The first stop along the way is to visit the state-owned concentrator and the dry concentrator station of Yexin Company. This dry concentrator station will soon be relocated to the mining site and further upgraded

Given that the site is relatively close to the pit mouth but far from the beneficiation plant, and the ore grade distribution is uneven, our company has designed a composite beneficiation system that can produce three types of materials: ore of grade 58 and above (directly sold to Golmud), ore of grade 45 (ball-milled down the mountain), and waste materials, thereby increasing economic benefits and expanding sales channels

There are several problems in the application sites of dry separation 1.The material in the middle is already a bit thick, but there is still no material on both sides. 2. The guide plate at the lower part of the Magnetic Separator used for adjusting the ore grade was not fully utilized, which is not conducive to adjusting the ore grade and tail running. 3. I took a few screenshots from the video. Particles like those one or two centimeters away from the surface of the magnetic separator can be absorbed or separated according to the requirements of our site. 4. The rotational speed of the magnetic separator at this position is also another major means to adjust the grade

This is a video produced by the filter machine. The frequency converter of the No. 1 filter cannot be used normally below 10Hz. 2. The material distribution of the No. 1 filter is uneven 3. The sealing of the rear baffle plate of the No. 3 filter is not good 4. The dehydration effects of both filters are average. It is recommended to check the vacuum pressure, further evenly distribute the materials, and install rubber plates at the injection ports


A thorough investigation was conducted on the on-site magnetic separator


Test results of the magnetic separator

Samples were taken from each section of materials and tested

The test results show that the tailings are high, the grade of fine powder is not high, and the on-site water volume is not high. A comprehensive analysis was conducted on reasons such as grinding fineness

Engineer Wang and others from the maintenance team were very professional. They installed the Metal Detector in a very short time and carried out the debugging. The effect was very ideal and it played a very good protective role for the cone crusher

The process of working is also the process of learning. After coming down the mountain, Mr. Liu invited me to watch the stage play "Princess Wencheng". I was deeply impressed by the grandeur of the scenes and the greatness of the historical figures. Have a deeper understanding of a prosperous country and strong people.