,151   $1,120,121
         
See Notes to Financial Statements.        

 

321

 

 

ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
STATEMENTS OF RETAINED EARNINGS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
Retained Earnings, January 1   $79,892   $84,424   $62,517
             
  Add:            
    Net income   5,344   1,250   28,072
             
  Deduct:            
    Dividends declared:            
      Preferred stock   1,286   482   965
      Common stock   -   5,300   5,200
          Total   1,286   5,782   6,165
             
Retained Earnings, December 31   $83,950   $79,892   $84,424
             
             
See Notes to Financial Statements.            
             

 

322

 

 

ENTERGY NEW ORLEANS, INC.
(DEBTOR-IN-POSSESSION)
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (In Thousands)
                     
Operating revenues   $571,154   $673,326   $735,868   $654,016   $507,874 
Net Income (loss)   $5,344   $1,250   $28,072   $7,859   ($230)
Total assets   $921,151   $1,120,121   $662,774   $629,627   $584,705 
Long-term obligations (1)   $229,875   $229,859   $199,902   $229,217   $229,191 
                     
(1) Includes long-term debt (excluding currently maturing debt). As a result of Entergy New Orleans' bankruptcy filing, long-term obligations are classified as pre-petion liablities subject to compromise on the Balance Sheet as of December 31, 2005.
                     
    2006   2005   2004   2003   2002
    (Dollars In Millions)
Electric Operating Revenues:                    
  Residential   $106   $150   $184   $178   $170
  Commercial   165   145   171   162   154
  Industrial   45   32   34   27   25
  Governmental   59   59   70   68   66
     Total retail   375   386   459   435   415
  Sales for resale:                    
    Associated companies   46   117   118   85   7
    Non-associated companies   45   21   2   2   2
  Other   5   12   9   6   1
     Total   $471   $536   $588   $528   $425
Billed Electric Energy Sales (GWh):                    
  Residential   914   1,616   2,139   2,133   2,158
  Commercial   1,666   1,798   2,316   2,262   2,255
  Industrial   547   498   575   413   409
  Governmental   632   800   1,025   1,036   1,053
     Total retail   3,759   4,712   6,055   5,844   5,875
  Sales for resale:                    
    Associated companies   519   1,705   1,514   1,312   144
    Non-associated companies   779   336   25   28   32
     Total   5,057   6,753   7,594   7,184   6,051
                     
                     

323

SYSTEM ENERGY RESOURCES, INC.

MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS

System Energy's principal asset consists of a 90% ownership and leasehold interest in Grand Gulf. The capacity and energy from its 90% interest is sold under the Unit Power Sales Agreement to its only four customers, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. System Energy's operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% interest in Grand Gulf pursuant to the Unit Power Sales Agreement. Payments under the Unit Power Sales Agreement are System Energy's only source of operating revenues.

Results of Operations

Net Income

2006 Compared to 2005

Net income increased $28.6 million primarily due to the income tax benefit of Entergy Corporation expenses in accordance with Entergy's intercompany tax allocation agreement. Also contributing to the increase was an increase in rate base in 2006 resulting in higher operating income and higher interest income earned on money pool investments.

2005 Compared to 2004

Net income increased $5.7 million primarily due to higher interest income earned on temporary cash and money pool investments.

Income Taxes

The effective income tax rates for 2006, 2005, and 2004 were 28.0%, 38.3%, and 42.4%, respectively. See Note 3 to the financial statements for a reconciliation of the federal statutory rate of 35.0% to the effective income tax rate. Tax reserves not expected to reverse within the next year are reflected as non-current taxes accrued on the balance sheet.

Liquidity and Capital Resources

Cash Flow

Cash flows for the years ended December 31, 2006, 2005, and 2004 were as follows:

2006

2005

2004

(In Thousands)

Cash and cash equivalents at beginning of period

$75,704 

$216,355 

$52,536 

Cash flow provided by (used in):

Operating activities

128,059 

274,239 

375,456 

Investing activities

130,738 

(273,500)

(87,581)

Financing activities

(199,489)

(141,390)

(124,056)

Net increase (decrease) in cash and cash equivalents

59,308 

(140,651)

163,819 

Cash and cash equivalents at end of period

$135,012 

$75,704 

$216,355 

324

Operating Activities

Cash flow from operations decreased by $146.2 million in 2006 primarily due to an increase of $162.9 million in income tax payments.

Cash flow from operations decreased by $101.2 million in 2005 primarily due to income tax payments of $29.9 million in 2005 compared to income tax refunds of $70.6 million in 2004.

Investing Activities

Investing activities provided $130.7 million in cash flow in 2006 compared to using $273.5 million in 2005 primarily due to money pool activity.

The increase of $185.9 million in net cash used in investing activities in 2005 was primarily due to money pool activity. Also contributing to the increase was an increase of $5.2 million in construction expenditures primarily resulting from capital spending on dry fuel storage partially offset by the reclassification of inventory items to capital in 2004.

Financing Activities

The increase of $58.1 million in net cash used in financing activities in 2006 was due to an increase of $63.9 million in common stock dividends paid, partially offset by a decrease of $5.8 million in the January 2006 principal payment made on the Grand Gulf sale-leaseback compared to the January 2005 principal payment.

The increase of $17.3 million in net cash used in financing activities in 2005 was primarily due to an increase of $22.4 million in the January 2005 principal payment made on the Grand Gulf sale-leaseback compared to the January 2004 principal payment and an increase of $8 million in common stock dividends paid. The increase was partially offset by the retirement of $7.6 million of long-term debt in 2004 and $5.5 million in costs related to System Energy refunding bonds associated with its Grand Gulf lease obligation in May 2004.

See Note 5 to the financial statements for details of long-term debt.

Capital Structure

System Energy's capitalization is balanced between equity and debt, as shown in the following table.

 

 

December 31,
2006

 

December 31,
2005

 

 

 

 

 

Net debt to net capital

 

46.4%

 

49.0%

Effect of subtracting cash from debt

 

4.2%

 

2.1%

Debt to capital

 

50.6%

 

51.1%

Net debt consists of debt less cash and cash equivalents. Debt consists of capital lease obligations and long-term debt, including the currently maturing portion. Capital consists of debt and common shareholder's equity. Net capital consists of capital less cash and cash equivalents. System Energy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy's financial condition.

Uses of Capital

System Energy requires capital resources for:

325

Following are the amounts of System Energy's planned construction and other capital investments, existing debt and lease obligations (includes estimated interest payments), and other purchase obligations:

 

2007

 

2008-2009

 

2010-2011

 

After 2011

 

Total

 

(In Millions)

Planned construction and

 

 

 

 

 

 

 

 

 

  capital investment

$46

 

$59

 

N/A

 

N/A

 

$105

Long-term debt

$144

 

$143

 

$147

 

$887

 

$1,321

Nuclear fuel lease obligations (1)

$33

 

$22

 

N/A

 

N/A

 

$55

Purchase obligations (2)

$10

$12

$25

$55

$102

(1)

It is expected that additional financing under the lease will be arranged as needed to acquire additional fuel, to pay interest, and to pay maturing debt. If such additional financing cannot be arranged, however, System Energy must repurchase sufficient nuclear fuel to allow the lessor to meet its obligations.

(2)

Purchase obligations represent the minimum purchase obligation or cancellation charge for contractual obligations to purchase goods or services. For System Energy, it includes nuclear fuel purchase obligations.

System Energy expects to contribute $5.7 million to pension plans and $1.1 million to other postretirement plans in 2007.

The planned capital investment estimate for System Energy reflects capital required to support the existing business of System Energy. The planned construction and capital investment amounts given above also include initial development costs for potential new nuclear development at the Grand Gulf and River Bend sites, including licensing and design activities. This project is in the early stages, and several issues remain to be addressed over time before significant capital would be committed to this project. Management provides more information on long-term debt in Note 5 to the financial statements.

As a wholly-owned subsidiary, System Energy dividends its earnings to Entergy Corporation at a percentage determined monthly. Currently, all of System Energy's retained earnings are available for distribution.

Sources of Capital

System Energy's sources to meet its capital requirements include:

System Energy had three-year letters of credit in place that were scheduled to expire in March 2003 securing certain of its obligations related to the sale-leaseback of a portion of Grand Gulf. System Energy replaced the letters of credit before their expiration with new three-year letters of credit totaling approximately $198 million that were backed by cash collateral. In December 2003, System Energy replaced the cash-backed letters of credit with syndicated bank letters of credit. In December 2004, System Energy amended these letters of credit and they now expire in May 2009.

System Energy may refinance or redeem debt prior to maturity, to the extent market conditions and interest and dividend rates are favorable.

All debt and common stock issuances by System Energy require prior regulatory approval. Debt issuances are also subject to issuance tests set forth in its bond indentures and other agreements. System Energy has sufficient capacity under these tests to meet its foreseeable capital needs.

Prior to February 8, 2006, borrowings and securities issuances by System Energy were limited to amounts authorized by the SEC. Effective with repeal of PUHCA 1935 on that date, the FERC, under the Federal Power Act, has jurisdiction over its securities issuances. System Energy has obtained a short-term borrowing authorization from the FERC under which it may borrow, through March 31, 2008, up to the aggregate amount, at

 

326

 

 

 any one time outstanding, of $200 million. See Note 4 to the financial statements for further discussion of System Energy's short-term borrowing limits.

Under a savings provisions in PUHCA 2005 which repealed PUHCA 1935, System Energy can rely, after the repeal, on the long-term securities issuance authority in its SEC PUHCA 1935 orders, unless superseded by FERC authorization.

System Energy's receivables from the money pool were as follows as of December 31 for each of the following years:

2006

 

2005

 

2004

 

2003

(In Thousands)

 

 

 

 

 

 

 

$88,231

 

$277,287

 

$61,592

 

$19,064

See Note 4 to the financial statements for a description of the money pool.

Significant Factors and Known Trends

Energy Policy Act of 2005

See "Energy Policy Act of 2005" in the "Significant Factors and Known Trends" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion, including a discussion of the implications of repeal of PUHCA 1935 and ongoing FERC regulation under the Federal Power Act.

Nuclear Matters

System Energy owns and operates Grand Gulf. System Energy is, therefore, subject to the risks related to owning and operating a nuclear plant. These include risks from the use, storage, handling and disposal of high-level and low-level radioactive materials, regulatory requirement changes, including changes resulting from events at other plants, limitations on the amounts and types of insurance commercially available for losses in connection with nuclear operations, and technological and financial uncertainties related to decommissioning nuclear plants at the end of their licensed lives, including the sufficiency of funds in decommissioning trusts. In the event of an unanticipated early shutdown of Grand Gulf, System Energy may be required to provide additional funds or credit support to satisfy regulatory requirements for decommissioning.

Litigation Risks

The states in which System Energy and its customers operate have proven to be unusually litigious environments. Judges and juries in these states have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. System Energy uses legal and appropriate means to contest litigation threatened or filed against it, but the litigation environment poses a significant business risk.

Environmental Risks

System Energy's facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that System Energy is in substantial compliance with environmental regulations currently applicable to its facilities and operations. Because environmental regulations are subject to change, future compliance costs cannot be precisely estimated.

327

Critical Accounting Estimates

The preparation of System Energy's financial statements in conformity with generally accepted accounting principles requires management to apply appropriate accounting policies and to make estimates and judgments that can have a significant effect on reported financial position, results of operations, and cash flows. Management has identified the following accounting policies and estimates as critical because they are based on assumptions and measurements that involve a high degree of uncertainty, and there is the potential for future changes in the assumptions and measurements that could produce estimates that would have a material impact on the presentation of System Energy's financial position or results of operations.

Nuclear Decommissioning Costs

See "Nuclear Decommissioning Costs" in the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of the estimates inherent in accounting for nuclear decommissioning costs.

In the third quarter of 2005, System Energy recorded a revision to its estimated decommissioning cost liability in accordance with a new decommissioning cost study for Grand Gulf.  The revised estimate resulted in a $41.4 million reduction in the decommissioning cost liability for Grand Gulf, along with a $39.7 million reduction in utility plant and a $1.7 million reduction in the related regulatory asset.

Qualified Pension and Other Postretirement Benefits

Entergy sponsors qualified defined benefit pension plans which cover substantially all employees. Additionally, Entergy currently provides postretirement health care and life insurance benefits for substantially all employees who reach retirement age while still working for Entergy. Entergy's reported costs of providing these benefits, as described in Note 11 to the financial statements, are impacted by numerous factors including the provisions of the plans, changing employee demographics, and various actuarial calculations, assumptions, and accounting mechanisms. See the "Critical Accounting Estimates" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for further discussion. Because of the complexity of these calculations, the long-term nature of these obligations, and the importance of the assumptions utilized, Entergy's estimate of these costs is a critical accounting estimate.

Cost Sensitivity

The following chart reflects the sensitivity of qualified pension cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Qualified Pension Cost

 

Impact on Projected
Qualified Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Discount rate

 

(0.25%)

 

$502

 

$4,882

Rate of return on plan assets

 

(0.25%)

 

$210

 

-

Rate of increase in compensation

 

0.25%

 

$240

 

$1,550

328

The following chart reflects the sensitivity of postretirement benefit cost to changes in certain actuarial assumptions (dollars in thousands):



Actuarial Assumption

 


Change in
Assumption

 


Impact on 2006
Postretirement Benefit Cost

 

Impact on Accumulated
Postretirement Benefit
Obligation

 

 

Increase/(Decrease)

 

 

 

 

 

 

 

Health care cost trend

 

0.25%

 

$175

 

$805

Discount rate

 

(0.25%)

 

$131

 

$949

Each fluctuation above assumes that the other components of the calculation are held constant.

Costs and Funding

Total qualified pension cost for System Energy in 2006 was $4.2 million. System Energy anticipates 2007 qualified pension cost to decrease to $3.0 million. System Energy contributed $13 million to its qualified pension plans in 2006, including the 2005 contribution of $5 million that was delayed until 2006 as a result of the Katrina Emergency Tax Relief Act. System Energy's contributions to the pension trust are projected to be $5.7 million in 2007.

System Energy's qualified pension accumulated benefit obligation at December 31, 2005 exceeded plan assets. As a result, System Energy was required to recognize an additional minimum liability as prescribed by SFAS 87. At December 31, 2005, System Energy's additional minimum liability for its qualified pension plans was $12.4 million. System Energy's intangible asset was $0.3 million and its regulatory asset was $12.1 million at December 31, 2005. Net income for 2005 and 2004 was not impacted. In accordance with SFAS 158, the additional minimum pension liability has been replaced with the recording of the funded status of the defined benefit and other postretirement benefit plans.

Total postretirement health care and life insurance benefit costs for System Energy in 2006 were $1.2 million, including $1.1 million in savings due to the estimated effect of future Medicare Part D subsidies. System Energy expects 2007 postretirement health care and life insurance benefit costs to approximate $1.1 million, including $1 million in savings due to the estimated effect of future Medicare Part D subsidies.

New Accounting Pronouncements

See "New Accounting Pronouncements" section of Entergy Corporation and Subsidiaries Management's Discussion and Analysis for discussion of new accounting pronouncements.

 

329

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholder
System Energy Resources, Inc.:

We have audited the accompanying balance sheets of System Energy Resources, Inc. (the "Company") as of December 31, 2006 and 2005, and the related statements of income, retained earnings, and cash flows (pages 331 through 336 and applicable items in pages 55 through 164) for each of the three years in the period ended December 31, 2006. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such financial statements present fairly, in all material respects, the financial position of System Energy Resources, Inc. as of December 31, 2006 and 2005, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2006, in conformity with accounting principles generally accepted in the United States of America.

As discussed in Note 11 to the respective financial statements, in 2006 the Company adopted the provisions of Statement of Financial Accounting Standards No. 158, Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans - an amendment of FASB Statements No. 87, 88, 106, and 132(R).

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the effectiveness of the Company's internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2007 expressed an unqualified opinion on management's assessment of the effectiveness of the Company's internal control over financial reporting and an unqualified opinion on the effectiveness of the Company's internal control over financial reporting.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

330

 

SYSTEM ENERGY RESOURCES, INC.
INCOME STATEMENTS
 
  For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING REVENUES            
Domestic electric   $555,459    $533,929    $545,381 
             
OPERATING EXPENSES            
Operation and Maintenance:            
  Fuel, fuel-related expenses, and            
   gas purchased for resale   44,062    37,660    38,337 
  Nuclear refueling outage expenses   16,642    12,571    12,655 
  Other operation and maintenance   108,022    106,377    96,809 
Decommissioning   23,919    24,437    23,434 
Taxes other than income taxes   23,963    25,239    24,364 
Depreciation and amortization   118,623    119,572    127,081 
Other regulatory (credits) - net   (10,366)   (15,337)   (10,433)
TOTAL   324,865    310,519    312,247 
             
OPERATING INCOME   230,594    223,410    233,134 
             
OTHER INCOME            
Allowance for equity funds used during construction   2,285    1,625    1,544 
Interest and dividend income   21,511    16,279    6,870 
Miscellaneous - net   (392)   (417)   841 
TOTAL   23,404    17,487    9,255 
             
INTEREST AND OTHER CHARGES      
Interest on long-term debt   59,829    60,404    58,561 
Other interest - net   102    20    367 
Allowance for borrowed funds used during construction   (720)   (514)   (500)
TOTAL   59,211    59,910    58,428 
             
INCOME BEFORE INCOME TAXES   194,787    180,987    183,961 
             
Income taxes   54,529    69,343    78,013 
              
NET INCOME   $140,258    $111,644    $105,948 
             
See Notes to Financial Statements.            
             

 

331

 

 

 

 

 

(Page left blank intentionally)

332

 

SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF CASH FLOWS
             
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
OPERATING ACTIVITIES            
Net income   $140,258    $111,644    $105,948 
Adjustments to reconcile net income to net cash flow provided by operating activities:            
  Other regulatory credits - net   (10,366)   (15,337)   (10,433)
  Depreciation, amortization, and decommissioning   142,542    144,009    150,515 
  Deferred income taxes, investment tax credits, and non-current taxes accrued   40,801    (141,128)   159,199 
  Changes in working capital:            
    Receivables   (3,739)   277    1,461 
    Accounts payable   5,500    (2,161)   (5,324)
    Taxes accrued   (180,180)   181,701    (9,117)
    Interest accrued   1,026    2,111    13,375 
    Other working capital accounts   5,466    (10,159)   2,763 
  Provision for estimated losses and reserves   23    21    (1,404)
  Changes in other regulatory assets   9,315    10,566    31,453 
  Other   (22,587)   (7,305)   (62,980)
Net cash flow provided by operating activities   128,059    274,239    375,456 
             
INVESTING ACTIVITIES            
Construction expenditures   (34,142)   (37,476)   (32,303)
Allowance for equity funds used during construction   2,285    1,625    1,544 
Nuclear fuel purchases   (370)   (48,391)   (45,497)
Proceeds from sale/leaseback of nuclear fuel   370    48,662    45,677 
Proceeds from nuclear decommissioning trust fund sales   88,193    91,137    100,668 
Investment in nuclear decommissioning trust funds   (114,654)   (113,362)   (121,624)
Change in money pool receivable - net   189,056    (215,695)   (42,528)
Changes in other temporary investments - net       6,482 
Net cash flow provided by (used in) investing activities   130,738    (273,500)   (87,581)
             
FINANCING ACTIVITIES            
Retirement of long-term debt   (22,989)   (28,790)   (13,973)
Other financing activities       (5,483)
Dividends paid:            
  Common stock   (176,500)   (112,600)   (104,600)
Net cash flow used in financing activities   (199,489)   (141,390)   (124,056)
             
Net increase (decrease) in cash and cash equivalents   59,308    (140,651)   163,819 
             
Cash and cash equivalents at beginning of period   75,704    216,355    52,536 
             
Cash and cash equivalents at end of period   $135,012    $75,704    $216,355 
             
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:            
Cash paid/(received) during the period for:            
  Interest - net of amount capitalized   $53,095    $52,508    $40,000 
  Income taxes   $192,829    $29,914    ($70,595)
             
See Notes to Financial Statements.            

 

333

 

 

SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
ASSETS
             
        December 31,
    2006   2005
  (In Thousands)
             
CURRENT ASSETS            
Cash and cash equivalents:            
  Cash       $56   $204
  Temporary cash investments - at cost,            
   which approximates market       134,956   75,500
     Total cash and cash equivalents       135,012   75,704
Accounts receivable:            
  Associated companies       142,121   327,454
  Other       3,301   3,285
Total accounts receivable       145,422   330,739
Materials and supplies - at average cost       61,097   55,183
Deferred nuclear refueling outage costs       5,060   17,853
Prepayments and other       1,480   1,878
TOTAL       348,071   481,357
             
OTHER PROPERTY AND INVESTMENTS        
Decommissioning trust funds       281,430   236,003
             
UTILITY PLANT        
Electric       3,248,582   3,212,596
Property under capital lease       471,933   467,005
Construction work in progress       38,088   47,178
Nuclear fuel under capital lease       55,280   87,500
Nuclear fuel       10,222   -
TOTAL UTILITY PLANT       3,824,105   3,814,279
Less - accumulated depreciation and amortization       2,000,320   1,889,886
UTILITY PLANT - NET       1,823,785   1,924,393
             
DEFERRED DEBITS AND OTHER ASSETS        
Regulatory assets:            
  SFAS 109 regulatory asset - net       92,600   92,883
  Other regulatory assets       293,292   292,968
Other       14,062   18,435
TOTAL       399,954   404,286
             
TOTAL ASSETS       $2,853,240   $3,046,039
             
See Notes to Financial Statements.            
 
 

334

 

 
SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
LIABILITIES AND SHAREHOLDER'S EQUITY
             
        December 31,
    2006   2005
  (In Thousands)
 
CURRENT LIABILITIES        
Currently maturing long-term debt       $93,335   $22,989
Accounts payable:            
  Associated companies       1,634   -
  Other       26,636   22,770
Taxes accrued       47,988   228,168
Accumulated deferred income taxes       1,828   6,678
Interest accrued       46,135   45,109
Obligations under capital leases       33,142   27,716
Other       -   1,811
TOTAL       250,698   355,241
             
NON-CURRENT LIABILITIES        
Accumulated deferred income taxes and taxes accrued       304,691   267,913
Accumulated deferred investment tax credits       68,660   72,136
Obligations under capital leases       22,138   63,307
Other regulatory liabilities       242,029   224,997
Decommissioning       342,846   318,927
Accumulated provisions       2,422   2,399
Pension and other postretirement liabilities       32,060   27,849
Long-term debt       729,914   819,642
Other       396   -
TOTAL       1,745,156   1,797,170
             
Commitments and Contingencies            
             
SHAREHOLDER'S EQUITY        
Common stock, no par value, authorized 1,000,000 shares;            
 issued and outstanding 789,350 shares in 2006 and 2005       789,350   789,350
Retained earnings       68,036   104,278
TOTAL       857,386   893,628
             
TOTAL LIABILITIES AND SHAREHOLDER'S EQUITY       $2,853,240   $3,046,039
             
See Notes to Financial Statements.            

 

335

 

 

SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF RETAINED EARNINGS
 
    For the Years Ended December 31,
    2006   2005   2004
    (In Thousands)
             
Retained Earnings, January 1   $104,278   $105,234   $103,886
             
  Add:            
    Net income   140,258   111,644   105,948
             
  Deduct:            
    Dividends declared   176,500   112,600   104,600
             
Retained Earnings, December 31   $68,036   $104,278   $105,234
             
             
See Notes to Financial Statements.            
             

 

336

 

 

SYSTEM ENERGY RESOURCES, INC.
SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON
                     
    2006   2005   2004   2003   2002
    (Dollars In Thousands)
                     
Operating revenues   $555,459   $533,929   $545,381   $583,820   $602,486
Net Income   $140,258   $111,644   $105,948   $106,003   $103,352
Total assets   $2,853,240   $3,046,039   $3,028,805   $2,880,724   $2,915,898
Long-term obligations (1)   $752,052   $882,949   $887,448   $898,377   $942,701
Electric energy sales (GWh)   9,727   9,070   9,212   9,812   9,053
                     
(1) Includes long-term debt (excluding currently maturing debt) and noncurrent capital lease obligations.
                     
                     

 

337

Item 2. Properties

Information regarding the registrant's properties is included in Part I. Item 1. - Business under the sections titled "Property and Other Generation Resources" in this report.

Item 3. Legal Proceedings

Details of the registrant's material environmental regulation and proceedings and other regulatory proceedings and litigation that are pending or those terminated in the fourth quarter of 2006 are discussed in Part I. Item 1. - Business under the sections titled "Retail Rate Regulation", "Environmental Regulation", and "Litigation" in this report.

Item 4. Submission of Matters to a Vote of Security Holders

During the fourth quarter of 2006, no matters were submitted to a vote of the security holders of Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy.

DIRECTORS AND EXECUTIVE OFFICERS OF ENTERGY CORPORATION

Directors

Information required by this item concerning directors of Entergy Corporation is set forth under the heading "Item 1--Election of Directors" contained in the Proxy Statement of Entergy Corporation, (the "Proxy Statement"), to be filed in connection with its Annual Meeting of Stockholders to be held May 4, 2007 ("Annual Meeting"), and is incorporated herein by reference. Information required by this item concerning officers and directors of the remaining registrants is reported in Part III of this document.

Executive Officers

Name

Age

Position

Period

J. Wayne Leonard (a)

56

Chairman of the Board of Entergy Corporation

2006-Present

Chief Executive Officer and Director of Entergy Corporation

1999-Present

Richard J. Smith (a)

55

Group President, Utility Operations of Entergy Corporation,
  Entergy Arkansas, Entergy Gulf States, Entergy Louisiana,
  Entergy Mississippi, and Entergy New Orleans

2001-Present

Director of Entergy Arkansas, Entergy Gulf States, Entergy
  Louisiana and Entergy Mississippi

2001-Present

Director of Entergy New Orleans

2001-2005

Leo P. Denault (a)

47

Executive Vice President and Chief Financial Officer of
  Entergy Corporation

2004-Present

Director of Entergy Arkansas, Entergy Gulf States, Entergy
  Louisiana, Entergy Mississippi and System Energy

2004-Present

Director of Entergy New Orleans

2004-2005

Vice President , Corporate Development and Strategic
  Planning of Entergy Services, Inc.

1999-2004

Curtis L. Hebert, Jr. (a)

44

Executive Vice President, External Affairs of Entergy
  Corporation

2001-Present

338

Mark T. Savoff (a)

50

Executive Vice President, Operations of Entergy
  Corporation

2004-Present

Director of Entergy Arkansas, Entergy Gulf States, Entergy
  Louisiana and Entergy Mississippi

2004-Present

Director of Entergy New Orleans

2004-2005

Executive Vice President of Entergy Services, Inc.

2003-Present

President, General Electric Power Systems - GE Nuclear
  Energy, San Jose, CA

2000-2003

Robert D. Sloan (a)

59

Executive Vice President, General Counsel and Secretary
  of Entergy Corporation, Entergy Arkansas, Entergy
  Gulf States, Entergy Louisiana, Entergy Mississippi,
  Entergy New Orleans, and System Energy

2004-Present

Senior Vice President, General Counsel and Secretary of
  Entergy Corporation, Entergy Arkansas, Entergy Gulf
  States, Entergy Louisiana, Entergy Mississippi, and
  Entergy New Orleans

2003-2004

Vice President, General Counsel of GE Industrial Systems,
  Plainville, CT

1998-2003

Gary J. Taylor (a)

53

Executive Vice President and Chief Nuclear Officer of
  Entergy Corporation

2004-Present

Director, President and Chief Executive Officer of System
  Energy

2003-Present

Senior Vice President and Chief Operating Officer of
  Entergy Operations, Inc.

2000-2003

Nathan E. Langston (a)

58

Senior Vice President and Chief Accounting Officer of
  Entergy Corporation, Entergy Arkansas, Entergy Gulf
  States, Entergy Louisiana, Entergy Mississippi, Entergy
  New Orleans, and System Energy

2001-Present

William E. Madison (a)

60

Senior Vice President - Human Resources and
  Administration of Entergy Corporation

2002-Present

Senior Vice President - Human Resources and
  Administration of Entergy Arkansas, Entergy Gulf States,
  Entergy Louisiana, Entergy Mississippi, and Entergy New
  Orleans

2001-Present

(a)

In addition, this officer is an executive officer and/or director of various other wholly owned subsidiaries of Entergy Corporation and its operating companies.

Each officer of Entergy Corporation is elected yearly by the Board of Directors.

339

 

PART II

Item 5. Market for Registrants' Common Equity and Related Stockholder Matters

Entergy Corporation

The shares of Entergy Corporation's common stock are listed on the New York Stock and Chicago Stock Exchanges under the ticker symbol ETR.

Entergy Corporation's stock price as of February 28, 2007 was $98.75. The high and low prices of Entergy Corporation's common stock for each quarterly period in 2006 and 2005 were as follows:

 

2006

 

2005

 

High

 

Low

 

High

 

Low

 

(In Dollars)

               

First

72.97

 

67.97

 

72.00

 

64.48

Second

72.97

 

66.78

 

76.60

 

69.35

Third

80.00

 

70.80

 

79.22

 

70.52

Fourth

94.03

 

78.38

 

76.42

 

67.00

Consecutive quarterly cash dividends on common stock were paid to stockholders of Entergy Corporation in 2006 and 2005. Quarterly dividends of $0.54 per share were paid in 2006 and 2005.

As of February 28, 2007, there were 46,102 stockholders of record of Entergy Corporation.

Unregistered Sales of Equity Securities and Use of Proceeds

Issuer Purchases of Equity Securities (1)

Period

 

Total Number of
Shares Purchased

 

Average Price Paid
per Share

 

Total Number of
Shares Purchased as Part of a Publicly
Announced Plan

 

Maximum $ Amount
of Shares that May
Yet be Purchased Under a Plan (2)

 

 

 

 

 

 

 

 

 

10/01/2006-10/31/2006

 

2,130,500

 

$83.00

 

2,130,500

 

$258,292,682

11/01/2006-11/30/2006

 

2,620,500

 

$88.38

 

2,620,500

 

$50,515,220

12/01/2006-12/31/2006

 

1,921,000

 

$91.43

 

1,921,000

 

$-

Total

 

6,672,000

 

$87.54

 

6,672,000

 

 

  1. In accordance with Entergy's stock-based compensation plan, Entergy periodically grants stock options to key employees, which may be exercised to obtain shares of Entergy's common stock. According to the plan, these shares can be newly issued shares, treasury stock, or shares purchased on the open market. Entergy's management has been authorized by the Board to repurchase on the open market shares up to an amount sufficient to fund the exercise of grants under the plans. In addition to this authority, the Board approved a program under which Entergy was authorized to repurchase up to $1.5 billion of its common stock through 2006. Entergy completed the $1.5 billion program in the fourth quarter 2006. In 2006, Entergy repurchased 6,672,000 shares of common stock under both programs for a total purchase price of $584 million.
  2. Maximum amount of shares that may yet be repurchased relates only to the $1.5 billion plan and does not include an estimate of the amount of shares that may be purchased to fund the exercise of grants under the stock-based compensation plans.

On January 29, 2007, the Board approved a new repurchase program under which Entergy is authorized to repurchase up to $1.5 billion of its common stock, which Entergy expects to complete over the next two years.

 

340

 

Comparison of Five-Year Cumulative Return

The following graph compares the performance of the common stock of Entergy Corporation to the S&P 500 index and the Philadelphia Utility Index (each of which includes Entergy Corporation) for the last five years.

 

Years ended December 31,

2001

2002

2003

2004

2005

2006

Entergy Corporation

$100

$119.99

$154.58

$188.00

$196.95

$271.06

S&P 500 (2)

$100

$78.03

$100.16

$110.92

$116.28

$134.43

Philadelphia Utility Index (2)

$100

$82.02

$101.77

$127.65

$150.62

$180.11

(1)

Assumes $100 invested at the closing price on December 31, 2001 in Entergy Corporation common stock, the S&P 500, and the Philadelphia Utility Index, and reinvestment of all dividends.

(2)

Cumulative total returns calculated from the S&P 500 Index and Philadelphia Utility Index maintained by Standard & Poor's Corporation. In previous years, Entergy has used the S&P Utility Index for comparison purposes. However, over the past several years the membership in that index has decreased significantly. The Philadelphia Utility Index membership, which also includes Entergy, has remained relatively consistent. Therefore, Entergy now utilizes the Philadelphia Utility Index for peer comparison purposes. As shown in the performance graph, Entergy's total return over the relevant period was 171%, and the total return of the Philadelphia Utility Index was 80%. If the S&P Electric Utilities Index was used, its total return would have been 91%.

341

Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy

There is no market for the common stock of Entergy Corporation's wholly owned subsidiaries. Cash dividends on common stock paid by the Registrant Subsidiaries to Entergy Corporation during 2006 and 2005, were as follows:

   

2006

 

2005

   

(In Millions)

         

Entergy Arkansas

 

$158.0

 

$64.1

Entergy Gulf States

 

$213.2

 

$61.9

Entergy Louisiana

 

$-

 

$51.6

Entergy Mississippi

 

$5.0

 

$21.9

Entergy New Orleans

 

$-

 

$5.3

System Energy

 

$176.5

 

$112.6

Information with respect to restrictions that limit the ability of the Registrant Subsidiaries to pay dividends is presented in Note 7 to the financial statements.

Item 6. Selected Financial Data

Refer to "SELECTED FINANCIAL DATA - FIVE-YEAR COMPARISON OF ENTERGY CORPORATION AND SUBSIDIARIES, ENTERGY ARKANSAS, INC., ENTERGY GULF STATES, INC., ENTERGY LOUISIANA, LLC, ENTERGY MISSISSIPPI, INC., ENTERGY NEW ORLEANS, INC., and SYSTEM ENERGY RESOURCES, INC." which follow each company's financial statements in this report, for information with respect to selected financial data and certain operating statistics.

Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations

Refer to "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS OF ENTERGY CORPORATION AND SUBSIDIARIES, ENTERGY ARKANSAS, INC., ENTERGY GULF STATES, INC., ENTERGY LOUISIANA, LLC, ENTERGY MISSISSIPPI, INC., ENTERGY NEW ORLEANS, INC., and SYSTEM ENERGY RESOURCES, INC."

Item 7A. Quantitative and Qualitative Disclosures About Market Risk

Refer to "MANAGEMENT'S FINANCIAL DISCUSSION AND ANALYSIS - Significant Factors and Known Trends - Market and Credit Risk Sensitive Instruments OF ENTERGY CORPORATION AND SUBSIDIARIES, ENTERGY ARKANSAS, INC., ENTERGY GULF STATES, INC., ENTERGY LOUISIANA, LLC, ENTERGY MISSISSIPPI, INC., ENTERGY NEW ORLEANS, INC., and SYSTEM ENERGY RESOURCES, INC."

Item 8. Financial Statements and Supplementary Data

Refer to "TABLE OF CONTENTS - Entergy Corporation, Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., and System Energy Resources, Inc."

Item 9. Changes In and Disagreements With Accountants On Accounting and Financial Disclosure.

No event that would be described in response to this item has occurred with respect to Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, or System Energy.

342

Item 9A. Controls and Procedures

Disclosure Controls and Procedures

As of December 31, 2006, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy (individually "Registrant" and collectively the "Registrants") management, including their respective Chief Executive Officers (CEO) and Chief Financial Officers (CFO). The evaluations assessed the effectiveness of the Registrants' disclosure controls and procedures. Based on the evaluations, each CEO and CFO has concluded that, as to the Registrant or Registrants for which they serve as CEO or CFO, the Registrant's or Registrants' disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant's or Registrants' disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant's or Registrants' management, including their respective CEO and CFO, as appropriate to allow timely decisions regarding required disclosure.

Internal Control over Financial Reporting

The managements of Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy (individually "Registrant" and collectively the "Registrants") are responsible for establishing and maintaining adequate internal control over financial reporting for the Registrants. Each Registrant's internal control system is designed to provide reasonable assurance regarding the preparation and fair presentation of each Registrant's financial statements presented in accordance with generally accepted accounting principles.

All internal control systems, no matter how well designed, have inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.

Each Registrant's management assessed the effectiveness of each Registrant's internal control over financial reporting as of December 31, 2006. In making this assessment, each management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control - Integrated Framework.

Based on each management's assessment and the criteria set forth by COSO, each Registrant's management believes that each Registrant maintained effective internal control over financial reporting as of December 31, 2006.

The Registrants' registered public accounting firm has issued an attestation report on each management's assessment of each Registrant's internal control over financial reporting.

343

Attestation Report of Registered Public Accounting Firm

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Corporation and Subsidiaries

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy Corporation and Subsidiaries (the "Corporation") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Corporation's management is responsible for maintaining effective internal control over financial reporting and for their assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Corporation's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Corporation maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Corporation maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements as of and for the year ended December 31, 2006 of the Corporation and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding their change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

 

344

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Arkansas, Inc.

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy Arkansas, Inc. (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

345

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Gulf States, Inc.

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy Gulf States, Inc. (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

346

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Members
Entergy Louisiana, LLC

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy Louisiana, LLC (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

347

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy Mississippi, Inc.

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy Mississippi, Inc. (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

348

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders
Entergy New Orleans, Inc.

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that Entergy New Orleans, Inc. (Debtor-in-Possession) (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion and includes explanatory paragraphs regarding its filing for reorganization under Chapter 11 of the Federal Bankruptcy Code, the existence of matters that raise substantial doubt about its ability to continue as a going concern, and its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

349

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholder
System Energy Resources, Inc.

We have audited management's assessment, included in the accompanying Controls and Procedures - Internal Control over Financial Reporting, that System Energy Resources, Inc. (the "Company") maintained effective internal control over financial reporting as of December 31, 2006, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Our responsibility is to express an opinion on management's assessment and an opinion on the effectiveness of the Company's internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, evaluating management's assessment, testing and evaluating the design and operating effectiveness of internal control, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinions.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, management's assessment that the Company maintained effective internal control over financial reporting as of December 31, 2006, is fairly stated, in all material respects, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2006, based on the criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the financial statements as of and for the year ended December 31, 2006 of the Company and our report dated February 26, 2007 expressed an unqualified opinion on those financial statements and included an explanatory paragraph regarding its change in the method of accounting for defined benefit pension and other postretirement plans.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

350

 

Item 9B. Other Information

As more fully-described in its report on Form 8-K filed on June 1, 2005 and in Note 4 to the financial statements in this Form 10-K, Entergy Corporation has two revolving credit facilities available to it. Entergy Corporation from time to time has borrowed under the facilities and has also from time to time issued letters of credit against the borrowing capacity of the facilities. Following is a summary of the borrowings outstanding and capacity available under these facilities as of March 1, 2007:


Facility

 


Capacity

 


Borrowings

 

Letters
of Credit

 

Capacity
Available

   

(In Millions)

                 

5-Year Facility

 

$2,000 

 

$895 

 

$79 

 

$1,026

3-Year Facility

 

$1,500 

 

$470 

 

$-  

 

$1,030

 

351

 

 

PART III

Item 10. Directors and Executive Officers of the Registrants (Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans)

All officers and directors listed below held the specified positions with their respective companies as of the date of filing this report, unless otherwise noted.

Name

Age

Position

Period

ENTERGY ARKANSAS, INC.

Directors

Hugh T. McDonald

48

President and Chief Executive Officer of Entergy Arkansas

2000-Present

Director of Entergy Arkansas

2000-Present

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Officers

Jay A. Lewis

45

Vice President and Chief Financial Officer - Utility
  Operations Group of Entergy Arkansas, Entergy Gulf
  States, Entergy Louisiana, LLC, Entergy Mississippi,
  and Entergy New Orleans

2004-Present

Director, Accounting Policy and Research of Entergy
  Services, Inc.

1999 - 2004

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Curtis L. Hebert, Jr.

See information under the Entergy Corporation Officers
  Section in Part I.

Nathan E. Langston

See information under the Entergy Corporation Officers
  Section in Part I.

J. Wayne Leonard

See information under the Entergy Corporation Officers
  Section in Part I.

William E. Madison

See information under the Entergy Corporation Officers
  Section in Part I.

Hugh T. McDonald

See information under the Entergy Arkansas Directors
  Section above.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Robert D. Sloan

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Gary J. Taylor

See information under the Entergy Corporation Officers
  Section in Part I.

ENTERGY GULF STATES, INC.

Directors

E. Renae Conley

49

Director of Entergy Gulf States and Entergy Louisiana, LLC

2000-Present

President and Chief Executive Officer - LA of Entergy Gulf
  States and Entergy Louisiana, LLC

2000-Present

Joseph F. Domino

58

Director of Entergy Gulf States

1999-Present

President and Chief Executive Officer - TX of Entergy Gulf
  States

1998-Present

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Officers

E. Renae Conley

See information under the Entergy Gulf States Directors
  Section above.

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Joseph F. Domino

See information under the Entergy Gulf States Directors
  Section above.

Curtis L. Hebert, Jr.

See information under the Entergy Corporation Officers
  Section in Part I.

352

Nathan E. Langston

See information under the Entergy Corporation Officers
  Section in Part I.

J. Wayne Leonard

See information under the Entergy Corporation Officers
  Section in Part I.

Jay A. Lewis

See information under the Entergy Arkansas Officers Section
  above.

William E. Madison

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Robert D. Sloan

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Gary J. Taylor

See information under the Entergy Corporation Officers
  Section in Part I.

ENTERGY LOUISIANA, LLC

Directors

E. Renae Conley

See information under the Entergy Gulf States Directors
  Section above.

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Officers

E. Renae Conley

See information under the Entergy Gulf States Directors
  Section above.

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Curtis L. Hebert, Jr.

See information under the Entergy Corporation Officers
  Section in Part I.

Nathan E. Langston

See information under the Entergy Corporation Officers
  Section in Part I.

J. Wayne Leonard

See information under the Entergy Corporation Officers
  Section in Part I.

Jay A. Lewis

See information under the Entergy Arkansas Officers Section
  above.

William E. Madison

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Robert D. Sloan

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Gary J. Taylor

See information under the Entergy Corporation Officers
  Section in Part I.

ENTERGY MISSISSIPPI, INC.

Directors

Carolyn C. Shanks

45

President and Chief Executive Officer of Entergy Mississippi

1999-Present

Director of Entergy Mississippi

1999-Present

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Officers

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Curtis L. Hebert, Jr.

See information under the Entergy Corporation Officers
  Section in Part I.

Nathan E. Langston

See information under the Entergy Corporation Officers
  Section in Part I.

J. Wayne Leonard

See information under the Entergy Corporation Officers
  Section in Part I.

Jay A. Lewis

See information under the Entergy Arkansas Officers Section
  above.

William E. Madison

See information under the Entergy Corporation Officers
  Section in Part I.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Carolyn C. Shanks

See information under the Entergy Mississippi Directors
  Section above.

Robert D. Sloan

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Gary J. Taylor

See information under the Entergy Corporation Officers
  Section in Part I.

353

ENTERGY NEW ORLEANS, INC.

Directors

Daniel F. Packer (a)

59

Chairman of the Board of Entergy New Orleans

1999-Present

Chief Executive Officer Entergy New Orleans

1998-2006

President of Entergy New Orleans

1997-2006

Director of Entergy New Orleans

1996-2006

Tracie L. Boutte

43

Director of Entergy New Orleans

2005-Present

Vice President, Regulatory Affairs - New Orleans of
  Entergy New Orleans

2004-Present

Vice President, Gas Distribution - Entergy Services, Inc.

2002-2004

Vice President, Gas & C & I Services - Entergy New
  Orleans

2000-2002

Roderick K. West (a)

38

Director of Entergy New Orleans

2005-Present

Director, Metro Distribution Operations of Entergy
  Services, Inc.

2005-2006

Region Manager, Distribution Operations of Entergy
  Services, Inc.

2003-2005

Director, Regulatory Affairs of Entergy New Orleans

2001-2003

Officers

Leo P. Denault

See information under the Entergy Corporation Officers
  Section in Part I.

Curtis L. Hebert, Jr.

See information under the Entergy Corporation Officers
  Section in Part I.

Nathan E. Langston

See information under the Entergy Corporation Officers
  Section in Part I.

J. Wayne Leonard

See information under the Entergy Corporation Officers
  Section in Part I.

Jay A. Lewis

See information under the Entergy Arkansas Officers
  Section above.

William E. Madison

See information under the Entergy Corporation Officers
  Section in Part I.

Daniel F. Packer

See information under the Entergy New Orleans Directors
  Section above.

Mark T. Savoff

See information under the Entergy Corporation Officers
  Section in Part I.

Robert D. Sloan

See information under the Entergy Corporation Officers
  Section in Part I.

Richard J. Smith

See information under the Entergy Corporation Officers
  Section in Part I.

Gary J. Taylor

See information under the Entergy Corporation Officers
  Section in Part I.

    (a)    Effective January 1, 2007, Roderick West was named President and Chief Executive Officer of Entergy New Orleans.

Each director and officer of the applicable Entergy company is elected yearly to serve by the unanimous consent of the sole stockholder, Entergy Corporation, at its annual meeting, with the exception of the directors and officers of Entergy Louisiana, LLC, who are elected yearly to serve by the unanimous consent of the sole common membership owner, Entergy Louisiana Holdings.

Corporate Governance Guidelines and Committee Charters

Each of the Audit, Corporate Governance and Personnel Committees of Entergy Corporation's Board of Directors operates under a written charter. In addition, the full Board has adopted Corporate Governance Guidelines. Each charter and the guidelines are available through Entergy's website (www.entergy.com) or upon written request.

Audit Committee of the Entergy Corporation Board

The following directors are members of the Audit Committee of Entergy Corporation's Board of Directors:

Steven V. Wilkinson (Chairman)
Simon D. deBree
Stuart L. Levenick
James R. Nichols

 

354

 

All Audit Committee members are independent. For purposes of independence of members of the Audit Committee, an independent director also may not accept directly or indirectly any consulting, advisory or other compensatory fee from Entergy or be affiliated with Entergy as defined in SEC rules. All Audit Committee members possess the level of financial literacy and accounting or related financial management expertise required by the NYSE rules. Steven V. Wilkinson qualifies as an "audit committee financial expert," as that term is defined in the SEC rules.

Code of Ethics

The Board of Directors has adopted a Code of Business Conduct and Ethics for Members of the Board of Directors. The code is available through Entergy's website (www.entergy.com) or upon written request. The Board has also adopted a Code of Business Conduct and Ethics for Employees, that includes Special Provision Relating to Principal Executive Officer and Senior Financial Officers. The Code of Business Conduct and Ethics for Employees is to be read in conjunction with Entergy's omnibus code of integrity under which Entergy operates called the Code of Entegrity as well as system policies. All employees are required to abide by the Codes. Non-bargaining employees are required to acknowledge annually that they understand and abide by the Code of Entegrity. The Code of Business Conduct and Ethics for Employees and the Code of Entegrity are available through Entergy's website (www.entergy.com) or upon written request.

Source of Nominations to the Board of Directors; Nominating Procedure

The Corporate Governance Committee has adopted a policy on consideration of potential director nominees. The Committee will consider nominees from a variety of sources, including nominees suggested by shareholders, executive officers, fellow board members, or a third party firm retained for that purpose. It applies the same procedures to all nominees regardless of the source of the nomination.

Any party wishing to make a nomination should provide a written resume of the proposed candidate, detailing relevant experience and qualifications, as well as a list of references. The Committee will review the resume and may contact references. It will decide based on the resume and references whether to proceed to a more detailed investigation. If the Committee determines that a more detailed investigation of the candidate is warranted, it will invite the candidate for a personal interview, conduct a background check on the candidate, and assess the ability of the candidate to provide any special skills or characteristics identified by the Committee or the Board.

Section 16(a) Beneficial Ownership Reporting Compliance

Information called for by this item concerning the directors and officers of Entergy Corporation is set forth in the Proxy Statement of Entergy Corporation to be filed in connection with its Annual Meeting of Stockholders to be held on May 4, 2007, under the heading "Section 16(a) Beneficial Ownership Reporting Compliance", which information is incorporated herein by reference.

355

 

 

Item 11. Executive Compensation

ENTERGY CORPORATION

Information concerning the directors and officers of Entergy Corporation is set forth in the Proxy Statement under the headings "Compensation Discussion and Analysis," "Executive Compensation Tables," "Nominees for the Board of Directors," and "Non-Employee Director Compensation," all of which information is incorporated herein by reference.

ENTERGY ARKANSAS, ENTERGY GULF STATES, ENTERGY LOUISIANA, ENTERGY MISSISSIPPI AND ENTERGY NEW ORLEANS

Compensation Discussion and Analysis (CD&A)

 

Introduction

This section discusses the compensation awarded to, earned by or paid to the Chief Executive Officers ("CEOs"), the Chief Financial Officers ("CFOs"), and the three other most highly compensated executive officers other than the CEO and CFO of each of Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans (the "Subsidiaries") (such officers collectively being referred to as the "Named Executive Officers") for 2006. The purpose of this section is to provide investors with material information necessary to understand the compensation policies for the Named Executive Officers. Investors should read this section in combination with the more detailed compensation tables and other data presented elsewhere in this report. For information regarding the compensation of the executive officers of Entergy Corporation, see the Proxy Statement of Entergy Corporation.

The Personnel Committee of the Board of Directors of Entergy Corporation (the "Personnel Committee" or the "Committee"), which is comprised entirely of independent directors, has overall responsibility for approving the compensation program for the Named Executive Officers. In discharging its duties, the Personnel Committee retains an independent compensation consultant to assist it, among other things, in evaluating different compensation programs and developing market data to assess Entergy Corporation's compensation programs. The Personnel Committee also may solicit recommendations from Entergy Corporation's CEO with respect to compensation decisions for other individual Named Executive Officers.

The Named Executive Officers are identified in the Summary Compensation Table immediately following this Compensation Discussion and Analysis. Mr. Leonard, Mr. Denault and Mr. Smith also serve as executive officers of Entergy Corporation. Mr. Leonard, Mr. Denault and Mr. Smith do not receive additional compensation for serving as Named Executive Officers of the Subsidiaries. Mr. Lewis, who serves as the Vice President and Chief Financial Officer - Utility Operations Group of the Subsidiaries, is not an executive officer of Entergy Corporation and, as such, does not participate in many of the compensation programs applicable to the other Named Executive Officers. For more information about the officers of the Subsidiaries, see Part III, Item 10 of this report.

Objectives of Entergy Corporation's Executive Compensation Program

The compensation program for the Named Executive Officers is designed to attract, retain, motivate and reward executives who can contribute to the long-term success of Entergy Corporation and its Subsidiaries and thereby build value for stockholders. The program is organized along the following principles.

The compensation programs are designed to ensure that a significant percentage of the total compensation of the Named Executive Officers is contingent on achievement of performance goals that drive total shareholder return and result in increases in Entergy Corporation's common stock

 

356

 

 

 price. For example, each of the annual cash bonus and long-term performance unit programs pay out only if Entergy Corporation achieves pre-established performance goals. Assuming achievement of these performance goals at target level, approximately 80% of the annual target total compensation (excluding non-qualified supplemental retirement income) of Entergy Corporation's CEO is represented by performance-based compensation and the remaining 20% is represented by base salary. For Mr. Denault and Mr. Smith, assuming achievement of performance goals at the target levels, approximately 65% of the annual target total compensation (excluding non-qualified supplemental retirement income) is represented by performance-based compensation and the remaining 35% by base salary. For substantially all of the other Named Executive Officers, assuming achievement of performance goals at the target levels, at least 50% of the annual target total compensation (excluding non-qualified supplemental retirement income) is represented by performance-based compensation and the remaining 50% by base salary.

To align the economic interests of the Named Executive Officers with the shareholders of Entergy Corporation, a substantial portion of the total compensation of these officers should be in the form of equity-based awards. Equity awards are typically granted in the form of stock options with a three-year vesting schedule and performance units with a three-year performance cycle. Although stock options are generally subject only to time-based vesting, performance units pay out only if Entergy Corporation achieves specified performance targets, and the amount of payout varies based on the level of performance achieved.

It is in the shareholders' best interests that Entergy Corporation and the Subsidiaries attract and retain talented executives by offering compensation packages that are competitive but fair. Entergy Corporation's Personnel Committee has sought to develop compensation programs that deliver total target compensation at approximately the 50th percentile of the market. To develop a competitive compensation program, the Personnel Committee on a regular basis reviews base salary and other compensation market data from two sources:

1. Surveys that track compensation data for executive officers who perform similar roles and responsibilities in corporations with comparable annual revenues. In general, the Committee compares the compensation of the Named Executive Officers to the compensation of their peers in general industry and/or energy services companies.

2. Compensation data derived from proxy statements for companies in Entergy Corporation's industry. Prior to 2006, the Committee used those companies in the Standard & Poor's Electric Utility Index (the "SPELEC") for this purpose. Starting in 2006, the Committee has used the companies that comprise the Philadelphia Utilities Index for compensation data. The companies in the Philadelphia Utilities Index (collectively, the "Industry Peer Group Companies") are:

AES Corporation

FirstEnergy Corporation

Ameren Corporation

FPL Group Inc.

American Electric Power Co. Inc.

Northeast Utilities

CenterPoint Energy Inc.

PG&E Corporation

Consolidated Edison Inc.

Progress Energy Inc.

Dominion Resources Inc.

Public Service Enterprise Group Inc.

DTE Energy Company

Southern Company

Duke Energy Corporation

TXU Corporation

Edison International

XCEL Energy

Exelon Corporation

 

357

While individual Named Executive Officers may have target compensation packages above or below the 50th percentile based on unique knowledge, skills, performance and responsibilities, the Committee considers its objectives to have been met if Entergy Corporation's executive officers, considered as a group, are eligible for and receive a target compensation package within the range of 90 - 110% of market 50th percentile as defined by reference to the above sources. In 2006, the subgroup of executive officers comprising the Named Executive Officers also fell within this range.

Elements of the Compensation Program

This section describes the elements of the compensation program for the Named Executive Officers, together with a discussion of various matters relating to these items, including why the Personnel Committee chose to include these items as compensation elements.

Base Salary. The Personnel Committee reviews and approves the base salaries for the Entergy Corporation CEO, CFO and the three other most highly compensated executive officers of Entergy Corporation. The CEO and the Group President, Utility Operations, Mr. Richard J. Smith review and approve the base salaries of certain of the Named Executive Officers of the Subsidiaries. Base salary is included in each Named Executive Officer's compensation package because the Company believes it is appropriate that some portion of the compensation provided to these officers be in a form that is a fixed cash amount. Also, base salary remains the most common form of payment throughout all industries. Its use ensures a competitive compensation package to the Named Executive Officers.

Annual merit increases in base salary are determined based on an assessment of Entergy Corporation, business unit and individual performance. Market data and internal pay equity are also considered in evaluating merit recommendations.

In 2006, after taking into account the market data and other factors described above, the Named Executive Officers received merit-based salary increases in amounts ranging from zero to approximately five percent. In general these merit-based increases were consistent with the merit increase percentages approved with respect to Named Executive Officers in the last two years (excluding adjustments in salaries related to promotions or other changes in job responsibilities).

Performance-based incentives are included in the Named Executive Officers' compensation packages because they permit the Personnel Committee to encourage the Named Executive Officers, in any particular year, to pursue objectives consistent with the overall goals and strategic direction that the Board has set for the Company. Annual incentive plans are commonly used by companies in a variety of industry sectors to compensate their executive officers.

The Named Executive Officers participate in the Executive Annual Incentive Plan ("EAIP"), a performance-based cash bonus plan (other than Mr. Lewis who participates in a management-level annual incentive plan ("MIP") substantially similar to the EAIP). The EAIP and MIP, which operate on a calendar year basis, use a performance metric known as the Entergy Achievement Multiplier ("EAM") to determine funding level for a particular calendar year. For the 2006 EAIP and MIP, the EAM was calculated based in equal part on Entergy Corporation's earnings per share ("EPS") and operating cash flow ("OCF"). The Committee selected these performance measures because (i) EPS and OCF have both a correlative and causal relationship to shareholder value performance, (ii) EPS and OCF targets are aligned with externally-communicated goals and (iii) EPS and OCF results are readily available in earnings releases and SEC filings. In addition, these measures are commonly used by other companies, including the Industry Peer Group Companies, as components of their incentive programs. The Personnel Committee evaluates the performance measures used for the EAIP and the MIP on an annual basis. The Committee sets performance targets at minimum, target and maximum achievement levels. Approximately two-thirds of the Industry Peer Group Companies use EPS as an incentive measure and one-third use some type of cash flow measure.

 

358

 

The Committee sets the target achievement levels under the EAIP and MIP based on their review of EPS and OCF objectives established in Entergy Corporation's financial plan, which is reviewed and discussed quarterly with the Board of Directors.  The Committee sets minimum and maximum achievement levels under the EAIP and MIP at approximately 10% below and 10% above target achievement levels.  Payouts for performance between minimum and target achievement levels and between target and maximum levels are calculated using straight line interpolation.  In general, the Committee seeks to establish target achievement levels such that the relative difficulty of achieving the target level is consistent from year to year.  Over the past five years ending in 2006, the average EAM, representing EPS and OCF results, was 140% of target.  This result reflects the strong performance of Entergy Corporation during this period.

At the end of each annual performance cycle, management reviews with the Personnel Committee actual against targeted performance, including any unusual events that occurred during the performance cycle. For example, actual performance may result in the EAM being measured at 105% of target. This is referred to as the multiplier for purposes of funding the incentive pool for officers. For the Named Executive Officers participating in the EAIP, a Management Effectiveness factor is applied to increase the annual funding multiplier by 25%, and the Committee then may exercise negative discretion in determining the actual incentive awards for those individuals.

In December 2005, the Committee established executives' target awards under the EAIP and MIP for 2006. The target awards for each Named Executive Officer were set as follows: Under the EAIP, J. Wayne Leonard, CEO of Entergy Corporation (100%); Leo P. Denault, Executive Vice President, CFO of Entergy Corporation (70%); Richard J. Smith, Group President, Utility Operations of Entergy Corporation (70%); E. Renae Conley, CEO - Entergy Louisiana, CEO - LA - Entergy Gulf States (60%); Joseph F. Domino, CEO - TX - Entergy Gulf States (50%); Hugh T. McDonald, CEO - Entergy Arkansas (50%); Daniel F. Packer, CEO - Entergy New Orleans (50%); and Carolyn C. Shanks, CEO - Entergy Mississippi (50%); under the MIP, Jay A. Lewis, Vice President, CFO - Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (35%).

In setting these target awards, the Personnel Committee considered several factors, including:

  • Analysis provided by the Committee's independent compensation consultant as to compensation practices at the Industry Peer Group Companies;
  • Competitiveness of Entergy Corporation's compensation plans and their ability to attract and retain top executive talent;
  • Target bonus levels in the market for comparable positions;
  • The desire to ensure that a substantial portion of total compensation is performance-based; and
  • The relative importance, in any given year, of the short-term performance goals established pursuant to the EAIP and MIP.

In January 2007, after reviewing EPS and OCF results against the performance objectives established for 2006, the Personnel Committee certified the EAM at 189% of target. This resulted in an EAIP payment to the Entergy Corporation CEO equal to 189% of his base salary (100% target multiplied by 189%) and to Mr. Denault and Mr. Smith equal to 132% of their respective base salaries (70% multiplied by 189%). Pursuant to the operation of the EAIP, the Management Effectiveness factor increased the EAM percentage by 25% with respect to the funding of incentive awards for the Named Executive Officers; however, the Committee exercised its negative discretion to eliminate this increase and applied the EAM of 189% to the awards for those individuals.

The EAIP payments to the other Named Executive Officers were determined by line of business multipliers based on key metrics and comprised of 50% financial goals (operating company's contribution to the EAM) and 50% operational goals (safety, system reliability and customer satisfaction): Ms. Conley's payment was equal to 120% of base salary (60% target multiplied by 200% achievement level); Mr. Domino's payment was equal to 100% of base pay (50% target multiplied by 200% achievement level); Mr. McDonald's payment was equal to 68% of base salary (50% target multiplied by 135% achievement level) and Ms. Shanks' payment was equal to 88% of base pay (50% target multiplied by 175% achievement level). Mr. Lewis, as CFO for the utilities, received an incentive payment under the MIP equal to 61% of his base pay (35% multiplied by 175% achievement level). Mr. Packer did not receive an EAIP payment due to the pending bankruptcy of Entergy New Orleans.

359

In fixing the amount of the EAIP and, in the case of Mr. Lewis, MIP payouts for fiscal 2006, the Committee noted that Entergy Corporation's EPS and OCF results were reflective of overall performance results that, in the judgment of the Committee, were among the best in the Company's history. Among other things, the Committee noted the following significant management achievements in 2006:

In reviewing Mr. Leonard's overall compensation, the Committee took special note of the performance of Entergy Corporation under Mr. Leonard's direction and leadership. In particular, the Committee noted that the total shareholder return of Entergy Corporation measured over the eight-year period since Mr. Leonard's appointment as CEO of Entergy Corporation in January 1999 exceeded all of the Industry Peer Group Companies as well as other U.S. utility companies.

Equity Compensation

Entergy Corporation's long-term equity incentive programs are intended to reward the Named Executive Officers for achievement of shareholder value creation over the long-term. In its long-term incentive programs, Entergy Corporation primarily uses a mix of performance units and stock options in order to accomplish different objectives. Performance units reward the Named Executive Officers on the basis of total shareholder return ("TSR"), which is a measure of stock appreciation and dividend payments relative to the Industry Peer Group Companies. Options provide a direct incentive for growing the price of Entergy Corporation common stock. In addition, Entergy Corporation occasionally awards restricted units for retention purposes or to offset forfeited compensation in order to attract officers and managers from other companies.

360

Each of the performance units and stock options granted to the Named Executive Officers in 2006 were awarded under the Amended and Restated 1998 Equity Ownership Plan of Entergy Corporation and Subsidiaries ("EOP" or "equity ownership plan"). At Entergy Corporation's annual meeting in 2006, its shareholders approved the 2007 Equity Ownership and Long Term Cash Incentive Plan of Entergy Corporation and Subsidiaries, which became effective as of January 1, 2007 (the "2007 Plan"). Awards made in 2007 and beyond will be issued under the 2007 Plan.

  • Performance Unit Program

In 2006, Entergy Corporation issued performance unit awards to the Named Executive Officers (other than Mr. Lewis) under Entergy Corporation's Performance Unit Program ("PUP") established under its equity ownership plan. The PUP is structured to reward Named Executive Officers only if, and to the extent that, performance goals set by the Personnel Committee are met. The PUP provides a minimum, target and maximum achievement level. Performance is measured by assessing Entergy Corporation's TSR relative to the TSR of the Industry Peer Group Companies. The Personnel Committee chose TSR as a measure of performance because it assesses Entergy Corporation's shareholder value creation relative to other electric utilities. Minimum, target and maximum performance levels are determined by reference to the quartile ranking of Entergy Corporation's TSR against the TSR of the Industry Peer Group Companies. Prior to 2006, this peer group was the SPELEC. However, beginning with the 2006-2008 performance period, the Personnel Committee identified the Philadelphia Utilities Index as the peer group for TSR performance because the companies represented in this index more closely approximate Entergy Corporation in terms of size and scale and because the companies comprising the SPELEC had been reduced by 50%, which resulted in a pool of companies insufficient for comparative purposes. Subject to achievement of the PUP performance levels, the Personnel Committee issued the following target amounts for the 2006-2008 performance cycle: 33,500 performance units for Entergy Corporation's CEO; 6,000 performance units for each of Mr. Denault and Mr. Smith; 2,400 performance units for Ms. Conley; and 1,100 performance units for each of Mr. Domino, Mr. McDonald, Mr. Packer and Ms. Shanks. The range of payouts under the program is shown below.

Quartiles:

4

3

2

1

Performance Levels:

Zero

Minimum

Target

Maximum

TSR Ranges:

25th percentile and below

25th to 50th percentiles

50th to 75th percentiles

75th percentile and above

Payouts:

No Payout

Interpolate between Minimum and Target
(10% to 100% of Target)

Interpolate between Target and Maximum (100% to 250% of Target)

Maximum Payout (250% of Target)

The Personnel Committee sets payout opportunities for the PUP each year. In determining payout opportunities, the Committee considers several factors, including:

 

361

 

 

In January 2007, the Personnel Committee determined the actual number of performance units to be paid to PUP participants for the 2004-2006 performance cycle. The target payouts for the 2004-2006 performance period, which targets were established by the Committee in January of 2004, were:

The range of potential payout on these performance unit awards was from 0% to 250% of target opportunity, with performance measured, in a manner similar to that described above for the 2006-2008 cycle, on the basis of relative TSR. In January 2007, the Committee assessed Entergy Corporation's performance for the 2004-2006 performance period. As noted above, the SPELEC was chosen as the peer group for purposes of determining Entergy Corporation's relative performance for the 2004-2006 period. Based on the advice of its independent compensation consultant, the Committee compared Entergy Corporation's total shareholder return against the TSR of the companies that comprised the SPELEC at the time the Board first approved its use for that period (i.e., the first day of the 2004-2006 performance period), to ensure a pool of companies sufficient for comparative purposes. On that basis, the Committee concluded that Entergy Corporation had achieved the performance targets for the 2004-2006 performance cycle, resulting in a payment of 150% of target. In accordance with the terms of the PUP, each performance unit was then automatically converted into cash at the rate of $92.32 per unit, the closing price of Entergy Corporation's common stock on the last trading day of the performance cycle (December 29, 2006), plus dividend equivalents accrued over the three-year performance cycle.

The Personnel Committee considers several factors in determining the amount of stock options it will grant under Entergy Corporation's equity ownership plan to the Named Executive Officers, including:

For stock option awards, the Committee's assessment of individual performance of each Named Executive Officer is the most important factor in determining the amount of the awards. For information regarding stock options awarded in 2006 to each of the Named Executive Officers, see the Grants of Plan-Based Awards Table included elsewhere in this report.

Under Entergy Corporation's equity ownership plan, all options must have an exercise price equal to the closing fair market value of Entergy Corporation common stock on the date of grant. In addition, Entergy Corporation has adopted a policy requiring that, if an executive officer (including a Named Executive Officer, other than Mr. Lewis) exercises any stock option granted on or after January 1, 2003, the officer must retain at least 75% of the after-tax net profit from such stock option exercise in the form of Entergy Corporation common stock until the earlier of 60 months from the date on which the option is exercised or the termination of the executive officer's full-time employment.

Entergy Corporation has not adopted a formal policy regarding the granting of options at times when it is in possession of material non-public information. However, Entergy Corporation generally grants options to Named Executive Officers only during the month of January in connection with annual executive compensation decisions. On occasion, it may grant options to newly hired employees or existing employees for retention or other limited purposes.

362

  • Restricted Units

Restricted units granted under the equity ownership plan ("RUs") represent phantom shares of Entergy Corporation common stock. Entergy Corporation occasionally grants RUs to newly-hired Named Executive Officers for retention purposes or to offset forfeited compensation from a previous employer or to existing employees for retention or other limited purposes. If all conditions of the grant are satisfied, restrictions on the RUs lift at the end of the restricted period, and a cash equivalent value of the RUs is paid. The settlement price is equal to the number of RUs multiplied by the closing price of Entergy Corporation common stock on the date restrictions lift. RUs are not entitled to dividends or voting rights. RUs are generally time-based awards for which restrictions lift, subject to continued employment, over a two- to five-year period.

In 2006, recognizing that Mr. Leonard is already entitled under his retention agreement to supplemental benefits upon any separation from the Company other than termination for cause, the Personnel Committee granted 100,000 RUs to Mr. Leonard based on its determination that Mr. Leonard's continued service to Entergy Corporation was essential to the completion of its strategic plan, including its recovery from storm damages suffered in 2005 and the expansion of its business operations. Prior to recommending to the Board that it approve the grant, the Committee consulted with its independent compensation consultant to confirm that the grant was consistent with market practice. Restrictions on the RUs granted to Mr. Leonard will lift over 36 months from the date of grant, with restrictions on 50% of the RUs lifting in August, 2008 and restrictions on the remaining RUs lifting in August, 2009.

No other Named Executive Officers received restricted units during 2006.

Benefits, Perquisites, Agreements and Post-Termination Plans

The Named Executive Officers participate in an Entergy Corporation-sponsored pension plan ("Pension Plan") that covers a broad group of employees. This Pension Plan is a funded, tax-qualified, noncontributory defined benefit pension plan. Benefits under the Pension Plan are based upon an employee's years of plan participation and the employee's average monthly rate of earnings (generally defined to include salary and eligible bonus, other than EAIP bonus) for the highest consecutive 60 months during the 120 months preceding termination of employment ("FAME"), and are payable after separation in the form of an annuity. The amount of annual earnings that may be considered in calculating benefits under the Pension Plan is limited by federal law.

Benefits under the Pension Plan are calculated as an annuity equal to 1.5% of the participant's FAME multiplied by years of benefit service. Years of benefit service under the Pension Plan formula cannot exceed 40. Contributions to the Pension Plan are made entirely by the employer and are paid into a trust fund from which the benefits of participants will be paid.

Entergy Corporation sponsors a Pension Equalization Plan ("PEP"), which is available to a select group of management and highly compensated employees, including the Named Executive Officers. The PEP is a nonqualified unfunded plan that provides out of the employer's general assets an amount substantially equal to the difference between the amount that would have been payable under the Pension Plan, in the absence of legislation limiting pension benefits and earnings that may be considered in calculating pension benefits, and the amount actually payable under the Pension Plan. The PEP also takes into account as earnings any EAIP or MIP bonus awards.

Entergy Corporation also sponsors a Supplemental Retirement Plan ("SRP"), which is available to a select group of management and highly compensated employees. Mr. Packer is the only Named Executive Officer currently participating in the SRP. The SRP provides that, under certain circumstances, a participant may receive a monthly retirement benefit payment for 120 months or elect a lump sum payment. The amount of any monthly payment shall not exceed 2.5% of the participant's average basic annual pay (as defined in the SRP).

363

Entergy Corporation also sponsors a System Executive Retirement Plan ("SERP") available to its approximately 50 officers, including the Named Executive Officers (other than Mr. Lewis). Participation in the SERP requires individual approval by the plan administrator or its delegate. The SERP is designed to offer a replacement income ratio in the range (based on management level and total years of service) of 55% to 65% of a Named Executive Officer's Final Three-Year Average Annual Compensation (i.e., generally one-third of the sum of the participant's base salary and EAIP bonus for the three years during the last 10 years preceding termination of employment in which such sum is the highest). The SERP recognizes a maximum of 30 years of service for purposes of calculating a participant's benefit. The value of the SERP benefit is offset by the value of the Pension Plan benefit and any PEP benefit payable, and also typically offset by any prior employer pension benefit available to the executive. While the SERP has a replacement ratio schedule from one year of service to the maximum of 30 years of service, the table below offers a sample ratio at 20 and 30 years of service.



Years of Service

 




CEO

 


Executives at Management
Level 3 & Above - includes 3 of
the Named Executive Officers

 

Executives at
Management Level 4 -
includes 4 of the
Named Executive Officers

             

20 Years

 

55.0%

 

50.0%

 

45.0%

30 years

 

65.0%

 

60.0%

 

55.0%

Mr. Leonard's retention agreement (as further discussed below) provides that, in lieu of his participation in the PEP and the SERP, upon the termination of his employment (unless such termination is for Cause, as defined in the agreement), he will be entitled to receive a benefit equal to 60% of his final three-year average compensation (as defined under the SERP) calculated as a single life annuity and available in a lump sum. This benefit will be reduced by other benefits to which he is entitled from the Entergy Corporation-sponsored Pension Plan or prior employer plans.

The Committee believes that the Pension Plan, PEP, SRP and SERP are an important part of the Named Executive Officers' compensation program. These plans are important in the recruitment of top talent in the competitive market, as these types of supplemental plans are typically found in companies of similar size to Entergy Corporation. These plans serve a critically important role in the retention of senior executives, as benefits from these plans increase for each year that these executives remain employed by an Entergy System company employer. The plans thereby encourage the most senior executives of Entergy Corporation and the Subsidiaries to remain employed within the Entergy System and continue their work on behalf of the stockholders.

The Entergy System company employer of Ms. Conley, Mr. Denault and Mr. Smith has agreed to provide service credit to each of them under either the PEP or the SERP. Entergy System company employers typically offer these service credit benefits when recruiting mid-level or senior executives from other companies. By offering these executives "credited service," Entergy System company employers are able to compete more effectively to hire these employees by mitigating the potential loss of their pension benefits resulting from accepting employment within the Entergy System.

See the Pension Benefits table included elsewhere in this report for additional information regarding the operation of the plans described under this caption.

The Named Executive Officers are eligible to participate in an Entergy Corporation-sponsored Savings Plan that covers a broad group of employees. This is a tax-qualified retirement savings plan, wherein total combined before-tax and after-tax contributions may not exceed 30 percent of a participant's base salary up to certain contribution limits defined below. In addition, under the Savings Plan, the participant's employer matches an amount equal to seventy cents for each dollar contributed by participating employees, including the Named Executive Officers, on the first six percent of their earnings for that pay period. Entergy Corporation maintains the Savings Plan for employees of participating Entergy System companies, including the Named Executive Officers, to encourage the employees to save some percentage of their cash compensation for their

 

364

 

eventual retirement. The Savings Plan permits employees to make such savings in a manner that is relatively tax efficient. This type of savings plan is also a critical element in attracting and retaining talent in a competitive market.

The Named Executive Officers are eligible to participate in a group of health and welfare benefits available to a broad group of employees. These benefits include medical, dental and vision coverage, life and accidental death & disability insurance, and long term disability insurance. Eligibility, coverage levels, potential employee contributions and other plan design features are the same for the Named Executive Officers as for the broad employee population.

Within limitations prescribed by law as well as the plan document, the Named Executive Officers (other than Mr. Lewis) are eligible to defer up to 100% of the following payments into the Entergy Corporation-sponsored Executive Deferred Compensation Plan ("EDCP"):

Within limitations prescribed by law as well as the plan document, the Named Executive Officers also are eligible to defer up to 100% of the following payments into Entergy Corporation's equity ownership plan:

Additionally, Named Executive Officers may also have deferred account balances under a frozen defined contribution restoration plan.

All deferral amounts represent an unfunded liability of the employer. Depending on the type of compensation deferred and the employee's choice of deemed investment options, the executive may elect deemed investment under the equity ownership plan in Entergy Corporation common stock or under the EDCP in one or more of several investment options offered under the Savings Plan. Within the EDCP, the participating Named Executive Officer may move funds from one deemed investment option to another. The Named Executive Officer does not have the ability to withdraw funds except within the terms provided in such officer's deferral election.

The employer does not "match" amounts that are deferred by employees pursuant to the EDCP or equity ownership plan. With the exception of allowing for the deferral of federal and state taxes, Entergy Corporation provides no additional benefit to the Named Executive Officer for deferring any of the above payments. The investment options available to the Named Executive Officers are the same investment options that are available to all participants. Deferred amounts are credited with earnings or losses based on the rate of return of deemed investment options or Entergy Corporation common stock, as selected by the participants.

Entergy Corporation provides this benefit because the Committee believes it is standard market practice to permit officers to defer the cash portion of their compensation. The EDCP and equity ownership plan permit them to do this while also receiving gains or losses on deemed investments, as described above. Entergy Corporation believes that provision of this benefit is important as a retention and recruitment tool as many, if not all, of the companies with which Entergy Corporation and the Subsidiaries compete for executive talent provide a similar arrangement to their senior employees.

365

  • Perquisites

Perquisites are not a material part of the compensation program for the Named Executive Officers. Neither Entergy Corporation nor the Subsidiaries provides the Named Executive Officers with company cars, drivers, apartments or other benefits not generally available to its other employees. In 2006, Entergy System company employers offered to their Named Executive Officers (other than Mr. Lewis) limited benefits such as the following (none of which individually exceeded $25,000): financial counseling and mandatory physical exams. For security and business convenience reasons, Entergy Corporation permits its CEO to use its corporate aircraft at Entergy Corporation expense for personal use. However, in 2006, Mr. Leonard did not make use of this benefit. The other Named Executive Officers may use corporate aircraft for personal travel subject to the approval of the CEO of Entergy Corporation. The Personnel Committee reviews all perquisites, including the use of corporate aircraft, on an annual basis. For additional information regarding perquisites, see the "All Other Compensation" column in the Summary Compensation Table included elsewhere in this report.

Entergy Corporation has entered into retention agreements with Mr. Leonard, Mr. Denault and Mr. Smith. In general, these agreements provide for "change in control" payments and other benefits if the employment of any of these officers is terminated for a qualifying event or circumstance, such as being terminated without "Cause" or leaving employment for "Good Reason" (as defined in the agreements). In addition, Entergy Corporation has established System Energy Continuity Plans under which each of the other Named Executive Officers (other than Mr. Lewis) is entitled to receive "change of control" payments and benefits if such officer's employment is involuntarily terminated for similar qualifying events or circumstances. For additional information regarding these arrangements, including a quantification of the benefits that each of the Named Executive Officers would have received if payment obligations under these arrangements had been triggered as of December 31, 2006, see "Potential Payments upon Termination or Change-in-Control" included elsewhere in this report.

Except for Ms. Shanks, none of the Entergy System companies has entered into any employment agreements with any of the Named Executive Officers (other than the retention agreements referenced above and described in "Potential Payments upon Termination or Change in Control"). The employment agreement with Ms. Shanks provides for her continued employment until 2011. During this period, Ms. Shanks will continue to participate in all executive plans, programs, and arrangements for which she is eligible. In October 2011, Ms. Shanks will become a special project coordinator of Entergy Mississippi or another Entergy System company until 2016. During her tenure as special project coordinator, Ms. Shanks will continue to receive her same rate of annual base salary in effect immediately prior to her assumption of this post, but will forfeit an amount sufficient to fund this salary from amounts that would otherwise be credited to her non-qualified deferral accounts. Commencing in October 2016, Ms. Shanks will be eligible to retire with all of the post-retirement compensation and benefits for which she is eligible.

During the term of the agreement, Ms. Shanks may resign, or her employer may terminate her for "cause," as defined in the agreement. In either of those events, Ms. Shanks is due no additional compensation or benefits under the agreement. If there is a "change in control" before October of 2011, she remains eligible for benefits under the System Executive Continuity Plan. If the change in control occurs while Ms. Shanks is a special project coordinator, and Entergy's obligations under this agreement are breached, she receives:

The Committee believes that these retention and employment transitional compensation arrangements are an important part of overall compensation for the Named Executive Officers. The Committee believes that these arrangements will help to secure the continued employment and dedication of the Named Executive Officers, notwithstanding any concern that they might have at such time regarding their own continued employment, prior to or following a change in control. The Committee also believes that these arrangements are important as a recruitment and retention device, as all or

 

366

 

 

 nearly all of the companies with which Entergy Corporation and the Subsidiaries compete for executive talent have similar arrangements in place for their senior employees.

Tax Considerations

Section 162(m) of the Internal Revenue Code limits the tax deductibility by a publicly held corporation of compensation in excess of $1 million paid to the chief executive officer or any other of its four most highly compensated executive officers, unless that compensation is "performance-based compensation" as defined by the Code. The Personnel Committee considers deductibility under Section 162(m) as it structures the compensation packages that are provided to the Named Executive Officers. However, the Personnel Committee and the Board believe that it is in the best interest of Entergy Corporation and the Subsidiaries that the Personnel Committee retains the flexibility and discretion to make compensation awards, whether or not deductible. This flexibility is necessary to foster achievement of performance goals established by the Personnel Committee as well as other corporate goals that the Committee deems important to the success of Entergy Corporation and the Subsidiaries, such as encouraging employee retention and rewarding achievement.

Compensation Committee Report

The "Compensation Committee Report" included in the Entergy Corporation Proxy Statement is incorporated by reference, but will not be deemed to be "filed" in this Annual Report on Form 10-K. None of the Subsidiaries has a compensation committee, or other board committee performing equivalent functions. The board of directors of each of the Subsidiaries is comprised of individuals who are officers or employees of Entergy Corporation or one of the Subsidiaries. These boards do not make determinations regarding the compensation paid to executive officers of the Subsidiaries.

Summary Compensation Table

The following table summarizes the total compensation paid or earned by each of the Named Executive Officers for the fiscal year ended December 31, 2006. For information on the principal positions held by each of the Named Executive Officers, see Item 10, "Directors and Executive Officers of the Registrants." The compensation set forth in the table represents the aggregate compensation paid by all Entergy System companies. Except for Ms. Shanks, none of the Entergy System companies has entered into any employment agreements with any of the Named Executive Officers (other than the retention agreements described in "Potential Payments upon Termination or Change in Control"). For a detailed description of Ms. Shanks' agreement, see the "Retention and Employment Agreements" section of the "Compensation Discussion and Analysis." For additional information regarding the material terms of the awards reported in the following tables, including a general description of the formula or criteria to be applied in determining the amounts payable, see "Compensation Discussion and Analysis."

(a)

 

(b)

 

(c)

 

(d)

 

(e)

 

(f)

 

(g)

 

(h)

 

(i)

 

(j)






Name and
Principal Position

 







Year

 







Salary

 







Bonus

 






Stock Awards
(1)

 






Option
Awards
(2)

 




Non-Equity
Incentive
Plan
Compensation
(3)

 

Change in
Pension
Value and
Nonqualified
Deferred
Compensation
Earnings
(4)

 





All
Other
Compensation
(5)(6)

 







Total

                                     

E. Renae Conley

2006

$373,230

$ -

$500,674

$129,170

$455,000

$96,200

$17,748

$1,572,022

CEO-Entergy Louisiana

CEO-LA-Entergy Gulf States

Leo P. Denault

2006

$538,493

$ -

$1,059,332

$344,099

$722,358

$1,212,300

$35,565

$3,912,147

Executive Vice President and

CFO - Entergy Corp.

 

367

(a)

 

(b)

 

(c)

 

(d)

 

(e)

 

(f)

 

(g)

 

(h)

 

(i)

 

(j)






Name and
Principal Position

 







Year

 







Salary

 







Bonus

 






Stock Awards
(1)

 






Option
Awards
(2)

 




Non-Equity
Incentive
Plan
Compensation
(3)

 

Change in
Pension
Value and
Nonqualified
Deferred
Compensation
Earnings
(4)

 





All
Other
Compensation
(5)(6)

 







Total

                                     

Joseph F. Domino

2006

$293,951

$71,625

$245,013

$75,216

$297,000

$73,700

$37,723

$1,094,228

CEO-TX-Entergy Gulf States

J. Wayne Leonard

2006

$1,168,577

$ -

$7,429,048

$1,622,682

$2,235,870

$2,250,100

$55,663

$14,761,940

Chairman of the Board and

CEO - Entergy Corp.

Jay A. Lewis

2006

$193,122

$ -

$ -

$11,163

$120,050

$17,600

$8,366

$350,301

Vice President, CFO -

Entergy Arkansas, Entergy

Gulf States, Entergy Louisiana,

Entergy Mississippi and

Entergy New Orleans

Hugh T. McDonald

2006

$298,870

$ -

$245,013

$75,216

$204,000

$70,600

$42,355

$936,054

CEO-Entergy Arkansas

Daniel F. Packer

2006

$278,708

$ -

$245,013

$75,216

$ -

$254,300

$41,829

$895,066

CEO-Entergy New Orleans

Carolyn C. Shanks

2006

$294,039

$71,500

$310,805

$75,216

$260,000

$58,700

$36,123

$1,106,383

CEO-Entergy Mississippi

Richard J. Smith

2006

$536,650

$ -

$1,084,755

$414,959

$718,918

$183,800

$67,338

$3,006,420

Group President, Utility

Operations - Entergy Corp.

(1)

The amounts in column (e) represent the dollar amount recognized for financial statement reporting purposes in accordance with Financial Accounting Standards Board Statement of Financial Accounting Standards No. 123 (revised 2004), Share-Based Payment (which we refer to as "SFAS l23R") of performance units granted under the PUP of the EOP. For a discussion of the relevant assumptions used in valuing these awards, see Note 12 to the Financial Statements.

(2)

The amounts in column (f) represent the dollar amount recognized for financial statement reporting purposes in accordance with SFAS l23R of stock options granted under the EOP. For a discussion of the relevant assumptions used in valuing these awards, see Note 12 to the Financial Statements.

(3)

The amounts in column (g) represent cash payments made under the EAIP (or, in the case of Mr. Lewis, the MIP).

(4)

The amounts in column (h) include the annual actuarial increase in the present value of the Named Executive Officer's benefits under all pension plans established by Entergy Corporation using interest rate and mortality rate assumptions consistent with those used in Entergy Corporation's financial statements and includes amounts which the Named Executive Officers may not currently be entitled to receive because such amounts are not vested.

(5)

Amounts in column (i) include the cost of the following perquisites: corporate aircraft usage, personal financial planning, club dues and annual physical exams. None of these individual items exceeded $25,000 for any of the Named Executive Officers.

(6)

Amounts in column (i) include the following. Except for the tax gross up payments, the value of each of these items received by the Named Executive Officers was less than $10,000.

 

368

 

  • Matching contributions allocated to each of the Named Executive Officers pursuant to the Savings Plan
  • Life insurance premiums
  • Tax gross up payments as follows: Mr. Leonard $10,563; Mr. McDonald $13,239; Ms. Shanks $10,553; and Mr. Smith $11,500.

2006 Grants of Plan-Based Awards

The following table summarizes award grants during 2006 to the Named Executive Officers.

       

Estimated Future
Payouts Under Non-Equity
Incentive Plan Awards
(1)

 

Estimated Future
Payouts under Equity
Incentive Plan Awards
(2)

               

Name









(a)

 

Grant
Date








(b)

 

Thresh-old
($)







(c)

 

Target
($)








(d)

 

Maximum
($)








(e)

 

Threshold
(#)








(f)

 

Target
(#)








(g)

 

Maximum
(#)








(h)

 

All Other
Stock
Awards:
Number
of Shares
of Stock
or Units
(#)
(3)

(i)

 

All Other
Option
Awards:
Number of
Securities
Under-lying
Options
(#)
(4)
(j)

 

Exercise
or Base
Price of
Option
Awards
($/Sh)




(k)

 

Grant
Date Fair
Value of
Stock and
Option
Awards




(l)

                                             

E. Renae Conley

 

1/26/06

 

-

 

$227,400

 

$454,800

                           
   

1/26/06

             

240

 

2,400

 

6,000

             

$165,336

   

1/26/06

                             

14,100

 

$68.89

 

$134,021

                                             

Leo P. Denault

 

1/26/06

 

-

 

$382,200

 

$764,400

                           
   

1/26/06

             

600

 

6,000

 

15,000

             

$413,340

   

1/26/06

                             

50,000

 

$68.89

 

$475,250

                                             

Joseph F. Domino

 

1/26/06

 

-

 

$148,500

 

$297,000

                           
   

1/26/06

             

110

 

1,100

 

2,750

             

$75,779

   

1/26/06

                             

7,500

 

$68.89

 

$71,288

                                             

J. Wayne Leonard

 

1/26/06

 

-

 

$1,183,000

 

$2,366,000

                           
   

1/26/06

             

3,350

 

33,500

 

83,750

             

$2,307,815

   

1/26/06

                             

210,000

 

$68.89

 

$1,996,050

   

8/03/06

                         

100,000

         

$7,771,000

                                             

Jay A. Lewis

 

1/26/06

 

-

 

$68,600

 

$137,200

                           
   

1/26/06

             

-

 

-

 

-

             

$ -

   

1/26/06

                             

1,000

 

$68.89

 

$8,880

                                             

Hugh T. McDonald

 

1/26/06

 

-

 

$150,750

 

$301,500

                           
   

1/26/06

             

110

 

1,100

 

2,750

             

$75,779

   

1/26/06

                             

7,500

 

$68.89

 

$71,288

                                             

Daniel F. Packer

 

1/26/06

 

-

 

$140,500

 

$281,000

                           
   

1/26/06

             

110

 

1,100

 

2,750

             

$75,779

   

1/26/06

                             

7,500

 

$68.89

 

$71,288

                                             

Carolyn C. Shanks

 

1/26/06

 

-

 

$148,500

 

$297,000

                           
   

1/26/06

             

110

 

1,100

 

2,750

             

$75,779

   

1/26/06

                             

7,500

 

$68.89

 

$71,288

                                             

Richard J. Smith

 

1/26/06

 

-

 

$380,380

 

$760,760

                           
   

1/26/06

             

600

 

6,000

 

15,000

             

$413,340

   

1/26/06

                             

50,000

 

$68.89

 

$475,250

                                             

369

(1)

The amounts in columns (c), (d) and (e) represent minimum, target and maximum payment levels under the EAIP (or in the case of Mr. Lewis, the MIP). The actual amounts awarded are reported in column (g) of the Summary Compensation Table.

(2)

The amounts in columns (f), (g) and (h) represent the minimum, target and maximum payment levels under the PUP. Performance under the program is measured by Entergy Corporation's TSR relative to the TSR of the companies included in the Philadelphia Utilities Index. If Entergy Corporation's TSR is 25% or below that of the Philadelphia Utilities Index, there is no payout. Subject to achievement of performance targets, each unit will be converted into the cash equivalent of one share of Entergy Corporation's common stock on the last day of the performance period (December 31, 2008).

(3)

In 2006, the Personnel Committee of Entergy Corporation granted 100,000 RUs to Mr. Leonard. Fifty percent of the RUs will vest in August 2008 and the remainder will vest in August 2009.

(4)

The amounts in column (j) represent options to purchase shares of Entergy Corporation's common stock. The options vest one-third on each of the first through third anniversaries of the grant date. The options have a ten-year term from the date of grant.

2006 Outstanding Equity Awards at Fiscal Year-End

The following table summarizes unexercised options, stock that has not vested and equity incentive plan awards for each Named Executive Officer outstanding as of the end of 2006.

   

Option Awards

 

Stock Awards

(a)














Name

 

(b)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Exercisable

 

(c)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Unexercisable
(1)

 

(d)




Equity
Incentive
Plan
Awards:
Number
of
Securities
Underlying
Unexercised
Unearned
Options
(#)

 

(e)












Option
Exercise
Price
($)

 

(f)












Option
Expiration
Date

 

(g)








Number
of Shares
or Units
of Stock
That Have
Not
Vested
(#)

 

(h)








Market
Value of
Shares or
Units of
Stock
That Have
Not Vested
($)

 

(i)



Equity
Incentive
Plan
Awards:
Number of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
(#)

 

(j)

Equity
Incentive
Plan
Awards:
Market or Payout
Value of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
($)

                                     

E. Renae Conley

 

-

 

14,100

     

$68.89

 

1/26/2016

               
   

5,000

 

10,000

     

$69.47

 

1/27/2015

               
   

12,266

 

6,134

     

$58.60

 

3/02/2014

               
   

9,092

 

-

     

$51.50

 

1/27/2010

               
   

24,000

 

-

     

$44.45

 

1/30/2013

               
   

40,000

 

-

     

$41.69

 

2/11/2012

               
   

34,600

 

-

     

$37.00

 

1/25/2011

               
   

7,500

 

-

     

$28.06

 

3/01/2009

               
                               

6,000(2)

 

$553,920

                               

6,700(3)

 

$618,544

                                     

Leo P. Denault

 

-

 

50,000

     

$68.89

 

1/26/2016

               
   

11,666

 

23,334

     

$69.47

 

1/27/2015

               
   

26,666

 

13,334

     

$58.60

 

3/02/2014

               
   

7,720

 

-

     

$52.40

 

1/25/2011

               
   

3,604

 

-

     

$52.40

 

3/01/2009

               
   

676

 

-

     

$52.40

 

2/11/2012

               
   

8,330

 

-

     

$51.60

 

1/27/2010

               
   

470

 

-

     

$51.60

 

3/01/2009

               
   

9,800

 

-

     

$44.45

 

1/30/2013

               
   

19,656

 

-

     

$41.69

 

2/11/2012

               
   

5,434

 

-

     

$37.00

 

1/25/2011

               
                               

15,000(2)

 

$1,384,800

                               

15,000(3)

 

$1,384,800

 

370

   

Option Awards

 

Stock Awards

(a)














Name

 

(b)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Exercisable

 

(c)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Unexercisable
(1)

 

(d)




Equity
Incentive
Plan
Awards:
Number
of
Securities
Underlying
Unexercised
Unearned
Options
(#)

 

(e)












Option
Exercise
Price
($)

 

(f)












Option
Expiration
Date

 

(g)








Number
of Shares
or Units
of Stock
That Have
Not
Vested
(#)

 

(h)








Market
Value of
Shares or
Units of
Stock
That Have
Not Vested
($)

 

(i)



Equity
Incentive
Plan
Awards:
Number of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
(#)

 

(j)

Equity
Incentive
Plan
Awards:
Market or Payout
Value of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
($)

                                     

Joseph F. Domino

 

-

 

7,500

     

$68.89

 

1/26/2016

               
   

4,601

 

-

     

$73.58

 

1/25/2011

               
   

3,333

 

6,667

     

$69.47

 

1/27/2015

               
   

670

 

-

     

$65.25

 

1/25/2011

               
   

1,601

 

-

     

$65.22

 

1/28/2009

               
   

1,308

 

-

     

$65.26

 

1/28/2009

               
   

6,666

 

3,334

     

$58.60

 

3/02/2014

               
   

4,610

 

-

     

$59.02

 

1/28/2009

               
   

10,500

 

-

     

$44.45

 

1/30/2013

               
                               

2,750(2)

 

$253,880

                               

3,200(3)

 

$295,424

                                     

J. Wayne Leonard

 

-

 

210,000

     

$68.89

 

1/26/2016

               
   

55,066

 

110,134

     

$69.47

 

1/27/2015

               
   

146,666

 

73,334

     

$58.60

 

3/02/2014

               
   

195,000

 

-

     

$44.45

 

1/30/2013

               
   

330,600

 

-

     

$41.69

 

2/11/2012

               
   

330,600

 

-

     

$37.00

 

1/25/2011

               
   

330,600

 

-

     

$23.00

 

1/27/2010

               
   

255,000

 

-

     

$29.94

 

1/28/2009

               
                               

83,750(2)

 

$7,731,800

                               

85,700(3)

 

$7,911,824

                       

100,000(4)

 

$9,232,000

       
                                     

Jay A. Lewis

 

-

 

1,000

     

$68.89

 

1/26/2016

               
   

2,000

 

1,000

     

$58.60

 

3/02/2014

               
   

5,867

 

-

     

$44.45

 

1/30/2013

               
   

13,334

 

-

     

$41.69

 

2/11/2012

               
                                     

Hugh T. McDonald

 

-

 

7,500

     

$68.89

 

1/26/2016

               
   

12,522

 

-

     

$73.25

 

2/11/2012

               
   

3,333

 

6,667

     

$69.47

 

1/27/2015

               
   

6,666

 

3,334

     

$58.60

 

3/02/2014

               
   

9,199

 

-

     

$45.50

 

1/27/2010

               
   

12,000

 

-

     

$44.45

 

1/30/2013

               
   

7,400

 

-

     

$37.00

 

1/25/2011

               
                               

2,750(2)

 

$253,880

                               

3,200(3)

 

$295,424

                                     

Daniel F. Packer

 

-

 

7,500

     

$68.89

 

1/26/2016

               
   

3,333

 

6,667

     

$69.47

 

1/27/2015

               
   

6,666

 

3,334

     

$58.60

 

3/02/2014

               
   

8,000

 

-

     

$44.45

 

1/30/2013

               
                               

2,750(2)

 

$253,880

                               

3,200(3)

 

$295,424

                                     

 

371

   

Option Awards

 

Stock Awards

(a)














Name

 

(b)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Exercisable

 

(c)







Number
of
Securities
Underlying
Unexercised
Options
(#)
Unexercisable
(1)

 

(d)




Equity
Incentive
Plan
Awards:
Number
of
Securities
Underlying
Unexercised
Unearned
Options
(#)

 

(e)












Option
Exercise
Price
($)

 

(f)












Option
Expiration
Date

 

(g)








Number
of Shares
or Units
of Stock
That Have
Not
Vested
(#)

 

(h)








Market
Value of
Shares or
Units of
Stock
That Have
Not Vested
($)

 

(i)



Equity
Incentive
Plan
Awards:
Number of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
(#)

 

(j)

Equity
Incentive
Plan
Awards:
Market or Payout
Value of
Unearned
Shares,
Units or
Other
Rights
That Have
Not Vested
($)

                                     

Carolyn C. Shanks

 

-

 

7,500

     

$68.89

 

1/26/2016

               
   

3,333

 

6,667

     

$69.47

 

1/27/2015

               
   

6,666

 

3,334

     

$58.60

 

3/02/2014

               
   

14,000

 

-

     

$44.45

 

1/30/2013

               
                               

2,750(2)

 

$253,880

                               

3,200(3)

 

$295,424

                       

1,800(5)

 

$166,176

       
                                     

Richard J. Smith

 

-

 

50,000

     

$68.89

 

1/26/2016

               
   

13,333

 

26,667

     

$69.47

 

1/27/2015

               
   

42,400

 

21,200

     

$58.60

 

3/02/2014

               
   

7,640

 

-

     

$51.50

 

1/25/2011

               
   

7,560

 

-

     

$51.50

 

8/30/2009

               
   

7,577

 

-

     

$51.50

 

1/27/2010

               
   

50,000

 

-

     

$44.45

 

1/30/2013

               
   

8,013

 

-

     

$45.45

 

8/30/2009

               
   

16,987

 

-

     

$45.45

 

1/27/2010

               
   

70,000

 

-

     

$41.69

 

2/11/2012

               
   

39,428

 

-

     

$37.00

 

1/25/2011

               
                               

15,000(2)

 

$1,384,800

                               

15,000(3)

 

$1,384,800

                                     

(1)

Each option grant has a ten year term and vests at the rate of one-third of the option grant per year beginning on the first anniversary of the grant date.

(2)

Consists of performance units that will pay out at the end of 2008 only if, and to the extent that, Entergy Corporation satisfies performance conditions as described under "Equity Compensation - Performance Unit Program" in Compensation Discussion and Analysis.

(3)

Consists of performance units that will pay out at the end of 2007 only if, and to the extent that, Entergy Corporation satisfies performance conditions as described under "Equity Compensation - Performance Unit Program" in Compensation Discussion and Analysis.

(4)

Consists of RUs granted under the EOP, 50,000 of which will vest in August 2008 and the remainder of which will vest in August 2009.

(5)

Consists of RUs granted under the EOP which will vest in 2011 based on continued service with an Entergy System company employer.

372

2006 Option Exercises and Stock Vested

The following table provides information concerning each exercise of stock options and each vesting of stock during 2006 for the Named Executive Officers.

   

Options Awards

 

Stock Awards

(a)




Name

 

(b)
Number of
Shares
Acquired
on Exercise
(#)

 

(c)

Value
Realized
on Exercise
($)

 

(d)
Number of
Shares
Acquired
on Vesting
(#) (1)

 

(e)

Value
Realized
on Vesting
($)

                 

E. Renae Conley

 

-

 

-

 

5,123

 

$472,955

                 

Leo P. Denault

 

-

 

-

 

10,139

 

$936,032

                 

Joseph F. Domino

 

22,035

 

$779,100

 

2,561

 

$236,432

                 

J. Wayne Leonard

 

-

 

-

 

54,644

 

$5,044,734

                 

Jay A. Lewis

 

-

 

-

 

-

 

-

                 

Hugh T. McDonald

 

-

 

-

 

2,561(2)

 

$236,432

                 

Daniel F. Packer

 

-

 

-

 

2,561

 

$236,432

                 

Carolyn C. Shanks

 

-

 

-

 

3,761(3)

 

$340,364

                 

Richard J. Smith

 

-

 

-

 

10,566

 

$975,453

                 

(1)

Represents the vesting of performance units for the 2004 - 2006 performance period (payable solely in cash based on the closing stock price of Entergy Corporation on the date of vesting) under the PUP.

(2)

Mr. McDonald has deferred receipt of his payment into the EDCP. See "Benefits, Perquisites, Agreements and Post-Termination Plans - Executive Deferred Compensation" in Compensation Discussion and Analysis.

(3)

Consists of the cash settlement of 1,200 RUs on October 30, 2006 and the vesting of performance units for the 2004 - 2006 performance period under the PUP.

2006 Pension Benefits

The following table shows the present value as of December 31, 2006, of accumulated benefits payable to each of the Named Executive Officers, including the number of years of service credited to each Named Executive Officer, under the retirement plans sponsored by Entergy Corporation, determined using interest rate and mortality rate assumptions consistent with those used in Entergy Corporation's financial statements. Information regarding these retirement plans is included in Compensation Discussion & Analysis under the heading, "Benefits, Perquisites, Agreements and Post-Retirement Plans - Pension Plan, Pension Equalization Plan, Supplemental Retirement Plan and System Executive Retirement Plan." In addition, this section includes information regarding early retirement options under the plans.




Name

 



Plan
Name

 

Number
of Years
Credited
Service

 

Present
Value of
Accumulated
Benefit

 


Payments
During
2006

                 

E. Renae Conley (1)

 

Non-qualified
  PEP

 


24.35

 


$634,200

 


$ -

   

Qualified
  defined
  benefit plan

 



7.83

 



$98,400

 



$ -

373

 




Name

 



Plan
Name

 

Number
of Years
Credited
Service

 

Present
Value of
Accumulated
Benefit

 


Payments
During
2006

                 

Leo P. Denault (2)

 

Non-qualified
  SERP

 


22.83

 


$1,693,700

 


$ -

   

Qualified
  defined
  benefit plan

 



7.83

 



$78,800

 



$ -

                 

Joseph F. Domino

 

Non-qualified
  SERP

 


33.08

 


$1,050,200

 


$ -

   

Qualified
  defined
  benefit plan

 



33.08

 



$631,600

 



$ -

                 

J. Wayne Leonard (3)

 

Non-qualified
  supplemental
  retirement
  plan benefit

 




8.68

 




$ 18,773,200

 




$ -

   

Qualified
  defined
  benefit plan

 



8.68

 



$ 144,400

 



$ -

                 

Jay A. Lewis

 

Non-qualified
  PEP

 


7.58

 


$10,800

 


$ -

   

Qualified
  defined
  benefit plan

 



7.58

 



$67,900

 



$ -

                 

Hugh T. McDonald

 

Non-qualified
  SERP

 


23.42

 


$601,800

 


$ -

   

Qualified
  defined
  benefit plan

 



23.42

 



$250,300

 



$ -

                 

Daniel F. Packer

 

Non-qualified
  PEP & SRP

 


24.08

 


$1,383,700

 


$ -

   

Qualified
  defined
  benefit plan

 



24.08

 



$487,400

 



$ -

                 

Carolyn C. Shanks

 

Non-qualified
  SERP

 


20.17

 


$535,100

 


$ -

   

Qualified
  defined
  benefit plan

 



20.17

 



$200,600

 



$ -

                 

Richard J. Smith (4)

 

Non-qualified
  PEP

 


30.25

 


$1,935,200

 


$ -

   

Qualified
  defined
  benefit plan

 



7.33

 



$116,800

 



$ -

                 

(1)

Ms. Conley entered into an agreement granting 16.52 additional years of service under the non-qualified PEP increasing the present value of the accumulated benefit by $86,500 over the benefit she would receive under the non-qualified SERP.

(2)

During 2006, Mr. Denault entered into an agreement granting an additional 15 years of service under the non-qualified SERP if he continues to work for an Entergy System company employer until age 55. This increased the present value of his benefit by $980,200.

(3)

Pursuant to his retention agreement, Mr. Leonard is entitled to a non-qualified supplemental retirement benefit in lieu of participation in Entergy Corporation's non-qualified supplemental retirement plans such as SERP or the PEP. Currently, Mr. Leonard may separate from employment without a reduction in his non-qualified supplemental retirement benefit.

(4)

Mr. Smith entered into an agreement granting 22.92 additional years of service under the non-qualified PEP providing an additional $898,300 above the accumulated benefit he would receive under the non-qualified SERP.

374

Qualified Retirement Benefits

The qualified retirement plan is a funded defined benefit pension plan that provides benefits to most of the non-bargaining unit employees of Entergy System companies. All Named Executive Officers are participants in this plan. The pension plan provides a monthly benefit payable for the participant's lifetime beginning at age 65 and equal to 1.5% of the participant's five-year average monthly eligible earnings times such participant's years of service. Participants are 100% vested in their benefit upon completing 5 years of vesting service.

Normal retirement under the plan is age 65. Employees who terminate employment prior to age 55 may receive a reduced deferred vested retirement benefit payable as early as age 55 that is actuarially equivalent to the normal retirement benefit (i.e., reduced by 7% per year for the first 5 years preceding age 65, and reduced by 6% for each additional year thereafter). Employees who are at least age 55 with 10 years of vesting service upon termination from Entergy Corporation are entitled to a subsidized early retirement benefit beginning as early as age 55. The subsidized early retirement benefit is equal to the normal retirement benefit reduced by 2% per year for each year that early retirement precedes age 65.

Mr. Packer and Mr. Domino are eligible for subsidized early retirement benefits.

Nonqualified Retirement Benefits

The Named Executive Officers are eligible to participate in certain nonqualified retirement benefit plans that provide retirement income, including the PEP, the SRP, and the SERP. Each of these plans is an unfunded nonqualified defined benefit pension plan that provides benefits to key management employees. In these plans, each described below, an executive is typically enrolled in one or more plans but only paid the amount due under the plan that provides the highest benefit, except that participants in the SRP are also eligible for benefits under the PEP. In general, upon disability, participants in the PEP and the SERP remain eligible for continued service credits until recovery or retirement. Generally, spouses of participants who die before commencement of benefits may be eligible for a portion of the participant's accrued benefit.

All of the Named Executive Officers (other than Mr. Leonard and Mr. Lewis) participate in both the PEP and SERP. Mr. Packer is the only Named Executive Officer who also participates in the SRP.

The PEP

All of the Named Executive Officers (with the exception of Mr. Leonard) are participants in the PEP. The benefit provisions are substantially the same as the qualified retirement plan but provide two additional benefits: (a) "restorative benefits" intended to offset limitations on certain earnings that may be considered in connection with the qualified retirement plan and (b) supplemental credited service (if granted to an individual participant). The benefits under this plan are offset by benefits payable from the qualified retirement plan and may be offset by prior employer benefits. Participants may elect to receive their PEP benefit in the form of a monthly annuity or an actuarially equivalent lump sum payment. The PEP benefit attributable to supplemental credited service is not vested until age 65. Subject to the approval of the Entergy System company employer, an employee who terminates employment prior to age 65 may be vested in his or her benefit, with payment of the benefit beginning as early as age 55. Benefits payable prior to age 65 are subject to the same reductions as qualified plan benefits.

The SRP

Mr. Packer is the only Named Executive Officer who is currently in the SRP. The SRP provides that, under certain circumstances, a participant may receive a monthly retirement benefit payment for 120 months or elect a lump sum payment, as further described in the CD&A. The SRP benefit is not vested until age 65. Subject to the approval of the Entergy System company employer, an employee who terminates employment prior to age 65 may be vested in his or her benefit, with payment of the benefit beginning as early as age 55. Benefits payable prior to age 65 may be subject to certain reductions if the participant has less than 10 years of service.

375

The SERP

All Named Executive Officers (except Mr. Leonard and Mr. Lewis) are participants in the SERP. The SERP provides a monthly benefit payable for the employees' lifetime beginning at age 65, as further described in the CD&A. The SERP benefit is not vested until age 65. Subject to the approval of the Entergy System company employer, an employee who terminates his or her employment prior to age 65 may be vested in the SERP benefit, with payment of the benefit beginning as early as age 55. Benefits payable prior to age 65 are subject to the same reductions as qualified plan benefits. Further, in the event of a change in control, participants in the SERP are also eligible for subsidized early retirement as early as age 55 even if they do not currently meet the age or service requirements for early retirement under that plan or have company permission to separate from employment.

Mr. Leonard's Nonqualified Supplemental Retirement Benefit

Mr. Leonard's retention agreement (as further discussed below) provides that, in lieu of his participation in the PEP and the SERP, upon the termination of his employment (unless such termination is for Cause, as defined in the agreement), he will be entitled to receive a benefit equal to 60% of his final three-year average compensation (as defined under the SERP) calculated as a single life annuity and available in a lump sum. This benefit will be reduced by other benefits to which he is entitled from the Entergy Corporation-sponsored qualified Pension Plan or prior employer plans.

Additional Information

For a description of the material terms and conditions of payments and benefits available under the retirement plans, including each plan's normal retirement payment and benefit, benefit formula and eligibility standards, specific elements of compensation included in applying the payment and benefit formula, and Entergy Corporation's policies with regard to granting extra years of credited service, see "Compensation Discussion and Analysis -- Benefits, Perquisites, Agreements and Post-Termination Plans -- Pension Plan, Pension Equalization Plan, Supplemental Retirement Plan and System Executive Retirement Plan." For a discussion of the relevant assumptions used in valuing these liabilities, see Note 11 to the Financial Statements.

2006 Nonqualified Deferred Compensation

The following table provides information regarding the EDCP and the EOP, which allow for the deferral of compensation for the Named Executive Officers. For additional information, see "Benefits, Perquisites, Agreements and Post-Termination Plans --Executive Deferred Compensation" in Compensation Discussion and Analysis. All Named Executive Officers except Mr. Lewis are eligible to participate in the deferral programs.

All deferrals are credited to the applicable Entergy System company employer's non-funded liability account. Depending on the payment deferred, the Named Executive Officers may elect investment in either phantom Company common stock or one or more of several investment options under the Savings Plan. Within limitations of the program, participating Named Executive Officers may move funds from one deemed investment option to another. The participating Named Executive Officers do not have the ability to withdraw funds from the deemed investment accounts except within the terms provided in their deferral elections. Within the limitations prescribed by law as well as the program, participating Named Executive Officers have the option to make a successive deferral of these funds. Assuming a Named Executive Officer does not elect a successive deferral, the Entergy System company employer of the participant is obligated to pay the amount credited to the participant's account at the conclusion of their deferral. These payments are paid out of the general assets of the employer.

FICA and Medicare taxes are paid on all deferred amounts prior to their deferral. Applicable federal and state taxes are paid at the conclusion of their deferral. Employees are not eligible for a "match" of amounts that are deferred by them pursuant to the deferred compensation programs. With the exception of allowing for the deferral of federal and state taxes, the Entergy System company employer provides no additional benefit to the Named Executive Officers in connection with amounts deferred under the EDCP. The deemed investment options available to participating Named

 

376

 

 

Executive Officers are limited to certain deemed investment options available to all non-officer employees under the Savings Plan. Deferred amounts are deemed credited with earnings or losses based on the rate of return of deemed investment options (under the EDCP) or Entergy Corporation common stock (under the EOP or 2007 Equity Plan). In 2006, the Personnel Committee approved a number of recommendations to simplify the deferral programs and reduce the number of options available to the Named Executive Officers.




Name
(a)

 


Executive
Contributions in
2006 (1)
(b)

 


Registrant
Contributions in
2006
(c)

 


Aggregate
Earnings in
2006 (2)
(d)

 


Aggregate
Withdrawals/
Distributions
(e)

 

Aggregate
Balance at
December 31,
2006
(f)

                     

E. Renae Conley

 

$ -

 

$ -

 

$891,668

 

($ 664,071)

 

$3,707,571

                     

Leo P. Denault

 

$ -

 

$ -

 

$831,366

 

$ - 

 

$3,773,268

                     

Joseph F. Domino

 

$210,721

 

$ -

 

$125,561

 

($ 670,428)

 

$1,309,307

                     

J. Wayne Leonard

 

$ -

 

$ -

 

$4,089,784

 

$ - 

 

$15,023,766

                     

Jay A. Lewis

 

$ -

 

$ -

 

$ -

 

$ - 

 

$ -

                     

Hugh T. McDonald

 

$277,649

 

$ -

 

$754,690

 

$ - 

 

$3,931,498

                     

Daniel F. Packer

 

$ -

 

$ -

 

$188,799

 

($125,302)

 

$695,399

                     

Carolyn C. Shanks

 

$210,057

 

$ -

 

$364,010

 

($587,990)

 

$1,936,660

                     

Richard J. Smith

 

$160,160

 

$ -

 

$1,655,886

 

$ - 

 

$7,252,378

                     

(1)

Amounts in this column are included in columns (c) and (g) in the 2006 Summary Compensation Table for Mr. McDonald and in the 2005 Summary Compensation Table for Mr. Domino, Ms. Shanks and Mr. Smith.

(2)

Amounts in this column are not included in the Summary Compensation Table.

Potential Payments upon Termination or Change in Control

Entergy Corporation has entered into individual retention agreements with Mr. Leonard and Mr. Denault, and Mr. Smith's Entergy System company employer has entered an individual retention agreement with Mr. Smith. In addition, Entergy Corporation has plans and other arrangements that provide compensation to the Named Executive Officers if the officer's employment is terminated under specified conditions, including in the event of a change in control of Entergy Corporation. In accordance with Code section 409A, the Named Executive Officers have made benefit payment elections with respect to certain deferred compensation benefits to which they may be entitled and may not receive such benefits until six months following the date of their separation from service.

Retention Agreements

J. Wayne Leonard

Mr. Leonard's retention agreement provides that if his Entergy System company employment is terminated for any reason other than for cause, he will be entitled to a non-qualified supplemental retirement benefit in lieu of participation in Entergy Corporation's non-qualified supplemental retirement plans such as the SERP or the PEP. If Mr. Leonard's employment is terminated for cause, he will forfeit his non-qualified supplemental retirement benefit and be entitled only to any accrued and unpaid salary, compensation and benefits payable to him through the termination date, and normal post-termination compensation and benefits as such payments become due in accordance with the retirement, insurance and other compensation or benefit plans, programs and arrangements in which he participates.

377

Mr. Leonard's non-qualified supplemental retirement benefit is calculated as a single life annuity equal to 60% of his final monthly compensation (as defined under the SERP), reduced to account for benefits payable to Mr. Leonard under Entergy Corporation's and a former employer's qualified pension plans. The benefit is payable in a single lump sum, or as periodic payments, as elected by Mr. Leonard in accordance with Internal Revenue Code Section 409A. If elected, periodic payments will be due for Mr. Leonard's life, and then a reduced benefit of 50% will be due for the life of his spouse. Because Mr. Leonard attained the age of 55 during 2005, Mr. Leonard is currently entitled under his retention agreement to his non-qualified supplemental retirement benefit if he were to leave Entergy System company employment other than as the result of a termination for cause.

The retention agreement with Mr. Leonard further provides that, subject to the provisions of Internal Revenue Code Section 409A, if his employment is terminated while a change in control is pending (i) by him for good reason, (ii) by Entergy Corporation other than for cause, or (iii) on account of disability or death, he will also be entitled to:

Leo P. Denault

The retention agreement with Mr. Denault provides that, if Mr. Denault's employment is terminated prior to his attainment of age 55 (i) by him for good reason or (ii) by his Entergy System company employer other than for cause or disability, he will be entitled to:

378

If Mr. Denault's employment is terminated (i) on or after he attains age 55, (a) by him for good reason or (b) by his Entergy System company employer other than for cause or disability, or (ii) at any time on account of death or disability, he will instead be entitled to:

If Mr. Denault's employment is terminated (i) for cause at any time or (ii) before age 55, by him other than for good reason, death or disability, then he will be entitled only to:

If his employment is terminated for any reason on or after age 55 other than (i) by him for good reason, (ii) by his Entergy System company employer other than for cause or disability or (iii) on account of his death, he will be entitled to:

Richard J. Smith

The retention agreement with Mr. Smith provides that Mr. Smith will be paid a retention payment of $525,000 on each of the first three anniversaries of a change in control if he remains employed by the surviving company on each of those dates. The agreement also provides that upon termination of employment while a change in control is pending and for three years following a change in control (a) by Mr. Smith for good reason or by his Entergy System company employer other than for cause, or (b) on account of Mr. Smith's death or disability, he will be entitled to:

 

379

 

 

If Mr. Smith's employment is terminated at any time for cause or by him without good reason, he will be entitled only to:

In addition to the payments and benefits described above, each of the retention agreements entitles the officer to receive a "gross-up" payment to compensate him for any excise tax imposed on payments or benefits received pursuant to the agreement or any other plan, arrangement or agreement with us. Furthermore each officer will be subject to non-competition and non-disparagement provisions for a period of two years following the termination date. If the officer violates either of these provisions, he will forfeit future payments under the agreement and must repay amounts previously paid (in each case, other than accrued and unpaid compensation and normal post-retirement benefits). The definitions of "cause," "good reason" and "disability" in each of these agreements are substantially the same as the definitions of such terms in our SECPs, as discussed below under "Termination Related to a Change in Control."

Termination Related to a Change in Control

All of the Named Executive Officers (other than Mr. Lewis) participate in one of Entergy Corporation's two System Executive Continuity Plans (the "SECPs"), which entitle them to certain benefits if their employment is terminated other than for "cause" or if they terminate their employment for "good reason," in each case within a "change in control period" (defined as the period commencing 90 days prior and ending 24 months following a change in control). Generally, a "change in control" is defined to include (i) the purchase of 25% or more of either Entergy Corporation common stock or the combined voting power of Entergy Corporation voting securities, (ii) the merger or consolidation of Entergy Corporation (unless the individuals serving on the board of directors of Entergy Corporation constitute at least a majority of the board of directors of the surviving entity), (iii) the liquidation, dissolution or sale of all or substantially all of Entergy Corporation's assets, or (iv) a change in the composition of the board of directors of Entergy Corporation such that during any two-year period, the individuals serving at the beginning of such period cease to constitute a majority of the board of directors of Entergy Corporation.

Under the SECPs, a Named Executive Officer's employment may be terminated for "cause" if he or she engages in any of a list of certain specified activities, including (i) the willful and continuing failure to substantially perform his or her duties that has not been cured within 30 days of receiving written demand from the board of directors of Entergy Corporation, (ii) willfully engaging in conduct that is demonstrably and materially injurious to Entergy Corporation or any one of the Subsidiaries, (iii) a conviction of or guilty plea to a felony or other crime that may have a material adverse effect on the executive's ability to carry out his or her duties or on the reputation of Entergy Corporation or any of the Subsidiaries, (iv) a material violation of any agreement with Entergy Corporation or any of the Subsidiaries, or (v) unauthorized disclosure of confidential information of Entergy Corporation or the Subsidiaries.

Under the SECPs, a Named Executive Officer may terminate his or her employment for "good reason" related to a change in control if, without his or her express written consent, (i) the nature or status of his or her duties and responsibilities is substantially altered or reduced from those enjoyed prior to the change in control, (ii) his or her base salary is reduced 5% or more, (iii) he or she is required to be based at a location outside of the continental United States and other than his or her primary work location prior to the change in control, (iv) any compensation plan in which he or she participated prior to the change in control is discontinued, unless an equitable arrangement has been made with respect to such plan, or his or her participation in any such plan is materially less favorable than prior to the change in control, (v) he or she is not provided with benefits

 

380

 

substantially similar to those enjoyed prior to the change in control or the number of vacation days to which he or she is entitled prior to the change in control, or (vi) his or her employment is purported to be terminated other than in accordance with the requirements of the SECP.

If a Named Executive Officer's employment is terminated other than for cause, or if he or she terminates his or her employment for good reason, in each case related to a change in control, he or she is entitled under the SECPs and the EOP to:

The executive may elect to receive all awards payable to him or her under the EOP on the first day of any month following his or her termination other than for cause or for good reason related to a change in control. Perquisites are not available after the separation date.

Under certain circumstances, the payments and benefits received by a Named Executive Officer pursuant to the SECPs may be forfeited and, in certain cases, subject to repayment. Benefits are no longer payable under the SECPs, and unvested performance units under the PUP are subject to forfeiture, if (i) the executive accepts employment with an Entergy System company employer, (ii) the executive elects to receive the benefits of another severance or separation program, (iii) the executive removes, copies or fails to return any property belonging to Entergy Corporation or the Subsidiaries, (iv) the executive discloses non-public data or information concerning Entergy Corporation or any of the Subsidiaries or (v) the executive violates his or her non-competition provision, which provisions generally run for two years but extend to three years if permissible under applicable law. Furthermore, if the executive discloses non-public data or information concerning Entergy Corporation or any of the Subsidiaries or violates his or her non-competition provision, he or she is required to repay any benefits previously received under the SECPs.

In addition to participation in the SECPs, upon completion of a transaction resulting in a change in control of Entergy Corporation, benefits already accrued under our SERP, PEP and SRP, if any, and awards granted under the EOP, if any, will become fully vested if the executive is involuntarily terminated without "cause" or terminates employment for "good reason" (as such terms are defined in such plans, which correspond to the definitions for such terms included in the SECPs).

381

Termination Not Related to a Change in Control

Entergy Corporation's compensation, benefit and retirement plans, including without limitation the Pension Plan, the PEP, the SERP, the SRP, the EAIP, the MIP, the PUP, the EOP, the 2007 Equity Plan, and the terms of the individual grants hereunder (the "General Compensation Plans"), describe the treatment of outstanding awards or benefits granted under those plans if the participant's employment is terminated due to one of the triggering events described below. In the event of any inconsistency with the descriptions below and the description of payments and benefits above to which Mr. Leonard, Mr. Denault, Mr. Smith, or Ms. Shanks are entitled pursuant to the terms of their respective agreements with respect to any termination event, the terms of the agreements control.

Termination for Cause

If a Named Executive Officer's employment is terminated for "cause" (as defined in the SECPs and described above under "Termination Related to a Change in Control"), he or she is generally entitled under the General Compensation Plans to the same compensation and separation benefits described below under "Voluntary Resignation."

Voluntary Resignation

If a Named Executive Officer voluntarily resigns from his Entergy System company employment, he or she is entitled under the General Compensation Plans to all accrued benefits and compensation as of the separation date, including qualified pension benefits (if any) and other post-employment benefits on terms consistent with those generally available to our other salaried employees. In the case of voluntary resignation, the officer would forfeit all unvested stock options and RUs as well as any perquisites to which he or she is entitled as an officer. In addition, the officer would forfeit, except as described below, his or her right to receive incentive payments under the PUP or the EAIP. If the officer resigns after the completion of an EAIP or PUP performance period, he or she could receive a payout under the PUP based on the outcome of the performance cycle and could, at Entergy Corporation's discretion, receive an annual incentive payment under the EAIP. Any vested stock options held by the officer as of the separation date will expire the earlier of ten years from date of grant or 90 days from the last day of active employment.

Retirement

Under our retirement plans, a Named Executive Officer's eligibility for retirement benefits is based on a combination of age and years of service. Normal retirement is defined as age 65. Early retirement is defined under the qualified retirement plan as minimum age 55 with 10 years of service, and in the case of the SERP, SRP, and supplemental credited service under the PEP, the consent of Entergy System company employer.

Upon a Named Executive Officer's retirement, he or she is entitled under the General Compensation Plans to all accrued benefits and compensation as of the separation date, including qualified pension benefits and other post-employment benefits consistent with those generally available to salaried employees. The annual incentive payment under the EAIP is pro-rated based on the actual number of days employed during the performance year in which the retirement date occurs. Similarly, payments under the PUP are pro-rated based on the actual number of days employed, in each outstanding performance cycle, in which the retirement date occurs. In each case, payments are delivered at the conclusion of each annual or performance cycle, consistent with the timing of payments to active participants in the EAIP and the PUP, respectively.

Unvested stock options issued under our EOP vest on the retirement date and expire ten years from the grant date. Any RUs held (other than those issued by the PUP) by the executive upon his or her retirement are forfeited, and perquisites (other than short-term financial counseling services) are not available following the separation date.

382

Disability

If a Named Executive Officer's employment is terminated due to disability, he or she is generally entitled under the General Compensation Plans to the same compensation and separation benefits described above under "Retirement," except that restricted units may be subject to specific disability benefits (as noted, where applicable, in the tables below).

Death

If a Named Executive Officer dies while actively employed by an Entergy System company employer, he or she is generally entitled under the General Compensation Plans to the same compensation and separation benefits described above under "Retirement," except that (i) all unvested stock options are forfeited, (ii) vested stock options will expire the earlier of ten years from the grant date or three years following the executive's death and (iii) RUs may be subject to specific death benefits (as noted, where applicable, in the tables below).

Estimated Payments

The tables below reflect the amount of compensation each named executive officer would receive upon the occurrence of the specified separation triggering events, based on available programs and specific agreements with each executive. The tables assume the separation was effective on December 29, 2006, the last business day of our last fiscal year, and our stock price is $92.32, which was the closing market price on such date.

E. Renae Conley
President & CEO, Entergy LA

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our President & CEO, Entergy LA would have been entitled to receive as a result of a termination of her employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(6)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$1,212,800

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

$166,176

 

$166,176

 

$249,264

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

$73,856

 

$73,856

 

$221,568

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

---

 

$765,701

 

---

 

$765,701

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Ms. Conley also would have been entitled to receive her vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Ms. Conley's employment were terminated under certain conditions relating to a change in control, she would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Ms. Conley's employment were terminated "for cause," she would forfeit her supplemental credited service and SERP supplemental benefits.

2

In the event of a termination related to a change in control, Ms. Conley would be entitled to receive pursuant to the System Executive Continuity Plan a lump sum severance payment equal to two times her base salary plus annual incentive, calculated at target opportunity.

3

In the event of a change in control, Ms. Conley would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to her PUP units. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Ms. Conley's awards have been calculated as follows:

 

383

 

 

2005 - 2007 Plan - 2,700 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 2,400 performance units at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Ms. Conley, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death or disability, the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of disability or a change in control qualifying event, Ms. Conley's unvested stock options would immediately vest. For purposes of this table, we assumed that Ms. Conley exercised her options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to the System Executive Continuity Plan, in a change in control qualifying event, Ms. Conley would be eligible to receive subsidized medical and dental benefits for a period of 24 months, the value of which as of December 29, 2006 was $21,450.

6

As of December 29, 2006 Ms. Conley was not eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

Leo P. Denault
Executive Vice President and Chief Financial Officer

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our Executive Vice President and Chief Financial Officer would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause(5)

 




Retirement(6)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

$2,775,318

 

---

 

---

 

---

 

$2,775,318

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

$553,920

 

---

 

$553,920

 

$553,920

 

$553,920

  2006-2008 PUP

 

---

 

---

 

$553,920

 

---

 

$553,920

 

$553,920

 

$553,920

                             

Unvested Stock Options(4)

 

---

 

---

 

$2,154,304

 

---

 

$2,154,304

 

$2,154,304

 

$2,154,304

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

$2,287,248

1

In addition to the payments and benefits in the table, Mr. Denault also would have been entitled to receive his vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Mr. Denault's employment were terminated under certain conditions relating to a change in control, he would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Mr. Denault's employment were terminated "for cause," he would forfeit his supplemental credited service and SERP supplemental benefits.

2

In the event of a termination related to a change in control or a termination for good reason or not for cause, Mr. Denault would be entitled to receive pursuant to his retention agreement a lump sum severance payment equal to 2.99 times the sum of his base salary plus annual incentive, calculated at target opportunity.

3

In the event of a termination related to a change in control or a termination for good reason or other than for cause, disability or death, Mr. Denault is entitled to receive under the terms of his retention agreement a lump sum payment relating to his performance units. The payment is calculated as if all performance goals relating to the particular PUP cycle were achieved at target level for the entire performance period. For purposes of the table, the value of Mr. Denault's performance units has been calculated as follows:

 

384

 

 

2005 - 2007 Plan - 6,000 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 6,000 performance units at target, assuming a stock price of $92.32

4

In the event of termination related to a change in control, termination for good reason or other than for cause, disability or death, Mr. Denault's unvested stock options would immediately vest pursuant to his retention agreement. For purposes of this table, we assumed that Mr. Denault exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to his retention agreement, in a termination other than for cause, Mr. Denault would have been eligible to receive company subsidized COBRA benefits for a period of 18 months the value of which as of December 29, 2006 was $12,727. In a change in control qualifying event, Mr. Denault would be eligible to receive subsidized medical and dental benefits for a period of 36 months, the value of which as of December 29, 2006 was $25,453.

6

As of December 29, 2006 Mr. Denault is not eligible to receive retirement benefits pursuant to the terms of Entergy Corporation's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

Joseph F. Domino
President & CEO, Entergy TX

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our President & CEO, Entergy TX would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(6)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$445,500

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

$80,011

 

$80,011

 

$80,011

 

$120,016

  2006-2008 PUP

 

---

 

---

 

---

 

$33,851

 

$33,851

 

$33,851

 

$101,552

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

$440,488

 

$440,488

 

---

 

$440,488

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Mr. Domino also would have been entitled to receive his vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Mr. Domino's employment were terminated under certain conditions relating to a change in control, he would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Mr. Domino's employment were terminated "for cause," he would forfeit his SERP and other similar supplemental benefits.

2

In the event of a termination related to a change in control, Mr. Domino would be entitled to receive pursuant to the System Executive Continuity Plan a lump sum severance payment equal to one times the sum of his base salary plus annual incentive, calculated at target opportunity.

3

In the event of a change in control, Mr. Domino would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to his performance units. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Mr. Domino's awards was calculated as follows:

2005 - 2007 Plan - 1,300 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 1,100 performance units at target, assuming a stock price of $92.32

 

385

 

For scenarios other than a termination related to a change in control, participants in the PUP, including Mr. Domino, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death, disability or retirement (as Mr. Domino is eligible for retirement), the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of retirement, disability or a change in control qualifying event, Mr. Domino's unvested stock options would immediately vest. For purposes of this table, we assumed that Mr. Domino exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to the System Executive Continuity Plan, in a change in control qualifying event, Mr. Domino would be eligible to receive subsidized medical and dental benefits for a period of 12 months, the value of which as of December 29, 2006 was $10,725.

6

As of December 29, 2006 Mr. Domino is eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are the same as available to substantially all exempt employees. For information regarding these vested benefits, see the Pension Benefits table included in this Form 10-K.

J. Wayne Leonard
Chairman and Chief Executive Officer

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our Chairman and Chief Executive Officer would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 


Termination for Good Reason or Not for Cause

 




Retirement(7)

 




Disability

 




Death

 

Termination Related to a Change in Control

                             

Annual Incentive
  Payment(2)

 


---

 


---

 


---

 


---

 


---

 


---

 


$2,366,000

Severance Payment(3)

 

---

 

---

 

---

 

---

 

---

 

---

 

$7,074,340

Performance Units:(4)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

$2,111,051

 

$2,111,051

 

$3,166,576

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

$1,030,907

 

$1,030,907

 

$3,092,720

                             

Unvested Stock Options(5)

 

---

 

---

 

---

 

---

 

$9,909,684

 

---

 

$9,909,684

Unvested Restricted
  Units(6)

 


---

 


---

 


$9,232,000

 


---

 


$9,232,000

 


$9,232,000

 


$9,232,000

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Mr. Leonard also would have been entitled to receive his vested pension benefits. However, a "for cause" termination would result in forfeiture of the supplemental retirement benefit. For additional information regarding Mr. Leonard's vested benefits and awards, see "2006 Pension Benefits."

2

In the event of a termination related to a change in control, Mr. Leonard would have been entitled under his retention agreement to receive a lump sum payment of his cash annual incentive bonus under the EAIP calculated at maximum annual bonus opportunity. For purposes of this table, we have calculated the award in accordance with this agreement at 200% of target opportunity and assumed a base salary of $1,183,000.

3

In the event of a termination related to a change in control, Mr. Leonard would have been entitled to receive pursuant to his retention agreement a lump sum severance payment equal to the sum of 2.99 times his base salary plus target annual incentive (calculated at 100% of his base salary).

4

In the event of a termination related to a change in control, Mr. Leonard would have been entitled to receive under the terms of his retention agreement a lump sum payment relating to his performance units under PUP. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, we have calculated the value of Mr. Leonard's awards as follows:

 

386

 

 

2005 - 2007 Plan - 34,300 performance nits at target, assuming a stock price of $92.32

2006 - 2008 Plan - 33,500 performance nits at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Mr. Leonard, are eligible to receive an award as defined by the terms and conditions of the PUP; however, the award is not enhanced or accelerated by the termination event. With respect to death or disability, the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

5

In the event of disability or a termination related to a change in control, Mr. Leonard's unvested stock options would immediately vest pursuant to his retention agreement. For purposes of this table, we assumed that Mr. Leonard exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

6

Mr. Leonard's 100,000 RUs vest 50% in 2008 and 50% in 2009. Pursuant to his restricted unit agreement, any unvested RUs will vest immediately in the event of the termination of Mr. Leonard's employment by Mr. Leonard for good reason, by the Company other than for cause, or by reason of his death or disability.

7

As of December 29, 2006, Mr. Leonard is not eligible to receive retirement benefits pursuant to the terms of Entergy Corporation's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

Jay A. Lewis
Vice President & Chief Financial Officer, Utility Operations Group

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our Vice President & Chief Financial Officer, Utility Operations Group would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(5)

 




Disability

 




Death

 

Termination Related to a Change in Control

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

---

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

---

 

---

 

---

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

---

 

---

 

---

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

---

 

$49,348

 

---

 

---

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Mr. Lewis would have been entitled to receive his vested pension benefits. For information regarding these vested benefits, see "2006 Pension Benefits."

2

Mr. Lewis does not participate in the SECP.

3

Mr. Lewis does not participate in the PUP.

4

In the event of disability, Mr. Lewis' unvested stock options would immediately vest. For purposes of this table, we assumed that Mr. Lewis exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

As of December 29, 2006 Mr. Lewis is not eligible to receive retirement benefits pursuant to the terms of Entergy Corporation's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

387

Hugh T. McDonald
President & CEO, Entergy AR

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our President & CEO, Entergy AR would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(6)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$452,250

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

$80,011

 

$80,011

 

$120,016

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

$33,851

 

$33,851

 

$101,552

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

---

 

$440,488

 

---

 

$440,488

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

$714,978

1

In addition to the payments and benefits in the table, Mr. McDonald also would have been entitled to receive his vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Mr. McDonald's employment were terminated under certain conditions relating to a change in control, he would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Mr. McDonald's employment were terminated "for cause," he would forfeit his SERP and other similar supplemental benefits.

2

In the event of a termination related to a change in control, Mr. McDonald would be entitled to receive pursuant to the System Executive Continuity Plan a lump sum severance payment equal to one times his base salary plus annual incentive, calculated at target opportunity.

3

In the event of a termination related to a change in control, termination for good reason or other than for cause or death, Mr. McDonald would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to his performance units under the PUP. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Mr. McDonald's awards has been calculated as follows:

2005 - 2007 Plan - 1,300 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 1,100 performance units at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Mr. McDonald, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death or disability, the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of disability or a change in control qualifying event, Mr. McDonald's unvested stock options would immediately vest. For purposes of this table, we assumed that Mr. McDonald exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to the System Executive Continuity Plan, in a change in control qualifying event, Mr. McDonald would be eligible to receive subsidized medical and dental benefits for a period of 12 months, the value of which as of December 29, 2006 was $14,420.

6

As of December 29, 2006 Mr. McDonald is not eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

388

Daniel Packer
President & CEO, Entergy New Orleans

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our President & CEO, Entergy New Orleans would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(6)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$421,500

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

$80,011

 

$80,011

 

$80,011

 

$120,016

  2006-2008 PUP

 

---

 

---

 

---

 

$33,851

 

$33,851

 

$33,851

 

$101,552

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

$440,488

 

$440,488

 

---

 

$440,488

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Mr. Packer also would have been entitled to receive his vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Mr. Packer's employment were terminated under certain conditions relating to a change in control, he would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Mr. Packer's employment were terminated "for cause," he would forfeit his SERP and other similar supplemental benefits.

2

In the event of a termination related to a change in control, Mr. Packer would be entitled to receive pursuant to the System Executive Continuity Plan a lump sum severance payment equal to one times his base salary plus annual incentive, calculated at target opportunity.

3

In the event of a termination related to a change in control, Mr. Packer would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to his performance units under the PUP. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Mr. Packer's awards has been calculated as follows:

2005 - 2007 Plan - 1,300 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 1,100 performance units at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Mr. Packer, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death, disability or retirement (as Mr. Packer is eligible for retirement), the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of retirement, disability or a change in control qualifying event, Mr. Packer's unvested stock options would immediately vest. For purposes of this table, we assumed that Mr. Packer exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to the System Executive Continuity Plan, in a change in control qualifying event, Mr. Packer would be eligible to receive subsidized medical and dental benefits for a period of 12 months, the value of which as of December 29, 2006 was $4,096.

6

As of December 29, 2006 Mr. Packer is eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are the same as available to substantially all exempt employees. For information regarding these vested benefits, see the Pension Benefits table included in this Form 10-K.

389

Carolyn Shanks
President & CEO, Entergy MS

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our President & CEO, Entergy MS would have been entitled to receive as a result of a termination of her employment under various scenarios as of December 29, 2006:

 



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(7)

 




Disability

 




Death

 

Termination Related to a Change in Control(5)

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$445,500

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

$80,011

 

$80,011

 

$120,016

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

$33,851

 

$33,851

 

$101,552

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

---

 

$440,488

 

---

 

$440,488

Unvested Restricted
  Units(6)

 


---

 


---

 


---

 


---

 


---

 


---

 


$166,176

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

---

1

In addition to the payments and benefits in the table, Ms. Shanks also would have been entitled to receive her vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Ms. Shanks' employment were terminated under certain conditions relating to a change in control, she would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Ms. Shanks' employment were terminated "for cause," she would forfeit her SERP and other similar supplemental benefits.

2

In the event of a termination related to a change in control, Ms. Shanks would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum severance payment equal to one times her base salary plus annual incentive, calculated at target opportunity.

3

In the event of a termination related to a change in control, Ms. Shanks would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to her performance units under the PUP. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Ms. Shanks' awards has been calculated as follows:

2005 - 2007 Plan - 1,300 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 1,100 performance units at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Ms. Shanks, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death or disability, the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of disability or a change in control qualifying event, Ms. Shanks' unvested stock options would immediately vest. For purposes of this table, we assumed that Ms. Shanks exercised her options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

Pursuant to the System Executive Continuity Plan, in a change in control qualifying event, Ms. Shanks would be eligible to receive subsidized medical and dental benefits for a period of 12 months, the value of which as of December 29, 2006 was $10,723.

6

Ms. Shanks' 1,800 RUs vest in 2011. In the event of a change in control qualifying event, any unvested restricted units would vest immediately.

7

As of December 29, 2006 Ms. Shanks is not eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

390

Richard J. Smith
Group President, Utility Operations

The following table shows certain payments and benefits, excluding vested or earned awards and benefits, which our Group President, Utility Operations would have been entitled to receive as a result of a termination of his employment under various scenarios as of December 29, 2006:



Benefits and Payments Upon Termination(1)

 



Voluntary
Resignation

 



For
Cause

 

Termination for Good Reason or Not for Cause

 




Retirement(5)

 




Disability

 




Death

 

Termination Related to a Change in Control

                             

Severance Payment(2)

 

---

 

---

 

---

 

---

 

---

 

---

 

$1,575,000

Performance Units:(3)

                           

  2005-2007 PUP

 

---

 

---

 

---

 

---

 

$369,280

 

$369,280

 

$553,920

  2006-2008 PUP

 

---

 

---

 

---

 

---

 

$184,640

 

$184,640

 

$553,920

                             

Unvested Stock Options(4)

 

---

 

---

 

---

 

---

 

$2,495,705

 

---

 

$2,495,705

280G Tax Gross-up

 

---

 

---

 

---

 

---

 

---

 

---

 

$2,370,633

1

In addition to the payments and benefits in the table, Mr. Smith also would have been entitled to receive his vested pension benefits. For a description of the pension benefits available to Named Executive Officers, see "2006 Pension Benefits." If Mr. Smith's employment were terminated under certain conditions relating to a change in control, he would also be eligible for early retirement benefits, which are described in "2006 Pension Benefits." If Mr. Smith's employment were terminated "for cause," he would forfeit his supplemental credited service and SERP supplemental benefits.

2

In the event of a termination related to a change in control, Mr. Smith would be entitled to receive pursuant to his retention agreement a lump sum severance payment equal $1,575,000.

3

In the event of a termination related to a change in control, Mr. Smith would have been entitled to receive pursuant to the System Executive Continuity Plan a lump sum payment relating to his performance units under the PUP. The payment is calculated as if all performance goals relating to the particular PUP cycles were achieved at target level for the entire performance period. The payment is accelerated to a lump payment on the date of the change of control. For purposes of the table, the value of Mr. Smith's awards has been calculated as follows:

2005 - 2007 Plan - 6,000 performance units at target, assuming a stock price of $92.32

2006 - 2008 Plan - 6,000 performance units at target, assuming a stock price of $92.32

For scenarios other than a termination related to a change in control, participants in the PUP, including Mr. Smith, are eligible to receive an award as defined by the terms and conditions of the PUP. With respect to death or disability, the award is pro-rated based on the number of months of participation in each PUP performance cycle. The amount of the award is based on actual performance achieved, with a stock price set as of the end of the performance period, and payable in the form of a lump sum after the completion of the performance period.

4

In the event of disability or a change in control qualifying event, Mr. Smith's unvested stock options would immediately vest. For purposes of this table, it was assumed that Mr. Smith exercised his options immediately upon vesting and received proceeds equal to the difference between the closing price of common stock on December 29, 2006, and the applicable exercise price of each option share.

5

As of December 29, 2006 Mr. Smith is not eligible to retire from Entergy's qualified retirement plan; consequently, compensation and benefits available under this scenario are substantially the same as available with a voluntary resignation.

391

Compensation of Directors

For information regarding compensation of the directors of Entergy Corporation, see the Proxy Statement under the heading "Director Compensation", which information is incorporated herein by reference. The Boards of Directors of Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are comprised solely of employee directors who receive no compensation for service as directors.

Item 12. Security Ownership of Certain Beneficial Owners and Management

Entergy Corporation owns 100% of the outstanding common stock of registrants Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans. The information with respect to persons known by Entergy Corporation to be beneficial owners of more than 5% of Entergy Corporation's outstanding common stock is included under the heading "Stockholders Who Own at Least Five Percent" in the Proxy Statement, which information is incorporated herein by reference. The registrants know of no contractual arrangements that may, at a subsequent date, result in a change in control of any of the registrants.

The following table sets forth the beneficial ownership of Common Stock of Entergy Corporation and stock-based units as of December 31, 2006 for all directors and Named Executive Officers. Unless otherwise noted, each person had sole voting and investment power over the number of shares of Common Stock and stock-based units of Entergy Corporation set forth across from his or her name.


Name

 


Shares
(1)

 

Options Exercisable
Within 60 Days

 


Stock Units
(2)

             

Entergy Corporation

           

Maureen S. Bateman*

 

3,900

 

-

 

4,800

W. Frank Blount*

 

10,434

 

-

 

15,200

Simon D. deBree*

 

2,383

 

-

 

3,837

Leo P. Denault**

 

1,275

 

122,355

 

29,816

Gary W. Edwards*

 

800

 

-

 

631

Alexis Herman*

 

2,100

 

-

 

2,400

Donald C. Hintz*

 

6,490

 

-

 

1,600

J. Wayne Leonard***

 

13,725

 

1,768,598

 

159,707

Stuart L. Levenick*

 

800

 

-

 

631

James R. Nichols* (3)

 

7,294

 

-

 

16,226

William A. Percy, II* (4)

 

4,150

 

-

 

5,054

Mark T. Savoff**

 

452

 

44,532

 

219

Richard J. Smith**

 

7,396

 

292,937

 

60,262

W. J. Tauzin*

 

700

 

-

 

493

Gary J. Taylor**

 

1,270

 

154,831

 

8,562

Steven V. Wilkinson*

 

1,855

 

-

 

2,027

All directors and executive

           

officers as a group

 

80,071

 

2,773,249

 

344,310

392

 


Name

 


Shares
(1)

 

Options Exercisable
Within 60 Days

 


Stock Units
(2)

             

Entergy Arkansas

           

Leo P. Denault***

 

1,275

 

122,355

 

29,816

J. Wayne Leonard**

 

13,725

 

1,768,598

 

159,707

Jay A. Lewis**

 

853

 

21,534

 

-

Hugh T. McDonald***

 

5,270

 

56,953

 

27,513

Mark T. Savoff*

 

452

 

44,532

 

219

Richard J. Smith***

 

7,396

 

292,937

 

60,262

All directors and executive

           

officers as a group

 

45,288

 

2,851,736

 

318,924

             

Entergy Gulf States

           

E. Renae Conley***

 

2,164

 

142,158

 

32,989

Leo P. Denault***

 

1,275

 

122,355

 

29,816

Joseph F. Domino***

 

7,534

 

39,122

 

2,860

J. Wayne Leonard**

 

13,725

 

1,768,598

 

159,707

Jay A. Lewis**

 

853

 

21,534

 

-

Mark T. Savoff*

 

452

 

44,532

 

219

Richard J. Smith***

 

7,396

 

292,937

 

60,262

All directors and executive

           

officers as a group

 

49,716

 

2,976,063

 

327,260

             

Entergy Louisiana

           

E. Renae Conley***

 

2,164

 

142,158

 

32,989

Leo P. Denault***

 

1,275

 

122,355

 

29,816

J. Wayne Leonard**

 

13,725

 

1,768,598

 

159,707

Jay A. Lewis**

 

853

 

21,534

 

-

Mark T. Savoff*

 

452

 

44,532

 

219

Richard J. Smith***

 

7,396

 

292,937

 

60,262

All directors and executive

           

officers as a group

 

42,182

 

2,936,941

 

324,400

             

Entergy Mississippi

           

Leo P. Denault***

 

1,275

 

122,355

 

29,816

J. Wayne Leonard**

 

13,725

 

1,768,598

 

159,707

Jay A. Lewis**

 

853

 

21,534

 

-

Mark T. Savoff*

 

452

 

44,532

 

219

Carolyn C. Shanks***

 

3,617

 

29,832

 

11,195

Richard J. Smith***

 

7,396

 

292,937

 

60,262

All directors and executive

           

officers as a group

 

43,635

 

2,824,615

 

302,606

             

Entergy New Orleans

           

Tracie L. Boutte*

 

1,932

 

9,499

 

6

Leo P. Denault**

 

1,275

 

122,355

 

29,816

J. Wayne Leonard**

 

13,725

 

1,768,598

 

159,707

Jay A. Lewis**

 

853

 

21,534

 

-

Daniel F. Packer***

 

581

 

23,832

 

5,042

Richard J. Smith**

 

7,396

 

292,937

 

60,262

Roderick K. West*

 

753

 

1,998

 

-

All directors and executive

           

officers as a group

 

43,284

 

2,830,112

 

296,459

             

393

*

Director of the respective Company

**

Named Executive Officer of the respective Company

***

Director and Named Executive Officer of the respective Company

(1)

The number of shares of Entergy Corporation common stock owned by each individual and by all directors and executive officers as a group does not exceed one percent of the outstanding Entergy Corporation common stock.

(2)

Represents the balances of phantom units each executive holds under the defined contribution restoration plan and the deferral provisions of the EOP. These units will be paid out in either Entergy Corporation Common Stock or cash equivalent to the value of one share of Entergy Corporation Common Stock per unit on the date of payout, including accrued dividends. The deferral period is determined by the individual and is at least two years from the award of the bonus. For directors of Entergy Corporation the phantom units are issued under the Service Recognition Program for Outside Directors. All non-employee directors are credited with units for each year of service on the Board.

(3)

Excludes 7,059 shares that are owned by a charitable foundation that Mr. Nichols controls.

(4)

Includes 1,500 shares deferred by Mr. Percy under EOP.

Equity Compensation Plan Information

The following table summarizes our equity compensation plan information as of December 31, 2006. Information is included for equity compensation plans approved by our stockholders and equity compensation plans not approved by our stockholders.




Plan

 


Number of Securities to
be Issued Upon Exercise
of Outstanding Options


(a)

 

Weighted
Average
Exercise
Price


(b)

 


Number of Securities
Remaining Available for
Future Issuance (excluding securities reflected in column (a))
(c)

 

 

 

 

 

 

 

Equity compensation plans
  approved by security holders (1)

 


7,613,078

 


$56.41

 


441,875

Equity compensation plans not
  approved by security holders(2)

 


3,189,845

 


$38.57

 


-

Total

 

10,802,923

 

$51.16

 

441,875

(1)

Includes the EOP, which was approved by our shareholders on May 15, 1998. The 2007 Equity Ownership and Long Term Cash Incentive Plan of Entergy Corporation and Subsidiaries ("2007 Plan"), was approved by Entergy Corporation shareholders on May 12, 2006. 7,000,000 shares of Entergy Corporation common stock can be issued from the 2007 Plan, with no more than 2,000,000 shares available for non-option grants. The EOP and the 2007 Plan (the "Plans") are administered by the Personnel Committee of the Board of Directors (other than with respect to awards granted to non-employee directors, which awards are administered by the entire Board of Directors). Eligibility under the Plans is limited to our non-employee directors and to the officers and employees of the Company and any corporation 80% or more of whose stock (based on voting power) or value is owned, directly or indirectly, by the Company. The Plans provide for the issuance of stock options, restricted shares, equity awards (units whose value is related to the value of shares of our Common Stock but do not represent actual shares of Common Stock), performance awards (performance shares or units valued by reference to shares of Common Stock or performance units valued by reference to financial measures or property other than Common Stock) and other stock-based awards.

(2)

Entergy has a Board-approved stock-based compensation plan. However, effective May 9, 2003, the Board has directed that no further awards be issued under that plan.

394

Item 13. Certain Relationships and Related Transactions and Director Independence

For information regarding certain relationships, related transactions and director independence of Entergy Corporation, see the Proxy Statement under the headings "Corporate Governance - Director Independence" and "Transactions with Related Persons," which information is incorporated herein by reference.

Since December 31, 2005, none of the Subsidiaries or any of their affiliates has participated in any transaction involving an amount in excess of $120,000 in which any director or executive officer of any of the Subsidiaries, any nominee for director, or any immediate family member of the foregoing had a material interest as contemplated by Item 404(a) of Regulation S-K ("Related Party Transactions").

Entergy Corporation's Board of Directors has adopted policies and procedures for the review, approval or ratification of Related Party Transactions. Under these policies and procedures, the Corporate Governance Committee, or a subcommittee of the Board of Directors of Entergy Corporation comprised of independent directors, reviews the transaction and either approves or rejects the transaction after taking into account the following factors:

The policy does not apply to (a) compensation and Related Party Transactions involving a director or an executive officer solely resulting from that person's service as a director or employment with the Company so long as the compensation is reported in the Company's filings with the SEC, (b) transactions involving the rendering of services as a public utility at rates or charges fixed in conformity with law or governmental authority or (c) any other categories of transactions currently or in the future excluded from the reporting requirements of Item 404(a) of Regulation SK.

None of the Subsidiaries are listed issuers. As previously noted, the Boards of Directors of the Subsidiaries are comprised solely of employee directors. None of the Boards of Directors of any of the Subsidiaries has any committees.

 

 

395

 

 

 

 

Item 14. Principal Accountant Fees and Services (Entergy Corporation, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Aggregate fees billed to Entergy Corporation (consolidated), Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy for the years ended December 31, 2006 and 2005 by Deloitte & Touche LLP, the member firms of Deloitte Touche Tohmatsu, and their respective affiliates (collectively, "Deloitte & Touche"), which includes Deloitte Consulting were as follows:

   

2006

 

2005

Entergy Corporation (consolidated)

       

Audit Fees

 

$6,128,113

 

$6,020,500

Audit-Related Fees (a)

 

299,319

 

232,000

         

Total audit and audit-related fees

 

6,427,432

 

6,252,500

Tax Fees (b)

 

39,891

 

118,684

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$6,467,323

 

$6,371,184

         

Entergy Arkansas

       

Audit Fees

 

$739,975

 

$725,813

Audit-Related Fees (a)

 

58,000

 

-

         

Total audit and audit-related fees

 

797,975

 

725,813

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$797,975

 

$725,813

         

Entergy Gulf States

       

Audit Fees

 

$776,975

 

$941,063

Audit-Related Fees (a)

 

-

 

30,000

         

Total audit and audit-related fees

 

776,975

 

971,063

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$776,975

 

$971,063

         

Entergy Louisiana

       

Audit Fees

 

$780,975

 

$974,013

Audit-Related Fees (a)

 

-

 

-

         

Total audit and audit-related fees

 

780,975

 

974,013

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$780,975

 

$974,013

396

 

   

2006

 

2005

Entergy Mississippi

       

Audit Fees

 

$738,975

 

$727,863

Audit-Related Fees (a)

 

-

 

-

         

Total audit and audit-related fees

 

738,975

 

727,863

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$738,975

 

$727,863

         

Entergy New Orleans

       

Audit Fees

 

$632,000

 

$638,000

Audit-Related Fees (a)

 

-

 

48,000

         

Total audit and audit-related fees

 

632,000

 

686,000

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$632,000

 

$686,000

         

System Energy

       

Audit Fees

 

$669,397

 

$578,113

Audit-Related Fees (a)

 

-

 

-

         

Total audit and audit-related fees

 

669,397

 

578,113

Tax Fees

 

-

 

-

All Other Fees

 

-

 

-

         

   Total Fees (c)

 

$669,397

 

$578,113

(a)

Includes fees for employee benefit plan audits, consultation on financial accounting and reporting, and other attestation services.

(b)

Includes fees for tax return review and tax compliance assistance.

(c)

100% of fees paid in 2006 and 2005 were pre-approved by the Entergy Corporation Audit Committee.

Entergy Audit Committee Guidelines for Pre-approval of Independent Auditor Services

The Audit Committee has adopted the following guidelines regarding the engagement of Entergy's independent auditor to perform services for Entergy:

1.

The independent auditor will provide the Audit Committee, for approval, an annual engagement letter outlining the scope of services proposed to be performed during the fiscal year, including audit services and other permissible non-audit services (e.g. audit-related services, tax services, and all other services).

2.

For other permissible services not included in the engagement letter, Entergy management will submit a description of the proposed service, including a budget estimate, to the Audit Committee for pre-approval. Management and the independent auditor must agree that the requested service is consistent with the SEC's rules on auditor independence prior to submission to the Audit Committee. The Audit Committee, at its discretion, will pre-approve permissible services and has established the following additional guidelines for permissible non-audit services provided by the independent auditor:

  • Aggregate non-audit service fees are targeted at fifty percent or less of the approved audit service fee.
  • All other services should only be provided by the independent auditor if it is the only qualified provider of that service or if the Audit Committee specifically requests the service.

3.

The Audit Committee will be informed quarterly as to the status of pre-approved services actually provided by the independent auditor.

   
   

397

   
   
   

4.

To ensure prompt handling of unexpected matters, the Audit Committee delegates to the Audit Committee Chair or its designee the authority to approve permissible services and fees. The Audit Committee Chair or designee will report action taken to the Audit Committee at the next scheduled Audit Committee meeting.

5.

The Vice President and General Auditor will be responsible for tracking all independent auditor fees and will report quarterly to the Audit Committee.

 

 

398

 

 

PART IV


Item 15. Exhibits and Financial Statement Schedules

(a)1.

Financial Statements and Independent Auditors' Reports for Entergy, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy are listed in the Table of Contents.

   

(a)2.

Financial Statement Schedules

Report of Independent Registered Public Accounting Firm (see page 409)

Financial Statement Schedules are listed in the Index to Financial Statement Schedules (see page S-1)

   

(a)3.

Exhibits

Exhibits for Entergy, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy are listed in the Exhibit Index (see page E-1). Each management contract or compensatory plan or arrangement required to be filed as an exhibit hereto is identified as such by footnote in the Exhibit Index.

399

ENTERGY CORPORATION

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY CORPORATION


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

J. Wayne Leonard (Chairman of the Board, Chief Executive Officer and Director; Principal Executive Officer); Leo P. Denault (Executive Vice President and Chief Financial Officer; Principal Financial Officer); Maureen S. Bateman, W. Frank Blount, Simon D. deBree, Gary W. Edwards, Alexis M. Herman, Donald C. Hintz, Stuart L. Levenick, James R. Nichols, William A. Percy, II, W. J. Tauzin, and Steven V. Wilkinson (Directors).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

   

400

ENTERGY ARKANSAS, INC.

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY ARKANSAS, INC.


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

Hugh T. McDonald (Chairman of the Board, President, Chief Executive Officer, and Director; Principal Executive Officer); Jay A. Lewis (Vice President, Chief Financial Officer - Utility Operations Group; Principal Financial Officer); Leo P. Denault, Mark T. Savoff, and Richard J. Smith (Directors).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

401

 

ENTERGY GULF STATES, INC.

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY GULF STATES, INC.


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

Joseph F. Domino (Chairman of the Board, President, Chief Executive Officer-Texas, and Director; Principal Executive Officer); E. Renae Conley (President, Chief Executive Officer-Louisiana, and Director; Principal Executive Officer); Jay A. Lewis (Vice President, Chief Financial Officer - Utility Operations Group; Principal Financial Officer); Leo P. Denault, Mark T. Savoff, and Richard J. Smith (Directors).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

402

ENTERGY LOUISIANA, LLC

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY LOUISIANA, LLC


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E . Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

E. Renae Conley (Chair of the Board, President, Chief Executive Officer, and Director; Principal Executive Officer); Jay A. Lewis (Vice President, Chief Financial Officer - Utility Operations Group; Principal Financial Officer); Leo P. Denault, Mark T. Savoff, and Richard J. Smith (Directors).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

 

403

 

ENTERGY MISSISSIPPI, INC.

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY MISSISSIPPI, INC.


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

Carolyn C. Shanks (Chairman of the Board, President, Chief Executive Officer, and Director; Principal Executive Officer); Jay A. Lewis (Vice President, Chief Financial Officer - Utility Operations Group; Principal Financial Officer); Leo P. Denault, Mark T. Savoff, and Richard J. Smith (Directors).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

404

 

ENTERGY NEW ORLEANS, INC.

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

ENTERGY NEW ORLEANS, INC.


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

 

Roderick K. West (President, Chief Executive Officer, and Director; Principal Executive Officer); Daniel F. Packer (Chairman of the Board and Director); Jay A. Lewis (Vice President, Chief Financial Officer - Utility Operations Group; Principal Financial Officer); Tracie L. Boutte (Director).

 

By: /s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

405

 

 

SYSTEM ENERGY RESOURCES, INC.

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

SYSTEM ENERGY RESOURCES, INC.


By /s/ Nathan E. Langston
Nathan E. Langston, Senior Vice President
and Chief Accounting Officer

Date: March 1, 2007

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

Signature

Title

Date

     
     

/s/ Nathan E. Langston
Nathan E. Langston

Senior Vice President and Chief Accounting Officer
(Principal Accounting Officer)

March 1, 2007

 

Gary J. Taylor (Chairman of the Board, President, Chief Executive Officer, and Director; Principal Executive Officer); Theodore H. Bunting, Jr. (Vice President, Chief Financial Officer - Nuclear Operations; Principal Financial Officer); Leo P. Denault and Steven C. McNeal (Directors).

 

By: &#/s/ Nathan E. Langston
(Nathan E. Langston, Attorney-in-fact)

March 1, 2007

406

 

 

EXHIBIT 23(a)

CONSENTS OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

 

We consent to the incorporation by reference in Post-Effective Amendments No. 3 and 5A on Form S-8 and their related prospectuses to Registration Statement No. 33-54298 on Form S-4, Registration Statements No. 333-02503 and 333-22007 of on Form S-3, Registration Statements No. 333-55692, 333-68950, 333-75097, 333-90914, 333-9817-9, and 333-140183 of on Form S-8 of our reports dated February 26, 2007, relating to the consolidated financial statements and consolidated financial statement schedules (which reports expresses an unqualified opinion and includes an explanatory paragraph regarding Entergy Corporation's change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy Corporation and Subsidiaries, and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy Corporation and Subsidiaries for the year ended December 31, 2006.

We consent to the incorporation by reference in Registration Statements No. 333-00103, 333-05045, 333-127780, and 333-132653 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements and financial statement schedule (which report expresses an unqualified opinion and includes an explanatory paragraph regarding Entergy Arkansas, Inc.'s change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy Arkansas, Inc. and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy Arkansas, Inc. for the year ended December 31, 2006.

We consent to the incorporation by reference in Registration Statements No. 33-49739, 33-51181, 333-60957, 333-109923, and 333-123691 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements and financial statement schedule (which report expresses an unqualified opinion and includes an explanatory paragraph regarding Entergy Gulf States, Inc.'s change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy Gulf States, Inc. and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy Gulf States, Inc. for the year ended December 31, 2006.

We consent to the incorporation by reference in Registration Statements No. 333-01329 and 333-132660 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements and financial statement schedule (which report expresses an unqualified opinion and includes an explanatory paragraph regarding Entergy Louisiana, LLC's change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy Louisiana, LLC and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy Louisiana, LLC for the year ended December 31, 2006.

We consent to the incorporation by reference in Registration Statements No. 333-124168 and 333-13268 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements and financial statement schedule (which report expresses an unqualified opinion and includes an explanatory paragraph regarding Entergy Mississippi, Inc.'s change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy Mississippi, Inc., and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy Mississippi, Inc. for the year ended December 31, 2006.

We consent to the incorporation by reference in Registration Statement No. 333-113586 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements and financial statement schedule (which report expresses an unqualified opinion and includes explanatory paragraphs regarding its filing for reorganization under Chapter 11 of the Federal Bankruptcy Code, the existence of matters that raise substantial doubt about its ability to continue as a going concern, and its change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of Entergy New Orleans, Inc.'s (Debtor-in Possession) and management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of Entergy New Orleans, Inc. (Debtor-in-Possession) for the year ended December 31, 2006.

407

We consent to the incorporation by reference in Registration Statements No. 33-47662, 33-61189, and 333-06717 on Form S-3 of our reports dated February 26, 2007, relating to the financial statements (which report expresses an unqualified opinion and includes an explanatory paragraph regarding System Energy Resources, Inc.'s change in 2006 in the method of accounting for defined benefit pension and other postretirement plans) of System Energy Resources, Inc. and to management's report on the effectiveness of internal control over financial reporting, appearing in this Annual Report on Form 10-K of System Energy Resources, Inc. for the year ended December 31, 2006.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

 

408

 

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

 

To the Board of Directors and Shareholders of
Entergy Corporation and Subsidiaries
Entergy Arkansas, Inc.
Entergy Gulf States, Inc.
Entergy Mississippi, Inc.
Entergy New Orleans, Inc.

To the Board of Directors and Members of
Entergy Louisiana, LLC

We have audited the consolidated financial statements of Entergy Corporation and Subsidiaries (the "Corporation") and we have also audited the financial statements of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., and Entergy New Orleans, Inc. (Debtor-in-Possession) as of December 31, 2006 and 2005, and for each of the three years in the period ended December 31, 2006 (collectively the "Companies"), and have issued our reports thereon dated February 26, 2007. We have also audited management's assessment of the effectiveness of the Corporation's and the respective Companies' internal control over financial reporting as of December 31, 2006, and the effectiveness of the Corporation's and the respective Companies' internal control over financial reporting as of December 31, 2006, and have issued our reports thereon dated February 26, 2007. Our reports on the financial statements of the Corporation and Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy Louisiana, LLC, and Entergy Mississippi, Inc., each expressed an unqualified opinion and include an explanatory paragraph regarding their change in the method of accounting for defined benefit and other postretirement plans. Our report on the financial statements of Entergy New Orleans, Inc. (Debtor-in-Possession) expressed an unqualified opinion and includes explanatory paragraphs regarding its filing for reorganization under Chapter 11 of the Federal Bankruptcy Code, the existence of matters that raise substantial doubt about its ability to continue as a going concern, and its change in the method of accounting for the defined benefit and other postretirement plans. The financial statements described above and our reports thereon are included elsewhere in this 2006 Annual Report on Form 10-K. Our audits also included the financial statement schedules of the Corporation and the respective Companies listed in Item 15. These financial statement schedules are the responsibility of the Corporation's and the respective Companies' managements. Our responsibility is to express an opinion based on our audits. In our opinion, such financial statement schedules, when considered in relation to the basic financial statements taken as a whole, present fairly in all material respects the information set forth therein.

 

DELOITTE & TOUCHE LLP

 

New Orleans, Louisiana
February 26, 2007

 

409

 

 

INDEX TO FINANCIAL STATEMENT SCHEDULES


Schedule

 

Page

     

II

Valuation and Qualifying Accounts 2006, 2005 and 2004:

 
 

   Entergy Corporation and Subsidiaries

S-2

 

   Entergy Arkansas, Inc.

S-3

 

   Entergy Gulf States, Inc.

S-4

 

   Entergy Louisiana, LLC

S-5

 

   Entergy Mississippi, Inc.

S-6

 

   Entergy New Orleans, Inc.

S-7


Schedules other than those listed above are omitted because they are not required, not applicable, or the required information is shown in the financial statements or notes thereto.

Columns have been omitted from schedules filed because the information is not applicable.

 

 

 

 

S-1

 

 

 

ENTERGY CORPORATION AND SUBSIDIARIES
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Years Ended December 31, 2006, 2005, and 2004
(In Thousands)
   
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $30,805    $19,020    $30,477    $19,348 
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($697,255)   $51,101    ($212,482)   ($433,672)
    Injuries and damages (Note 2)   30,278    14,083    9,669    34,692 
    Impairments   63,000    -    63,000    - 
    Environmental   12,277    5,778    8,512    9,543 
      Total   ($591,700)   $70,962    ($131,301)   ($389,437)
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $20,266    $15,524    $4,985    $30,805 
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($125,393)   $39,172    $611,034    ($697,255)
    Injuries and damages (Note 2)   30,224    15,509    15,455    30,278 
    Impairments   87,000    -    24,000    63,000 
    Environmental   16,683    1,757    6,163    12,277 
      Total   $8,514    $56,438    $656,652    ($591,700)
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $25,976    $5,479    $7,697    $23,758 
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($123,314)   $49,950    $50,762    ($124,126)
    Injuries and damages (Note 2)   34,189    28,936    27,636    35,489 
    Impairments   50,000    55,000    18,000    87,000 
    Environmental   26,537    26,652    35,740    17,449 
      Total   ($12,588)   $160,538    $132,138    $15,812 
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off.
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages.
                 
                 

 

S-2

 

 

ENTERGY ARKANSAS, INC.
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Years Ended December 31, 2006, 2005, and 2004
(In Thousands)
   
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $15,777    $10,432    $10,952    $15,257 
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($46,450)   $4,810    $11,866    ($53,506)
    Injuries and damages (Note 2)   2,273    1,458    1,451    2,280 
    Environmental   1,561    1,596    1,700    1,457 
       Total   ($42,616)   $7,864    $15,017    ($49,769)
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $11,039    $5,837   $1,099   $15,777
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($29,027)   $4,810   $22,233   ($46,450)
    Injuries and damages (Note 2)   2,613    1,692   2,032   2,273
    Environmental   1,565    1,454   1,458   1,561
      Total   ($24,849)   $7,956   $25,723   ($42,616)
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $9,020    $3,030   $1,011   $11,039
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($25,283)   $10,476   $14,220   ($29,027)
    Injuries and damages (Note 2)   3,353    2,849   3,589   2,613
    Environmental   1,729    1,761   1,925   1,565
      Total   ($20,201)   $15,086   $19,734   ($24,849)
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off.
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages.
                 
     S-3            
ENTERGY GULF STATES, INC.
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Years Ended December 31, 2006, 2005, and 2004
(In Thousands)
                 
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $4,794    $3,144   $6,320   $1,618
  Accumulated Provisions                
    Not Deducted from Assets--                
    Property insurance   ($337,193)   $17,851   ($146,567)   ($172,775)
    Injuries and damages (Note 2)   9,031    4,425   3,617   9,839
    Environmental   4,295    2,505   2,770   4,030
      Total   ($323,867)   $24,781   ($140,180)   ($158,906)
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $2,687    $3,858   $1,751   $4,794
  Accumulated Provisions                
    Not Deducted from Assets--                
    Property insurance   ($57,133)   $7,827   $287,887   ($337,193)
    Injuries and damages (Note 2)   8,970    4,032   3,971   9,031
    Environmental   4,482    2,942   3,129   4,295
      Total   ($43,681)   $14,801   $294,987   ($323,867)
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $4,856    $889   $3,058   $2,687
  Accumulated Provisions                
    Not Deducted from Assets--                
    Property insurance   ($57,353)   $7,673   $7,453   ($57,133)
    Injuries and damages (Note 2)   11,554    12,288   14,872   8,970
    Environmental   14,711    20,201   30,430   4,482
      Total   ($31,088)   $40,162   $52,755   ($43,681)
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off.
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages. 
                 
     S-4            
                 
ENTERGY LOUISIANA, LLC
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Year Ended December 31, 2006, 2005, and 2004
(In Thousands)
 
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
                 
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $6,141    $5,093   $9,378   $1,856
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($227,565)   $20,393   ($1,229)   ($205,943)
    Injuries and damages (Note 2)   $10,728    5,372   3,391   12,709
    Environmental   $4,037    1,345   1,765   3,617
      Total   ($212,800)   $27,110   $3,927   ($189,617)
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $3,135    $4,435   $1,429   $6,141
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($41,705)   $18,593   $204,453   ($227,565)
    Injuries and damages (Note 2)   10,396    8,319   7,987   10,728
    Environmental   8,064    (2,981)   1,046   4,037
      Total   ($23,245)   $23,931   $213,486   ($212,800)
                 
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $4,487    $473   $1,825   $3,135
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($40,878)   $20,146   $20,973   ($41,705)
    Injuries and damages (Note 2)   8,537    6,188   4,329   10,396
    Environmental   7,245    2,589   1,770   8,064
      Total   ($25,096)   $28,923   $27,072   ($23,245)
                 
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off. 
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages.
                 
     S-5            
   
ENTERGY MISSISSIPPI, INC.
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Years Ended December 31, 2006, 2005, and 2004
(In Thousands)
   
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $1,826    $351   $1,561   $616
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($83,672)   $8,047   ($76,337)   $712
    Injuries and damages (Note 2)   4,882    1,228   976   5,134
    Environmental   704    332   602   434
      Total   ($78,086)   $9,607   ($74,759)   $6,280
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $1,126    $1,385   $685   $1,826
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   $2,473    $7,942   $94,087   ($83,672)
    Injuries and damages (Note 2)   5,549    834   1,501   4,882
    Environmental   890    342   528   704
      Total   $8,912    $9,118   $96,116   ($78,086)
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $1,375    $357   $606   $1,126
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($3,481)   $10,916   $4,962   $2,473
    Injuries and damages (Note 2)   5,414    2,938   2,803   5,549
    Environmental   495    1,236   841   890
      Total   $2,428    $15,090   $8,606   $8,912
                 
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off.
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages. 
                 
     S-6            
 
ENTERGY NEW ORLEANS, INC.
 
SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS
Years Ended December 31, 2006, 2005, and 2004
(In Thousands)
   
Column A   Column B   Column C   Column D   Column E
            Other    
        Additions   Changes    
            Deductions    
    Balance at       from   Balance
    Beginning   Charged to Income   Provisions   at End
Description   of Period   or Regulatory Assets   (Note 1)   of Period
Year ended December 31, 2006                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $25,422    $809   $15,668   $10,563
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   ($121,938)   $-   $15,867   ($137,805)
    Injuries and damages (Note 2)   5,770    93   (209)   6,072
    Environmental   131    102   122   111
      Total   ($116,037)   $195   $15,780   ($131,622)
                 
Year ended December 31, 2005                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $3,492    $29,645   $7,715   $25,422
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   $1,267    $-   $123,205   ($121,938)
    Injuries and damages (Note 2)   5,265    1,182   677   5,770
    Environmental   766    (566)   69   131
      Total   $7,298    $616   $123,951   ($116,037)
                 
Year ended December 31, 2004                
  Accumulated Provisions                
    Deducted from Assets--                
    Doubtful Accounts   $3,104    $612   $224   $3,492
  Accumulated Provisions Not                
    Deducted from Assets:                
    Property insurance   $3,682    $739   $3,154   $1,267
    Injuries and damages (Note 2)   4,077    3,231   2,043   5,265
    Environmental   663    866   763   766
      Total   $8,422    $4,836   $5,960   $7,298
                 
___________                
Notes:                
(1) Deductions from provisions represent losses or expenses for which the respective provisions were created. In the case of the provision for doubtful accounts, such deductions are reduced by recoveries of amounts previously written off.
                 
(2) Injuries and damages provision is provided to absorb all current expenses as appropriate and for the estimated cost of settling claims for injuries and damages.

S-7

 

 

EXHIBIT INDEX

The following exhibits indicated by an asterisk preceding the exhibit number are filed herewith.  The balance of the exhibits have heretofore been filed with the SEC as the exhibits and in the file numbers indicated and are incorporated herein by reference.  The exhibits marked with a (+) are management contracts or compensatory plans or arrangements required to be filed herewith and required to be identified as such by Item 15 of Form 10-K.  Reference is made to a duplicate list of exhibits being filed as a part of this Form 10-K, which list, prepared in accordance with Item 102 of Regulation S-T of the SEC, immediately precedes the exhibits being physically filed with this Form 10-K.

(3) Articles of Incorporation and By-laws

Entergy Corporation

(a) 1 --

Restated Certificate of Incorporation of Entergy Corporation dated October 10, 2006 (3(a) to Form 10-Q for the quarter ended September 30, 2006).

   

(a) 2 --

By-Laws of Entergy Corporation as amended February 12, 2007, and as presently in effect (3(ii) to Form 8-K dated February 16, 2007 in 1-11299).

System Energy

(b) 1 --

Amended and Restated Articles of Incorporation of System Energy and amendments thereto through April 28, 1989 (A-1(a) to Form U-1 in 70-5399).

   

(b) 2 --

By-Laws of System Energy effective July 6, 1998, and as presently in effect (3(f) to Form 10-Q for the quarter ended June 30, 1998 in 1-9067).

Entergy Arkansas

(c) 1 --

Amended and Restated Articles of Incorporation of Entergy Arkansas, as amended, effective March 22, 2006 (3(ii) to Form 8-K dated March 28, 2006 in 1-10764).

   

(c) 2 --

By-Laws of Entergy Arkansas effective November 26, 1999, and as presently in effect (3(ii)(c) to Form 10-K for the year ended December 31, 1999 in 1-10764).

Entergy Gulf States

(d) 1 --

Restated Articles of Incorporation of Entergy Gulf States effective November 17, 1999 (3(i)(d)1 to Form 10-K for the year ended December 31, 1999 in 1-27031).

   

(d) 2 --

By-Laws of Entergy Gulf States effective November 26, 1999, and as presently in effect (3(ii)(d) to Form 10-K for the year ended December 31, 1999 in 1-27031).

Entergy Louisiana

(e) 1 --

Articles of Organization of Entergy Louisiana effective December 31, 2005 (3(c) to Form 8-K dated January 6, 2006 in 1-32718).

   

(e) 2 --

Regulations of Entergy Louisiana effective December 31, 2005, and as presently in effect (3(d) to Form 8-K dated January 6, 2006 in 1-32718).

E-1

Entergy Mississippi

(f) 1 --

Amended and Restated Articles of Incorporation of Entergy Mississippi effective June 21, 2005 (A-1(b) to Rule 24 Certificate dated February 6, 2006 in 70-10157).

   

(f) 2 --

By-Laws of Entergy Mississippi effective November 26, 1999, and as presently in effect (3(ii)(f) to Form 10-K for the year ended December 31, 1999 in 0-320).

Entergy New Orleans

(g) 1 --

Amended and Restated Articles of Incorporation of Entergy New Orleans effective November 15, 1999 (3(a) to Form S-3 in 333-95599).

   

(g) 2 --

By-Laws of Entergy New Orleans effective November 30, 1999, and as presently in effect (3(b) to Form S-3 in File No. 333-95599).

(4) Instruments Defining Rights of Security Holders, Including Indentures

Entergy Corporation

(a) 1 --

See (4)(b) through (4)(g) below for instruments defining the rights of holders of long-term debt of System Energy, Entergy Arkansas, Entergy Gulf States, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans.

   

(a) 2 --

Credit Agreement, dated as of May 25, 2005, among Entergy Corporation, the Banks (Citibank, N.A., ABN AMRO Bank N.V., BNP Paribas, J. P. Morgan Chase Bank, The Royal Bank of Scotland plc, Barclays Bank PLC, Calyon New York Branch, KeyBank National Association, Morgan Stanley Bank, The Bank of New York, Wachovia Bank, N.A., Credit Suisse First Boston (Cayman Islands Branch), Lehman Brothers Bank (FSB), Regions Bank, Societe Generale, Union Bank of California, N.A., Bayerische Hypo-und Vereinsbank AG (New York Branch), Mellon Bank, N.A., KBC Bank N.V., Mizuho Corporate Bank Limited, West LB AG, New York Branch, and UFJ Bank Limited, Citibank, N.A., as Administrative Agent and LC Issuing Bank, and ABN AMRO Bank, N.V., as LC Issuing Bank (4(d) to Form 10-Q for the quarter ended June 30, 2005 in 1-11299).

   

(a) 3 --

Amendment dated as of September 22, 2005, to the Credit Agreement, dated as of May 25, 2005, among Entergy Corporation, the Banks (Citibank, N.A., ABN AMRO Bank N.V., BNP Paribas, J. P. Morgan Chase Bank, The Royal Bank of Scotland plc, Barclays Bank PLC, Calyon New York Branch, KeyBank National Association, Morgan Stanley Bank, The Bank of New York, Wachovia Bank, N.A., Credit Suisse First Boston (Cayman Islands Branch), Lehman Brothers Bank (FSB), Regions Bank, Societe Generale, Union Bank of California, N.A., Bayerische Hypo-und Vereinsbank AG (New York Branch), Mellon Bank, N.A., KBC Bank N.V., Mizuho Corporate Bank Limited, West LB AG, New York Branch, and UFJ Bank Limited, Citibank, N.A., as Administrative Agent and LC Issuing Bank, and ABN AMRO Bank, N.V., as LC Issuing Bank (4(a) to Form 8-K dated September 28, 2005 in 1-11299).

   

(a) 4 --

Amended and Restated Credit Agreement, dated as of June 30, 2005, among Entergy Corporation, as Borrower, Bayerische Hypo- und Vereinsbank AG, New York Branch, as Bank, and Bayerische Hypo-und Vereinsbank AG, New York Branch, as Administrative Agent (4(f) to Form 10-Q for the quarter ended June 30, 2005 in 1-11299).

   

(a) 5 --

Amendment dated as of September 21, 2005, to the Amended and Restated Credit Agreement, dated as of June 30, 2005, among Entergy Corporation, as Borrower, Bayerische Hypo- und Vereinsbank AG, New York Branch, as Bank, and Bayerische Hypo-und Vereinsbank AG, New York Branch, as Administrative Agent (4(b) to Form 8-K dated September 28, 2005 in 1-11299).

   
E-2
   
   
   

(a) 6 --

Amended and Restated Credit Agreement, dated as of June 30, 2005, among Entergy Corporation, as Borrower, Bayerische Hypo- und Vereinsbank AG, New York Branch, as Bank, and Bayerische Hypo-und Vereinsbank AG, New York Branch, as Administrative Agent (4(g) to Form 10-Q for the quarter ended June 30, 2005 in 1-11299).

   

(a) 7 --

Amendment dated as of September 21, 2005, to the Amended and Restated Credit Agreement, dated as of June 30, 2005, among Entergy Corporation, as Borrower, Bayerische Hypo- und Vereinsbank AG, New York Branch, as Bank, and Bayerische Hypo-und Vereinsbank AG, New York Branch, as Administrative Agent (4(c) to Form 8-K dated September 28, 2005 in 1-11299).

   

(a) 8 --

DIP Credit Agreement, dated as of September 26, 2005, between Entergy New Orleans, Inc., as a debtor-in-possession and Entergy Corporation, as Lender (4(d) to Form 8-K dated September 28, 2005 in 1-11299).

   

(a) 9 --

Credit Agreement, dated as of December 7, 2005, among Entergy Corporation, the Banks (Citibank, N.A., ABN AMRO Bank N.V., BNP Paribas, J. P. Morgan Chase Bank, The Royal Bank of Scotland plc, Barclays Bank PLC, Calyon New York Branch, KeyBank National Association, Morgan Stanley Bank, The Bank of New York, Wachovia Bank, N.A., Credit Suisse First Boston (Cayman Islands Branch), Lehman Brothers Bank (FSB), Regions Bank, Societe Generale, Union Bank of California, N.A., Bayerische Hypo-und Vereinsbank AG (New York Branch), Mellon Bank, N.A., and Mizuho Corporate Bank Limited, and Citibank, N.A., as Administrative Agent and LC Issuing Bank (4 to Form 8-K dated December 13, 2005 in 1-11299).

   

(a) 10 --

Indenture, dated as of December 1, 2002, between Entergy Corporation and Deutsche Bank Trust Company Americas, as Trustee (10(a)4 to Form 10-K for the year ended December 31, 2002 in 1-11299).

   

(a) 11 --

Supplemental No. 1, dated as of December 20, 2005, between Entergy Corporation and Deutsche Bank Trust Company Americas, as Trustee (4(a)11 to Form 10-K for the year ended December 31, 2005 in 1-11299).

   

(a) 12 --

Purchase Contract and Pledge Agreement, dated as of December 20, 2005, among Entergy Corporation, The Bank of New York, as Purchase Contract Agent, and JP Morgan Chase Bank, N.A., as Collateral Agent, Custodial Agent, and Securities Intermediary (4(a)12 to Form 10-K for the year ended December 31, 2005 in 1-11299).

   

(a) 13 --

Remarketing Agreement, dated as of December 20, 2005, among Entergy Corporation, Citigroup Global Markets, Inc., and The Bank of New York (4(a)13 to Form 10-K for the year ended December 31, 2005 in 1-11299).

   

(a) 14 --

Officer' Certificate for Entergy Corporation relating to 7.75% Senior Notes due December 15, 2009 (10(a)5 to Form 10-K for the year ended December 31, 2002 in 1-11299).

   

(a) 15 --

Officer' Certificate for Entergy Corporation relating to 6.17% Senior Notes due March 15, 2008 (4(c) to Form 10-Q for the quarter ended March 31, 2003 in 1-11299).

   

(a) 16 --

Officer' Certificate for Entergy Corporation relating to 7.06% Senior Notes due March 15, 2011 (4(d) to Form 10-Q for the quarter ended March 31, 2003 in 1-11299).

   
E-3
   
   
   
   

(a) 17 --

Officer' Certificate for Entergy Corporation relating to 6.58% Senior Notes due May 15, 2010 (4(d) to Form 10-Q for the quarter ended June 30, 2003 in 1-11299).

   

(a) 18 --

Officer' Certificate for Entergy Corporation relating to 6.13% Senior Notes due September 15, 2008 (4(a) to Form 10-Q for the quarter ended September 30, 2003 in 1-11299).

   

(a) 19 --

Officer' Certificate for Entergy Corporation relating to 6.23% Senior Notes due March 15, 2008 (4(a)9 to Form 10-K for the year ended December 31, 2003 in 1-11299).

   

(a) 20 --

Officer' Certificate for Entergy Corporation relating to 6.90% Senior Notes due November 15, 2010 (4(a)10 to Form 10-K for the year ended December 31, 2003 in 1-11299).

System Energy

(b) 1 --

Mortgage and Deed of Trust, dated as of June 15, 1977, as amended by twenty-two Supplemental Indentures (A-1 in 70-5890 (Mortgage); B and C to Rule 24 Certificate in 70-5890 (First); B to Rule 24 Certificate in 70-6259 (Second); 20(a)-5 to Form 10-Q for the quarter ended June 30, 1981 in 1-3517 (Third); A-1(e)-1 to Rule 24 Certificate in 70-6985 (Fourth); B to Rule 24 Certificate in 70-7021 (Fifth); B to Rule 24 Certificate in 70-7021 (Sixth); A-3(b) to Rule 24 Certificate in 70-7026 (Seventh); A-3(b) to Rule 24 Certificate in 70-7158 (Eighth); B to Rule 24 Certificate in 70-7123 (Ninth); B-1 to Rule 24 Certificate in 70-7272 (Tenth); B-2 to Rule 24 Certificate in 70-7272 (Eleventh); B-3 to Rule 24 Certificate in 70-7272 (Twelfth); B-1 to Rule 24 Certificate in 70-7382 (Thirteenth); B-2 to Rule 24 Certificate in 70-7382 (Fourteenth); A-2(c) to Rule 24 Certificate in 70-7946 (Fifteenth); A-2(c) to Rule 24 Certificate in 70-7946 (Sixteenth); A-2(d) to Rule 24 Certificate in 70-7946 (Seventeenth); A-2(e) to Rule 24 Certificate dated May 4, 1993 in 70-7946 (Eighteenth); A-2(g) to Rule 24 Certificate dated May 6, 1994 in 70-7946 (Nineteenth); A-2(a)(1) to Rule 24 Certificate dated August 8, 1996 in 70-8511 (Twentieth); A-2(a)(2) to Rule 24 Certificate dated August 8, 1996 in 70-8511 (Twenty-first); and A-2(a) to Rule 24 Certificate dated October 4, 2002 in 70-9753 (Twenty-second)).

   

(b) 2 --

Facility Lease No. 1, dated as of December 1, 1988, between Meridian Trust Company and Stephen M. Carta (Steven Kaba, successor), as Owner Trustees, and System Energy (B-2(c)(1) to Rule 24 Certificate dated January 9, 1989 in 70-7561), as supplemented by Lease Supplement No. 1 dated as of April 1, 1989 (B-22(b) (1) to Rule 24 Certificate dated April 21, 1989 in 70-7561), Lease Supplement No. 2 dated as of January 1, 1994 (B-3(d) to Rule 24 Certificate dated January 31, 1994 in 70-8215), and Lease Supplement No. 3 dated as of May 1, 2004 (B-3(d) to Rule 24 Certificate dated June 4, 2004 in 70-10182).

   

(b) 3 --

Facility Lease No. 2, dated as of December 1, 1988 between Meridian Trust Company and Stephen M. Carta (Steven Kaba, successor), as Owner Trustees, and System Energy (B-2(c)(2) to Rule 24 Certificate dated January 9, 1989 in 70-7561), as supplemented by Lease Supplement No. 1 dated as of April 1, 1989 (B-22(b) (2) to Rule 24 Certificate dated April 21, 1989 in 70-7561), Lease Supplement No. 2 dated as of January 1, 1994 (B-4(d) Rule 24 Certificate dated January 31, 1994 in 70-8215), and Lease Supplement No. 3 dated as of May 1, 2004 (B-4(d) to Rule 24 Certificate dated June 4, 2004 in 70-10182).

E-4

Entergy Arkansas

(c) 1 --

Mortgage and Deed of Trust, dated as of October 1, 1944, as amended by sixty-five Supplemental Indentures (7(d) in 2-5463 (Mortgage); 7(b) in 2-7121 (First); 7(c) in 2-7605 (Second); 7(d) in 2-8100 (Third); 7(a)-4 in 2-8482 (Fourth); 7(a)-5 in 2-9149 (Fifth); 4(a)-6 in 2-9789 (Sixth); 4(a)-7 in 2-10261 (Seventh); 4(a)-8 in 2-11043 (Eighth); 2(b)-9 in 2-11468 (Ninth); 2(b)-10 in 2-15767 (Tenth); D in 70-3952 (Eleventh); D in 70-4099 (Twelfth); 4(d) in 2-23185 (Thirteenth); 2(c) in 2-24414 (Fourteenth); 2(c) in 2-25913 (Fifteenth); 2(c) in 2-28869 (Sixteenth); 2(d) in 2-28869 (Seventeenth); 2(c) in 2-35107 (Eighteenth); 2(d) in 2-36646 (Nineteenth); 2(c) in 2-39253 (Twentieth); 2(c) in 2-41080 (Twenty-first); C-1 to Rule 24 Certificate in 70-5151 (Twenty-second); C-1 to Rule 24 Certificate in 70-5257 (Twenty-third); C to Rule 24 Certificate in 70-5343 (Twenty-fourth); C-1 to Rule 24 Certificate in 70-5404 (Twenty-fifth); C to Rule 24 Certificate in 70-5502 (Twenty-sixth); C-1 to Rule 24 Certificate in 70-5556 (Twenty-seventh); C-1 to Rule 24 Certificate in 70-5693 (Twenty-eighth); C-1 to Rule 24 Certificate in 70-6078 (Twenty-ninth); C-1 to Rule 24 Certificate in 70-6174 (Thirtieth); C-1 to Rule 24 Certificate in 70-6246 (Thirty-first); C-1 to Rule 24 Certificate in 70-6498 (Thirty-second); A-4b-2 to Rule 24 Certificate in 70-6326 (Thirty-third); C-1 to Rule 24 Certificate in 70-6607 (Thirty-fourth); C-1 to Rule 24 Certificate in 70-6650 (Thirty-fifth); C-1 to Rule 24 Certificate dated December 1, 1982 in 70-6774 (Thirty-sixth); C-1 to Rule 24 Certificate dated February 17, 1983 in 70-6774 (Thirty-seventh); A-2(a) to Rule 24 Certificate dated December 5, 1984 in 70-6858 (Thirty-eighth); A-3(a) to Rule 24 Certificate in 70-7127 (Thirty-ninth); A-7 to Rule 24 Certificate in 70-7068 (Fortieth); A-8(b) to Rule 24 Certificate dated July 6, 1989 in 70-7346 (Forty-first); A-8(c) to Rule 24 Certificate dated February 1, 1990 in 70-7346 (Forty-second); 4 to Form 10-Q for the quarter ended September 30, 1990 in 1-10764 (Forty-third); A-2(a) to Rule 24 Certificate dated November 30, 1990 in 70-7802 (Forty-fourth); A-2(b) to Rule 24 Certificate dated January 24, 1991 in 70-7802 (Forty-fifth); 4(d)(2) in 33-54298 (Forty-sixth); 4(c)(2) to Form 10-K for the year ended December 31, 1992 in 1-10764 (Forty-seventh); 4(b) to Form 10-Q for the quarter ended June 30, 1993 in 1-10764 (Forty-eighth); 4(c) to Form 10-Q for the quarter ended June 30, 1993 in 1-10764 (Forty-ninth); 4(b) to Form 10-Q for the quarter ended September 30, 1993 in 1-10764 (Fiftieth); 4(c) to Form 10-Q for the quarter ended September 30, 1993 in 1-10764 (Fifty-first); 4(a) to Form 10-Q for the quarter ended June 30, 1994 in 1-10764 (Fifty-second); C-2 to Form U5S for the year ended December 31, 1995 (Fifty-third); C-2(a) to Form U5S for the year ended December 31, 1996 (Fifty-fourth); 4(a) to Form 10-Q for the quarter ended March 31, 2000 in 1-10764 (Fifty-fifth); 4(a) to Form 10-Q for the quarter ended September 30, 2001 in 1-10764 (Fifty-sixth); C-2(a) to Form U5S for the year ended December 31, 2001 (Fifty-seventh); 4(c)1 to Form 10-K for the year December 31, 2002 in 1-10764 (Fifty-eighth); 4(a) to Form 10-Q for the quarter ended June 30, 2003 in 1-10764 (Fifty-ninth); 4(f) to Form 10-Q for the quarter ended June 30, 2003 in 1-10764 (Sixtieth); 4(h) to Form 10-Q for the quarter ended June 30, 2003 in 1-10764 (Sixty-first); 4(e) to Form 10-Q for the quarter ended September 30, 2004 in 1-10764 (Sixty-second); 4(c)1 to Form 10-K for the year December 31, 2004 in 1-10764 (Sixty-third); C-2(a) to Form U5S for the year ended December 31, 2004 (Sixty-fourth); 4(c) to Form 10-Q for the quarter ended June 30, 2005 in 1-10764 (Sixty-fifth); and 4(a) to Form 10-Q for the quarter ended June 30, 2005 in 1-10764 (Sixty-sixth)).

Entergy Gulf States

(d) 1 --

Indenture of Mortgage, dated September 1, 1926, as amended by certain Supplemental Indentures (B-a-I-1 in Registration No. 2-2449 (Mortgage); 7-A-9 in Registration No. 2-6893 (Seventh); B to Form 8-K dated September 1, 1959 (Eighteenth); B to Form 8-K dated February 1, 1966 (Twenty-second); B to Form 8-K dated March 1, 1967 (Twenty-third); C to Form 8-K dated March 1, 1968 (Twenty-fourth); B to Form 8-K dated November 1, 1968 (Twenty-fifth); B to Form 8-K dated April 1, 1969 (Twenty-sixth); 2-A-8 in Registration No. 2-66612 (Thirty-eighth); 4-2 to Form 10-K for the year ended December 31, 1984 in 1-27031 (Forty-eighth); 4-2 to Form 10-K for the year ended December 31, 1988 in 1-27031 (Fifty-second); 4 to Form 10-K for the year ended December 31, 1991 in 1-27031 (Fifty-third); 4 to Form 8-K dated July 29, 1992 in 1-27031 (Fifth-fourth); 4 to Form 10-K dated December 31, 1992 in 1-27031 (Fifty-fifth); 4 to Form 10-Q for the quarter ended March 31, 1993 in 1-27031 (Fifty-sixth); 4-2 to Amendment No. 9 to Registration No. 2-76551 (Fifty-seventh); 4(b) to Form 10-Q for the quarter ended March 31,1999 in 1-27031 (Fifty-eighth); A-2(a) to Rule 24 Certificate dated June 23, 2000 in 70-8721 (Fifty-ninth); A-2(a) to Rule 24 Certificate dated September 10, 2001 in 70-9751 (Sixtieth); A-2(b) to Rule 24 Certificate dated November 18, 2002 in 70-9751 (Sixty-first); A-2(c) to Rule 24 Certificate dated December 6, 2002 in 70-9751 (Sixty-second); A-2(d) to Rule 24 Certificate dated June 16, 2003 in 70-9751 (Sixty-third); A-2(e) to Rule 24 Certificate dated June 27, 2003 in 70-9751 (Sixty-fourth); A-2(f) to Rule 24 Certificate dated July 11, 2003 in 70-9751 (Sixty-fifth); A-2(g) to Rule 24 Certificate dated July 28, 2003 in 70-9751 (Sixty-sixth); A-3(i) to Rule 24 Certificate dated November 4, 2004 in 70-10158 (Sixty-seventh); A-3(ii) to Rule 24 Certificate dated November 23, 2004 in 70-10158 (Sixty-eighth); A-3(iii) to Rule 24 Certificate dated February 16, 2005 in 70-10158 (Sixty-ninth); A-3(iv) to Rule 24 Certificate dated June 2, 2005 in 70-10158 (Seventieth); A-3(v) to Rule 24 Certificate dated July 21, 2005 in 70-10158 (Seventy-first); A-3(vi) to Rule 24 Certificate dated October 7, 2005 in 70-10158 (Seventy-second); A-3(vii) to Rule 24 Certificate dated December 19, 2005 in 70-10158 (Seventy-third); and 4(a) to Form 10-Q for the quarter ended March 31, 2006 in 1-27031 (Seventy-fourth)).

   
E-5
   
   
   
   

(d) 2 --

Indenture, dated March 21, 1939, accepting resignation of The Chase National Bank of the City of New York as trustee and appointing Central Hanover Bank and Trust Company as successor trustee (B-a-1-6 in Registration No. 2-4076).

Entergy Louisiana

(e) 1 --

Mortgage and Deed of Trust, dated as of April 1, 1944, as amended by sixty-four Supplemental Indentures (7(d) in 2-5317 (Mortgage); 7(b) in 2-7408 (First); 7(c) in 2-8636 (Second); 4(b)-3 in 2-10412 (Third); 4(b)-4 in 2-12264 (Fourth); 2(b)-5 in 2-12936 (Fifth); D in 70-3862 (Sixth); 2(b)-7 in 2-22340 (Seventh); 2(c) in 2-24429 (Eighth); 4(c)-9 in 2-25801 (Ninth); 4(c)-10 in 2-26911 (Tenth); 2(c) in 2-28123 (Eleventh); 2(c) in 2-34659 (Twelfth); C to Rule 24 Certificate in 70-4793 (Thirteenth); 2(b)-2 in 2-38378 (Fourteenth); 2(b)-2 in 2-39437 (Fifteenth); 2(b)-2 in 2-42523 (Sixteenth); C to Rule 24 Certificate in 70-5242 (Seventeenth); C to Rule 24 Certificate in 70-5330 (Eighteenth); C-1 to Rule 24 Certificate in 70-5449 (Nineteenth); C-1 to Rule 24 Certificate in 70-5550 (Twentieth); A-6(a) to Rule 24 Certificate in 70-5598 (Twenty-first); C-1 to Rule 24 Certificate in 70-5711 (Twenty-second); C-1 to Rule 24 Certificate in 70-5919 (Twenty-third); C-1 to Rule 24 Certificate in 70-6102 (Twenty-fourth); C-1 to Rule 24 Certificate in 70-6169 (Twenty-fifth); C-1 to Rule 24 Certificate in 70-6278 (Twenty-sixth); C-1 to Rule 24 Certificate in 70-6355 (Twenty-seventh); C-1 to Rule 24 Certificate in 70-6508 (Twenty-eighth); C-1 to Rule 24 Certificate in 70-6556 (Twenty-ninth); C-1 to Rule 24 Certificate in 70-6635 (Thirtieth); C-1 to Rule 24 Certificate in 70-6834 (Thirty-first); C-1 to Rule 24 Certificate in 70-6886 (Thirty-second); C-1 to Rule 24 Certificate in 70-6993 (Thirty-third); C-2 to Rule 24 Certificate in 70-6993 (Thirty-fourth); C-3 to Rule 24 Certificate in 70-6993 (Thirty-fifth); A-2(a) to Rule 24 Certificate in 70-7166 (Thirty-sixth); A-2(a) in 70-7226 (Thirty-seventh); C-1 to Rule 24 Certificate in 70-7270 (Thirty-eighth); 4(a) to Quarterly Report on Form 10-Q for the quarter ended June 30, 1988 in 1-8474 (Thirty-ninth); A-2(b) to Rule 24 Certificate in 70-7553 (Fortieth); A-2(d) to Rule 24 Certificate in 70-7553 (Forty-first); A-3(a) to Rule 24 Certificate in 70-7822 (Forty-second); A-3(b) to Rule 24 Certificate in 70-7822 (Forty-third); A-2(b) to Rule 24 Certificate in 70-7822 (Forty-fourth); A-3(c) to Rule 24 Certificate in 70-7822 (Forty-fifth); A-2(c) to Rule 24 Certificate dated April 7, 1993 in 70-7822 (Forty-sixth); A-3(d) to Rule 24 Certificate dated June 4, 1993 in 70-7822 (Forth-seventh); A-3(e) to Rule 24 Certificate dated December 21, 1993 in 70-7822 (Forty-eighth); A-3(f) to Rule 24 Certificate dated August 1, 1994 in 70-7822 (Forty-ninth); A-4(c) to Rule 24 Certificate dated September 28, 1994 in 70-7653 (Fiftieth); A-2(a) to Rule 24 Certificate dated April 4, 1996 in 70-8487 (Fifty-first); A-2(a) to Rule 24 Certificate dated April 3, 1998 in 70-9141 (Fifty-second); A-2(b) to Rule 24 Certificate dated April 9, 1999 in 70-9141 (Fifty-third); A-3(a) to Rule 24 Certificate dated July 6, 1999 in 70-9141 (Fifty-fourth); A-2(c) to Rule 24 Certificate dated June 2, 2000 in 70-9141 (Fifty-fifth); A-2(d) to Rule 24 Certificate dated April 4, 2002 in 70-9141 (Fifty-sixth); A-3(a) to Rule 24 Certificate dated March 30, 2004 in 70-10086 (Fifty-seventh); A-3(b) to Rule 24 Certificate dated October 15, 2004 in 70-10086 (Fifty-eighth); A-3(c) to Rule 24 Certificate dated October 26, 2004 in 70-10086 (Fifty-ninth); A-3(d) to Rule 24 Certificate dated May 18, 2005 in 70-10086 (Sixtieth); A-3(e) to Rule 24 Certificate dated August 25, 2005 in 70-10086 (Sixty-first); A-3(f) to Rule 24 Certificate dated October 31, 2005 in 70-10086 (Sixty-second); B-4(i) to Rule 24 Certificate dated January 10, 2006 (Sixty-third); and B-4(ii) to Rule 24 Certificate dated January 10, 2006 (Sixty-fourth)).

   
E-6
   
   
   
   

(e) 2 --

Facility Lease No. 1, dated as of September 1, 1989, between First National Bank of Commerce, as Owner Trustee, and Entergy Louisiana (4(c)-1 in Registration No. 33-30660), as supplemented by Lease Supplement No. 1 dated as of July 1, 1997 (attached to Refunding Agreement No. 1, dated as of June 27, 1997, with such Refunding Agreement filed as Exhibit 2 to Current Report on Form 8-K, dated July 14, 1997 in 1-8474).

   

(e) 3 --

Facility Lease No. 2, dated as of September 1, 1989, between First National Bank of Commerce, as Owner Trustee, and Entergy Louisiana (4(c)-2 in Registration No. 33-30660), as supplemented by Lease Supplemental No. 1 dated as of July 1, 1997 (attached to Refunding Agreement No. 2, dated as of June 27, 1997, with such Refunding Agreement filed as Exhibit 3 to Current Report on Form 8-K, dated July 14, 1997 in 1-8474).

   

(e) 4 --

Facility Lease No. 3, dated as of September 1, 1989, between First National Bank of Commerce, as Owner Trustee, and Entergy Louisiana (4(c)-3 in Registration No. 33-30660), as supplemented by Lease Supplemental No. 1 dated as of July 1, 1997 (attached to Refunding Agreement No. 3, dated as of June 27, 1997, with such Refunding Agreement filed as Exhibit 4 to Current Report on Form 8-K, dated July 14, 1997 in 1-8474).

Entergy Mississippi

(f) 1 --

Mortgage and Deed of Trust, dated as of February 1, 1988, as amended by twenty-five Supplemental Indentures (A-2(a)-2 to Rule 24 Certificate in 70-7461 (Mortgage); A-2(b)-2 in 70-7461 (First); A-5(b) to Rule 24 Certificate in 70-7419 (Second); A-4(b) to Rule 24 Certificate in 70-7554 (Third); A-1(b)-1 to Rule 24 Certificate in 70-7737 (Fourth); A-2(b) to Rule 24 Certificate dated November 24, 1992 in 70-7914 (Fifth); A-2(e) to Rule 24 Certificate dated January 22, 1993 in 70-7914 (Sixth); A-2(g) to Form U-1 in 70-7914 (Seventh); A-2(i) to Rule 24 Certificate dated November 10, 1993 in 70-7914 (Eighth); A-2(j) to Rule 24 Certificate dated July 22, 1994 in 70-7914 (Ninth); (A-2(l) to Rule 24 Certificate dated April 21, 1995 in 70-7914 (Tenth); A-2(a) to Rule 24 Certificate dated June 27, 1997 in 70-8719 (Eleventh); A-2(b) to Rule 24 Certificate dated April 16, 1998 in 70-8719 (Twelfth); A-2(c) to Rule 24 Certificate dated May 12, 1999 in 70-8719 (Thirteenth); A-3(a) to Rule 24 Certificate dated June 8, 1999 in 70-8719 (Fourteenth); A-2(d) to Rule 24 Certificate dated February 24, 2000 in 70-8719 (Fifteenth); A-2(a) to Rule 24 Certificate dated February 9, 2001 in 70-9757 (Sixteenth); A-2(b) to Rule 24 Certificate dated October 31, 2002 in 70-9757 (Seventeenth); A-2(c) to Rule 24 Certificate dated December 2, 2002 in 70-9757 (Eighteenth); A-2(d) to Rule 24 Certificate dated February 6, 2003 in 70-9757 (Nineteenth); A-2(e) to Rule 24 Certificate dated April 4, 2003 in 70-9757 (Twentieth); A-2(f) to Rule 24 Certificate dated June 6, 2003 in 70-9757 (Twenty-first); A-3(a) to Rule 24 Certificate dated April 8, 2004 in 70-10157 (Twenty-second); A-3(b) to Rule 24 Certificate dated April 29, 2004 in 70-10157 (Twenty-third); A-3(c) to Rule 24 Certificate dated October 4, 2004 in 70-10157 (Twenty-fourth); and A-3(d) to Rule 24 Certificate dated January 27, 2006 in 70-10157 (Twenty-fifth)).

E-7

Entergy New Orleans

(g) 1 --

Mortgage and Deed of Trust, dated as of May 1, 1987, as amended by fourteen Supplemental Indentures (A-2(c) to Rule 24 Certificate in 70-7350 (Mortgage); A-5(b) to Rule 24 Certificate in 70-7350 (First); A-4(b) to Rule 24 Certificate in 70-7448 (Second); 4(f)4 to Form 10-K for the year ended December 31, 1992 in 0-5807 (Third); 4(a) to Form 10-Q for the quarter ended September 30, 1993 in 0-5807 (Fourth); 4(a) to Form 8-K dated April 26, 1995 in 0-5807 (Fifth); 4(a) to Form 8-K dated March 22, 1996 in 0-5807 (Sixth); 4(b) to Form 10-Q for the quarter ended June 30, 1998 in 0-5807 (Seventh); 4(d) to Form 10-Q for the quarter ended June 30, 2000 in 0-5807 (Eighth); C-5(a) to Form U5S for the year ended December 31, 2000 (Ninth); 4(b) to Form 10-Q for the quarter ended September 30, 2002 in 0-5807 (Tenth); 4(k) to Form 10-Q for the quarter ended June 30, 2003 in 0-5807 (Eleventh); 4(a) to Form 10-Q for the quarter ended September 30, 2004 in 0-5807 (Twelfth); 4(b) to Form 10-Q for the quarter ended September 30, 2004 in 0-5807 (Thirteenth); and 4(e) to Form 10-Q for the quarter ended June 30, 2005 in 0-5807 (Fourteenth)).

(10) Material Contracts

Entergy Corporation

(a) 1 --

Agreement, dated April 23, 1982, among certain System companies, relating to System Planning and Development and Intra-System Transactions (10(a)1 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(a) 2 --

Middle South Utilities (now Entergy Corporation) System Agency Agreement, dated December 11, 1970 (5(a)2 in 2-41080).

   

(a) 3 --

Amendment, dated February 10, 1971, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(a) 4 --

Amendment, dated May 12, 1988, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(a) 5 --

Middle South Utilities System Agency Coordination Agreement, dated December 11, 1970 (5(a)3 in 2-41080).

   

(a) 6 --

Service Agreement with Entergy Services, dated as of April 1, 1963 (5(a)5 in 2-41080).

   

(a) 7 --

Amendment, dated April 27, 1984, to Service Agreement with Entergy Services (10(a)7 to Form 10-K for the year ended December 31, 1984 in 1-3517).

   

(a) 8 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(a)12 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

(a) 9 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(a)9 to Form 10-K for the year ended December 31, 2004 in 1-11299).

   

(a) 10 --

Availability Agreement, dated June 21, 1974, among System Energy and certain other System companies (B to Rule 24 Certificate dated June 24, 1974 in 70-5399).

   

(a) 11 --

First Amendment to Availability Agreement, dated as of June 30, 1977 (B to Rule 24 Certificate dated June 24, 1977 in 70-5399).

   

(a) 12 --

Second Amendment to Availability Agreement, dated as of June 15, 1981 (E to Rule 24 Certificate dated July 1, 1981 in 70-6592).

   
E-8
   
   
   
   

(a) 13 --

Third Amendment to Availability Agreement, dated as of June 28, 1984 (B-13(a) to Rule 24 Certificate dated July 6, 1984 in 70-6985).

   

(a) 14 --

Fourth Amendment to Availability Agreement, dated as of June 1, 1989 (A to Rule 24 Certificate dated June 8, 1989 in 70-5399).

   

(a) 15 --

Eighteenth Assignment of Availability Agreement, Consent and Agreement, dated as of September 1, 1986, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (C-2 to Rule 24 Certificate dated October 1, 1986 in 70-7272).

   

(a) 16 --

Nineteenth Assignment of Availability Agreement, Consent and Agreement, dated as of September 1, 1986, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (C-3 to Rule 24 Certificate dated October 1, 1986 in 70-7272).

   

(a) 17 --

Twenty-sixth Assignment of Availability Agreement, Consent and Agreement, dated as of October 1, 1992, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-2(c) to Rule 24 Certificate dated November 2, 1992 in 70-7946).

   

(a) 18 --

Twenty-seventh Assignment of Availability Agreement, Consent and Agreement, dated as of April 1, 1993, with United States Trust Company of New York and Gerard F. Ganey as Trustees (B-2(d) to Rule 24 Certificate dated May 4, 1993 in 70-7946).

   

(a) 19 --

Twenty-ninth Assignment of Availability Agreement, Consent and Agreement, dated as of April 1, 1994, with United States Trust Company of New York and Gerard F. Ganey as Trustees (B-2(f) to Rule 24 Certificate dated May 6, 1994 in 70-7946).

   

(a) 20 --

Thirtieth Assignment of Availability Agreement, Consent and Agreement, dated as of August 1, 1996, among System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans, and United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-2(a) to Rule 24 Certificate dated August 8, 1996 in 70-8511).

   

(a) 21 --

Thirty-first Assignment of Availability Agreement, Consent and Agreement, dated as of August 1, 1996, among System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans, and United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-2(b) to Rule 24 Certificate dated August 8, 1996 in 70-8511).

   

(a) 22 --

Thirty-fourth Assignment of Availability Agreement, Consent and Agreement, dated as of September 1, 2002, among System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans, The Bank of New York and Douglas J. MacInnes (B-2(a)(1) to Rule 24 Certificate dated October 4, 2001 in 70-9753).

   

(a) 23 --

Amendment to the Thirty-fourth Assignment of Availability Agreement, Consent and Agreement, dated as of December 15, 2005 (B-5(i) to Rule 24 Certificate dated January 10, 2006 in 70-10324).

   

(a) 24 --

Thirty-fifth Assignment of Availability Agreement, Consent and Agreement, dated as of December 22, 2003, among System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans, and Union Bank of California, N.A (10(a)25 to Form 10-K for the year ended December 31, 2003 in 1-11299).

   

(a) 25 --

First Amendment to Thirty-fifth Assignment of Availability Agreement, Consent and Agreement, dated as of December 17, 2004 (10(a)24 to Form 10-K for the year ended December 31, 2004 in 1-11299).

   
E-9
   
   
   
   

(a) 26 --

Capital Funds Agreement, dated June 21, 1974, between Entergy Corporation and System Energy (C to Rule 24 Certificate dated June 24, 1974 in 70-5399).

   

(a) 27 --

First Amendment to Capital Funds Agreement, dated as of June 1, 1989 (B to Rule 24 Certificate dated June 8, 1989 in 70-5399).

   

(a) 28 --

Eighteenth Supplementary Capital Funds Agreement and Assignment, dated as of September 1, 1986, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (D-2 to Rule 24 Certificate dated October 1, 1986 in 70-7272).

   

(a) 29 --

Nineteenth Supplementary Capital Funds Agreement and Assignment, dated as of September 1, 1986, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (D-3 to Rule 24 Certificate dated October 1, 1986 in 70-7272).

   

(a) 30 --

Twenty-sixth Supplementary Capital Funds Agreement and Assignment, dated as of October 1, 1992, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-3(c) to Rule 24 Certificate dated November 2, 1992 in 70-7946).

   

(a) 31 --

Twenty-seventh Supplementary Capital Funds Agreement and Assignment, dated as of April 1, 1993, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-3(d) to Rule 24 Certificate dated May 4, 1993 in 70-7946).

   

(a) 32 --

Twenty-ninth Supplementary Capital Funds Agreement and Assignment, dated as of April 1, 1994, with United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-3(f) to Rule 24 Certificate dated May 6, 1994 in 70-7946).

   

(a) 33 --

Thirtieth Supplementary Capital Funds Agreement and Assignment, dated as of August 1, 1996, among Entergy Corporation, System Energy and United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-3(a) to Rule 24 Certificate dated August 8, 1996 in 70-8511).

   

(a) 34 --

Thirty-first Supplementary Capital Funds Agreement and Assignment, dated as of August 1, 1996, among Entergy Corporation, System Energy and United States Trust Company of New York and Gerard F. Ganey, as Trustees (B-3(b) to Rule 24 Certificate dated August 8, 1996 in 70-8511).

   

(a) 35 --

Thirty-fourth Supplementary Capital Funds Agreement and Assignment, dated as of September 1, 2002, among Entergy Corporation, System Energy, The Bank of New York and Douglas J. MacInnes (B-3(a)(1) to Rule 24 Certificate dated October 4, 2002 in 70-9753).

   

(a) 36 --

Thirty-fifth Supplementary Capital Funds Agreement and Assignment, dated as of December 22, 2003, among Entergy Corporation, System Energy, and Union Bank of California, N.A (10(a)38 to Form 10-K for the year ended December 31, 2003 in 1-11299).

   

(a) 37 --

First Amendment to Supplementary Capital Funds Agreements and Assignments, dated as of June 1, 1989, by and between Entergy Corporation, System Energy, Deposit Guaranty National Bank, United States Trust Company of New York and Gerard F. Ganey (C to Rule 24 Certificate dated June 8, 1989 in 70-7026).

   

(a) 38 --

First Amendment to Supplementary Capital Funds Agreements and Assignments, dated as of June 1, 1989, by and between Entergy Corporation, System Energy, United States Trust Company of New York and Gerard F. Ganey (C to Rule 24 Certificate dated June 8, 1989 in 70-7123).

   
E-10
   
   
   
   

(a) 39 --

First Amendment to Supplementary Capital Funds Agreement and Assignment, dated as of June 1, 1989, by and between Entergy Corporation, System Energy and Chemical Bank (C to Rule 24 Certificate dated June 8, 1989 in 70-7561).

   

(a) 40 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   

(a) 41 --

Joint Construction, Acquisition and Ownership Agreement, dated as of May 1, 1980, between System Energy and SMEPA (B-1(a) in 70-6337), as amended by Amendment No. 1, dated as of May 1, 1980 (B-1(c) in 70-6337) and Amendment No. 2, dated as of October 31, 1980 (1 to Rule 24 Certificate dated October 30, 1981 in 70-6337).

   

(a) 42 --

Operating Agreement dated as of May 1, 1980, between System Energy and SMEPA (B(2)(a) in 70-6337).

   

(a) 43 --

Assignment, Assumption and Further Agreement No. 1, dated as of December 1, 1988, among System Energy, Meridian Trust Company and Stephen M. Carta, and SMEPA (B-7(c)(1) to Rule 24 Certificate dated January 9, 1989 in 70-7561).

   

(a) 44 --

Assignment, Assumption and Further Agreement No. 2, dated as of December 1, 1988, among System Energy, Meridian Trust Company and Stephen M. Carta, and SMEPA (B-7(c)(2) to Rule 24 Certificate dated January 9, 1989 in 70-7561).

   

(a) 45 --

Substitute Power Agreement, dated as of May 1, 1980, among Entergy Mississippi, System Energy and SMEPA (B(3)(a) in 70-6337).

   

(a) 46 --

Grand Gulf Unit No. 2 Supplementary Agreement, dated as of February 7, 1986, between System Energy and SMEPA (10(aaa) in 33-4033).

   

(a) 47 --

Compromise and Settlement Agreement, dated June 4, 1982, between Texaco, Inc. and Entergy Louisiana (28(a) to Form 8-K dated June 4, 1982 in 1-3517).

   

(a) 48 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(a) 49 --

First Amendment to Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(a) 50 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(a) 51 --

Middle South Utilities Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement, dated April 28, 1988 (D-1 to Form U5S for the year ended December 31, 1987).

   

(a) 52 --

First Amendment, dated January 1, 1990, to the Middle South Utilities Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-2 to Form U5S for the year ended December 31, 1989).

   

(a) 53 --

Second Amendment dated January 1, 1992, to the Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3 to Form U5S for the year ended December 31, 1992).

   
E-11
   
   
   
   

(a) 54 --

Third Amendment dated January 1, 1994 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   

(a) 55 --

Fourth Amendment dated April 1, 1997 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

   

(a) 56 --

Guaranty Agreement between Entergy Corporation and Entergy Arkansas, dated as of September 20, 1990 (B-1(a) to Rule 24 Certificate dated September 27, 1990 in 70-7757).

   

(a) 57 --

Guarantee Agreement between Entergy Corporation and Entergy Louisiana, dated as of September 20, 1990 (B-2(a) to Rule 24 Certificate dated September 27, 1990 in 70-7757).

   

(a) 58 --

Guarantee Agreement between Entergy Corporation and System Energy, dated as of September 20, 1990 (B-3(a) to Rule 24 Certificate dated September 27, 1990 in 70- 7757).

   

(a) 59 --

Loan Agreement between Entergy Operations and Entergy Corporation, dated as of September 20, 1990 (B-12(b) to Rule 24 Certificate dated June 15, 1990 in 70-7679).

   

(a) 60 --

Loan Agreement between Entergy Power and Entergy Corporation, dated as of August 28, 1990 (A-4(b) to Rule 24 Certificate dated September 6, 1990 in 70-7684).

   

(a) 61 --

Loan Agreement between Entergy Corporation and Entergy Systems and Service, Inc., dated as of December 29, 1992 (A-4(b) to Rule 24 Certificate in 70-7947).

   

+(a) 62 --

Executive Financial Counseling Program of Entergy Corporation and Subsidiaries (10(a)64 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 63 --

Amended and Restated Executive Annual Incentive Plan of Entergy Corporation and Subsidiaries, effective January 1, 2003 (10(b) to Form 10-Q for the quarter ended March 31, 2003 in 1-11299).

   

+(a) 64 --

Equity Ownership Plan of Entergy Corporation and Subsidiaries (A-4(a) to Rule 24 Certificate dated May 24, 1991 in 70-7831).

   

+(a) 65 --

Amendment No. 1 to the Equity Ownership Plan of Entergy Corporation and Subsidiaries (10(a)71 to Form 10-K for the year ended December 31, 1992 in 1-3517).

   

+(a) 66 --

2007 Equity Ownership and Long Term Cash Incentive Plan of Entergy Corporation and Subsidiaries (Effective for Grants and Elections On or After January 1, 2007) (Appendix B to Entergy Corporation's definitive proxy statement for its annual meeting of stockholders held on May 12, 2006 in 1-11299)

   

+(a) 67 --

Amended and Restated 1998 Equity Ownership Plan of Entergy Corporation and Subsidiaries (10(a) to Form 10-Q for the quarter ended March 31, 2003 in 1-11299).

   

+(a) 68 --

Supplemental Retirement Plan of Entergy Corporation and Subsidiaries, as amended effective January 1, 2000 (10(a)70 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 69 --

Amendment, effective December 28, 2001, to the Supplemental Retirement Plan of Entergy Corporation and Subsidiaries (10(a)71 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   
E-12
   
   
   
   

+(a) 70 --

Defined Contribution Restoration Plan of Entergy Corporation and Subsidiaries, as amended effective January 1, 2000 (10(a)72 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 71 --

Amendment, effective December 28, 2001, to the Defined Contribution Restoration Plan of Entergy Corporation and Subsidiaries (10(a)73 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 72 --

Executive Disability Plan of Entergy Corporation and Subsidiaries (10(a)74 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 73 --

Amended and Restated Executive Deferred Compensation Plan of Entergy Corporation and Subsidiaries, dated June 10, 2003 (10(d) to Form 10-Q for the quarter ended June 30, 2003 in 1-11299).

   

+(a) 74 --

Equity Awards Plan of Entergy Corporation and Subsidiaries, effective as of August 31, 2000 (10(a)77 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 75 --

Amendment, effective December 7, 2001, to the Equity Awards Plan of Entergy Corporation and Subsidiaries (10(a)78 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 76 --

Amendment, effective December 10, 2001, to the Equity Awards Plan of Entergy Corporation and Subsidiaries (10(b) to Form 10-Q for the quarter ended March 31, 2002 in 1-11299).

   

+(a) 77 --

Restatement of System Executive Continuity Plan of Entergy Corporation and Subsidiaries, effective as of March 8, 2004 (10(d) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   

+(a) 78--

First Amendment of the System Executive Continuity Plan of Entergy Corporation and Subsidiaries, effective December 29, 2004 (10(a)76 to Form 10-K for the year ended December 31, 2004 in 1-11299).

   

+(a) 79 --

Second Amendment of the System Executive Continuity Plan of Entergy Corporation and Subsidiaries, effective April 15, 2005 (10(a) to Form 10-Q for the quarter ended March 31, 2005 in 1-11299).

   

+(a) 80 --

System Executive Continuity Plan II of Entergy Corporation and Subsidiaries, effective March 8, 2004 (10(e) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   

+(a) 81 --

First Amendment of the System Executive Continuity Plan II of Entergy Corporation and Subsidiaries, effective December 29, 2004 (10(a)78 to Form 10-K for the year ended December 31, 2004 in 1-11299).

   

+(a) 82 --

Post-Retirement Plan of Entergy Corporation and Subsidiaries, as amended effective January 1, 2000 (10(a)80 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 83 --

Amendment, effective December 28, 2001, to the Post-Retirement Plan of Entergy Corporation and Subsidiaries (10(a)81 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 84 --

Pension Equalization Plan of Entergy Corporation and Subsidiaries, as amended effective January 1, 2000 (10(a)82 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   
E-13
   
   
   
   

+(a) 85 --

Amendment, effective December 28, 2001, to the Pension Equalization Plan of Entergy Corporation and Subsidiaries (10(a)83 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 86 --

Service Recognition Program for Non-Employee Outside Directors of Entergy Corporation and Subsidiaries, effective January 1, 2000 (10(a)84 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 87 --

Executive Income Security Plan of Gulf States Utilities Company, as amended effective March 1, 1991 (10(a)86 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 88 --

System Executive Retirement Plan of Entergy Corporation and Subsidiaries, effective January 1, 2000 (10(a)87 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 89 --

Amendment, effective December 28, 2001, to the System Executive Retirement Plan of Entergy Corporation and Subsidiaries (10(a)88 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

+(a) 90 --

Retention Agreement effective October 27, 2000 between J. Wayne Leonard and Entergy Corporation (10(a)81 to Form 10-K for the year ended December 31, 2000 in 1-11299).

   

+(a) 91 --

Amendment to Retention Agreement effective March 8, 2004 between J. Wayne Leonard and Entergy Corporation (10(c) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   

+(a) 92 --

Amendment to Retention Agreement effective December 30, 2005 between J. Wayne Leonard and Entergy Corporation (10(a)91 to Form 10-K for the year ended December 31, 2005 in 1-11299).

   

+(a) 93 --

Restricted Unit Agreement between J. Wayne Leonard and Entergy Corporation (10(a) to Form 10-Q for the quarter ended June 30, 2006 in 1-11299).

   

+(a) 94 --

Retention Agreement effective January 22, 2001 between Richard J. Smith and Entergy Services, Inc (10(a)87 to Form 10-K for the year ended December 31, 2000 in 1-11299).

   

+(a) 95 --

Employment Agreement effective August 7, 2001 between Curt L. Hebert and Entergy Corporation (10(a)97 to Form 10-K for the year ended December 31, 2001 in 1-11299).

   

(a) 96 --

Agreement of Limited Partnership of Entergy-Koch, LP among EKLP, LLC, EK Holding I, LLC, EK Holding II, LLC and Koch Energy, Inc. dated January 31, 2001 (10(a)94 to Form 10-K/A for the year ended December 31, 2000 in 1-11299).

   

+(a) 97 --

Employment Agreement effective April 15, 2003 between Robert D. Sloan and Entergy Services (10(c) to Form 10-Q for the quarter ended June 30, 2003 in 1-11299).

   

+(a) 98 --

Employment Agreement effective November 24, 2003 between Mark T. Savoff and Entergy Services (10(a)99 to Form 10-K for the year ended December 31, 2003 in 1-11299).

   

+(a) 99 --

Employment Agreement effective February 9, 1999 between Leo P. Denault and Entergy Services (10(a) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   

+(a) 100 --

Amendment to Employment Agreement effective March 5, 2004 between Leo P. Denault and Entergy Corporation (10(b) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   
E-14
   
   
   
   

+(a) 101 --

Retention Agreement effective August 3, 2006 between Leo P. Denault and Entergy Corporation (10(b) to Form 10-Q for the quarter ended June 30, 2006 in 1-11299).

   

+(a) 102 --

Shareholder Approval of Future Severance Agreements Policy, effective March 8, 2004 (10(f) to Form 10-Q for the quarter ended March 31, 2004 in 1-11299).

   

(a) 103 --

Consulting Agreement effective May 4, 2004 between Hintz & Associates, LLC and Entergy Services, Inc. (10(d) to Form 10-Q for the quarter ended June 30, 2004 in 1-11299).

   

+(a) 104 --

Form of Stock Option Grant Agreement Letter, as of December 31, 2004 (99.1 to Form 8-K dated January 26, 2005 in 1-11299).

   

+(a) 105 --

Form of Long Term Incentive Plan Performance Unit Grand Letter, as of December 31, 2004 (99.2 to Form 8-K dated January 26, 2005 in 1-11299).

   

*+(a) 106 --

Entergy Corporation Outside Director Stock Program Established under the 2007 Equity Ownership and Long Term Cash Incentive Plan of Entergy Corporation and Subsidiaries (Effective for Grants and Elections on or After January 1, 2007.

System Energy

(b) 1 through
(b) 16 -- See 10(a)10 through 10(a)25 above.
 
(b) 17 through
(b) 30 -- See 10(a)26 through 10(a)39 above.
 

(b) 31 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   

(b) 32 --

Joint Construction, Acquisition and Ownership Agreement, dated as of May 1, 1980, between System Energy and SMEPA (B-1(a) in 70-6337), as amended by Amendment No. 1, dated as of May 1, 1980 (B-1(c) in 70-6337) and Amendment No. 2, dated as of October 31, 1980 (1 to Rule 24 Certificate dated October 30, 1981 in 70-6337).

   

(b) 33 --

Operating Agreement, dated as of May 1, 1980, between System Energy and SMEPA (B(2)(a) in 70-6337).

   

(b) 34 --

Amended and Restated Installment Sale Agreement, dated as of February 15, 1996, between System Energy and Claiborne County, Mississippi (B-6(a) to Rule 24 Certificate dated March 4, 1996 in 70-8511).

   

(b) 35 --

Loan Agreement, dated as of October 15, 1998, between System Energy and Mississippi Business Finance Corporation (B-6(b) to Rule 24 Certificate dated November 12, 1998 in 70-8511).

   

(b) 36 --

Loan Agreement, dated as of May 15, 1999, between System Energy and Mississippi Business Finance Corporation (B-6(c) to Rule 24 Certificate dated June 8, 1999 in 70-8511).

   

(b) 37 --

Facility Lease No. 1, dated as of December 1, 1988, between Meridian Trust Company and Stephen M. Carta (Stephen J. Kaba, successor), as Owner Trustees, and System Energy (B-2(c)(1) to Rule 24 Certificate dated January 9, 1989 in 70-7561), as supplemented by Lease Supplement No. 1 dated as of April 1, 1989 (B-22(b) (1) to Rule 24 Certificate dated April 21, 1989 in 70-7561), Lease Supplement No. 2 dated as of January 1, 1994 (B-3(d) to Rule 24 Certificate dated January 31, 1994 in 70-8215), and Lease Supplement No. 3 dated as of May 1, 2004 (B-3(d) to Rule 24 Certificate dated June 4, 2004 in 70-10182).

   
E-15
   
   
   
   

(b) 38 --

Facility Lease No. 2, dated as of December 1, 1988 between Meridian Trust Company and Stephen M. Carta (Stephen J. Kaba, successor), as Owner Trustees, and System Energy (B-2(c)(2) to Rule 24 Certificate dated January 9, 1989 in 70-7561), as supplemented by Lease Supplement No. 1 dated as of April 1, 1989 (B-22(b) (2) to Rule 24 Certificate dated April 21, 1989 in 70-7561), Lease Supplement No. 2 dated as of January 1, 1994 (B-4(d) Rule 24 Certificate dated January 31, 1994 in 70-8215), and Lease Supplement No. 3 dated as of May 1, 2004 (B-4(d) to Rule 24 Certificate dated June 4, 2004 in 70-10182).

   

(b) 39 --

Assignment, Assumption and Further Agreement No. 1, dated as of December 1, 1988, among System Energy, Meridian Trust Company and Stephen M. Carta, and SMEPA (B-7(c)(1) to Rule 24 Certificate dated January 9, 1989 in 70-7561).

   

(b) 40 --

Assignment, Assumption and Further Agreement No. 2, dated as of December 1, 1988, among System Energy, Meridian Trust Company and Stephen M. Carta, and SMEPA (B-7(c)(2) to Rule 24 Certificate dated January 9, 1989 in 70-7561).

   

(b) 41 --

Collateral Trust Indenture, dated as of May 1, 2004, among GG1C Funding Corporation, System Energy, and Deutsche Bank Trust Company Americas, as Trustee (A-3(a) to Rule 24 Certificate dated June 4, 2004 in 70-10182), as supplemented by Supplemental Indenture No. 1 dated May 1, 2004, (A-4(a) to Rule 24 Certificate dated June 4, 2004 in 70-10182).

   

(b) 42 --

Substitute Power Agreement, dated as of May 1, 1980, among Entergy Mississippi, System Energy and SMEPA (B(3)(a) in 70-6337).

   

(b) 43 --

Grand Gulf Unit No. 2 Supplementary Agreement, dated as of February 7, 1986, between System Energy and SMEPA (10(aaa) in 33-4033).

   

(b) 44 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(b) 45 --

First Amendment to the Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(b) 46 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(b) 47 --

Fuel Lease, dated as of February 24, 1989, between River Fuel Funding Company #3, Inc. and System Energy (B-1(b) to Rule 24 Certificate dated March 3, 1989 in 70-7604).

   

(b) 48 --

System Energy's Consent, dated January 31, 1995, pursuant to Fuel Lease, dated as of February 24, 1989, between River Fuel Funding Company #3, Inc. and System Energy (B-1(c) to Rule 24 Certificate dated February 13, 1995 in 70-7604).

   

(b) 49 --

Sales Agreement, dated as of June 21, 1974, between System Energy and Entergy Mississippi (D to Rule 24 Certificate dated June 26, 1974 in 70-5399).

   

(b) 50 --

Service Agreement, dated as of June 21, 1974, between System Energy and Entergy Mississippi (E to Rule 24 Certificate dated June 26, 1974 in 70-5399).

   
E-16
   
   
   
   

(b) 51 --

Partial Termination Agreement, dated as of December 1, 1986, between System Energy and Entergy Mississippi (A-2 to Rule 24 Certificate dated January 8, 1987 in 70-5399).

   

(b) 52 --

Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement, dated April 28, 1988 (D-1 to Form U5S for the year ended December 31, 1987).

   

(b) 53 --

First Amendment, dated January 1, 1990 to the Middle South Utilities Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-2 to Form U5S for the year ended December 31, 1989).

   

(b) 54 --

Second Amendment dated January 1, 1992, to the Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3 to Form U5S for the year ended December 31, 1992).

   

(b) 55 --

Third Amendment dated January 1, 1994 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   

(b) 56 --

Fourth Amendment dated April 1, 1997 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

   

(b) 57 --

Service Agreement with Entergy Services, dated as of July 16, 1974, as amended (10(b)43 to Form 10-K for the year ended December 31, 1988 in 1-9067).

   

(b) 58 --

Amendment, dated January 1, 2004, to Service Agreement with Entergy Services (10(b)57 to Form 10-K for the year ended December 31, 2004 in 1-9067).

   

(b) 59 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(b)58 to Form 10-K for the year ended December 31, 2004 in 1-9067).

   

(b) 60 --

Operating Agreement between Entergy Operations and System Energy, dated as of June 6, 1990 (B-3(b) to Rule 24 Certificate dated June 15, 1990 in 70-7679).

   

(b) 61 --

Guarantee Agreement between Entergy Corporation and System Energy, dated as of September 20, 1990 (B-3(a) to Rule 24 Certificate dated September 27, 1990 in 70-7757).

   

(b) 62 --

Letter of Credit and Reimbursement Agreement, dated as of December 22, 2003, among System Energy Resources, Inc., Union Bank of California, N.A., as administrating bank and funding bank, Keybank National Association, as syndication agent, Banc One Capital Markets, Inc., as documentation agent, and the Banks named therein, as Participating Banks (10(b)63 to Form 10-K for the year ended December 31, 2003 in 1-9067).

   

(b) 63 --

Amendment to Letter of Credit and Reimbursement Agreement, dated as of December 22, 2003 (10(b)62 to Form 10-K for the year ended December 31, 2004 in 1-9067).

   

(b) 64 --

First Amendment and Consent, dated as of May 3, 2004, to Letter of Credit and Reimbursement Agreement (10(b)63 to Form 10-K for the year ended December 31, 2004 in 1-9067).

   

(b) 65 --

Second Amendment and Consent, dated as of December 17, 2004, to Letter of Credit and Reimbursement Agreement (99 to Form 8-K dated December 22, 2004 in 1-9067).

E-17

Entergy Arkansas

(c) 1 --

Agreement, dated April 23, 1982, among Entergy Arkansas and certain other System companies, relating to System Planning and Development and Intra-System Transactions (10(a) 1 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(c) 2 --

Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)2 in 2-41080).

   

(c) 3 --

Amendment, dated February 10, 1971, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(c) 4 --

Amendment, dated May 12, 1988, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(c) 5 --

Middle South Utilities System Agency Coordination Agreement, dated December 11, 1970 (5(a)3 in 2-41080).

   

(c) 6 --

Service Agreement with Entergy Services, dated as of April 1, 1963 (5(a)5 in 2-41080).

   

(c) 7 --

Amendment, dated April 27, 1984, to Service Agreement, with Entergy Services (10(a)7 to Form 10-K for the year ended December 31, 1984 in 1-3517).

   

(c) 8 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(a)12 to Form 10-K for the year ended December 31, 2002 in 1-10764).

   

(c) 9 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(c)9 to Form 10-K for the year ended December 31, 2004 in 1-10764).

   
(c) 10 through
(c) 25 -- See 10(a)10 through 10(a)25 above.
 

(c) 26 --

Agreement, dated August 20, 1954, between Entergy Arkansas and the United States of America (SPA)(13(h) in 2-11467).

   

(c) 27 --

Amendment, dated April 19, 1955, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)2 in 2-41080).

   

(c) 28 --

Amendment, dated January 3, 1964, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)3 in 2-41080).

   

(c) 29 --

Amendment, dated September 5, 1968, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)4 in 2-41080).

   

(c) 30 --

Amendment, dated November 19, 1970, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)5 in 2-41080).

   

(c) 31 --

Amendment, dated July 18, 1961, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)6 in 2-41080).

   

(c) 32 --

Amendment, dated December 27, 1961, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)7 in 2-41080).

   
E-18
   
   
   
   

(c) 33 --

Amendment, dated January 25, 1968, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)8 in 2-41080).

   

(c) 34 --

Amendment, dated October 14, 1971, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)9 in 2-43175).

   

(c) 35 --

Amendment, dated January 10, 1977, to the United States of America (SPA) Contract, dated August 20, 1954 (5(d)10 in 2-60233).

   

(c) 36 --

Agreement, dated May 14, 1971, between Entergy Arkansas and the United States of America (SPA) (5(e) in 2-41080).

   

(c) 37 --

Amendment, dated January 10, 1977, to the United States of America (SPA) Contract, dated May 14, 1971 (5(e)1 in 2-60233).

   

(c) 38 --

Contract, dated May 28, 1943, Amendment to Contract, dated July 21, 1949, and Supplement to Amendment to Contract, dated December 30, 1949, between Entergy Arkansas and McKamie Gas Cleaning Company; Agreements, dated as of September 30, 1965, between Entergy Arkansas and former stockholders of McKamie Gas Cleaning Company; and Letter Agreement, dated June 22, 1966, by Humble Oil & Refining Company accepted by Entergy Arkansas on June 24, 1966 (5(k)7 in 2-41080).

   

(c) 39 --

Fuel Lease, dated as of December 22, 1988, between River Fuel Trust #1 and Entergy Arkansas (B-1(b) to Rule 24 Certificate in 70-7571).

   

(c) 40 --

White Bluff Operating Agreement, dated June 27, 1977, among Entergy Arkansas and Arkansas Electric Cooperative Corporation and City Water and Light Plant of the City of Jonesboro, Arkansas (B-2(a) to Rule 24 Certificate dated June 30, 1977 in 70-6009).

   

(c) 41 --

White Bluff Ownership Agreement, dated June 27, 1977, among Entergy Arkansas and Arkansas Electric Cooperative Corporation and City Water and Light Plant of the City of Jonesboro, Arkansas (B-1(a) to Rule 24 Certificate dated June 30, 1977 in 70-6009).

   

(c) 42 --

Agreement, dated June 29, 1979, between Entergy Arkansas and City of Conway, Arkansas (5(r)3 in 2-66235).

   

(c) 43 --

Transmission Agreement, dated August 2, 1977, between Entergy Arkansas and City Water and Light Plant of the City of Jonesboro, Arkansas (5(r)3 in 2-60233).

   

(c) 44 --

Power Coordination, Interchange and Transmission Service Agreement, dated as of June 27, 1977, between Arkansas Electric Cooperative Corporation and Entergy Arkansas (5(r)4 in 2-60233).

   

(c) 45 --

Independence Steam Electric Station Operating Agreement, dated July 31, 1979, among Entergy Arkansas and Arkansas Electric Cooperative Corporation and City Water and Light Plant of the City of Jonesboro, Arkansas and City of Conway, Arkansas (5(r)6 in 2-66235).

   

(c) 46 --

Amendment, dated December 4, 1984, to the Independence Steam Electric Station Operating Agreement (10(c)51 to Form 10-K for the year ended December 31, 1984 in 1-10764).

   

(c) 47 --

Independence Steam Electric Station Ownership Agreement, dated July 31, 1979, among Entergy Arkansas and Arkansas Electric Cooperative Corporation and City Water and Light Plant of the City of Jonesboro, Arkansas and City of Conway, Arkansas (5(r)7 in 2-66235).

   
E-19
   
   
   
   

(c) 48 --

Amendment, dated December 28, 1979, to the Independence Steam Electric Station Ownership Agreement (5(r)7(a) in 2-66235).

   

(c) 49 --

Amendment, dated December 4, 1984, to the Independence Steam Electric Station Ownership Agreement (10(c)54 to Form 10-K for the year ended December 31, 1984 in 1-10764).

   

(c) 50 --

Owner's Agreement, dated November 28, 1984, among Entergy Arkansas, Entergy Mississippi, other co-owners of the Independence Station (10(c)55 to Form 10-K for the year ended December 31, 1984 in 1-10764).

   

(c) 51 --

Consent, Agreement and Assumption, dated December 4, 1984, among Entergy Arkansas, Entergy Mississippi, other co-owners of the Independence Station and United States Trust Company of New York, as Trustee (10(c)56 to Form 10-K for the year ended December 31, 1984 in 1-10764).

   

(c) 52 --

Power Coordination, Interchange and Transmission Service Agreement, dated as of July 31, 1979, between Entergy Arkansas and City Water and Light Plant of the City of Jonesboro, Arkansas (5(r)8 in 2-66235).

   

(c) 53 --

Power Coordination, Interchange and Transmission Agreement, dated as of June 29, 1979, between City of Conway, Arkansas and Entergy Arkansas (5(r)9 in 2-66235).

   

(c) 54 --

Agreement, dated June 21, 1979, between Entergy Arkansas and Reeves E. Ritchie (10(b)90 to Form 10-K for the year ended December 31, 1980 in 1-10764).

   

(c) 55 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   

(c) 56 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(c) 57 --

First Amendment to Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(c) 58 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(c) 59 --

Contract For Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste, dated June 30, 1983, among the DOE, System Fuels and Entergy Arkansas (10(b)57 to Form 10-K for the year ended December 31, 1983 in 1-10764).

   

(c) 60 --

Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement, dated April 28, 1988 (D-1 to Form U5S for the year ended December 31, 1987).

   

(c) 61 --

First Amendment, dated January 1, 1990, to the Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-2 to Form U5S for the year ended December 31, 1989).

   

(c) 62 --

Second Amendment dated January 1, 1992, to the Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3 to Form U5S for the year ended December 31, 1992).

   
E-20
   
   
   
   

(c) 63 --

Third Amendment dated January 1, 1994, to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   

(c) 64 --

Fourth Amendment dated April 1, 1997 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

   

(c) 65 --

Assignment of Coal Supply Agreement, dated December 1, 1987, between System Fuels and Entergy Arkansas (B to Rule 24 letter filing dated November 10, 1987 in 70-5964).

   

(c) 66 --

Coal Supply Agreement, dated December 22, 1976, between System Fuels and Antelope Coal Company (B-1 in 70-5964), as amended by First Amendment (A to Rule 24 Certificate in 70-5964); Second Amendment (A to Rule 24 letter filing dated December 16, 1983 in 70-5964); and Third Amendment (A to Rule 24 letter filing dated November 10, 1987 in 70-5964).

   

(c) 67 --

Operating Agreement between Entergy Operations and Entergy Arkansas, dated as of June 6, 1990 (B-1(b) to Rule 24 Certificate dated June 15, 1990 in 70-7679).

   

(c) 68 --

Guaranty Agreement between Entergy Corporation and Entergy Arkansas, dated as of September 20, 1990 (B-1(a) to Rule 24 Certificate dated September 27, 1990 in 70-7757).

   

(c) 69 --

Agreement for Purchase and Sale of Independence Unit 2 between Entergy Arkansas and Entergy Power, dated as of August 28, 1990 (B-3(c) to Rule 24 Certificate dated September 6, 1990 in 70-7684).

   

(c) 70 --

Agreement for Purchase and Sale of Ritchie Unit 2 between Entergy Arkansas and Entergy Power, dated as of August 28, 1990 (B-4(d) to Rule 24 Certificate dated September 6, 1990 in 70-7684).

   

(c) 71 --

Ritchie Steam Electric Station Unit No. 2 Operating Agreement between Entergy Arkansas and Entergy Power, dated as of August 28, 1990 (B-5(a) to Rule 24 Certificate dated September 6, 1990 in 70-7684).

   

(c) 72 --

Ritchie Steam Electric Station Unit No. 2 Ownership Agreement between Entergy Arkansas and Entergy Power, dated as of August 28, 1990 (B-6(a) to Rule 24 Certificate dated September 6, 1990 in 70-7684).

   

(c) 73 --

Power Coordination, Interchange and Transmission Service Agreement between Entergy Power and Entergy Arkansas, dated as of August 28, 1990 (10(c)71 to Form 10-K for the year ended December 31, 1990 in 1-10764).

   

(c) 74 --

Loan Agreement dated June 15, 1993, between Entergy Arkansas and Independence Country, Arkansas (B-1(a) to Rule 24 Certificate dated July 9, 1993 in 70-8171).

   

(c) 75 --

Loan Agreement dated June 15, 1994, between Entergy Arkansas and Jefferson County, Arkansas (B-1(a) to Rule 24 Certificate dated June 30, 1994 in 70-8405).

   

(c) 76 --

Loan Agreement dated June 15, 1994, between Entergy Arkansas and Pope County, Arkansas (B-1(b) to Rule 24 Certificate in 70-8405).

   
E-21
   
   
   
   

(c) 77 --

Loan Agreement dated November 15, 1995, between Entergy Arkansas and Pope County, Arkansas (10(c)96 to Form 10-K for the year ended December 31, 1995 in 1-10764).

   

(c) 78 --

Loan Agreement dated December 1, 1997, between Entergy Arkansas and Jefferson County, Arkansas (10(c)100 to Form 10-K for the year ended December 31, 1997 in 1-10764).

   

(c) 79 --

Refunding Agreement, dated December 1, 2001, between Entergy Arkansas and Pope Country, Arkansas (10(c)81 to Form 10-K for the year ended December 31, 2001 in 1-10764).

Entergy Gulf States

(d) 1 --

Guaranty Agreement, dated August 1, 1992, between Entergy Gulf States and Hibernia National Bank, relating to Pollution Control Revenue Refunding Bonds of the Industrial Development Board of the Parish of Calcasieu, Inc. (Louisiana) (10-1 to Form 10-K for the year ended December 31, 1992 in 1-27031).

   

(d) 2 --

Guaranty Agreement, dated January 1, 1993, between Entergy Gulf States and Hancock Bank of Louisiana, relating to Pollution Control Revenue Refunding Bonds of the Parish of Pointe Coupee (Louisiana) (10-2 to Form 10-K for the year ended December 31, 1992 in 1-27031).

   

(d) 3 --

Deposit Agreement, dated as of December 1, 1983 between Entergy Gulf States, Morgan Guaranty Trust Co. as Depositary and the Holders of Depository Receipts, relating to the Issue of 900,000 Depositary Preferred Shares, each representing 1/2 share of Adjustable Rate Cumulative Preferred Stock, Series E-$100 Par Value (4-17 to Form 10-K for the year ended December 31, 1983 in 1-27031).

   

(d) 4 --

Agreement effective February 1, 1964, between Sabine River Authority, State of Louisiana, and Sabine River Authority of Texas, and Entergy Gulf States, Central Louisiana Electric Company, Inc., and Louisiana Power & Light Company, as supplemented (B to Form 8-K dated May 6, 1964, A to Form 8-K dated October 5, 1967, A to Form 8-K dated May 5, 1969, and A to Form 8-K dated December 1, 1969 in 1-27031).

   

(d) 5 --

Joint Ownership Participation and Operating Agreement regarding River Bend Unit 1 Nuclear Plant, dated August 20, 1979, between Entergy Gulf States, Cajun, and SRG&T; Power Interconnection Agreement with Cajun, dated June 26, 1978, and approved by the REA on August 16, 1979, between Entergy Gulf States and Cajun; and Letter Agreement regarding CEPCO buybacks, dated August 28, 1979, between Entergy Gulf States and Cajun (2, 3, and 4, respectively, to Form 8-K dated September 7, 1979 in 1-27031).

   

(d) 6 --

Ground Lease, dated August 15, 1980, between Statmont Associates Limited Partnership (Statmont) and Entergy Gulf States, as amended (3 to Form 8-K dated August 19, 1980 and A-3-b to Form 10-Q for the quarter ended September 30, 1983 in 1-27031).

   

(d) 7 --

Lease and Sublease Agreement, dated August 15, 1980, between Statmont and Entergy Gulf States, as amended (4 to Form 8-K dated August 19, 1980 and A-3-c to Form 10-Q for the quarter ended September 30, 1983 in 1-27031).

   

(d) 8 --

Lease Agreement, dated September 18, 1980, between BLC Corporation and Entergy Gulf States (1 to Form 8-K dated October 6, 1980 in 1-27031).

   

(d) 9 --

Joint Ownership Participation and Operating Agreement for Big Cajun, between Entergy Gulf States, Cajun Electric Power Cooperative, Inc., and Sam Rayburn G&T, Inc, dated November 14, 1980 (6 to Form 8-K dated January 29, 1981 in 1-27031); Amendment No. 1, dated December 12, 1980 (7 to Form 8-K dated January 29, 1981 in 1-27031); Amendment No. 2, dated December 29, 1980 (8 to Form 8-K dated January 29, 1981 in 1-27031).

   
E-22
   
   
   
   

(d) 10 --

Agreement of Joint Ownership Participation between SRMPA, SRG&T and Entergy Gulf States, dated June 6, 1980, for Nelson Station, Coal Unit #6, as amended (8 to Form 8-K dated June 11, 1980, A-2-b to Form 10-Q for the quarter ended June 30, 1982; and 10-1 to Form 8-K dated February 19, 1988 in 1-27031).

   

(d) 11 --

Agreements between Southern Company and Entergy Gulf States, dated February 25, 1982, which cover the construction of a 140-mile transmission line to connect the two systems, purchase of power and use of transmission facilities (10-31 to Form 10-K for the year ended December 31, 1981 in 1-27031).

   

(d) 12 --

Transmission Facilities Agreement between Entergy Gulf States and Mississippi Power Company, dated February 28, 1982, and Amendment, dated May 12, 1982 (A-2-c to Form 10-Q for the quarter ended March 31, 1982 in 1-27031) and Amendment, dated December 6, 1983 (10-43 to Form 10-K for the year ended December 31, 1983 in 1-27031).

   

(d) 13 --

First Amended Power Sales Agreement, dated December 1, 1985 between Sabine River Authority, State of Louisiana, and Sabine River Authority, State of Texas, and Entergy Gulf States, Central Louisiana Electric Co., Inc., and Louisiana Power and Light Company (10-72 to Form 10-K for the year ended December 31, 1985 in 1-27031).

   

+(d) 14 --

Deferred Compensation Plan for Directors of Entergy Gulf States and Varibus Corporation, as amended January 8, 1987, and effective January 1, 1987 (10-77 to Form 10-K for the year ended December 31, 1986 in 1-27031). Amendment dated December 4, 1991 (10-3 to Amendment No. 8 in Registration No. 2-76551).

   

+(d) 15 --

Trust Agreement for Deferred Payments to be made by Entergy Gulf States pursuant to the Executive Income Security Plan, by and between Entergy Gulf States and Bankers Trust Company, effective November 1, 1986 (10-78 to Form 10-K for the year ended December 31, 1986 in 1-27031).

   

+(d) 16 --

Trust Agreement for Deferred Installments under Entergy Gulf States' Management Incentive Compensation Plan and Administrative Guidelines by and between Entergy Gulf States and Bankers Trust Company, effective June 1, 1986 (10-79 to Form 10-K for the year ended December 31, 1986 in 1-27031).

   

+(d) 17 --

Nonqualified Deferred Compensation Plan for Officers, Nonemployee Directors and Designated Key Employees, effective December 1, 1985, as amended, continued and completely restated effective as of March 1, 1991 (10-3 to Amendment No. 8 in Registration No. 2-76551).

   

+(d) 18 --

Trust Agreement for Entergy Gulf States' Nonqualified Directors and Designated Key Employees by and between Entergy Gulf States and First City Bank, Texas-Beaumont, N.A. (now Texas Commerce Bank), effective July 1, 1991 (10-4 to Form 10-K for the year ended December 31, 1992 in 1-27031).

   

(d) 19 --

Lease Agreement, dated as of June 29, 1987, among GSG&T, Inc., and Entergy Gulf States related to the leaseback of the Lewis Creek generating station (10-83 to Form 10-K for the year ended December 31, 1988 in 1-27031).

   

(d) 20 --

Nuclear Fuel Lease Agreement between Entergy Gulf States and River Bend Fuel Services, Inc. to lease the fuel for River Bend Unit 1, dated February 7, 1989 (10-64 to Form 10-K for the year ended December 31, 1988 in 1-27031).

   
E-23
   
   
   
   

(d) 21 --

Trust and Investment Management Agreement between Entergy Gulf States and Morgan Guaranty and Trust Company of New York (the "Decommissioning Trust Agreement") with respect to decommissioning funds authorized to be collected by Entergy Gulf States, dated March 15, 1989 (10-66 to Form 10-K for the year ended December 31, 1988 in 1-27031).

   

(d) 22 --

Amendment No. 2 dated November 1, 1995 between Entergy Gulf States and Mellon Bank to Decommissioning Trust Agreement (10(d)31 to Form 10-K for the year ended December 31, 1995 in 1-27031).

   

(d) 23 --

Amendment No. 3 dated March 5, 1998 between Entergy Gulf States and Mellon Bank to Decommissioning Trust Agreement (10(d)23 to Form 10-K for the year ended December 31, 2004 in 1-27031).

   

(d) 24 --

Amendment No. 4 dated December 17, 2003 between Entergy Gulf States and Mellon Bank to Decommissioning Trust Agreement (10(d)24 to Form 10-K for the year ended December 31, 2004 in 1-27031).

   

(d) 25 --

Partnership Agreement by and among Conoco Inc., and Entergy Gulf States, CITGO Petroleum Corporation and Vista Chemical Company, dated April 28, 1988 (10-67 to Form 10-K for the year ended December 31, 1988 in 1-27031).

   

+(d) 26 --

Gulf States Utilities Company Executive Continuity Plan, dated January 18, 1991 (10-6 to Form 10-K for the year ended December 31, 1990 in 1-27031).

   

+(d) 27 --

Trust Agreement for Entergy Gulf States' Executive Continuity Plan, by and between Entergy Gulf States and First City Bank, Texas-Beaumont, N.A. (now Texas Commerce Bank), effective May 20, 1991 (10-5 to Form 10-K for the year ended December 31, 1992 in 1-27031).

   

+(d) 28 --

Gulf States Utilities Board of Directors' Retirement Plan, dated February 15, 1991 (10-8 to Form 10-K for the year ended December 31, 1990 in 1-27031).

   

(d) 29 --

Operating Agreement between Entergy Operations and Entergy Gulf States, dated as of December 31, 1993 (B-2(f) to Rule 24 Certificate in 70-8059).

   

(d) 30 --

Guarantee Agreement between Entergy Corporation and Entergy Gulf States, dated as of December 31, 1993 (B-5(a) to Rule 24 Certificate in 70-8059).

   

(d) 31 --

Service Agreement with Entergy Services, dated as of December 31, 1993 (B-6(c) to Rule 24 Certificate in 70-8059).

   

(d) 32 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(d)31 to Form 10-K for the year ended December 31, 2002 in 1-27031).

   

(d) 33 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(d)33 to Form 10-K for the year ended December 31, 2004 in 1-27031).

   

(d) 34 --

Third Amendment, dated January 1, 1994, to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   
E-24
   
   
   
   

(d) 35 --

Fourth Amendment, dated April 1, 1997, to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

   

(d) 36 --

Refunding Agreement dated as of May 1, 1998 between Entergy Gulf States and Parish of Iberville, State of Louisiana (B-3(a) to Rule 24 Certificate dated May 29, 1998 in 70-8721).

   

(d) 37 --

Refunding Agreement dated as of May 1, 1998 between Entergy Gulf States and Industrial Development Board of the Parish of Calcasieu, Inc. (B-3(b) to Rule 24 Certificate dated January 29, 1999 in 70-8721).

   

(d) 38 --

Refunding Agreement (Series 1999-A) dated as of September 1, 1999 between Entergy Gulf States and Parish of West Feliciana, State of Louisiana (B-3(c) to Rule 24 Certificate dated October 8, 1999 in 70-8721).

   

(d) 39 --

Refunding Agreement (Series 1999-B) dated as of September 1, 1999 between Entergy Gulf States and Parish of West Feliciana, State of Louisiana (B-3(d) to Rule 24 Certificate dated October 8, 1999 in 70-8721).

Entergy Louisiana, LLC

(f) 1 --

Agreement, dated April 23, 1982, among Entergy Louisiana and certain other System companies, relating to System Planning and Development and Intra-System Transactions (10(a)1 to Form 10-K for the year ended December 31, 1982, in 1-3517).

   

(f) 2 --

Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)2 in 2-41080).

   

(f) 3 --

Amendment, dated as of February 10, 1971, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(f) 4 --

Amendment, dated May 12, 1988, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(f) 5 --

Middle South Utilities System Agency Coordination Agreement, dated December 11, 1970 (5(a)3 in 2-41080).

   

(f) 6 --

Service Agreement with Entergy Services, dated as of April 1, 1963 (5(a)5 in 2-42523).

   

(f) 7 --

Amendment, dated as of April 27, 1984, to Service Agreement with Entergy Services (10(a)7 to Form 10-K for the year ended December 31, 1984 in 1-3517).

   

(f) 8 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(e)12 to Form 10-K for the year ended December 31, 2002 in 1-8474).

   

(f) 9 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(e)9 to Form 10-K for the year ended December 31, 2004 in 1-8474).

   
(f) 10 through
(f) 25 -- See 10(a)10 through 10(a)25 above.
   

(f) 26 --

Fuel Lease, dated as of January 31, 1989, between River Fuel Company #2, Inc., and Entergy Louisiana (B-1(b) to Rule 24 Certificate in 70-7580).

   
E-25
   
   
   
   

(f) 27 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   

(f) 28 --

Compromise and Settlement Agreement, dated June 4, 1982, between Texaco, Inc. and Entergy Louisiana (28(a) to Form 8-K dated June 4, 1982 in 1-8474).

   

(f) 29 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(f) 30 --

First Amendment to the Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(f) 31 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(f) 32 --

Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste, dated February 2, 1984, among DOE, System Fuels and Entergy Louisiana (10(d)33 to Form 10-K for the year ended December 31, 1984 in 1-8474).

   

(f) 33--

Operating Agreement between Entergy Operations and Entergy Louisiana, dated as of June 6, 1990 (B-2(c) to Rule 24 Certificate dated June 15, 1990 in 70-7679).

   

(f) 34 --

Guarantee Agreement between Entergy Corporation and Entergy Louisiana, dated as of September 20, 1990 (B-2(a) to Rule 24 Certificate dated September 27, 1990 in 70-7757).

   

(f) 35 --

Refunding Agreement (Series 1999-A), dated as of June 1, 1999, between Entergy Louisiana and Parish of St. Charles, State of Louisiana (B-6(a) to Rule 24 Certificate dated July 6, 1999 in 70-9141).

   

(f) 36 --

Amendment No. 1 to Refunding Agreement (Series 1999-A), dated as of December 15, 2005 (B-8(i) to Rule 24 Certificate dated January 10, 2006 in 70-10324).

   

(f) 37 --

Refunding Agreement (Series 1999-B), dated as of June 1, 1999, between Entergy Louisiana and Parish of St. Charles, State of Louisiana (B-6(b) to Rule 24 Certificate dated July 6, 1999 in 70-9141).

   

(f) 38 --

Amendment No. 1 to Refunding Agreement (Series 1999-B), dated as of December 16, 2005 (B-8(ii) to Rule 24 Certificate dated January 10, 2006 in 70-10324).

   

(f) 39 --

Refunding Agreement (Series 1999-C), dated as of October 1, 1999, between Entergy Louisiana and Parish of St. Charles, State of Louisiana (B-11(a) to Rule 24 Certificate dated October 15, 1999 in 70-9141).

   

(f) 40 --

Amendment No. 1 to Refunding Agreement (Series 1999-C), dated as of December 15, 2005 (B-8(iii) to Rule 24 Certificate dated January 10, 2006 in 70-10324).

Entergy Mississippi

(g) 1 --

Agreement dated April 23, 1982, among Entergy Mississippi and certain other System companies, relating to System Planning and Development and Intra-System Transactions (10(a)1 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   
E-26
   
   
   
   

(g) 2 --

Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)2 in 2-41080).

   

(g) 3 --

Amendment, dated February 10, 1971, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(g) 4 --

Amendment, dated May 12, 1988, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(g) 5 --

Middle South Utilities System Agency Coordination Agreement, dated December 11, 1970 (5(a)3 in 2-41080).

   

(g) 6 --

Service Agreement with Entergy Services, dated as of April 1, 1963 (D in 37-63).

   

(g) 7 --

Amendment, dated April 27, 1984, to Service Agreement with Entergy Services (10(a)7 to Form 10-K for the year ended December 31, 1984 in 1-3517).

   

(g) 8 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(f)12 to Form 10-K for the year ended December 31, 2002 in 1-31508).

   

(g) 9 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(f)9 to Form 10-K for the year ended December 31, 2004 in 1-31508).

   
(g) 10 through
(g) 25 -- See 10(a)10 through 10(a)25 above.
   

(g) 26 --

Loan Agreement, dated as of September 1, 2004, between Entergy Mississippi and Mississippi Business Finance Corporation (B-3(a) to Rule 24 Certificate dated October 4, 2004 in 70-10157).

   

(g) 27 --

Refunding Agreement, dated as of May 1, 1999, between Entergy Mississippi and Independence County, Arkansas (B-6(a) to Rule 24 Certificate dated June 8, 1999 in 70-8719).

   

(g) 28 --

Substitute Power Agreement, dated as of May 1, 1980, among Entergy Mississippi, System Energy and SMEPA (B-3(a) in 70-6337).

   

(g) 29 --

Amendment, dated December 4, 1984, to the Independence Steam Electric Station Operating Agreement (10(c)51 to Form 10-K for the year ended December 31, 1984 in 0-375).

   

(g) 30 --

Amendment, dated December 4, 1984, to the Independence Steam Electric Station Ownership Agreement (10(c)54 to Form 10-K for the year ended December 31, 1984 in 0-375).

   

(g) 31 --

Owners Agreement, dated November 28, 1984, among Entergy Arkansas, Entergy Mississippi and other co-owners of the Independence Station (10(c)55 to Form 10-K for the year ended December 31, 1984 in 0-375).

   

(g) 32 --

Consent, Agreement and Assumption, dated December 4, 1984, among Entergy Arkansas, Entergy Mississippi, other co-owners of the Independence Station and United States Trust Company of New York, as Trustee (10(c)56 to Form 10-K for the year ended December 31, 1984 in 0-375).

   

(g) 33 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   
E-27
   
   
   
   

+(g) 34 --

Post-Retirement Plan (10(d)24 to Form 10-K for the year ended December 31, 1983 in 0-320).

   

(g) 35 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(g) 36 --

First Amendment to the Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(g) 37 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(g) 38 --

Sales Agreement, dated as of June 21, 1974, between System Energy and Entergy Mississippi (D to Rule 24 Certificate dated June 26, 1974 in 70-5399).

   

(g) 39 --

Service Agreement, dated as of June 21, 1974, between System Energy and Entergy Mississippi (E to Rule 24 Certificate dated June 26, 1974 in 70-5399).

   

(g) 40 --

Partial Termination Agreement, dated as of December 1, 1986, between System Energy and Entergy Mississippi (A-2 to Rule 24 Certificate dated January 8, 1987 in 70-5399).

   

(g) 41 --

Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement, dated April 28, 1988 (D-1 to Form U5S for the year ended December 31, 1987).

   

(g) 42 --

First Amendment dated January 1, 1990 to the Middle South Utilities Inc. and Subsidiary Companies Intercompany Tax Allocation Agreement (D-2 to Form U5S for the year ended December 31, 1989).

   

(g) 43 --

Second Amendment dated January 1, 1992, to the Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3 to Form U5S for the year ended December 31, 1992).

   

(g) 44 --

Third Amendment dated January 1, 1994 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   

(g) 45 --

Fourth Amendment dated April 1, 1997 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

   

+(g) 46 --

Employment Agreement effective July 24, 2003 between Carolyn C. Shanks and Entergy Mississippi (10(f)48 to Form 10-K for the year ended December 31, 2003 in 1-31508).

   

(g) 47 --

Purchase and Sale Agreement by and between Central Mississippi Generating Company, LLC and Entergy Mississippi, Inc., dated as of March 16, 2005 (10(b) to Form 10-Q for the quarter ended March 31, 2005 in 1-31508).

Entergy New Orleans

(h) 1 --

Agreement, dated April 23, 1982, among Entergy New Orleans and certain other System companies, relating to System Planning and Development and Intra-System Transactions (10(a)1 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   
E-28
   
   
   
   

(h) 2 --

Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)2 in 2-41080).

   

(h) 3 --

Amendment dated as of February 10, 1971, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(h) 4 --

Amendment, dated May 12, 1988, to Middle South Utilities System Agency Agreement, dated December 11, 1970 (5(a)4 in 2-41080).

   

(h) 5 --

Middle South Utilities System Agency Coordination Agreement, dated December 11, 1970 (5(a)3 in 2-41080).

   

(h) 6 --

Service Agreement with Entergy Services dated as of April 1, 1963 (5(a)5 in 2-42523).

   

(h) 7 --

Amendment, dated as of April 27, 1984, to Service Agreement with Entergy Services (10(a)7 to Form 10-K for the year ended December 31, 1984 in 1-3517).

   

(h) 8 --

Amendment, dated January 1, 2000, to Service Agreement with Entergy Services (10(g)12 to Form 10-K for the year ended December 31, 2002 in 0-5807).

   

(h) 9 --

Amendment, dated March 1, 2004, to Service Agreement with Entergy Services (10(g)9 to Form 10-K for the year ended December 31, 2004 in 0-5807).

   
(h) 10 through
(h) 25 -- See 10(a)10 through 10(a)25 above.
   

(h) 26 --

Reallocation Agreement, dated as of July 28, 1981, among System Energy and certain other System companies (B-1(a) in 70-6624).

   

(h) 27 --

Unit Power Sales Agreement, dated as of June 10, 1982, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (10(a)39 to Form 10-K for the year ended December 31, 1982 in 1-3517).

   

(h) 28 --

First Amendment to the Unit Power Sales Agreement, dated as of June 28, 1984, between System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi and Entergy New Orleans (19 to Form 10-Q for the quarter ended September 30, 1984 in 1-3517).

   

(h) 29 --

Revised Unit Power Sales Agreement (10(ss) in 33-4033).

   

(h) 30 --

Transfer Agreement, dated as of June 28, 1983, among the City of New Orleans, Entergy New Orleans and Regional Transit Authority (2(a) to Form 8-K dated June 24, 1983 in 1-1319).

   

(h) 31 --

Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement, dated April 28, 1988 (D-1 to Form U5S for the year ended December 31, 1987).

   

(h) 32 --

First Amendment, dated January 1, 1990, to the Middle South Utilities, Inc. and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-2 to Form U5S for the year ended December 31, 1989).

   

(h) 33 --

Second Amendment dated January 1, 1992, to the Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3 to Form U5S for the year ended December 31, 1992).

   
E-29
   
   
   
   

(h) 34 --

Third Amendment dated January 1, 1994 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-3(a) to Form U5S for the year ended December 31, 1993).

   

(h) 35 --

Fourth Amendment dated April 1, 1997 to Entergy Corporation and Subsidiary Companies Intercompany Income Tax Allocation Agreement (D-5 to Form U5S for the year ended December 31, 1996).

(12) Statement Re Computation of Ratios

*(a)

Entergy Arkansas' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(b)

Entergy Gulf States' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(c)

Entergy Louisiana's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Distributions, as defined.

   

*(d)

Entergy Mississippi's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(e)

Entergy New Orleans' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(f)

System Energy's Computation of Ratios of Earnings to Fixed Charges, as defined.

*(21) Subsidiaries of the Registrants

(23) Consents of Experts and Counsel

*(a)

The consent of Deloitte & Touche LLP is contained herein at page 407.

*(24) Powers of Attorney

(31) Rule 13a-14(a)/15d-14(a) Certifications

*(a)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

   

*(b)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

   

*(c)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

   

*(d)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

   

*(e)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(f)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(g)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(h)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

   
E-30
   
   
   
   

*(i)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

   

*(j)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

   

*(k)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

   

*(l)

Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

   

*(m)

Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

   

*(n)

Rule 13a-14(a)/15d-14(a) Certification for System Energy.

   

*(o)

Rule 13a-14(a)/15d-14(a) Certification for System Energy.

(32) Section 1350 Certifications

*(a)

Section 1350 Certification for Entergy Corporation.

   

*(b)

Section 1350 Certification for Entergy Corporation.

   

*(c)

Section 1350 Certification for Entergy Arkansas.

   

*(d)

Section 1350 Certification for Entergy Arkansas.

   

*(e)

Section 1350 Certification for Entergy Gulf States.

   

*(f)

Section 1350 Certification for Entergy Gulf States.

   

*(g)

Section 1350 Certification for Entergy Gulf States.

   

*(h)

Section 1350 Certification for Entergy Louisiana.

   

*(i)

Section 1350 Certification for Entergy Louisiana.

   

*(j)

Section 1350 Certification for Entergy Mississippi.

   

*(k)

Section 1350 Certification for Entergy Mississippi.

   

*(l)

Section 1350 Certification for Entergy New Orleans.

   

*(m)

Section 1350 Certification for Entergy New Orleans.

   

*(n)

Section 1350 Certification for System Energy.

   

*(o)

Section 1350 Certification for System Energy.

_________________
* Filed herewith.
+ Management contracts or compensatory plans or arrangements.

 

 

 

 

E-31

 

 

 

 

EXHIBIT INDEX

 

(10) Material Contracts

Entergy Corporation

*+(a) 106 --

Entergy Corporation Outside Director Stock Program Established under the 2007 Equity Ownership and Long Term Cash Incentive Plan of Entergy Corporation and Subsidiaries (Effective for Grants and Elections on or After January 1, 2007.

(12) Statement Re Computation of Ratios

*(a)

Entergy Arkansas' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(b)

Entergy Gulf States' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(c)

Entergy Louisiana's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Distributions, as defined.

   

*(d)

Entergy Mississippi's Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(e)

Entergy New Orleans' Computation of Ratios of Earnings to Fixed Charges and of Earnings to Fixed Charges and Preferred Dividends, as defined.

   

*(f)

System Energy's Computation of Ratios of Earnings to Fixed Charges, as defined.

*(21) Subsidiaries of the Registrants

(23) Consents of Experts and Counsel

*(a)

The consent of Deloitte & Touche LLP is contained herein at page 407.

*(24) Powers of Attorney

(31) Rule 13a-14(a)/15d-14(a) Certifications

*(a)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

   

*(b)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Corporation.

   

*(c)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

   

*(d)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Arkansas.

   

*(e)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(f)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(g)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Gulf States.

   

*(h)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

   

*(i)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Louisiana.

   

*(j)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

   

*(k)

Rule 13a-14(a)/15d-14(a) Certification for Entergy Mississippi.

   

*(l)

Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

   

*(m)

Rule 13a-14(a)/15d-14(a) Certification for Entergy New Orleans.

   

*(n)

Rule 13a-14(a)/15d-14(a) Certification for System Energy.

   

*(o)

Rule 13a-14(a)/15d-14(a) Certification for System Energy.

(32) Section 1350 Certifications

*(a)

Section 1350 Certification for Entergy Corporation.

   

*(b)

Section 1350 Certification for Entergy Corporation.

   

*(c)

Section 1350 Certification for Entergy Arkansas.

   

*(d)

Section 1350 Certification for Entergy Arkansas.

   

*(e)

Section 1350 Certification for Entergy Gulf States.

   

*(f)

Section 1350 Certification for Entergy Gulf States.

   

*(g)

Section 1350 Certification for Entergy Gulf States.

   

*(h)

Section 1350 Certification for Entergy Louisiana.

   

*(i)

Section 1350 Certification for Entergy Louisiana.

   

*(j)

Section 1350 Certification for Entergy Mississippi.

   

*(k)

Section 1350 Certification for Entergy Mississippi.

   

*(l)

Section 1350 Certification for Entergy New Orleans.

   

*(m)

Section 1350 Certification for Entergy New Orleans.

   

*(n)

Section 1350 Certification for System Energy.

   

*(o)

Section 1350 Certification for System Energy.

_________________
* Filed herewith.
+ Management contracts or compensatory plans or arrangements.